GB2522145A - Improved hydraulic fracturing process for deviated wellbores - Google Patents
Improved hydraulic fracturing process for deviated wellbores Download PDFInfo
- Publication number
- GB2522145A GB2522145A GB1507159.0A GB201507159A GB2522145A GB 2522145 A GB2522145 A GB 2522145A GB 201507159 A GB201507159 A GB 201507159A GB 2522145 A GB2522145 A GB 2522145A
- Authority
- GB
- United Kingdom
- Prior art keywords
- hydraulic fracturing
- fracturing process
- stage
- improved hydraulic
- deviated wellbores
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title abstract 3
- 239000004215 Carbon black (E152) Substances 0.000 abstract 3
- 229930195733 hydrocarbon Natural products 0.000 abstract 3
- 150000002430 hydrocarbons Chemical class 0.000 abstract 3
- 238000002955 isolation Methods 0.000 abstract 2
- 230000004936 stimulating effect Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/2605—Methods for stimulating production by forming crevices or fractures using gas or liquefied gas
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/263—Methods for stimulating production by forming crevices or fractures using explosives
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Transformer Cooling (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261709588P | 2012-10-04 | 2012-10-04 | |
PCT/CA2012/001077 WO2014053043A1 (fr) | 2012-10-04 | 2012-11-21 | Procédé amélioré de fracturation hydraulique pour forages déviés |
Publications (2)
Publication Number | Publication Date |
---|---|
GB201507159D0 GB201507159D0 (en) | 2015-06-10 |
GB2522145A true GB2522145A (en) | 2015-07-15 |
Family
ID=50431485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB1507159.0A Withdrawn GB2522145A (en) | 2012-10-04 | 2012-11-21 | Improved hydraulic fracturing process for deviated wellbores |
Country Status (7)
Country | Link |
---|---|
US (1) | US20140096950A1 (fr) |
CN (1) | CN105026684B (fr) |
AR (1) | AR093192A1 (fr) |
CA (1) | CA2795940A1 (fr) |
GB (1) | GB2522145A (fr) |
MX (1) | MX2015004345A (fr) |
WO (1) | WO2014053043A1 (fr) |
Families Citing this family (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10808497B2 (en) | 2011-05-11 | 2020-10-20 | Schlumberger Technology Corporation | Methods of zonal isolation and treatment diversion |
US10001613B2 (en) * | 2014-07-22 | 2018-06-19 | Schlumberger Technology Corporation | Methods and cables for use in fracturing zones in a well |
US10738577B2 (en) | 2014-07-22 | 2020-08-11 | Schlumberger Technology Corporation | Methods and cables for use in fracturing zones in a well |
US10180037B2 (en) | 2014-08-13 | 2019-01-15 | Geodynamics, Inc. | Wellbore plug isolation system and method |
US9062543B1 (en) | 2014-08-13 | 2015-06-23 | Geodyanmics, Inc. | Wellbore plug isolation system and method |
US9810051B2 (en) | 2014-11-20 | 2017-11-07 | Thru Tubing Solutions, Inc. | Well completion |
CA2977373A1 (fr) | 2015-02-27 | 2016-09-01 | Schlumberger Canada Limited | Procede de forage vertical et de fracturation |
CA2887292A1 (fr) * | 2015-04-02 | 2016-10-02 | Nexen Energy Ulc | Procedes de fracturation hydraulique |
US9828843B2 (en) * | 2015-04-09 | 2017-11-28 | Highlands Natural Resources, Plc | Gas diverter for well and reservoir stimulation |
US10344204B2 (en) | 2015-04-09 | 2019-07-09 | Diversion Technologies, LLC | Gas diverter for well and reservoir stimulation |
US10012064B2 (en) | 2015-04-09 | 2018-07-03 | Highlands Natural Resources, Plc | Gas diverter for well and reservoir stimulation |
US9759053B2 (en) | 2015-04-09 | 2017-09-12 | Highlands Natural Resources, Plc | Gas diverter for well and reservoir stimulation |
WO2016183001A1 (fr) * | 2015-05-08 | 2016-11-17 | Louisiana State University | Procédé de drainage par gravité assisté par gaz à puits unique pour la récupération de pétrole |
US20160333680A1 (en) * | 2015-05-12 | 2016-11-17 | Schlumberger Technology Corporation | Well re-fracturing method |
US10400538B2 (en) * | 2015-07-03 | 2019-09-03 | Cameron International Corporation | Method and apparatus for hydraulic fracturing |
US10677626B2 (en) * | 2016-03-01 | 2020-06-09 | Besst, Inc. | Flowmeter profiling system for use in groundwater production wells and boreholes |
US10422207B2 (en) * | 2016-03-07 | 2019-09-24 | Schlumberger Technology Corporation | Methods for creating multiple hydraulic fractures in oil and gas wells |
CN105863569A (zh) * | 2016-04-14 | 2016-08-17 | 中国石油大学(华东) | 一种单井压裂重力自循环开采干热岩地热方法 |
US10982520B2 (en) | 2016-04-27 | 2021-04-20 | Highland Natural Resources, PLC | Gas diverter for well and reservoir stimulation |
CN105971580B (zh) * | 2016-06-27 | 2018-04-20 | 中国海洋石油总公司 | 一种筛管爆燃压裂实验装置及方法 |
WO2018049367A1 (fr) | 2016-09-12 | 2018-03-15 | Schlumberger Technology Corporation | Accès à des régions de production fracturées compromises au niveau d'un champ pétrolifère |
WO2018049368A1 (fr) * | 2016-09-12 | 2018-03-15 | Schlumberger Technology Corporation | Procédés d'arrivée de puits de forage pour stimulation de réservoir |
US9725993B1 (en) | 2016-10-13 | 2017-08-08 | Geodynamics, Inc. | Constant entrance hole perforating gun system and method |
US10753183B2 (en) | 2016-10-13 | 2020-08-25 | Geodynamics, Inc. | Refracturing in a multistring casing with constant entrance hole perforating gun system and method |
WO2018129136A1 (fr) | 2017-01-04 | 2018-07-12 | Schlumberger Technology Corporation | Activation de réservoir comportant une fracturation hydraulique réalisée à l'aide de tunnels étendus |
US11203901B2 (en) | 2017-07-10 | 2021-12-21 | Schlumberger Technology Corporation | Radial drilling link transmission and flex shaft protective cover |
US11486214B2 (en) | 2017-07-10 | 2022-11-01 | Schlumberger Technology Corporation | Controlled release of hose |
CN107605449B (zh) * | 2017-08-03 | 2020-04-10 | 中国石油天然气股份有限公司 | 一种用于非均质储层的投球暂堵分层压裂方法 |
CN109539611A (zh) * | 2017-08-08 | 2019-03-29 | 魏志海 | 干热岩(egs)单井双分支人工致裂换热系统 |
US11098568B2 (en) * | 2017-09-22 | 2021-08-24 | Statoil Gulf Services LLC | Reservoir stimulation method and system |
WO2019074731A1 (fr) * | 2017-10-11 | 2019-04-18 | Geodynamics, Inc. | Re-fracturation dans un tubage à trains multiples avec un système et un procédé de perforation à trou d'entrée constant |
US11434730B2 (en) | 2018-07-20 | 2022-09-06 | Halliburton Energy Services, Inc. | Stimulation treatment using accurate collision timing of pressure pulses or waves |
US11193332B2 (en) | 2018-09-13 | 2021-12-07 | Schlumberger Technology Corporation | Slider compensated flexible shaft drilling system |
CN111350486B (zh) * | 2020-03-02 | 2022-01-11 | 中国地质大学(北京) | 基于周向应力的开发井的布置方法 |
CN114458310B (zh) * | 2022-02-16 | 2024-05-24 | 西南石油大学 | 一种断层低速率运动条件下原油侧向分流定向评价的方法 |
CN117072134B (zh) * | 2023-10-19 | 2024-02-06 | 中国煤炭地质总局勘查研究总院 | 深部地层水平井大规模体积压裂方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3835928A (en) * | 1973-08-20 | 1974-09-17 | Mobil Oil Corp | Method of creating a plurality of fractures from a deviated well |
US4415035A (en) * | 1982-03-18 | 1983-11-15 | Mobil Oil Corporation | Method for fracturing a plurality of subterranean formations |
US4687061A (en) * | 1986-12-08 | 1987-08-18 | Mobil Oil Corporation | Stimulation of earth formations surrounding a deviated wellbore by sequential hydraulic fracturing |
US4977961A (en) * | 1989-08-16 | 1990-12-18 | Chevron Research Company | Method to create parallel vertical fractures in inclined wellbores |
WO2012054139A2 (fr) * | 2010-10-20 | 2012-04-26 | Exxonmobil Upstream Research Company | Procédés d'établissement de réseau de fractures souterrain |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4867241A (en) * | 1986-11-12 | 1989-09-19 | Mobil Oil Corporation | Limited entry, multiple fracturing from deviated wellbores |
US5322126A (en) * | 1993-04-16 | 1994-06-21 | The Energex Company | System and method for monitoring fracture growth during hydraulic fracture treatment |
US5894888A (en) * | 1997-08-21 | 1999-04-20 | Chesapeake Operating, Inc | Horizontal well fracture stimulation methods |
DZ3387A1 (fr) * | 2000-07-18 | 2002-01-24 | Exxonmobil Upstream Res Co | Procede pour traiter les intervalles multiples dans un trou de forage |
US8826985B2 (en) * | 2009-04-17 | 2014-09-09 | Baker Hughes Incorporated | Open hole frac system |
US20130008646A1 (en) * | 2011-07-08 | 2013-01-10 | Conocophillips Company | Depth/orientation detection tool and methods thereof |
US9027641B2 (en) * | 2011-08-05 | 2015-05-12 | Schlumberger Technology Corporation | Method of fracturing multiple zones within a well using propellant pre-fracturing |
CN102518418B (zh) * | 2011-12-26 | 2014-07-16 | 四机赛瓦石油钻采设备有限公司 | 一种不限层压裂工艺方法 |
CN102691494B (zh) * | 2012-06-08 | 2014-10-22 | 四川大学 | 页岩气开采的气动脆裂法与设备 |
-
2012
- 2012-11-21 MX MX2015004345A patent/MX2015004345A/es unknown
- 2012-11-21 CN CN201280077552.1A patent/CN105026684B/zh active Active
- 2012-11-21 CA CA2795940A patent/CA2795940A1/fr not_active Abandoned
- 2012-11-21 US US13/683,610 patent/US20140096950A1/en not_active Abandoned
- 2012-11-21 WO PCT/CA2012/001077 patent/WO2014053043A1/fr active Application Filing
- 2012-11-21 GB GB1507159.0A patent/GB2522145A/en not_active Withdrawn
-
2013
- 2013-01-04 AR ARP130100055A patent/AR093192A1/es unknown
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3835928A (en) * | 1973-08-20 | 1974-09-17 | Mobil Oil Corp | Method of creating a plurality of fractures from a deviated well |
US4415035A (en) * | 1982-03-18 | 1983-11-15 | Mobil Oil Corporation | Method for fracturing a plurality of subterranean formations |
US4687061A (en) * | 1986-12-08 | 1987-08-18 | Mobil Oil Corporation | Stimulation of earth formations surrounding a deviated wellbore by sequential hydraulic fracturing |
US4977961A (en) * | 1989-08-16 | 1990-12-18 | Chevron Research Company | Method to create parallel vertical fractures in inclined wellbores |
WO2012054139A2 (fr) * | 2010-10-20 | 2012-04-26 | Exxonmobil Upstream Research Company | Procédés d'établissement de réseau de fractures souterrain |
Also Published As
Publication number | Publication date |
---|---|
WO2014053043A1 (fr) | 2014-04-10 |
CN105026684A (zh) | 2015-11-04 |
CA2795940A1 (fr) | 2014-04-04 |
GB201507159D0 (en) | 2015-06-10 |
US20140096950A1 (en) | 2014-04-10 |
MX2015004345A (es) | 2015-06-10 |
CN105026684B (zh) | 2018-05-04 |
AR093192A1 (es) | 2015-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2522145A (en) | Improved hydraulic fracturing process for deviated wellbores | |
MX2015012373A (es) | La fracturacion hidraulica con reaccion exotermica. | |
WO2012058027A3 (fr) | Procédé et système de fracturation d'une formation | |
MX370614B (es) | Produccion de hidrocarburos. | |
MX343560B (es) | Metodos y dispositivos para la fracturacion hidraulica y optimizacion: una modificacion a la fracturacion tipo cremallera. | |
IN2014DN07327A (fr) | ||
HK1210567A1 (en) | A system and method for stimulating wells, deposits and boreholes using the plasma source | |
MX2016002657A (es) | Metodo para optimizar la conductividad en una operacion de fracturacion hidraulica. | |
WO2012123461A3 (fr) | Fracturation electrique et statique d'un reservoir | |
EA201491101A1 (ru) | Поверхностно-активные добавки для стимулирования подземного пласта во время операций по разрыву пласта | |
GB201205985D0 (en) | Frac packing tools | |
WO2011013056A3 (fr) | Procédés et appareil pour stimulation à étages multiples multilatérale d'un puits | |
MX365203B (es) | Un método de incremento de eficiencia en la operación de fracturación hidráulica. | |
GB2535346A (en) | Methods for enhancing propped fracture conductivity | |
EA201490168A1 (ru) | Способ разработки газоносных и низкопроницаемых угольных пластов | |
MX337567B (es) | Método para la fracturación de múltiples zonas dentro de un pozo. | |
MX2015014465A (es) | Metodo para la recuperacion mejorada de petroleo por dioxido de carbono y su almacenamiento, y uso de los mismos. | |
GB2536534A (en) | Sequential surfactant treatments for enhancing fracturing fluid recovery | |
WO2014163853A3 (fr) | Production d'hydrocarbures à partir d'une formation | |
WO2013010050A3 (fr) | Agents de soutènement à faible frottement de surface | |
MX2016000097A (es) | Agentes de sosten sinteticos de baja densidad de alta resistencia para la fracturacion hidraulica y recuperacion de hidrocarburos. | |
AR096590A1 (es) | Inhibidores de arcilla para perforación, fracturación, y otros procedimientos | |
MY163889A (en) | Wellbore servicing compositions and methods of making and using same | |
WO2014110441A3 (fr) | Appareil et procédé de fonctionnement de tubage | |
GB2554209A (en) | Providing communication between wellbores through directional hydraulic fracturing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WAP | Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1) |