GB2546791B - Suspension bridges - Google Patents

Suspension bridges Download PDF

Info

Publication number
GB2546791B
GB2546791B GB1601662.8A GB201601662A GB2546791B GB 2546791 B GB2546791 B GB 2546791B GB 201601662 A GB201601662 A GB 201601662A GB 2546791 B GB2546791 B GB 2546791B
Authority
GB
United Kingdom
Prior art keywords
deck
span
suspension bridge
bridge
region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
GB1601662.8A
Other versions
GB2546791A (en
GB201601662D0 (en
Inventor
Michael Corney John
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to GB1601662.8A priority Critical patent/GB2546791B/en
Publication of GB201601662D0 publication Critical patent/GB201601662D0/en
Priority to PCT/GB2017/000008 priority patent/WO2017129936A1/en
Publication of GB2546791A publication Critical patent/GB2546791A/en
Application granted granted Critical
Publication of GB2546791B publication Critical patent/GB2546791B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/14Floating bridges, e.g. pontoon bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

SUSPENSION BRIDGES
This invention relates to suspension bridges, especially those with extremely long spans of over 3000 metres.
BACKGROUND
Suspension bridges invariably have decks with their highest elevation arou nd the mid-span position; this is convenient for taller ships sailing down the middle of the river. Simple geometry indicates that the height of the towers must be at least equal to the elevation of the bridge deck at mid span plus the sag of the cables.
One of the main design issues with very long span suspension bridges is the rapidly increasing mass of the cables and towers as the span is increased. In fact as the length of the span approaches the practical maximum, the mass of the cables becomes dominant, and in the limit, the cables may be only just strong enough to support their own weight.
The higher the sag of the cables, the lower is the required tension in the cables hence the lower mass of the cables for a given deck load. Of course the higher sag leads to higher towers which for extremely long span bridges may be several hundred metres high.
The invention described here suggests a design of the bridge such that the elevation of the deck at its mid-span is at a practical minimum hence the elevation of the lowest part of the suspension cables is also at its practical minimum. In this way it will be possible to improve the compromise between the cable sag and the tower height.
DESCRIPTION OF THE DRAWINGS
Figure 1 shows a side view of a typical suspension bridge deck with the highest point of the deck at a position around the middle of the span.
Figure 2 shows a cross-sectional view of a suspension bridge with the lowest point of the deck at the middle of the span, with high points of the deck near the respective ends of the span.
Figure 3 shows a cross-sectional view of a suspension bridge with the lowest point of the deck at a position around the middle of the span, with the highest point at a position near one edge of the span.
Figure 4 shows a cross section of a typical deck with an attached underwater feature at mid-span which provides additional torsional damping of the deck.
Figure 5 shows a cross section of the deck with an attached neutral buoyancy underwater feature at mid-span which provides additional torsional damping of the deck.
Figure 6 shows a cross section of a deck attached to which is a pair of lateral stays anchored to the sea bed.
Figure 7 shows a cross section of a deck attached to which is a pair of lateral stays anchored to the sea bed via intermediate pontoons.
Figure 8 shows a cross section of a typical bridge deck mechanically coupled at its midspan to a pair of outboard buoyancy elements.
Figure 9 shows the mid-span region of a single centre-line cable supporting the bridge deck and attached to the mid-point of the deck at its centre-line.
Figure 10 shows the mid-span region of a single centre-line cable supporting the bridge deck by vertical centre-line hangers and located above the deck
Figure 11 shows a single centre-line suspension cable bifurcated in the mid-span region and attached to the sides of the deck around its mid-span position.
Figure 12 shows a single centre-line suspension cable bifurcated in the mid-span region and located above the deck and supporting the sides of the deck around mid-span
EMBODIMENTS OF THE INVENTION
The embodiments of this invention are hereinafter described with reference to the accompanying drawings and are the subject of the claims in the schedule hereof.
Figure 1 shows the side view of a conventional suspension bridge with its towers [1] and [2] supporting the deck [3] by means of the suspension cable [4] via hangers (not shown). The water level under the bridge is shown at [5] while the edge portions of the ground below the water are shown at [6] and [7], and the respective side spans [12] and [13] are connected to ground anchors (not shown). It will be noted that the highest point of the deck above the water is at [8], under the middle of the deck, with the elevation of the deck progressively reducing towards the ends of the span. The required under-deck clearance [8] is determined by the maximum height of the ships that may need to pass under the bridge deck. To accommodate large ocean-going liners, cruise ships, oil tankers etc, this clearance height needs to be around 75 metres. Two such ships [9] and [10] are shown passing beneath the central area of the deck.
With this invention, it is possible to reduce the heights of the towers by reducing the clearance under the middle of the deck, hence reducing the height of the suspension cables and lengths of the hangers throughout the span. Figure 2 shows a suspension bridge otherwise similar to that of Figure 1, with what amounts to an inverted deck profile [3]. This enables the reduction of the under-deck clearance at midspan [8] to a minimum.
For example the mid-span clearance may be perhaps 10 metres, which in this example would allow the whole cable assembly [4] to be reduced in elevation by perhaps 65 metres, thus allowing for the heights of the towers [1] and [2] to be reduced by a similar amount. This would result in a significant reduction in the cost, size and mass of the towers and their foundations, and a reduction in lateral wind loads on the towers and cables.
In order to allow the said shipping to pass under the bridge, there needs to be an increase in deck elevation towards the ends of the span. Figure 2 shows a symmetrical arrangement with the increased deck elevation at both ends of the span so that large ships [9] and [10] can pass underneath the deck near the respective ends of the span.
As a variation of this invention, Figure 3 shows an arrangement with the maximum deck elevation near one end only of the span. This enables large ships [9] and [10] to pass beneath this area of the deck. The embodiment puts no constraint in respect of the under-deck clearance below the other end of the span [11], which may be constrained to ascend or descend from the mid-span region or remain substantially horizontal from the mid-span region.
Clearly the viability of such an arrangement will depend on adequate water depth towards the end(s) of the span and the ability of the traffic on the deck to traverse the gradient between the middle of the deck to the highest point of the deck.
The deck profile according to this invention is close to the water surface below the mid-span region of the deck. This enables some form of water-contact or water immersed device to be introduced so as to stabilise the deck in one way or another. Examples of such water-contact features are described below.
Figure 4 shows a cross section of a typical bridge deck [1] at its mid-span position. (This single deck section is shown for clarity, although the embodiments of this invention would apply equally to more complex deck types). This area of the deck is close to the water in accordance with this invention. This enables a structure to be attached to the underside of the deck such that its lower part is immersed under the surface of the water [2], with the lower part of the structure [3] supported by the deck via rigid structural elements [4] and [5]. The lower part of the structure [3] is subject to forces resulting from rotational movement of the deck with respect to the water in such a way as to provide torsional damping to the deck. This would help to damp out oscillatory motion of the deck that may result from a tendency towards flutter at high wind speeds.
Figure 5 shows an underwater structure similar to that shown in Figure 4, again able to provide torsional damping to the bridge deck, but now including a buoyancy element [7] and a counterbalance mass [6]. Such an arrangement would give the under-deck structure substantially neutral buoyancy, and with self-righting characteristics to facilitate the attachment and detachment of the structure to the deck.
Figure 6 shows a cross section of the bridge deck [1] at its mid-span, with laterally disposed tensile elements [8] and [9] anchored to the sea-bed [10] at locations [11] and [12] respectively. The purpose of these tensile elements is to restrain the lateral displacement of the bridge deck under conditions of high cross-winds. Each tensile element may consist of a single or a multiple set of cables and/or cable strands.
Figure 7 shows an arrangement of lateral constraints broadly similar to those shown in Figure 6. However intervening buoyant elements, or pontoons as they will now be termed, are now introduced at either side of the deck. The bridge deck is linked via tensile elements [8] and [9] to these two respective pontoons [13] and [14], which in turn are anchored to the sea bed at [11] and [12] via two further tensile elements [15] and [16]. The pontoons reduce the undesirable down-force on the bridge deck resulting from the mass and tension of the lateral restraining elements, and also help to warn shipping about the presence of underwater cables.
Figure 8 shows a simplified arrangement of outboard pontoons [3] and [4] attached to the deck [1] at its mid-span position, via intervening support structures [5] and [6] acting in compression. Additional tensile restraints [7], [8] and [9] link the deck to the pontoon [3] float [19], while similar tensile restraints [10], [11] and [12] link the deck to the pontoon [4].
As the sea level will generally be subject to tidal and other variations, and the elevation of the deck around its mid span position will also vary due the effects of traffic loads and thermal expansion of the cables, it will be necessary to introduce the means to compensate for the variation of the clearance elevation of the deck [1] above the surface of the water [2]. The mechanism required to achieve this compensation is shown simply as the two tensile elements [9] and [12] which are parts of the said tensile restraints. These elements could be simple damper/strut assemblies with a long time constant characteristic which would make the elements operate as rigid struts for short time constant motions, but which would be able to adjust their length in long term conditions due to tidal and other effects. Alternatively these tensile elements could be actuators controlled by sensors to detect and compensate for departure from the nominal deck clearance elevation above the water, or to enable the retraction of the pontoon assembly for maintenance action.
There is likely to be some benefit in adopting an unconventional suspension system for extremely long span bridges relevant to this invention. This would involve replacing the conventional Ή’ shaped towers, with its twin cables, by ‘A’ shaped towers supporting a single suspension cable either along the complete length of the span, or at least over much of the outer regions of the span. The benefit of arrangements such as these relates to the structural triangulation of the deck and its inclined hangers which would be expected to increase the torsional stiffness of the deck with a consequent improvement in both flutter alleviation at high wind speeds, and any tendency of the deck to tilt under asymmetric loading conditions. This embodiment, along with the underwater damping arrangement, would be expected to have such a beneficial impact on flutter as to make the retention of a single deck (rather than two or more laterally disposed deck sections) a realistic possibility.
Figures 9 and 10 each show the central region of a bridge deck [1] where the single suspension cable [3] supports the mid-span region of the deck by means of vertical hangers [5]. Outside this mid-span region the deck is supported along its sides by means of inclined hangers [4]. In figure 9 the cable is attached to the deck at its midspan centre-line position [2], whereas in Figure 10, the centre-line cable is located above the deck.
Figures 11 and 12 each show the deck [1] supported by a single cable [3] outside the central region of the deck, supported by inclined hangers [4], In its mid-span region, the suspension cable is bifurcated into two cables [6] and [7], and over this region the deck is supported along its edges by means of hangers [5] connected to the respective bifurcated cables. Figure 11 shows an arrangement where the bifurcated cables are attached to the sides of the deck, whereas in Figure 12 the bifurcated cables are located above the sides of the deck.
As a point of clarification, the word 'cable’ may include an arrangement of two or more immediately adjacent and mutually attached sub-cables which together perform the functions of a single cable.

Claims (13)

1. A suspension bridge, comprising a continuous cable means whose ends are attached to ground anchors and which passes over the tops of two towers located at the respective ends of the span of the bridge, and which supports the deck via hangers at intervals along the span, and in which the deck has a region of progressively increasing gradient away from the mid-span region followed by a region of substantially constant uphill gradient, followed by a further region of progressively reducing gradient.
2. A suspension bridge as claimed in Claims 1, in which a water-immersed means is attached to the deck in the region of its mid-span position.
3. A suspension bridge as claimed in Claim 2, in which the water-immersed means includes a damping device which provides a damping moment on the deck about its longitudinal axis as the deck rotates about its said longitudinal axis.
4. A suspension bridge as claimed in Claim 3, in which the said water-immersed means includes a buoyancy element that provides buoyancy and self-righting characteristics when detached from the deck.
5. A suspension bridge as claimed in Claim 2, where laterally disposed tensile restraints are connected from the bridge deck and anchored to the river or sea bed at either sides of the bridge deck.
6. A suspension bridge as claimed in Claim 5, where the said lateral tensile restraints are anchored to the river or sea bed via a pair of pontoons laterally disposed one at each side of the bridge deck.
7. A suspension bridge as claimed in Claim 2, in which the deck is mechanically attached to a pair of outboard pontoons.
8. A suspension bridge as claimed in Claim 7, in which the mechanical attachment to a pair of outboard pontoons includes an actuator that enables the vertical adjustment of the position of the pontoon assembly.
9. A suspension bridge as claimed in Claim 7, in which the mechanical attachment to a pair of outboard pontoons includes a damping means that automatically adjusts itself to accommodate long term variations in the clearance of the deck above the water.
10. A suspension bridge as claimed in Claim 1, in which the cable means consists of a single cable attached to the centre-line of the deck at its mid-span position.
11. A suspension bridge as claimed in Claim 1, in which the cable means consists of a single cable located above the centre-line of the deck.
12. A suspension bridge as claimed in Claim 1, in which the cable means consists of a single cable over the outer regions of the span which is bifurcated to form two cables over the central region of the span, and where the bifurcated cables are attached to the sides of the deck at around the mid-span region.
13. A suspension bridge as claimed in Claim 1, in which the cable means consists of a single cable over the outer regions of the span which is bifurcated to form two cables over the central region of the span.
GB1601662.8A 2016-01-29 2016-01-29 Suspension bridges Expired - Fee Related GB2546791B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB1601662.8A GB2546791B (en) 2016-01-29 2016-01-29 Suspension bridges
PCT/GB2017/000008 WO2017129936A1 (en) 2016-01-29 2017-01-25 Long span suspension bridges - deck geometry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB1601662.8A GB2546791B (en) 2016-01-29 2016-01-29 Suspension bridges

Publications (3)

Publication Number Publication Date
GB201601662D0 GB201601662D0 (en) 2016-03-16
GB2546791A GB2546791A (en) 2017-08-02
GB2546791B true GB2546791B (en) 2019-06-05

Family

ID=55590405

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1601662.8A Expired - Fee Related GB2546791B (en) 2016-01-29 2016-01-29 Suspension bridges

Country Status (2)

Country Link
GB (1) GB2546791B (en)
WO (1) WO2017129936A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794076B (en) * 2020-06-24 2024-08-30 中铁第一勘察设计院集团有限公司 Suspension bridge structure for controlling vibration by reversely and symmetrically suspending under beam
CN112853925A (en) * 2021-01-11 2021-05-28 大连理工大学 Hang down and swing board active control device of suppression cross-sea bridge flutter
CN114232456A (en) * 2021-11-23 2022-03-25 湖南首创路桥装备制造有限公司 Suspension cable auxiliary assembly type floating bridge

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1030211A (en) * 1996-07-18 1998-02-03 Randosukeepu:Kk Simple pedestrian suspension bridge
KR100877082B1 (en) * 2008-07-29 2009-01-07 (주)신흥이앤지 Hanger cable connetor and construction method of hanger cable

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3857130A (en) * 1972-04-10 1974-12-31 Intreprindera Ind De Stat Ener Suspension bridge
JP2000240001A (en) * 1999-02-19 2000-09-05 Hitachi Zosen Corp Over bridge

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1030211A (en) * 1996-07-18 1998-02-03 Randosukeepu:Kk Simple pedestrian suspension bridge
KR100877082B1 (en) * 2008-07-29 2009-01-07 (주)신흥이앤지 Hanger cable connetor and construction method of hanger cable

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
(SPEIRS) "On the suspension bridge over the Allt a'Chaoil-Reidhe burn" published 27 May 2011 (accessed 4 July 2016) *

Also Published As

Publication number Publication date
GB2546791A (en) 2017-08-02
GB201601662D0 (en) 2016-03-16
WO2017129936A1 (en) 2017-08-03

Similar Documents

Publication Publication Date Title
JP7014498B2 (en) Floating wind turbine assemblies, as well as methods for mooring such floating wind turbine assemblies
CN101965454B (en) Power generation assemblies
EP2684792A1 (en) Spar type floating structure
GB2546791B (en) Suspension bridges
US9528501B2 (en) Floating offshore wind turbine with tuned mass dampers
KR101140488B1 (en) Floating platform method and apparatus
US20160101833A1 (en) Floating offshore wind turbine comprising a combination of damping means
DK3225835T3 (en) Floating platform for utilization of wind energy
JP6155326B2 (en) Wind turbine on a floating support stabilized by a raised anchoring system
US6431284B1 (en) Gimbaled table riser support system
US5971075A (en) Production riser equipped with a suitable stiffener and with an individual float
JP2024505494A (en) wind power plant
CN117561198A (en) Anchor system and method for installing a floating platform using the same
NL8005142A (en) MOORING SYSTEM.
TW201809463A (en) Floating support structure comprising a floater and a heave plate provided with a row of orifices
US8136465B2 (en) Apparatus and method for reducing motion of a floating vessel
NL8202504A (en) SEMI-SUBMERSIBLE PLATFORM FOR THE SEA.
WO2021256939A1 (en) Floating windmill construction
KR20150021303A (en) Topside module capable of CoG control and lifting method of topside module through CoG control
WO1998014667A1 (en) A method and a device for erosion protecting a coast
US20210284295A1 (en) Floating support structure comprising a floater and a heave plate with section varying with depth
KR102646244B1 (en) Pontoon with Improved Dynamic Stability
JPH0234498A (en) Multi-point mooring method for floating type ocean structure
NO347810B1 (en) Floating wind turbine construction
GB2337964A (en) Trim correcting mooring system

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee