GB2574447A - Electrical load monitoring system - Google Patents

Electrical load monitoring system Download PDF

Info

Publication number
GB2574447A
GB2574447A GB1809334.4A GB201809334A GB2574447A GB 2574447 A GB2574447 A GB 2574447A GB 201809334 A GB201809334 A GB 201809334A GB 2574447 A GB2574447 A GB 2574447A
Authority
GB
United Kingdom
Prior art keywords
switch
meter
electrical
loads
monitored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB1809334.4A
Other versions
GB201809334D0 (en
GB2574447B (en
Inventor
Andrew Ross Edward
Richard Ryan Simon
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Totem Sustainable Solutions Ltd
Original Assignee
Totem Sustainable Solutions Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Totem Sustainable Solutions Ltd filed Critical Totem Sustainable Solutions Ltd
Priority to GB1809334.4A priority Critical patent/GB2574447B/en
Publication of GB201809334D0 publication Critical patent/GB201809334D0/en
Priority to PCT/IB2019/054136 priority patent/WO2019234533A1/en
Publication of GB2574447A publication Critical patent/GB2574447A/en
Application granted granted Critical
Publication of GB2574447B publication Critical patent/GB2574447B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • G01R21/133Arrangements for measuring electric power or power factor by using digital technique
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00004Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D4/00Tariff metering apparatus
    • G01D4/002Remote reading of utility meters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/70Load identification
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

An electrical load monitoring system comprises: a primary energy meter 36 to measure a power parameter of electrical loads 11 - 17; a plurality of switch monitors, monitoring the status of electrical supply switches 18 – 21 for the loads; and a hub 40 for recording at intervals the status of the switches as determined by the switch monitors and, simultaneously, a measurement of the power parameter from the primary energy meter. The hub comprises a processor, stores a plurality of measurement events, and applies regression to the stored measurement events to estimate the current drawn by the electrical load behind each monitored switch. Any loads 16, 17 not connected by monitored switches have a sub-meter 30. Non-intrusive load monitoring may also be used to monitor loads 50, 52 that are not monitored by a switch or sub-meter. The regression may be trained during a period of normal operation of the switched loads. The invention allows demand side response monitoring, by disaggregating the loads behind the primary meter.

Description

Electrical Load Monitoring System
This invention relates to systems and methods used to monitor an electrical system in an industrial, commercial or domestic environment. More particularly, it relates to systems and methods of benefit to electricity suppliers or aggregators, and also to consumers, for monitoring sub-sets of the electrical load behind an electrical meter.
Electricity supplies to a client consumer typically comprise of one or more main feeds to the client location, where the feed first goes to a meter, and from there it splits off into various circuits as required, with each circuit generally being used to supply electricity for particular loads, or types of load. For example, in a domestic environment, there may be different circuits for lighting and sockets (with separate circuits for upstairs and downstairs, or different regions of a property), outside supply, etc. Other circuits may exist for individual items that have a large current draw, such as cookers, showers, or electrical heaters. In a commercial environment such as a large store, there may be circuits for e.g. lighting, warehouse conveyors, tills, heating, and air conditioning. Similarly, in an industrial environment, there may be circuits for various items that consume significant amounts of electricity, such as motors, mills, crucibles, etc., as well as the usual lighting and socket circuits.
For industrial and commercial clients, there is currently a system in place known as Demand Side Response (DSR), or, synonymously, Demand Side Flexibility (DSF). This is a system whereby the electricity supplier or an electricity aggregator may request that a client switches off an electrical load for a period, or delays switching one on, in times of peak load on the system. The loads that typically fall under DSR control will tend to be those that are not time-critical. For example, a large freezer unit may be switched off for a few minutes, which will have no great effect on the freezer functionality. Similarly, a request may be made to delay switching on a significant electrical load like a heater for a crucible. These interventions have the effect of smoothing out, or balancing the load on the electricity grid by lowering peak demand. Such balancing can provide significant savings for the electricity generating companies, as they do not need such an extensive network of power stations at the ready to cope with these, often short-lived, demands.
On the client side, the implementation of the requests to switch off or delay the switch-on of electrical loads may be done either manually (with a person controlling appropriate switchgear), or automatically, with the supplier or aggregator having the ability to switch on or off the electrical loads. Where the control is done manually, then there may be disputes between the supplier and the client as to what load was switched off, or when a given load was switched off. Such data may not be immediately apparent from the electricity meter, due to random switch-on of other systems etc., masking the switching process of the desired load. Where the control is done automatically, both the client and supplier need to be sure that a load in question is switched appropriately.
There is thus a need for electricity companies to be confident that switching requests are complied with both in the time and duration of execution and the level of reduction or shift in electric load during the time period. A solution is to have smart meters attached to all loads subject to DSR. This however can be expensive to retrofit to a given installation, as smartmeters are relatively expensive.
There is thus a desire at the supply side to have reliable information as to what electrical loads are in operation at the client side, both for DSR type applications, and also more generally, for disaggregation of client electricity usage for various purposes.
US Patent 4,858,141 discloses a technique for non-intrusive load monitoring (NILM), which comprises taking measurements from an electricity meter at regular, frequent intervals, and pairing increases in power draw with subsequent equal sized decreases in power draw, and calculating an energy consumption of an electrical load based upon the paired readings. NILM can be very useful where the client load characteristics are relatively simple. However it suffers from various drawbacks. Primarily, it requires a high sample rate typically of at least 1 second intervals, and preferably shorter - of the load measurements to reduce the chances of it missing a switching event. For example, if multiple switching operations take place between meter readings, then it will get confused as to which event is associated with which electrical load. There is also general uncertainty in the process as to how many different loads there may be, and so electricity suppliers tend not to rely too much on NILM techniques for reliable disaggregation, particularly for DSR, and so it is unsuitable for DSR billing settlement. It tends not to be particularly useful for situations more complex than a domestic environment.
Embodiments of the invention have the object of addressing one or more shortcomings of the background art, and/or to provide an alternative thereto.
According to a first aspect of the present invention there is provided an electrical load monitoring system comprising of:
a) a primary energy meter, attached to an electrical supply line that supplies a plurality of independently switchable electrical loads within an electrical installation, the meter being able to measure at least one power parameter of the electrical loads;
b) a plurality of switch monitors, each adapted to monitor the status, either on or off, of an associated electrical supply switch associated with an independently switchable load,
c) a hub, in communication with the plurality of switch monitors, arranged to record at intervals i) the status of the switches as determined by the switch monitors, and simultaneously, ii) a measurement of the at least one power parameter from the primary energy meter; where (i) and (ii) together comprise a measurement event;
wherein the hub further comprises a processor and memory, and is arranged to store a plurality of measurement events, and to apply regression to the stored measurement events to estimate the current drawn by the electrical loads behind each monitored switch.
The invention provides a way of disaggregating the loads behind the primary meter, which is typically a fiscal meter - i.e. the meter that is used by an electricity supplier for billing purposes - with a defined accuracy, that in many cases, and with appropriate setup and commissioning, is good enough for DSR billing settlement and other purposes. Thus, the output from the regression provides an estimate, at the time of the latest measurement interval, of power being used by the electrical load behind each monitored switch. The processor is thus arranged to calculate a disambiguated power drawn by loads behind the monitored switches at a given instant with reference to the regression output and the switch state at the given instant.
Note that, in a typical installation, the primary meter and any sub-meters present are able to measure voltage and current, and hence power drawn by the loads they supply. Some meters may be arranged just to measure current flow, from which power may be inferred from knowledge of the system voltage. Either way, the power is often the term ultimately required by users (either a plant operator or an electricity supplier), and so such terms will be herein referred to as power parameters, and may comprise of the power or the current, and may further comprise of the voltage, the power factor, or other such parameters that may be useful in determining the power draw. The power may be multiplied by, or integrated over time to produce an energy reading, which may then be used for billing purposes. Often, the voltage supplied to loads is assumed to be the same throughout a client installation, and so, where this is the case, it only needs to be measured at one location (typically the primary meter). Advantageously, the meter will be arranged to measure at least the current drawn, as then such readings will be of direct use in, for example, subtracting off currents from complex loads before applying the regression.
When being used for DSR purposes, for example when a load is being controlled using DSR automatically by an electricity supplier, embodiments of the invention allow the supplier to switch off a load, and based upon the regression output and switch state, to be sure, even if the overall load current of the client installation increases following the switchoff, that the load in question was switched off, and the increased current draw was caused by other loads.
An installation of an embodiment of the invention within a client’s electrical network will preferably have all electrical loads on the client side of the fiscal meter monitored by means of being able to record whether each is, at a given measurement instance, switched on or off, through the use of monitored switches. In some instances that may not be possible, and there may be, for example, behind one or more monitored switches, more than one electrical load, each having its own particular load characteristics. These multiple loads sitting behind a switch may be in unknown states at any given instant. The status (e.g. whether switched off or on) of multiple loads behind a monitored switch cannot be ascertained using the regression analysis of the invention, and any switching of these multiple unmonitored loads can appear as measurement “noise”, which reduces the accuracy of the estimations (from the regression) of the monitored loads. A further source of measurement noise or error is where there are electrical loads that do not sit behind a monitored switch, in which case their changing power requirements again will tend to reduce the accuracy of the regression estimations of the monitored loads.
It is advantageous to ameliorate these situations, which may be done, in various embodiments, in different ways. For example, in an embodiment of the invention where there are a plurality of loads that are not individually monitored by means of a monitored switch, then a sub-meter may be positioned to record the power taken by an (otherwise) unmonitored load, the sub-meter then being read at a measurement instance, and the power drawn from the load components it is monitoring being subtracted from the total power (as read by the fiscal meter) before applying the regression to estimate the power being drawn by the loads sitting behind the monitored switches. This may be useful for example where there are lots of small loads, such as in a lighting system, where individual lights are controllable by users, and where it would be cost prohibitive to monitor each one individually. Thus, in some embodiments at least one load is monitored by a sub-meter, and wherein a reading recorded by the sub-meter is subtracted from the reading recorded by the primary meter before applying the regression.
Another approach for disaggregating a plurality of loads behind a monitored switch is to carry out a local NILM process (as described above) on those loads, where those loads are not monitored by, for example, individual sub-meters or monitored switches. In such cases, a meter (either the primary meter, or, if available, a sub-meter that is monitoring a power parameter drawn by the multiple loads) is polled at a suitable frequency (preferably at least every second), and the data so gathered used in an NILM process to infer individual load power draws. So, advantageously, in some embodiments, at least two electrical loads are monitored by a meter, and a Non-lntrusive Load Monitoring process is carried out on the loads to disambiguate such loads behind the meter. This will provide an estimate, subject to the various potential errors involved in NILM as mentioned above, of the loads behind this meter. This estimate can feed into the regression process, by finding NILM events that are not time correlated with the monitored switches and subtracting these from the total meter reading before applying the regression.
During the commissioning of an embodiment of the invention in a client installation, a training cycle will be used before regression analysis can be performed. This comprises recording a plurality of measurement events to build up a training dataset that is then used for the regression analysis, where each measurement event comprises of a measurement of one or more power parameters. A measurement event may also advantageously comprise the time of the event. When a system according to the present invention is installed in a client facility, then this training cycle may be entered as part of a commissioning process. The training cycle involves recording a plurality of measurement events, preferably taken during normal operation of the system, and further preferably at different times of day, and different power draw periods, such as at weekends and during working days, with different switch settings of the monitored switches. By “normal operation”, it is meant that the client facility should be operating in a manner that is consistent with its operation when not undergoing a training cycle. However, the measurements events captured during the training cycle should capture each monitored switch in both of their on and off positions, preferably more than once, such as more than 5 times, 10 times, 30 times or more than 100 times. This should preferably be done until sufficient sample data points are gathered to perform the regression process, to a defined accuracy. The number of training points required will depend upon the complexity of the electrical load installation, and hence the number of monitored switches, as would be appreciated by a person of ordinary skill in the relevant art. It will, in typical environments normally number in the hundreds or thousands, with more data being required where there are more monitored switches present. It will be understood that the number of measurements taken will affect the accuracy of the regression process. Too few measurements will tend to give larger errors in predicting the current or power drawn by a given load. It will also be appreciated that, once a sufficient number of measurements have been taken, the accuracy will approach a working limit, whereby further training measurements do not have an impact upon the accuracy of the estimation process.
As the training dataset grows (and up until the threshold where sufficient readings have been taken) it becomes easier to disambiguate power draw contributions from individual electrical loads using the linear regression techniques employed with the present invention. An embodiment may be arranged to run a regression at various times during the recording of the training dataset, with estimations of current drawn by a given load being compared with actual power measurements of the same load. This will give an indication of the error in the regression process, and also whether the error is decreasing with an increasing training dataset. Thus, it provides a means for determining when a training dataset is of a sufficient size.
The training cycle therefore comprises recording at least one power parameter, including power drawn at the primary meter and any sub-meters (either directly, or by measurement of current, and preferably also voltage (which may otherwise be inferred from other knowledge of the system voltage) and the status of the monitored switches at intervals. The measurement intervals may typically be every 30 seconds, 1 minute, 5 minutes or 10 minutes, unless a particular meter is being used in NILM monitoring, in which case the measurement interval will preferably be at least ever second. Note that the measurement interval need not be fixed, but may vary, sometimes considerably, between measurements.
The gathering of information making up the dataset may continue beyond the duration during which the original training cycle is active. Thus, the dataset may be expanded or replaced with live data, comprising measurements taken from the electricity meter along with the status of the monitored switches during subsequent operation of the client facility, and the expanded or renewed dataset used in inferring which electrical loads are currently drawing power.
Thus, the processor is arranged to process the data gathered, comprising at least one power parameter measured at intervals, along with simultaneously monitored switch status, using linear regression and knowledge of the current monitored switch status, to associate power drawn with a particular electrical load.
The association uses regression to find weighting factors (e.g. currents) for each switch that represent the current drawn from each switch during the training cycle. Then, during a subsequent operational phase, these weights are applied to the switches to establish the energy usage.
Advantageously, at least one switch monitor may be arranged to monitor the status of its associated switch by means of a current transformer. This provides a simple technique for measuring whether any current is flowing to the loads associated with the switch, and so is indicative of the status of the switch.
Alternatively, or as well, at least one switch monitor may be arranged to monitor the status of its associated switch by means of making a measurement of resistance across the switch, or voltage across the load. As will be understood, if there are zero volts across the load between a switched live to neutral then it is in an OFF state, equivalently if there is very low resistance across the switch it is ON assuming it is in a normally functioning environment.
There may be different types of switch monitor for different switches, as governed, for example, by what may be already present in existing systems.
Other ways of monitoring the status of monitored switches may be employed, such as determining the physical position of a switching lever etc. Of course, where remotely controlled relay switches are used, then the hub will be able to read the status of the switch from whatever system is controlling the switches. Advantageously therefore, the hub may be integrated into any such systems so as to be able to read the switch status.
Advantageously, one or more of the switch monitors may include a wireless communication means for transmitting information to the hub. In environments where this is possible, it saves on installing additional wiring systems, which may be expensive or inconvenient to do.
In some environments it may be more appropriate to use wired connections between the monitored switches and the hub. The wired connection may comprise a separate, dedicated data network, or may be integrated along with other existing networks. In some embodiments the electrical cabling itself (i.e. that cable carrying the current for the monitored loads) may be used to additionally carry switch state data. Such environments may comprise, for example, those where a wireless link cannot be made, due to blockage or significant attenuation of the wireless signal, or where safety concerns do not allow EM fields to be generated.
The hub may advantageously be a computer system. It may comprise, for example, a processor and memory, along with other standard functions of a computer system such as input/output capabilities. It may conveniently comprise, for example, a small form factor computer such as a Cubox or Beaglebone or the like, having hardware to allow it to communicate with the primary meter, and other components of particular embodiments the invention, such as the monitored switches and any sub-meters that may be present.
Advantageously the hub is further arranged to communicate to external (to the client installation) systems, such as the billing system of the aggregator or energy supplier, or the DSR/DSF dispatch system of the aggregator, energy supplier or Distribution Network Operator (DNO), or a centralised energy monitoring system. Such communication may conveniently be done using existing WAN links, so providing internet access, but any suitable system may be employed.
The regression performed by embodiments of the invention is preferably a linear regression, but the invention should not be limited to such, and thus covers other such forms of estimation, based upon a training set. Preferably a least squares linear regression is performed. The regression will typically be linear however non-linear regression may also be used. Examples of non-linear regressors include, but are not limited to: softmax; support vector machines; (deep) feed-forward neural networks; (deep) recurrent neural networks
According to a second aspect of the invention there is provided an electrical load monitoring system comprising of a software program product arranged to run on a computer, the computer being arranged to communicate with a primary energy meter in a client electrical installation and a plurality of switch monitors, wherein
a) the primary energy meter is attached to an electrical supply line that supplies a plurality of independently switchable electrical loads within an electrical installation, the meter being able to measure at least one power parameter of the electrical loads;
b) the plurality of switch monitors are each adapted to monitor the status, either on or off, of an associated electrical supply switch associated with an independently switchable load,
c) the software is arranged to instruct the computer to record at intervals i) the status of the switches as determined by the switch monitors, and simultaneously, ii) a measurement of the at least one electrical parameter from the primary energy meter; where (i) and (ii) together comprise a measurement event;
wherein the computer further comprises a processor and memory, the software being arranged to store a plurality of measurement events, and to apply regression to the stored measurement events to estimate the current drawn by the electrical loads behind each monitored switch.
The system of the second aspect may be arranged to function, when coupled to the primary energy meter and switch monitors, in a manner as described in relation to the first aspect of the invention.
According to a third aspect of the invention there is provided a method of monitoring a plurality of switched electrical loads located behind a primary energy meter, wherein the electrical loads have monitoring means adapted to measure the state of their associated switches, comprising the steps of:
a) measuring a power parameter from the energy meter, and substantially simultaneously measuring the state of switches supplying the electrical loads, and storing said power parameter and switch states as a measurement event;
b) repeating step (a) to build up a plurality of measurement events with the switches in different positions.
c) applying regression to the measurement events to estimate the current drawn by the electrical loads behind each switch.
The method may be used to carry out other aspects of the invention as explained herein.
It will be appreciated the various aspects, and embodiments as described herein may be taken independently or in any suitable combination, unless such features are incompatible. In particular, features described in relation to one aspect may be applied to another aspect as appropriate, and claims may be drafted accordingly. Features described in relation to software may be carried out in firmware or hardware as appropriate, and features described in relation to hardware may be carried out in software or firmware where appropriate.
Embodiments of the invention are further described hereinafter, by way of example only, with reference to the accompanying drawings, in which:
Figure 1 diagrammatically illustrates a simplified view of a client installation, at which is installed an embodiment of the present invention;
Figure 2 diagrammatically illustrates a similar installation to that shown in Figure 1, but wherein two further unmonitored electrical loads are present; and
Figure 3 shows three graphs that give an indication, using simulations, of how the accuracy of an embodiment of the invention varies with the number of measurement events used in its training data.
Shown in Figure 1 is a highly simplified representation of a client installation, such as a factory, with hardware elements of the invention located therein. Although it is described as being (in this example) a factory, it may, in other embodiments, equally be a commercial unit, a domestic unit, an agricultural unit, or any other suitable consumer of electricity.
Factory unit 10 has various items of equipment or electrical loads 11-17 installed therein. These all require supplies of electricity. Some, such as items 11-15 may be single, large, high power items, whilst others, such as 16 and 17 may comprise of a plurality of smaller individual elements, that generally work together, to provide their function, such as a lighting function (comprising of a large number of individually switchable lights) or an IT function (comprising of several computers, monitors or the like, independently switchable by their users). Also shown are four monitored isolation switches 18-21, which may be used to switch on and off electrical loads supplied by them. Thus, switch 18 can be used to control power delivery to electrical load 11 via cable 25; switch 19 can be used to control power delivery to load 12 via cable 26, switch 20 can be used to control power delivery to loads 13 and 14 via cable 27, and switch 21 can be used to control power deliver to load 15 through cable 28. Load 14 is monitored by current transformer (CT) 29, that is able to measure current flowing thereto at an accuracy sufficient to provide a measurement for fiscal purposes. Note that electrical loads 16 and 17 are not switched (or at least not switched by a monitored switch). Instead, they are monitored by a sub-meter 30. The factory is supplied with electricity from grid equipment 35, and the electricity goes through primary electricity meter 36, from where it is fed to the electrical loads mentioned above through cable 37.
A hub 40 is connected to the electricity meter, and is able to poll the meter 36 for a power parameter measurement as desired. In this embodiment both voltage and current are measured, but other embodiments may also include other parameters such as power factor. The hub also has a connection to the monitored switches 18-21, sub-meter 30 and CT 29 as indicated functionally by connection 42. This may be, in practice a wired connection or a wireless connection, or a combination of both. The hub is able to request any given switch or switches to provide its or their present status (e.g. either on or off) back to the hub. Thus, the hub is able, at arbitrary time intervals and instances, to measure total power draw at a given time, and also to measure the status of the monitored switches at the given time instance.
The hub comprises of interface hardware for communicating with the various switches and the electricity meter, and also comprises a processor and memory store. The processor may be a microprocessor, and conveniently in some embodiments may comprise of a small, computer such as a Cubox from SolidRun Ltd., or a Beaglebone. Although shown in Figure 1 as a separate item from that of meter 36, it may, in some embodiments, be integrated with the meter 36.
When the system as described above has been installed and is operational, before it can provide information relating the current or power draw of each monitored load, it is necessary for a training cycle to be instituted. During this training cycle the client installation 10 will operate as normal, with the loads 11-17 being operated as required to perform the various tasks required by the client. This involves switching the various monitored switches to operate the equipment, resulting in different power consumption and current draws over the operational period. The system records at intervals, typically of between every 30 seconds to every 5 minutes the current switch state - i.e. the status (on or off) of each monitored switch, the electrical current drawn by the CT 29, and the power or current drawn by sub-meter 30 and primary meter 36. This information is stored in a table for subsequent use by a linear regression algorithm. The table is built up over time, until it is judged that it holds sufficient data for accurate estimation of current draw by a given load behind a monitored switch.
When taking data for the table, the system measures the voltage and current drawn by the loads 16 and 17, as shown by sub-meter 30. As this current is therefore known with some accuracy, it is subtracted from the current measured by primary meter 36, so that the difference current is that drawn by the loads behind monitored switches 18-21 and CT 29. The current drawn by the load being monitored by CT 29 can also be subtracted before the regression analysis takes place. The primary meter 36 has no idea as to the individual current drawn by any individual load behind the monitored switches, but the invention is able to provide an estimate of this, as described below.
Once the training data has been gathered, then the system is able to start estimating current or power associated with each of the monitored loads.
A linear regression analysis provides an output comprising of a series of weights, which are representative of the electrical currents being drawn by the various monitored loads. Thus, it may, when given the total power being drawn at a given instant, and the switch state at that instant (e.g. that switches 18, 20, 21 are on, and switch 19 is off, with CT 29 also showing no current being drawn), provide an estimation that the current drawn by the load behind switch 18 is x amps, the current drawn by the load 13 behind switch 20 is y amps, and the current drawn by the load behind switch 21 is z amps. This information is provided by the linear regression without direct measurement of the power or current taken by those individual loads.
Tables 1 and 2 show a highly simplified set of (simulated) sample training data to illustrate the principle more clearly. This set of training data assumes perfect measurement of the total current drawn, and hence no error is present. Each row records the switch status of two devices, Device A and Device B (with a Ί” representing the switch being on, and a “0” representing the switch being off), along with the total current drawn (“Total”) as measured by a (perfect, error free) primary meter, and thus is a measurement event.
Device A Device B Total
1 0 30
0 1 20
1 0 30
1 1 50
1 1 50
0 1 20
0 0 0
0 1 20
1 1 50
1 1 50
0 0 0
1 1 50
0 1 20
0 1 20
1 1 50
Table 1: Simplified two-device regression training sample data.
The training data is provided to the linear regression “Linest” function of Microsoft Excel, and Table 2 shows the results of the regression analysis. The regression output produces the second “Estimate” row, whereas the first row, “Actual” data is provided merely for comparison purposes, and is not known to the algorithm itself. The “Actual” row therefore represents the actual (as simulated) current consumption of each device. It can be seen that the regression estimate matches perfectly with actual consumption, and hence the error between the two, as shown in the third row, is zero. An energy provider could thus obtain an (in this case perfect) estimation of the current consumption of each monitored device using embodiments of the invention.
Actual
Estimate
Device A Device B
20
20
Error
Table 2: Results of using Microsoft Excel linear regression Linest function on the data from
Table 1
In order to perform the linear regression for example with Microsoft Excel the total current draw is treated as the single known Y and the switch states are the known Xs. The output of the linest function includes a weight for each input X value, and this weight is the estimated current draw for the load behind the associated switch. Although Microsoft Excel is used here, for convenience, it is likely that an installation of the invention would use a regression program that is written specifically for the task. This may conveniently use standard (e.g. open-source) libraries such as the Java Apache Commons Math Library, or some other such library, or alternatively may be coded specially for the task..
It will be appreciated that the above example is trivial, but is provided as a simple example for clarity.
Tables 3 and 4 show a slightly more realistic simulation example, whereby there are now five devices, and wherein there is measurement error, as may be caused by use of a realworld meter, and by small non-metered loads being present in a system. Devices A-E again represent loads, whereby a “1” in the appropriate column indicates the monitored switch is on, and a “0” indicates it is off. The “Total” column represents the actual current drawn by the devices which are switched on (which is not known to the system of course). The “Error” column is a randomly generated inaccuracy value of between -2% and +2%, representing the measurement errors. The “Measured” column represents the measurement as made from a primary meter, and thus has the errors present in the measurements. This (rather than that in the “Total” column) forms part of the data used in the regression process.
The total current as measured at a primary meter in each row is thus the sum of the (unknown prior to the operation of the invention) currents being drawn by those devices that are switched on, plus a contribution from the random inaccuracy percentage value. The error is estimated as a percentage of the current load. For example for measurement at peak load of around 100, we add an a contribution of up to +/- 2 watts in this case.
Device A Device B Device C Device D Device E Total Error % Measured
1 0 0 1 1 100.00 -0.4 99.58
1 0 1 1 1 110.00 -0.3 109.63
1 1 1 0 1 110.00 1.4 111.54
0 0 1 0 1 60.00 -1.0 59.42
1 0 1 1 1 110.00 -1.1 108.77
0 0 1 0 1 60.00 1.4 60.84
1 1 0 1 0 70.00 1.9 71.33
1 0 0 1 0 50.00 -1.8 49.10
0 1 0 0 0 20.00 -1.7 19.66
0 1 1 0 0 30.00 -1.6 29.53
1 1 1 0 1 110.00 1.8 111.93
0 0 0 1 1 70.00 0.5 70.34
1 1 1 1 0 80.00 2.0 81.59
0 1 1 1 1 100.00 1.2 101.17
1 1 1 1 0 80.00 1.0 80.81
1 0 0 0 1 80.00 -1.5 78.81
1 0 0 0 0 30.00 0.6 30.17
1 0 1 0 1 90.00 0.9 90.80
1 1 1 0 0 60.00 -1.0 59.42
0 0 0 0 1 50.00 -1.6 49.20
Table 3
It can be seen that there are 20 measurement events in this sample of training data. The regression analysis, as performed again by the Linest function, gives the results in Table 4. It can be seen for example that Device A, has an actual current draw of 30 amps, but the estimate as predicted by the regression is 30.28 amps, leading to an error of -0.9%.
Device A Device B Device C Device D Device E
Actual 30 20 10 20 50
Estimate 30.28 21.38 10.11 20.15 50.70
Error -0.9% -6.9% -1.1% -0.8% -1.4%
Table 4
The actual (for the purposes of the simulation) current drawn by each device when switched on is shown in the “Actual” row of Table 4, and again this is not explicitly known by the system.
It can be seen in Table 4 that there are some more significant errors here, of up to 6.9% in this particular example, with the estimation of the current draw of Device B against its actual current draw. This error can be improved by increasing the number of measurement events making up the training set. Table 5 shows a similar system to that of Tables 3-4, but instead using 200 measurement events rather than the 20 used previously. It can be seen that this brings the estimation error down significantly.
Device A Device B Device C Device D Device E
Actual 30 20 10 20 50
Estimate 30.21 19.97 9.87 20.11 50.31
Error -0.7% 0.1% 1.3% -0.6% -0.6%
Table 5
Clearly, most real client installations will be more complex than that shown in the simulation, but it can be seen that provided the errors due to unmonitored current drains can be kept within reasonable levels, a good estimation of the current (and hence power) levels drawn by particular loads can be achieved. The results may be used for any required purpose, either by the energy suppliers, distribution network operators or by the clients themselves, e.g. for DSR purposes.
Figure 2 shows a system similar to that of Figure 1, but with two additional equipment loads 50, 52 present. These loads are unmonitored by any monitored switches, sub-meters or CTs, and so their power draw cannot be ascertained by just using the regression process described in relation to Figure 1. Left unaccounted for, their power draws would effectively add a greater degree of error to the regression output otherwise computed.
One way to disambiguate the power drawn by them is to use NILM. Such a process is suitable where the loads exhibit discrete on-off behaviours (such as, for example, the switching on or off of a motor or lighting circuit), and are less suitable where the load tends to vary (e.g. a dimmable lighting load or variable speed motor). The meter 36 is polled here at 1 second intervals, to catch any transitions in the measured power parameter. Given knowledge of the monitored switch positions, any transitions that occur at the same time as switching events from switches 18 to 21 can be ignored during the NILM processing. Remaining transitions must therefore be due to loads 50 and 52, and by tracing the power parameter changes the current drawn by each may be distinguished. The NILM estimations of current drawn by loads 50 and 52 may then be subtracted from current readings recorded by meter 36 before the regression is applied, to improve the accuracy thereof.
If, because of the load type, NILM is not suitable, then the loads should be placed behind a monitored switch, or behind a sub-meter whereby the currents drawn by them can be subtracted before the regression is applied.
Figure 3 shows how the accuracy of an embodiment of the invention can vary with the size of the training data set. Six graphs are shown, in three pairs, where each graph has the number of measurement events (observations) on the x-axis, and each pair shows the mean and standard deviation of error percentage, as viewed across all the devices in the network, on the y-axis. The three pairs show these figures for 10, 100, and 1000 devices. The loads are assumed to switch on and off at random times, whereas in practice it is likely that there will be more correlation between loads and their switching times. The error is the percentage error of the estimated device power usage as compared to the actual power usage for the device. Each simulation is repeated 10 times, and the result of each repetition plotted, so giving the spread in the y-axis.
Figure 3a and 3b show graphs representing a simulation of a client system having ten independent electrical loads, each with a monitored switch. Figure 3a shows mean error whilst Figure 3b shows standard deviation. It can be seen that as the training data set increases in size the percentage error converges towards zero for both the mean error and standard deviation of the error. Both the mean and standard deviation go below 1% by about 500 measurements.
Figure 3c and 3d show similar graphs, but this time where there are a simulated 100 switched devices in a monitored system. Here, a mean error value of 0.1% with standard deviation of 1% is reached at around 20,000 measurement events with convergence towards zero as the observations increase.
Figure 3e and 3f again show similar graphs but this time with 1000 switchable client loads being simulated. The graphs again converge towards a percentage error of zero. After 100,000 observations the mean error value has reached about +/- 0.1% but the standard deviation of the error is still around 6%.
Although the invention has been described in relation to current measurements being obtained by the regression process, it may also be used, as appropriate, to obtain power or energy measurements. Also, the data making up the measurement events may comprise not only current draw information, but as well as or instead of, any other pertinent information such as power, energy, power factor, voltage etc., as would be understood by a normally skilled person.
The functions described herein as provided by individual components could, where appropriate, be provided by a combination of components instead. Similarly, functions described as provided by a combination of components could, where appropriate, be provided by a single component.
Throughout the description and claims of this specification, the singular encompasses the plural unless the context otherwise requires. In particular, where the indefinite article is used, the specification is to be understood as contemplating plurality as well as singularity, unless the context requires otherwise.
Features, integers, characteristics or compounds, described in conjunction with a particular aspect, embodiment or example of the invention are to be understood to be applicable to any other aspect, embodiment or example described herein unless incompatible therewith. All of the features disclosed in this specification (including any accompanying claims, abstract and drawings), and/or all of the steps of any method or process so disclosed, may be combined in any combination, except combinations where at least some of such features and/or steps are mutually exclusive. The invention is not restricted to the details of any foregoing embodiments. The invention extends to any novel one, or any novel combination, of the features disclosed in this specification (including any accompanying claims, abstract and drawings), or to any novel one, or any novel combination, of the steps of any method or process so disclosed.

Claims (15)

Claims
1. An electrical load monitoring system comprising of:
a) a primary energy meter, attached to an electrical supply line that supplies a plurality of independently switchable electrical loads within an electrical installation, the meter being able to measure at least one power parameter of the electrical loads;
b) a plurality of switch monitors, each adapted to monitor the status, either on or off, of an associated electrical supply switch associated with an independently switchable load,
c) a hub, in communication with the plurality of switch monitors, arranged to record at intervals i) the status of the switches as determined by the switch monitors, and simultaneously, ii) a measurement of the at least one power parameter from the primary energy meter; where (i) and (ii) together comprise a measurement event;
wherein the hub further comprises a processor and memory, and is arranged to store a plurality of measurement events, and to apply regression to the stored measurement events to estimate the current drawn by the electrical loads behind each monitored switch.
2. A monitoring system as claimed in claim 1 wherein the system is adapted to undergo a training cycle, comprising recording a plurality of measurement events to build up a training dataset that is then used for the regression analysis.
3. A monitoring system as claimed in claim 2 wherein system is arranged to record the plurality of measurement events when an electrical installing being monitored is operating in a normal fashion.
4. A monitoring system as claimed in any of the above claims wherein the output from the regression is an estimate, at the time of the latest measurement interval, of current being drawn by the electrical load behind each monitored switch.
5. A monitoring system as claimed in claim 4 wherein the processor is arranged to calculate a disambiguated power drawn by loads behind the monitored switches at a given instant with reference to the regression output and the switch state at the given instant.
6. A monitoring system as claimed in any of the above claims wherein at least one load is monitored by a sub-meter, and wherein a reading recorded by the sub-meter is subtracted from the reading recorded by the primary meter before applying the regression.
7. A monitoring system as claimed in any of the above claims wherein the energy meter, and/or, when dependent upon claim 6, a sub-meter, is arranged to additionally measure at least one of total current drawn, power factor, and supply voltage.
8. A monitoring system as claimed in any of the above claims wherein at least two electrical loads are monitored by a meter - either a sub- meter or the primary meter - and a Non-lntrusive Load Monitoring process is carried out on the loads to disambiguate subsystems behind the meter.
9. A monitoring system as claimed in any of the above claims wherein the regression is a linear regression.
10. A monitoring system as claimed in any of the above claims wherein at least one switch monitor is arranged to monitor the status of its associated switch by means of a current transformer.
11. A monitoring system as claimed in any of the above claims wherein at least one switch monitor is arranged to monitor the status of its associated switch by means of making a measurement of a voltage across at least one of the switch or the load.
12. A monitoring system as claimed in any of the above claims wherein one or more of the switch monitors include a wireless communication means for transmitting information to the hub.
13. A monitoring system as claimed in any of the above claims wherein one or more of the switch monitors connect to the hub using a wired protocol.
14. An electrical load monitoring system comprising of a software program product arranged to run on a computer, the computer being arranged to communicate with a primary energy meter in a client electrical installation and a plurality of switch monitors, wherein
a) the primary energy meter is attached to an electrical supply line that supplies a plurality of independently switchable electrical loads within an electrical installation, the meter being able to measure at least one power parameter of the electrical loads;
b) the plurality of switch monitors are each adapted to monitor the status, either on or off, of an associated electrical supply switch associated with an independently switchable load,
c) the software is arranged to instruct the computer to record at intervals i) the status of the switches as determined by the switch monitors, and simultaneously, ii) a measurement of the at least one electrical parameter from the primary energy meter; where (i) and (ii) together comprise a measurement event;
wherein the computer further comprises a processor and memory, the software being arranged to store a plurality of measurement events, and to apply regression to the stored measurement events to estimate the current drawn by the electrical loads behind each monitored switch.
15. A method of monitoring a plurality of switched electrical loads located behind a primary energy meter, wherein the electrical loads have monitoring means adapted to measure the state of their associated switches, comprising the steps of:
a) measuring a power parameter from the energy meter, and substantially simultaneously measuring the state of switches supplying the electrical loads, and storing said power parameter and switch states as a measurement event;
b) repeating step (a) to build up a plurality of measurement events with the switches in different positions.
c) applying regression to the measurement events to estimate the current drawn by the electrical loads behind each switch.
GB1809334.4A 2018-06-06 2018-06-06 Electrical load monitoring system Expired - Fee Related GB2574447B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB1809334.4A GB2574447B (en) 2018-06-06 2018-06-06 Electrical load monitoring system
PCT/IB2019/054136 WO2019234533A1 (en) 2018-06-06 2019-05-20 Electrical load monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB1809334.4A GB2574447B (en) 2018-06-06 2018-06-06 Electrical load monitoring system

Publications (3)

Publication Number Publication Date
GB201809334D0 GB201809334D0 (en) 2018-07-25
GB2574447A true GB2574447A (en) 2019-12-11
GB2574447B GB2574447B (en) 2020-06-03

Family

ID=62975586

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1809334.4A Expired - Fee Related GB2574447B (en) 2018-06-06 2018-06-06 Electrical load monitoring system

Country Status (2)

Country Link
GB (1) GB2574447B (en)
WO (1) WO2019234533A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113595242B (en) * 2021-06-28 2024-02-20 湖南大学 Non-invasive load identification method based on depth CNN-HMM
CN115018217B (en) * 2022-08-09 2022-10-25 国网山东省电力公司东营市河口区供电公司 Photovoltaic transmission management method and system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4858141A (en) 1986-04-14 1989-08-15 Massachusetts Institute Of Technology Non-intrusive appliance monitor apparatus
US9024617B2 (en) * 2011-09-23 2015-05-05 Carrier Corporation Non-intrusive electrical load monitoring
US9705327B2 (en) * 2015-07-14 2017-07-11 Restore Nv Self-learning, real-time, data-driven power metering system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
2016 IEEE Innovative Smart Grid Technologies - Asia (ISGT-Asia), Melbourne, Australia, Nov 28 - Dec 1, 2016, N K Thokala et al, "On load disaggregation using discrete events", pages 324 - 329 *
2016 International Conference on Advances in Electrical, Electronic and System Engineering, 14 - 16 Nov 2016, Putrajaya, Malaysia, K Khalid et al, "Nonintrusive load identification using extreme learning machine and TT-transform", pages 271 - 276 *

Also Published As

Publication number Publication date
GB201809334D0 (en) 2018-07-25
WO2019234533A1 (en) 2019-12-12
GB2574447B (en) 2020-06-03

Similar Documents

Publication Publication Date Title
JP2013050445A (en) Method and system of phase identification
JP6593325B2 (en) Monitoring device, monitoring system, monitoring method and program
US9257840B2 (en) Synchronized PWM randomization for coordinated load management
KR102067095B1 (en) Digital twin device
US8718798B2 (en) Gateway mirroring of metering data between zigbee networks
WO2015087470A1 (en) Demand prediction device and program
WO2019234533A1 (en) Electrical load monitoring system
KR101652109B1 (en) Power monitoring device
KR101922031B1 (en) Watt-hour method and watt-hour meter f unctioning analysis of realtime power pattern, arc information extraction and arc fault alert on the basis of bigdata
US20190137551A1 (en) Power measuring system and power measuring method
JP2016045570A (en) Power saving amount calculation device
JP6547631B2 (en) Monitoring device, monitoring system, monitoring method, correction information creating device, correction information creating method, and program
EP3133373B1 (en) Power monitoring system
JP6597606B2 (en) Monitoring system, monitoring device, server, operation method of monitoring device, operation method of server, and program
JP2000245064A (en) State estimation equipment of distribution system and its method
KR102350728B1 (en) Energy meter including load estimation unit based on neural network
WO2020003624A1 (en) Power consumption estimation device
Sorongan et al. The Application of Energy Management Systems Using the Internet of Things to Improve the Efficiency of Electrical Energy Usage in the MSMEs Sector
Aksanli et al. Distributed control of a swarm of buildings connected to a smart grid: Demo abstract
US20180095118A1 (en) Method for accurately determining power usage in a two phase circuit having both two phase and single phase loads
KR20160040401A (en) System and Method for Monitoring Energy Consumption
Meher et al. Adaptive load scheduling for residential load
Kurczveil et al. Consumer load measurement in automated buildings
KR102523551B1 (en) Real-time voltage/interval load management method of distribution system based on load distribution coefficient and operation device
CN106469942A (en) Electricity monitoring system

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 20220606