GB2597036B - Integrated thermal and stress analysis for a multiple tubing completion well - Google Patents
Integrated thermal and stress analysis for a multiple tubing completion well Download PDFInfo
- Publication number
- GB2597036B GB2597036B GB2116281.3A GB202116281A GB2597036B GB 2597036 B GB2597036 B GB 2597036B GB 202116281 A GB202116281 A GB 202116281A GB 2597036 B GB2597036 B GB 2597036B
- Authority
- GB
- United Kingdom
- Prior art keywords
- stress analysis
- integrated thermal
- multiple tubing
- tubing completion
- completion well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/007—Measuring stresses in a pipe string or casing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
- E21B47/07—Temperature
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/20—Computer models or simulations, e.g. for reservoirs under production, drill bits
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Earth Drilling (AREA)
- Measuring Fluid Pressure (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
- Pipeline Systems (AREA)
- Investigating Or Analyzing Materials By The Use Of Magnetic Means (AREA)
- Investigating Or Analyzing Materials Using Thermal Means (AREA)
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB2300608.3A GB2616120B (en) | 2019-08-22 | 2020-05-19 | Integrated thermal and stress analysis for a multiple tubing completion well |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201962890522P | 2019-08-22 | 2019-08-22 | |
PCT/US2020/033548 WO2021034360A1 (en) | 2019-08-22 | 2020-05-19 | Integrated thermal and stress analysis for a multiple tubing completion well |
Publications (3)
Publication Number | Publication Date |
---|---|
GB202116281D0 GB202116281D0 (en) | 2021-12-29 |
GB2597036A GB2597036A (en) | 2022-01-12 |
GB2597036B true GB2597036B (en) | 2023-04-05 |
Family
ID=74659913
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB2300608.3A Active GB2616120B (en) | 2019-08-22 | 2020-05-19 | Integrated thermal and stress analysis for a multiple tubing completion well |
GB2116281.3A Active GB2597036B (en) | 2019-08-22 | 2020-05-19 | Integrated thermal and stress analysis for a multiple tubing completion well |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB2300608.3A Active GB2616120B (en) | 2019-08-22 | 2020-05-19 | Integrated thermal and stress analysis for a multiple tubing completion well |
Country Status (4)
Country | Link |
---|---|
US (1) | US20220178243A1 (en) |
GB (2) | GB2616120B (en) |
NO (1) | NO20211402A1 (en) |
WO (1) | WO2021034360A1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110320047A1 (en) * | 2010-06-24 | 2011-12-29 | Chevron U.S.A. Inc. | Design and control of multiple tubing string well systems |
US20140034390A1 (en) * | 2012-08-06 | 2014-02-06 | Landmark Graphics Corporation | System and method for simulation of downhole conditions in a well system |
US20140214326A1 (en) * | 2013-01-25 | 2014-07-31 | Landmark Graphics Corporation | Well Integrity Management Using Coupled Engineering Analysis |
US20180142536A1 (en) * | 2016-11-22 | 2018-05-24 | Landmark Graphics Corporation | Vector-ratio safety factors for wellbore tubular design |
US20190041182A1 (en) * | 2015-10-29 | 2019-02-07 | Landmark Graphics Corporation | Tubular Wear Volume Determination Using Stretch Correction |
-
2020
- 2020-05-19 WO PCT/US2020/033548 patent/WO2021034360A1/en active Application Filing
- 2020-05-19 GB GB2300608.3A patent/GB2616120B/en active Active
- 2020-05-19 GB GB2116281.3A patent/GB2597036B/en active Active
- 2020-05-19 US US17/594,826 patent/US20220178243A1/en active Pending
-
2021
- 2021-11-19 NO NO20211402A patent/NO20211402A1/en unknown
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110320047A1 (en) * | 2010-06-24 | 2011-12-29 | Chevron U.S.A. Inc. | Design and control of multiple tubing string well systems |
US20140034390A1 (en) * | 2012-08-06 | 2014-02-06 | Landmark Graphics Corporation | System and method for simulation of downhole conditions in a well system |
US20140214326A1 (en) * | 2013-01-25 | 2014-07-31 | Landmark Graphics Corporation | Well Integrity Management Using Coupled Engineering Analysis |
US20190041182A1 (en) * | 2015-10-29 | 2019-02-07 | Landmark Graphics Corporation | Tubular Wear Volume Determination Using Stretch Correction |
US20180142536A1 (en) * | 2016-11-22 | 2018-05-24 | Landmark Graphics Corporation | Vector-ratio safety factors for wellbore tubular design |
Also Published As
Publication number | Publication date |
---|---|
GB202116281D0 (en) | 2021-12-29 |
WO2021034360A1 (en) | 2021-02-25 |
GB202300608D0 (en) | 2023-03-01 |
GB2616120B (en) | 2024-05-08 |
US20220178243A1 (en) | 2022-06-09 |
NO20211402A1 (en) | 2021-11-19 |
GB2597036A (en) | 2022-01-12 |
GB2616120A (en) | 2023-08-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB202018060D0 (en) | Downhole tool | |
GB2556259B (en) | A downhole ultrasonic transducer, downhole probe and tool comprising such a transducer | |
GB2576228B (en) | A mini-spinner flowmeter and downhole tool | |
IL289180A (en) | Pipeline connecting device, pipeline element coupling piece and coupling method therefor | |
GB202000107D0 (en) | Method and system for analyzing a drill string stuck pipe event | |
GB2599880B (en) | Anti-rotation coupling for use in a downhole assembly | |
SG11202106250RA (en) | Downhole tool for connecting with a conveyance line | |
EP3268578A4 (en) | Determining a fracture type using stress analysis | |
NO20220535A1 (en) | Downhole tool with a releasable shroud at a downhole tip thereof | |
NO20210969A1 (en) | Downhole tool diagnostics | |
IL280978A (en) | A method for testing body fluids | |
GB2616120B (en) | Integrated thermal and stress analysis for a multiple tubing completion well | |
DK3692295T3 (en) | Fastening end piece for a flexible pipe, associated flexible pipe and associated method | |
DE112018001607A5 (en) | HEATING INSERT FOR A PRIMARY TOOL AND PRIMARY TOOL | |
GB2600058B (en) | System and method for dual tubing well design and analysis | |
GB201912284D0 (en) | Measuring strain in a work string during completion operations | |
GB2584142B (en) | Fastener placement tool | |
PL3835729T3 (en) | Fixing element, sensor unit comprising a sensor and a fixing element, sensor unit and method for fixing a sensor unit | |
GB202110731D0 (en) | Cataluminescence for downhole fluid analysis | |
GB2576011B (en) | Downhole Tool | |
GB2585140B (en) | Downhole tool | |
DK3620285T3 (en) | A HAND TOOL AND A MANUFACTURING PROCEDURE FOR A HAND TOOL | |
EP3824194C0 (en) | Connection element and method for introducing a connection element | |
ZA201906974B (en) | Drill coupling and a drill string using same | |
GB2586380B (en) | A wellbore tool including a petro-physical identification device and method for use thereof |