GB2618559A - Subsea well interventions - Google Patents

Subsea well interventions Download PDF

Info

Publication number
GB2618559A
GB2618559A GB2206808.4A GB202206808A GB2618559A GB 2618559 A GB2618559 A GB 2618559A GB 202206808 A GB202206808 A GB 202206808A GB 2618559 A GB2618559 A GB 2618559A
Authority
GB
United Kingdom
Prior art keywords
riser
lubricator
pressure control
subsea well
subsea
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
GB2206808.4A
Inventor
Aga Morten
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Equinor Energy AS
Original Assignee
Equinor Energy AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Equinor Energy AS filed Critical Equinor Energy AS
Priority to GB2206808.4A priority Critical patent/GB2618559A/en
Priority to PCT/NO2023/050108 priority patent/WO2023219516A1/en
Publication of GB2618559A publication Critical patent/GB2618559A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/002Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/068Well heads; Setting-up thereof having provision for introducing objects or fluids into, or removing objects from, wells
    • E21B33/072Well heads; Setting-up thereof having provision for introducing objects or fluids into, or removing objects from, wells for cable-operated tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/068Well heads; Setting-up thereof having provision for introducing objects or fluids into, or removing objects from, wells
    • E21B33/076Well heads; Setting-up thereof having provision for introducing objects or fluids into, or removing objects from, wells specially adapted for underwater installations

Abstract

A method for performing subsea well interventions, wherein a riser 2 is connected to a vessel 8 on the sea surface such that it extends at least some distance between the vessel and the well 12 but is spaced (d) apart from a subsea lubricator 4 on the seabed. A tool 14 and pressure control head 16 are lowered through the riser, then through open water to the lubricator. The bottom of the riser may remain open to the sea during the method, the tool may be a bottom hole assembly (BHA) and is lowered attached to a wireline 18. The outer diameter of the pressure control head is selected to be less than the riser inner diameter. The riser may be anchored to the sea floor or comprise a transmitter for motion compensation purposes upon misalignment. A pressure control head with an outer diameter below 5 inches is claimed.

Description

Subsea well interventions
Technical Field
The present invention relates to a method for performing subsea well interventions, particularly in deep water.
Background
Performing subsea well intervention with a riser is known and involves connecting a riser to the Christmas Tree (XT) at the seabed which allows access to the well. The riser runs from the well to the vessel or rig on the surface of the water and is pressurised with the same pressure that is experienced by the well (up to 15000 psi). A subsea lubricator and a pressure control head (PCH) cap the riser at the top of the riser, on the vessel and enable tools to be passed into the pressurised riser and transferred to the well. This method can be complex and costly, because the riser must be manufactured to withstand the extreme levels of pressure that are in the well, as well as tension variations along its length underwater, which makes it very heavy. Additionally, there is the risk of having a highly pressurised pipeline so close to a manned vessel. Finally, the assembly of the riser must be done piece by piece as it is lowered to the subsea well which is very time consuming.
To combat the risk and cost of riser well interventions, riserless interventions were developed in which a well control package (WCP) and subsea lubricator, with a PCH, are installed on top of the XT and a wireline is used to pass tools, such as a bottom hole assembly (BHA), into the well. This method is well established and used in shallow water (e.g. 300 -500m depth), enabling the omission of a riser, which reduces the cost, time, and risk of performing subsea well interventions. Sometimes it is desirable for the wireline (WL) to deliver a precise downward force through the wireline tool, in a procedure called "jarring". Such a force is delivered by raising the wireline tool by a predetermined amount, and letting it fall back down to impact the desired target (jarring). While there are no or less issues in shallow water, issues arise when performing riserless well interventions in deep water (e.g. >2000m depth). As shown in Figure 1, current in the water can cause wireline deflections in the wireline, meaning that raising the top of the wireline by a predetermined amount will not necessarily raise the BHA by the same amount. As a result, it is difficult to determine the height to which the BHA is raised, as well as the jarring force that the Wire Line operator will apply to the Wire Line tool, and the jarring procedure may not have the proper response.
Summary
The invention provides a method of performing subsea well interventions, and a pressure control head, in accordance with the accompanying claims.
Embodiments of the invention will now be described, by way of example only, with reference to the accompanying drawings.
Brief Description of the Drawings
Figure 1 shows wireline deflections caused by underwater currents during a riserless well intervention; Figure 2 shows a method of installing a well control package and a subsea lubricator onto a vertical Christmas tree using a riser in an embodiment of the invention; Figure 3A shows the lowering of a bottom hole assembly and a pressure control head through the riser of Figure 2; Figure 3B shows the passing of the bottom hole assembly into the well, and the pressure control head on top of the subsea lubricator; and Figure 4 shows an enlarged view of the top of the subsea lubricator when the bottom hole assembly and the pressure control head land on the top of the lubricator.
Description of preferred embodiments
As shown by Figure 2, a riser 2 may be used to run a subsea lubricator 4 and a well control package (WCP) 6 from a vessel 8 on the surface of the water to a vertical Christmas tree (VXT) 10 that is installed on top of a subsea well 12. The riser 2 is connected to the vessel 8 and may be a drill pipe riser, but could also be a marine riser or the like as long as it has a sufficient inner diameter (ID) as discussed later. The vessel 8 may be an oil rig, or a drill ship or any other suitable vessel. It is not necessary that the WCP 6 and the subsea lubricator 4 be installed using the riser 2, and many other methods may be employed. Once installation of the subsea lubricator 4 and the WCP 6 is complete, the riser is positioned at a predetermined distance from the subsea lubricator 4. The distance the riser 2 is positioned from the subsea lubricator 4 may vary depending on various conditions such as weather conditions, underwater currents, and the type of intervention to be performed, but is typically between 50m and 1000m. The distance could be shorter than 50m, however, if the distance is too small there is a risk of the riser 2 hitting the subsea lubricator 4, the WCP 6, or the VXT 10 due to the vertical motion of the vessel 8 to which the riser 2 is connected while it floats on the surface of the water. Therefore the distance should be large enough to avoid this risk.
After the riser 2 has been positioned away from the subsea lubricator 4, a bottom hole assembly (BHA) 14 and a pressure control head (PCH) 16 are then lowered on a wire to the subsea lubricator 4 through the riser 2 as shown in Figure 3A. The lubricator 4 has valves 17 which are pumped with grease to enable a pressure-tight seal between the PCH 16 and the Wire Line (WL). The ID of the riser 2 must, therefore, be wide enough to accommodate both the PCH 16 and the BHA 14. Alternatively, the outer diameter (OD) of the PCH 16 and the BHA 14 must be less than the ID of the riser 2. For example, when the riser 2 is a drill pipe riser, a PCH 16 with an OD less than the ID of the drill riser 2 (e.g. ID < 5") may be used. The BHA 14 enters the subsea lubricator 4 and the PCH 16 sits on top of the subsea lubricator 4 to enable the subsea lubricator 4 to pressurise and convey the BHA 14 into the well 12 as will be discussed below.
As shown in steps 1, 2 and 3 of Figure 4, the BHA 14 and the PCH 16 are lowered through the riser 2 toward the subsea lubricator 4 using a wireline 18. It is preferable that the wireline 18 is preinstalled through the PCH 16 and holding the BHA 14 before they are fed through the riser 2. The subsea lubricator 4 has a storage compartment 20 and a hydraulic operated latch 22. The storage compartment 20 is vertically below a receiving end 24 of the subsea lubricator 4, and the hydraulic operated latch 22 is located in the receiving end 24 of the subsea lubricator 4. This is a typical latch that will 'stay as is" if hydraulic latch pressure is lost since it is critical that this latch does not fail. The ID of the storage compartment 20 is more than the ID of the receiving end 24. The OD of the BHA 14 is less than the ID of the receiving end 24 of the subsea lubricator 4 such that when the BHA 14 is lowered, it passes through the receiving end 24 of the subsea lubricator 4 and into the storage compartment 20 where it is stored. The PCH 16 is then lowered by the wireline 18, and while step 1 of Figure 4 shows a vertical space between the BHA 14 and the PCH 16, this is not necessary. The PCH 16 stops being lowered when it is in the receiving end 24 on top of the storage compartment 20 and aligned with the hydraulic operated latch 22. The latch 22 then locks the PCH 16 in place and pumps grease into the valves 17 of the receiving end 24 to enable it to withstand the pressure of the well 12 and seal the subsea lubricator 4 around the wireline 18. After the PCH 16 is secured, the subsea lubricator 4 opens valves on the end of the subsea lubricator 4 that is connected to the well 12 and once the pressure in the storage compartment 20 has equalised with the pressure of the well 12, the BHA 14 is lowered into the well 12.
When the PCH 16 and the BHA 14 are in place, the wireline 18 connecting them to the vessel 8 remains surrounded by the riser 2, except for the portion of the wireline 18 that is between the riser 2 and the subsea lubricator 4. Because most of the wireline 18 is surrounded by the riser 2, most of the underwater currents are prevented from affecting the wireline 18. Indeed, it will only be the portion of the wireline 18 between the bottom of the riser 2 and the top of the subsea lubricator 4 that could be affected by currents, and deep-water currents are not as fast as those closer to the surface. Therefore, when a precise jarring force is desired, the riser 2 ensures that there are minimal wireline deflections affecting the vertical height that the BHA 14 is raised.
The disclosed method is advantageous for several other reasons. As the riser 2 is not sealed to the well 12, it is not pressurised, and so does not need to be reinforced to withstand the pressure of the well 12. Therefore, manufacturing costs are reduced. The riser 2 will also be lighter in weight, and so can be used on a larger variety of vessels 4 and deployed in a shorter time. Since the PCH 16 and the subsea lubricator 4 are disposed on the VXT 10, instead of on the vessel 8, the vessel 8 is in less danger should either of these two components malfunction, as the riser 2 connecting to the vessel is not pressurised.
As the underwater currents will mostly act upon the riser 2 instead of the wireline 18, it is likely that the bottom of the riser 2 will move out of alignment vertically above VXT 10, however, there are many methods to prevent such motion or account for it. For example, the bottom of the riser 2 may be connected to the sea floor with anchors to reduce the motion of the riser 2 caused by underwater currents. Alternatively, or additionally, a transponder or similar device may be used to send the position of the bottom of the riser 2 relative to the VXT 10, and when the position is known to be out of alignment, the vessel 8 to which the riser 2 is attached can move the required amount to compensate for the motion of the bottom of the riser 2 away from the VXT 10. Another method to prevent the riser 2 from moving out of alignment with the VXT is to increase the weight at the bottom of the riser 2 which would then require more force to cause the riser 2 not to stay substantially vertical in the length direction.
In scenarios where the OD of the PCH 16 is too big to go through the riser 2, the wireline 18 may be installed through the PCH 16 once it has been attached to the subsea lubricator 4. Alternatively, the PCH 16 and installed wireline 18 could be attached to the subsea lubricator 4 such that the other end of the wireline 18 is also on the sea floor, and then the wireline 18 could be pulled back through the riser 2.
Each feature disclosed or illustrated in the present specification may be incorporated in the invention, whether alone or in any appropriate combination with any other feature disclosed or illustrated herein.

Claims (15)

  1. Claims 1. A method for performing subsea well interventions in a subsea well which is provided with a vessel at the sea surface and a subsea lubricator at the seabed, the method comprising: connecting a riser to the vessel, so that the riser extends for at least some of the distance between the vessel and the well, but is spaced apart from said lubricator; and lowering a tool and a pressure control head through said riser to said lubricator.
  2. 2. The method of claim 1, wherein the bottom end of the riser is open to the sea, and remains open to the sea during said method.
  3. 3. The method of claim 1 or 2, wherein said tool is, or includes, a bottom hole assembly.
  4. 4. The method of any preceding claim, which further includes lowering said pressure control head into a receiving section of said lubricator.
  5. 5. The method of any preceding claim, which includes securing said pressure control head to said lubricator using a hydraulic operated latch.
  6. 6. The method of any preceding claim, wherein the tool and the pressure control head are attached to a wireline.
  7. 7. The method of any preceding, wherein the outer diameter of the pressure control head is less than the inner diameter of the riser.
  8. 8. The method of any preceding claim, wherein the riser is a drill riser with an inner diameter of 5 inches.
  9. 9. The method of any preceding claim, wherein the riser is anchored to the seafloor to maintain vertical alignment with the lubricator.
  10. 10. The method of any preceding claim, wherein a transmitter transmits the position of the end of the riser closest to the subsea well relative to the lubricator to enable compensation for any motion causing misalignment between the end of the riser and the lubricator.
  11. 11. The method of any preceding claim, wherein the density of the riser closer to the subsea well is greater than the density of the riser farther from the subsea well to increase the force required to move the end of the riser closer to the subsea well out of vertical alignment.
  12. 12. The method of any preceding claim, wherein the riser lowers the subsea lubricator to the subsea well before being positioned at the predetermined distance from the lubricator.
  13. 13. The method of any preceding claim, wherein the subsea well is at least 500m below sea level.
  14. 14. The method of any preceding claim, wherein the distance between the end of the riser closest to the subsea well and the lubricator is between 50 and 1000m.
  15. 15. A pressure control head for performing subsea well interventions, wherein the outer diameter of the pressure control head is less than 5 inches.
GB2206808.4A 2022-05-10 2022-05-10 Subsea well interventions Pending GB2618559A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB2206808.4A GB2618559A (en) 2022-05-10 2022-05-10 Subsea well interventions
PCT/NO2023/050108 WO2023219516A1 (en) 2022-05-10 2023-05-10 Subsea well interventions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB2206808.4A GB2618559A (en) 2022-05-10 2022-05-10 Subsea well interventions

Publications (1)

Publication Number Publication Date
GB2618559A true GB2618559A (en) 2023-11-15

Family

ID=88730664

Family Applications (1)

Application Number Title Priority Date Filing Date
GB2206808.4A Pending GB2618559A (en) 2022-05-10 2022-05-10 Subsea well interventions

Country Status (2)

Country Link
GB (1) GB2618559A (en)
WO (1) WO2023219516A1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011150363A1 (en) * 2010-05-28 2011-12-01 Weatherford/Lamb, Inc. Deepwater completion installation and intervention system
WO2013101601A1 (en) * 2011-12-29 2013-07-04 Shell Oil Company Method and system for wireline intervention in a subsea well from a floating vessel

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2474211B (en) * 2008-08-13 2012-05-02 Schlumberger Holdings Umbilical management system and method for subsea well intervention
US9080393B2 (en) * 2012-05-31 2015-07-14 Transocean Sedco Forex Ventures Limited Drilling riser retrieval in high current
US20180223603A1 (en) * 2015-08-04 2018-08-09 Shell Oil Company Flexible dynamic riser for subsea well intervention
US10107048B2 (en) * 2016-09-29 2018-10-23 Ensco International Incorporated Weathervaning riser joint

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011150363A1 (en) * 2010-05-28 2011-12-01 Weatherford/Lamb, Inc. Deepwater completion installation and intervention system
WO2013101601A1 (en) * 2011-12-29 2013-07-04 Shell Oil Company Method and system for wireline intervention in a subsea well from a floating vessel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Sander Vroling, captured on 13 June 2021, Wellhead, Resato [online], Available from: https://www.resato.com/en/pressure-testing/oil-gas/objects/wellhead [Accessed 21/09/2022] *

Also Published As

Publication number Publication date
WO2023219516A1 (en) 2023-11-16

Similar Documents

Publication Publication Date Title
US7416025B2 (en) Subsea well communications apparatus and method using variable tension large offset risers
AU2005202612B2 (en) Dry tree subsea well communications apparatus and method using variable tension large offset risers
US3196958A (en) Offshore drilling method and apparatus
US7458425B2 (en) System and method of installing and maintaining an offshore exploration and production system having an adjustable buoyancy chamber
EP1837482A1 (en) System and method of installing and maintaining an offshore exploration and production system having an adjustable buoyancy chamber
US5875848A (en) Weight management system and method for marine drilling riser
US10151151B2 (en) Riser deflection mitigation
CA1256792A (en) Multi-well hydrocarbon development system
KR101792706B1 (en) Riser and floating drillship the same
US20140338918A1 (en) Self-Standing Riser with Artificial Lift System
GB2618559A (en) Subsea well interventions
US11286754B2 (en) Landing system for subsea equipment
EA006866B1 (en) System and method of installing and maintaining an offshore exploration and production system having an adjustable buoyancy chamber
US11761284B2 (en) Method for BOP stack structure
US20230030007A1 (en) Method for gate valve failsafe actuators
Harris et al. Drilling in 1300 Feet of Water-Santa Barbara Channel, California
KR20150108548A (en) Supply Barge for Installing BOP Test Apparatus
KR20150108549A (en) Test Apparatus and Method for Drilling Equipment