GB865567A - Improvements in or relating to the construction of tunnels - Google Patents
Improvements in or relating to the construction of tunnelsInfo
- Publication number
- GB865567A GB865567A GB284358A GB284358A GB865567A GB 865567 A GB865567 A GB 865567A GB 284358 A GB284358 A GB 284358A GB 284358 A GB284358 A GB 284358A GB 865567 A GB865567 A GB 865567A
- Authority
- GB
- United Kingdom
- Prior art keywords
- length
- tunnel
- laid
- lengths
- bulkhead
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/063—Tunnels submerged into, or built in, open water
- E02D29/073—Tunnels or shuttering therefor assembled from sections individually sunk onto, or laid on, the water-bed, e.g. in a preformed trench
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
865,567. Tunnels. BERTLIN, D. P. Feb. 13, 1959 [Jan. 28, 1958], No. 2843/58. Class 85. A tunnel is built on a sea or river bed from a multiplicity of interfitting lengths 2, each length initially having a removable bulkhead 31, 32 near each end, by sinking a second tunnel length and guiding it so that one end thereof mates with the end of a first tunnel length already on the sea bed and from which water has been removed up to bulkhead 31 near the end to be mated; sealing the tunnel lengths together; opening the bulkhead 31 in the first tunnel length manually from within the said length so as to remove water from the neighbourhood of the joint between the lengths; and then removing water from the second tunnel length by removing or opening the second bulkhead 32. The lengths 2 are handled by means on mobile platforms 4 and supporting legs 5 of the kind used for off-shore oil-well drilling, and are provided, at one end, with feet 10 which rest upon platforms 7 which are formed by depositing screed from a retractible and revoluble pipe having a blade at the lower end to form the level surface. The ends 9 of the length are socketed and the other ends are spigotted and each length is guided during lowering to the length last laid by connecting links 24 which are formed to embrace and slide down the cables 13 of the last laid length, so that, finally, because the stub axles 21 are much below the axis of the descending length, the links 24 pivot about the axles 14 and swing the spigot into the socket. The tunnel length is first floated to the platform 4, the cables 13 are placed in recesses in the faces of the links and retained therein by complementarily recessed cover plates which are bolted to the links, the length is flooded sufficiently to sink it, and the mating ends are joined. A packing 29 is compressed as the external pressure forces the last laid length into the previous one, and the joint is finished with lead caulking 35. Settlement in the tunnel may be countered when it occurs by injecting cement grout 36 through radial channels 37. The stub axles 14, 21 are on metal plates secured to the lengths by bolts with internal nuts, and when the length is laid, the plates and stub axles may be released by removing the nuts. The bulkheads are built-in sections 11 secured to a frame 12 extending across the tunnel section, and include a pressure gauge 33 and a valve 34 for releasing water from a length being laid, to the main length of the tunnel. The laid tunnel is flanked by banks of rubble and is covered by sand retained between the rubble banks. The tunnel is divided by a horizontal floor, the upper section being for road traffic and the lower for rail traffic. A ventilation shaft 42 has pipes 43 projecting upwardly' to above the sand covering, foul air being forced out of these pipes. A casing 44 guides a shut-off plate and also a slide carrying two non-return valves, which are used in alternation, to permit repair of either valve. A warning beacon is positioned where the tunnel emerges from the water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB284358A GB865567A (en) | 1958-01-28 | 1958-01-28 | Improvements in or relating to the construction of tunnels |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB284358A GB865567A (en) | 1958-01-28 | 1958-01-28 | Improvements in or relating to the construction of tunnels |
Publications (1)
Publication Number | Publication Date |
---|---|
GB865567A true GB865567A (en) | 1961-04-19 |
Family
ID=9747007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB284358A Expired GB865567A (en) | 1958-01-28 | 1958-01-28 | Improvements in or relating to the construction of tunnels |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB865567A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112726652A (en) * | 2020-12-16 | 2021-04-30 | 中交公路规划设计院有限公司 | Box type foundation device for controlling tunnel push-out type joint settlement and construction method |
CN113529796A (en) * | 2021-05-21 | 2021-10-22 | 中交三航局第二工程有限公司 | Suspended tunnel joint device |
CN115198798A (en) * | 2022-06-01 | 2022-10-18 | 中铁第四勘察设计院集团有限公司 | Immersed tunnel shoreside joint installation structure and construction method |
-
1958
- 1958-01-28 GB GB284358A patent/GB865567A/en not_active Expired
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112726652A (en) * | 2020-12-16 | 2021-04-30 | 中交公路规划设计院有限公司 | Box type foundation device for controlling tunnel push-out type joint settlement and construction method |
CN113529796A (en) * | 2021-05-21 | 2021-10-22 | 中交三航局第二工程有限公司 | Suspended tunnel joint device |
CN115198798A (en) * | 2022-06-01 | 2022-10-18 | 中铁第四勘察设计院集团有限公司 | Immersed tunnel shoreside joint installation structure and construction method |
CN115198798B (en) * | 2022-06-01 | 2024-03-15 | 中铁第四勘察设计院集团有限公司 | Immersed tube tunnel bank joint installation structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6533842B2 (en) | Joints used as final connections in submerged tunnels | |
CN113833480B (en) | Construction method for initial tunneling and arrival of shield | |
CN115539095A (en) | Waterproof and monitoring method for shield construction | |
CN113756825A (en) | Mechanical method connecting channel construction method utilizing pipe jacking technology | |
GB865567A (en) | Improvements in or relating to the construction of tunnels | |
US4889448A (en) | Tunnel construction | |
CN110985052A (en) | Self-compacting concrete pouring construction process method | |
CN109930610A (en) | Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete | |
KR20150053056A (en) | Submerged floating tunnel and construction method thereof | |
CN113339003A (en) | Construction method of tunnel integrated arch sheathing trolley | |
KR20100120326A (en) | An underwater bridge with inflection point of alignment or ventilating opening | |
CN111827355A (en) | Immersed tube tunnel and construction method | |
CN207184008U (en) | A kind of assembly type draws well | |
CN110552702A (en) | Underground excavation construction method for assembled corrugated steel plate underground comprehensive pipe gallery | |
CN116538348B (en) | Water diversion engineering jacking pipe internally-penetrating steel pipe and self-compacting concrete pouring construction method | |
CN204623783U (en) | Self-closed type excluder | |
CN221029952U (en) | Plugging device is pour in hole drilling of blowing out | |
CN114992382B (en) | Open caisson method construction muddy water balance pipe jacking working well opening construction method | |
CN217150321U (en) | Water drainage system falls in anti little foundation ditch under in rock foundation ditch | |
Hill | THE THIRLMERE WORKS FOR THE WATER-SUPPLY OF MANCHESTER.(INCLUDING APPENDIX AND PLATES). | |
Nowson | The history and construction of the foundations of the Asia Insurance Building, Singapore. | |
Haigh | SUBAQUEOUS TUNNELLING THROUGH THE THAMES GRAVEL: BAKER STREET AND WATERLOO RAILWAY.(INCLUDING APPENDIX AND PLATES AT BACK OF VOLUME). | |
CN107276006B (en) | A kind of assembly type traction well | |
Goldmark | The Power Plant, Pipe Line and Dam of the Pioneer Electric Power Company at Ogden, Utah | |
CN2312970Y (en) | Detachable sinking-floating multi-purpose box-type form board |