GB2614955B - Horizontal wellbore trajectory optimization method for deep shale gas fracturing to maximize SRV - Google Patents
Horizontal wellbore trajectory optimization method for deep shale gas fracturing to maximize SRV Download PDFInfo
- Publication number
- GB2614955B GB2614955B GB2217776.0A GB202217776A GB2614955B GB 2614955 B GB2614955 B GB 2614955B GB 202217776 A GB202217776 A GB 202217776A GB 2614955 B GB2614955 B GB 2614955B
- Authority
- GB
- United Kingdom
- Prior art keywords
- srv
- maximize
- optimization method
- shale gas
- horizontal wellbore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title 1
- 238000005457 optimization Methods 0.000 title 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V99/00—Subject matter not provided for in other groups of this subclass
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/28—Design optimisation, verification or simulation using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/20—Computer models or simulations, e.g. for reservoirs under production, drill bits
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/08—Fluids
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/14—Force analysis or force optimisation, e.g. static or dynamic forces
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210067539.3A CN114462272A (en) | 2022-01-20 | 2022-01-20 | Method for optimizing wellbore track of shale gas horizontal well under deep complex structure |
Publications (3)
Publication Number | Publication Date |
---|---|
GB202217776D0 GB202217776D0 (en) | 2023-01-11 |
GB2614955A GB2614955A (en) | 2023-07-26 |
GB2614955B true GB2614955B (en) | 2024-02-28 |
Family
ID=81408723
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB2217776.0A Active GB2614955B (en) | 2022-01-20 | 2022-11-28 | Horizontal wellbore trajectory optimization method for deep shale gas fracturing to maximize SRV |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN114462272A (en) |
GB (1) | GB2614955B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116306330A (en) * | 2022-11-23 | 2023-06-23 | 西南石油大学 | Shale gas fracturing cluster spacing optimization method near deep fault |
CN116927740A (en) * | 2023-05-31 | 2023-10-24 | 中国石油天然气股份有限公司 | Three-dimensional development integral fracturing sequence optimization design method |
CN117684938B (en) * | 2024-02-04 | 2024-04-26 | 新疆石油管理局有限公司 | Reservoir transformation method and device for directional pulse jet flow control seam height |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109723435A (en) * | 2018-12-12 | 2019-05-07 | 长江大学 | Determine the method and apparatus of existing stress field before shale gas reservoir horizontal well refracturing |
CN110850470A (en) * | 2018-08-20 | 2020-02-28 | 中国石油化工股份有限公司 | Method for calculating ground stress difference coefficient by using seismic data |
-
2022
- 2022-01-20 CN CN202210067539.3A patent/CN114462272A/en active Pending
- 2022-11-28 GB GB2217776.0A patent/GB2614955B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110850470A (en) * | 2018-08-20 | 2020-02-28 | 中国石油化工股份有限公司 | Method for calculating ground stress difference coefficient by using seismic data |
CN109723435A (en) * | 2018-12-12 | 2019-05-07 | 长江大学 | Determine the method and apparatus of existing stress field before shale gas reservoir horizontal well refracturing |
Also Published As
Publication number | Publication date |
---|---|
CN114462272A (en) | 2022-05-10 |
GB2614955A (en) | 2023-07-26 |
GB202217776D0 (en) | 2023-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2614955B (en) | Horizontal wellbore trajectory optimization method for deep shale gas fracturing to maximize SRV | |
MX337567B (en) | Method of fracturing multiple zones within a well. | |
GB2522145A (en) | Improved hydraulic fracturing process for deviated wellbores | |
WO2014015230A3 (en) | System and method employing perforating gun for same location multiple reservoir penetrations | |
RU2010111774A (en) | METHOD FOR FINISHING WELLS IN LOW-PERMEABLE OIL AND GAS COLLECTORS | |
WO2012145494A3 (en) | System and method for drilling a borehole using streaming reference data | |
BR112014005479A2 (en) | method for profiling a formation and method for well profiling subsurface formations penetrated by a wellbore | |
MX2015004346A (en) | Method for enhancing fracture propagation in subterranean formations. | |
WO2011050083A3 (en) | Steam distribution apparatus and method for enhanced oil recovery of viscous oil | |
EA201991640A1 (en) | LINE INTENSIFICATION, INCLUDING HYDRAULIC BREAKTHROUGH LAYER THROUGH SPEED CHANNELS | |
RU2008101051A (en) | METHOD FOR OPERATING HYDROCARBON DEPOSITS | |
RU2008101052A (en) | METHOD FOR OPERATING HYDROCARBON DEPOSITS | |
WO2011089151A3 (en) | Method for producing methane gas | |
GB2535405A (en) | Biodegradable, food grade shale stabilizer for use in oil and gas wells | |
RU2011128115A (en) | METHOD OF DEGRASING COAL LAYER | |
RU2443853C1 (en) | Development method of oil deposit with oil-water zones | |
WO2015049125A3 (en) | Method for extracting crude oil from an underground oil deposit using a borehole that acts simultaneously as an injection and production borehole | |
GB202313497D0 (en) | Method for optimizing fracturing cluster spacing near deep shale gas fault | |
EA201590643A1 (en) | METHOD OF DIRECTED HYDRAULIC EXPLOSION OF UNDERGROUND FORMATION WHICH IS DRILLED AT A LESS THAN ONE DIRECTLY DIRECTED WELL | |
GB202313427D0 (en) | Method for calculating fracture network expansion of in-fracture diverted fracturing of deep shale gas horizontal well | |
UA76540U (en) | Method of concurrent degassing carbonic rock mass of operating mines | |
RU2010128425A (en) | METHOD FOR OPERATING HYDROCARBON DEPOSITS | |
UA152172U (en) | Shale gas extraction method | |
ZA202200518B (en) | Method for forming roadway anti-impact soft structure layer by repeated coal-rock drilling fracturing | |
RU2507385C1 (en) | Development of oil deposits by horizontal wells |