GB2515741A - Liquefaction of natural gas - Google Patents

Liquefaction of natural gas Download PDF

Info

Publication number
GB2515741A
GB2515741A GB1311756.9A GB201311756A GB2515741A GB 2515741 A GB2515741 A GB 2515741A GB 201311756 A GB201311756 A GB 201311756A GB 2515741 A GB2515741 A GB 2515741A
Authority
GB
United Kingdom
Prior art keywords
lng
natural gas
vessel
vapour
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
GB1311756.9A
Other versions
GB201311756D0 (en
Inventor
David Edwards
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Houlder Ltd
Original Assignee
Houlder Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Houlder Ltd filed Critical Houlder Ltd
Priority to GB1311756.9A priority Critical patent/GB2515741A/en
Priority to US13/941,045 priority patent/US20150000334A1/en
Publication of GB201311756D0 publication Critical patent/GB201311756D0/en
Publication of GB2515741A publication Critical patent/GB2515741A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/006Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the refrigerant fluid used
    • F25J1/007Primary atmospheric gases, mixtures thereof
    • F25J1/0072Nitrogen
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/0002Processes or apparatus for liquefying or solidifying gases or gaseous mixtures characterised by the fluid to be liquefied
    • F25J1/0022Hydrocarbons, e.g. natural gas
    • F25J1/0025Boil-off gases "BOG" from storages
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0203Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a single-component refrigerant [SCR] fluid in a closed vapor compression cycle
    • F25J1/0204Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using a single-component refrigerant [SCR] fluid in a closed vapor compression cycle as a single flow SCR cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0221Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using the cold stored in an external cryogenic component in an open refrigeration loop
    • F25J1/0222Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process using the cold stored in an external cryogenic component in an open refrigeration loop in combination with an intermediate heat exchange fluid between the cryogenic component and the fluid to be liquefied
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0228Coupling of the liquefaction unit to other units or processes, so-called integrated processes
    • F25J1/0234Integration with a cryogenic air separation unit
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J1/00Processes or apparatus for liquefying or solidifying gases or gaseous mixtures
    • F25J1/02Processes or apparatus for liquefying or solidifying gases or gaseous mixtures requiring the use of refrigeration, e.g. of helium or hydrogen ; Details and kind of the refrigeration system used; Integration with other units or processes; Controlling aspects of the process
    • F25J1/0243Start-up or control of the process; Details of the apparatus used; Details of the refrigerant compression system used
    • F25J1/0257Construction and layout of liquefaction equipments, e.g. valves, machines
    • F25J1/0275Construction and layout of liquefaction equipments, e.g. valves, machines adapted for special use of the liquefaction unit, e.g. portable or transportable devices
    • F25J1/0277Offshore use, e.g. during shipping
    • F25J1/0278Unit being stationary, e.g. on floating barge or fixed platform
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/033Small pressure, e.g. for liquefied gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/04Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by other properties of handled fluid after transfer
    • F17C2225/042Localisation of the filling point
    • F17C2225/043Localisation of the filling point in the gas
    • F17C2225/044Localisation of the filling point in the gas at several points, e.g. with a device for recondensing gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/03Treating the boil-off
    • F17C2265/032Treating the boil-off by recovery
    • F17C2265/033Treating the boil-off by recovery with cooling
    • F17C2265/034Treating the boil-off by recovery with cooling with condensing the gas phase
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/06Fluid distribution
    • F17C2265/066Fluid distribution for feeding engines for propulsion
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J2210/00Processes characterised by the type or other details of the feed stream
    • F25J2210/42Nitrogen
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J2290/00Other details not covered by groups F25J2200/00 - F25J2280/00
    • F25J2290/34Details about subcooling of liquids
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25JLIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS OR LIQUEFIED GASEOUS MIXTURES BY PRESSURE AND COLD TREATMENT OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE
    • F25J2290/00Other details not covered by groups F25J2200/00 - F25J2280/00
    • F25J2290/62Details of storing a fluid in a tank

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

A method and system is provided for condensing natural gas vapour to generate liquefied natural gas (LNG), comprising providing a liquid coolant, wherein the liquid coolant has a boiling point less than that of natural gas. LNG is cooled at a first heat exchanger using the liquid coolant to generate sub-cooled LNG, and condensing natural gas vapour at a second heat exchanger using the sub-cooled LNG to liquefy the natural gas vapour and thereby generate further LNG. Also claimed is a vessel such as a bunker vessel comprising the system.

Description

Liquefaction of Natural Gas
Field of the Invention
The present invention relates to liquefaction of natural gas vapour, particularly during the transport and storage of liquefied natural gas (LNG). In particular, but not exclusively, the present invention relates to the handling of boil off gas in a bunker vessel used to refuel LNG-powered vessels.
Background to the Invention
Liquefied natural gas (LNG) is natural gas (typically methane -CH4) that has been liquefied, typically to make it more manageable during storage and/or transport. At atmospheric pressure, this means the temperature of the LNG is reduced to around -163 degrees centigrade or below.
LNG carriers are vessels used to carry LNG across large distances, particularly to carry LNG from gas producing nations to gas consuming nations. The journey times of such vessels are significant, measured in days, weeks and even months. During such time, the LNG is stared at low temperature in order that it does not vaporise.
Notwithstanding the efforts made to maintain this low temperature, there is in practice some evaporation of LNG during the vessel's journey. This evaporation creates boil-off gas (BOG) which must be handled by the vessel in some way. Indeed, this has been a factor in the continuing use of steam-turbine propulsion on LNG carriers. Carriers that use such a propulsion system are able to use BOG to drive turbines for propulsion and electricity generation.
However, steam turbine propulsion is a relatively inefficient means to drive a large ship.
As a result, a move towards slow speed diesel engine powered vessels has been apparent. The diesel engine in such a ship is unable to handle BOG and instead an independent LNG re-liquefaction plant is provided on the vessel. Typically nitrogen vapour is compressed and expanded in a "compander" in such a way as to lower its temperature so that it can be used as a coolant during the re-liquefaction process. The re-liquefaction plant is typically powered by the electricity generated on-board and has significant requirements in this regard, with ratings of 5MW or above not uncommon.
Furthermore, as well as high power requirements, the re-liquefaction plant is typically unable to handle high boil-off rates. Excess BOG that the LNG re-liquefaction plant is unable to handle is burnt in a gas combustion unit (GCU) and thereby wasted.
Another type of propulsion system used in LNG carriers is a dual fuel diesel electric propulsion system which can operate off either diesel or LNG itself. In such a vessel, the BOG can be used as fuel for the engines to provide propulsion and electrical load, If there is insufficient engine load it is necessary to burn the excess BOG in a GCU.
There has been an increasing drive towards the use of LNG as a primary fuel in vessels of all types, driven at least partially by the relative cost of LNG in comparison to other fuels.
As mentioned above, while this offers a potential method for handling BOG needed to provide propulsion and/or electricity, there remains the issue of handling such BOG when the required load does not match the BOG present.
Simply burning the BOG in a GCU is both wasteful and polluting. Nor can the BOG simply be vented to the atmosphere, for similar reasons. Indeed, environmental regulations in many territories prohibit the handling of BOG in this way within close proximity to shore.
Furthermore, using LNG as a primary fuel source creates its own challenges. For example, in many circumstances it may be desirable to re-fuel an LNG fuelled vessel using a bunker vessel. A bunker vessel is a smaller vessel designed to carry fuel to the carrier from shore. The bunker vessel must dock with the carrier and transfer fuel from its tanks to that of the carrier.
As well as having to handle BOG during general operation, the bunker vessel must cope with the fact that the process of fuel transfer is likely to involve an increased production of BOG as the LNG is transferred between the vessels. Even if this were not the case the base level production of BOG would still need to be handled. However, as both vessels are stationary during this process, the BOG created cannot be used for propulsion and must be handled in some other manner.
A re-liquefaction plant is impractical for a relatively small vessel such as a bunker vessel due to its large energy requirements and, as mentioned above, burning off excess BOG is both wasteful and environmentally unsound. There remains a need to find a method of handling BOG in bunker vessels that is both practical and effective.
Summary of the Invention
According to a first aspect of the present invention there is provided a method for condensing natural gas vapour to generate liquefied natural gas (LNG), comprising: providing a liquid coolant, wherein the liquid coolant has a boiling point less than that of natural gas; cooling LNG at a first heat exchanger using the liquid coolant to generate sub-cooled LNG; and condensing natural gas vapour at a second heat exchanger using the sub-cooled LNG to liquefy the natural gas vapour and thereby generate further LNG.
According to a second aspect of the present invention, there is provided a system for condensing natural gas vapour to generate liquefied natural gas (LNG); comprising a first heat exchanger arranged to cool LNG using a liquid coolant to generate sub-cooled LNG, wherein the liquid coolant has a boiling point less than that of natural gas; and a second heat exchanger arranged to condense natural gas vapour using the sub-cooled LNG to liquefy the natural gas vapour and thereby generate further LNG.
The present invention can provide an efficient method of condensing natural gas vapour to provide LNG. Existing LNG is cooled at a first heat exchanger to create sub-cooled LNG that can be used to condense the natural gas vapour. This is significantly more energy efficient than provision of a plant for generating LNG directly from the natural gas vapour. The use of a liquid coolant to first sub-cool existing available LNG reduces the need for energy intensive refrigeration cycles to generate a coolant to directly cool the natural gas vapour.
The present invention finds particular utility in circumstances in which boil-off gas is present. Boil-off gas is natural gas vapour that has arisen through the evaporation of an LNG source. In such circumstances, the boil-off gas is likely not to be significantly warmer than the boiling temperature of natural gas, and furthermore LNG is likely to be available for sub-cooling. Thus, in a preferred embodiment, the natural gas vapour is boil-off gas.
The method may comprise receiving the LNG for cooling at the first heat exchanger from at least one LNG storage tank and returning the sub-cooled LNG to the at least one storage tank after it is used at the second heat exchanger. In this manner, LNG may be re-used for subsequent condensing of natural gas vapour. After use at the second heat exchanger the sub-cooled LNG is likely to have warmed somewhat, but the method is preferably arranged such that it remains in liquid form for returning to the LNG storage tank.
Preferably, the method may further comprise delivering the further LNG to the at least one storage tank. Accordingly, the LNG that is created through the method may subsequently be used for condensing further natural gas vapour in future cycles. Furthermore, the system is compact and efficient in that there is no requirement for separate tanks for the coolant used at the second heat exchanger and the generated LNG.
As mentioned above, the liquid coolant used at the first generator has a boiling point less than that of the natural gas vapour. The natural gas vapour is preferably predominantly methane, more preferably at least 90 Mole % methane, at least 95 Mole % methane or over 97% Mole methane. Methane has a boiling point at atmospheric pressure of around -163 degrees centigrade. Preferably, the liquid coolant has a boiling point at atmospheric pressure of less than that of methane (i.e. less than -163 degrees centigrade), more preferably less than -170 degrees centigrade, and most preferably less than -190 degrees centigrade. In preferred embodiments, the liquid coolant is liquid nitrogen. The boiling point of nitrogen is around -193 degrees centigrade at atmospheric pressure. References to atmospheric pressure refer to a pressure equal to the understood unit of one atmosphere, rather than to prevailing climatic conditions.
The system may comprise a storage facility for the liquid coolant. For example, the system may comprise at least one storage tank for storing the liquid coolant. The system may additionally or alternatively comprise a generator for generating the liquid coolant.
Equally, the method may comprise a step of generating the liquid coolant. For example, where the system is provided on a maritime vessel, an initial supply of liquid coolant may be provided to the storage facility from an on-shore facility while the vessel is docked, but when the vessel is at sea additional liquid coolant may be provided as needed by the generator.
According to a further aspect, a vessel may be provided comprising the system of the second aspect. The vessel may comprise a flow boom arranged to transfer LNG to a second vessel and to receive natural gas vapour from the second vessel. The method may further comprise transferring LNG from a first vessel to a second vessel, and receiving the natural gas vapour from the second vessel. In preferred embodiments, one or both vessels are maritime vessels. In particular, the vessel comprising the system (i.e. the first vessel) may be a bunker vessel while the second vessel may be an LNG fuelled vessel. Alternatively or additionally, the second vessel may be a carrier, particularly an LNG carrier. A bunker vessel is a vessel arranged to re-fuel other vessels while at sea.
Preferably, one or both vessels are LNG powered vessels.
Brief Description of the Figures
A preferred embodiment of the present invention will now be described with reference to the accompanying drawings, in which: Figure 1 is a schematic diagram showing a bunker vessel comprising a system or handling LNG; Figure 2 is a schematic diagram showing the connection between various elements of the system in more detail; and Figure 3 is a schematic diagram illustrating the components of a re-condenser unit.
Detailed Description
Referring to Figure 1, a schematic diagram is provided showing the principle elements of a LNG handling system aboard a bunker vessel 1 for re-fuelling larger ships. The system comprises two LNG storage tanks 10, port and starboard manifolds 20, a liquid nitrogen tank 30, a gaseous nitrogen tank 40, a liquid nitrogen generator 50, a re-condenser unit 60, engines 70 and a flow boom 80. Figure 1 illustrates functional connections between the various illustrated elements of the system for the transfer of LNG (indicated as "L", dotted lines), natural gas vapour (indicated as "V", thick lines) and nitrogen (both liquid and gaseous indicated as "N", thin lines).
The port and starboard manifolds 20 are arranged to allow transfer of LNG, natural gas vapour, and nitrogen between the bunker vessel and an on-shore facility. LNG received from the port and starboard manifolds is stored in the storage tanks 10. In this embodiment, the storage tanks are pressurised, C-class, storage tanks which may operate at up to 10 bar, but the skilled person will recognize that alternative tanks may be used. Indeed, the storage tanks may be any type of chamber or container suitable to act as a reservoir for LNG. Pressurised tanks, particularly pressurised "C" Type tanks, allow a wider range of operating temperature and pressure within the bunker vessel. The storage tanks store LNG at around -163 degrees centigrade.
Liquid nitrogen received from the manifolds 20 is stored in liquid nitrogen tank 30.
Nitrogen that evaporates from liquid nitrogen tank 30 may be received in gas nitrogen tank from where it is passed to the ship's systems for use in for purging of cargalfuel lines, inerting tanks and hold spaces and so on. Alternatively or additionally, nitrogen may be vented to the atmosphere or re-used by liquid nitrogen generator 50. The liquid nitrogen tank 30 and the gas nitrogen tank 40 may be any suitable container or chamber suitable to act as a reservoir for liquid nitrogen and gaseous nitrogen respectively.
The liquid nitrogen generator 50 passes generated liquid nitrogen back to the liquid nitrogen tank 30. The liquid nitrogen generator 50 may be a compression cooling system, and is preferably powered by the vessel's electrical systems. For example, the liquid nitrogen generator 50 may be arranged to filter and compress atmospheric air before carbon dioxide water and residual hydrocarbons are removed in an air purification unit.
The air is then passed to a cold box where it is cooled and liquefied. The liquid air is distilled then in a distillation column to yield pure nitrogen gas which is condensed in a condenser to yield pure liquid nitrogen.
The system comprises a flow boom 80 for transferring LNG to another vessel, such as an LNG carrier. The flow boom 80 is a transfer boom in this embodiment. The transfer boom 80 receives LNG from LNG storage tank 10 and may also receive natural gas vapour from the other vessel. Natural gas vapour received by the transfer boom is passed to the re-condenser unit 60.
The re-condenser unit 60 also receives natural gas vapour from the LNG storage tank 10.
The re-condenser unit 60 is arranged to re-liquefy the natural gas vapour to return it to an LNG state. Once re-liquefied the LNG may be passed back to the LNG storage tank 10.
The re-condenser unit 60 also receives liquid nitrogen from the liquid nitrogen tank 30 and LNG from the LNG tanks 10. These liquids are used during the processes of cooling the natural gas vapour at the re-condenser unit, as will be explained in greater detail below with reference to Figure 3.
In the embodiment shown in Figure 1, the engines 70 of the bunker vessel use the stored LNG as a fuel source. In practice, natural gas vapour is used for combustion in the engines. The natural gas vapour used for this purpose may be boil-off gas (BOG) spontaneously occurring in the LNG storage tanks 10, or may be deliberately vaporised LNG from the LNG storage tanks. LNG from the storage tank may be vaporised by a forcing vaporizer, for example.
Figure 2 shows in more detail the connections between various elements of the system of Figure 1. In particular, Figure 2 illustrates the LNG storage tanks 10 and the port and starboard manifolds 20. As shown, a variety of valves are provided to control the flows and pressures of gas and liquid in the system. Figure 2 also illustrates various connection points to other elements of the system. In particular, connection points 201 are provided for LNG returning from the re-condenser unit 60, while connection points 202 are provided for natural gas vapour passed to the re-condensing unit 60. There is also provided connection point 210 for passing LNG to the re-condensing unit 60 for use during a re-liquefaction process implemented by the re-condensing unit 60 and a connection point 214 for receiving LNG from the re-condensing unit that has been used for this purpose.
LNG that is extracted from the LNG storage tanks 10 but is not ultimately used in the engine 70 or the re-condensing unit 60 may be returned to the LNG storage tanks via connection points 215.
Connection point 203 is shown for passing LNG to the transfer boom 80, while connection point 204 receives natural gas vapour from the transfer boom 80. In this manner, LG can be transferred to another vessel, while excess boil-off as from the vessel can be retrieved for handling on the bunker vessel.
Connection point 205 is provided for passing gas vapour to the engines 70. There is also provided a connection point 206 for transferring natural gas vapour to a gas combustion unit (GCU). In an emergency situation, this OCU may be used to burn and thus dispose of natural gas vapour that is not otherwise handled by the system. There is also provided a vent 208 to vent natural gas vapour to the atmosphere where this is appropriate.
Connection point 207 is provided for the receipt of nitrogen vapour for purging of lines, and inerting spaces as required. Excess vapour would be vented via the GCU. The vapour may be received from the gas nitrogen tank 40 which receives boil-off from the liquid nitrogen tank 30. Connection point 210 is for supply of liquid nitrogen via the manifolds 20 from shore for charging the liquid nitrogen storage tank 30..
Each LNG storage tank is provided with a discharge pump 11 for pumping LNG to the transfer boom 80 and a LNG fuel pump 12 for pumping LNG to the engines 70. Various connections allow the LNG pumped by either the discharge pump 11 or the LNG fuel pump 12 to be re-directed as appropriate.
Each LNG storage tank 10 also comprises a first LNG inlet 13 and a second LNG inlet 14.
LNG can be received at the LNG storage tanks 10 from the re-condenser unit 60 via connection points 201 and from the port and starboard manifolds 20. The LNG storage tanks also comprise a gas dome 15 above the storage tanks, where boil off gas (BOG) from the stored LNG is collected. The LNG storage tanks 10 comprise a gas outlet 17 for passing this natural gas vapour to other elements of the system.
The LNG storage tanks 10 also comprise a return spray header 16. The spray header returns a proportion of the LNG extracted from the LNG storage tank 10 as a spray applied to the surface of the stored LNG in the tank. This helps to maintain uniform temperature within the stored LNG and thereby reduces the rate of generation of boil off gas.
The port and starboard manifolds 20 comprise a first LNG interlace 21. A second LNG interface 22, a natural gas vapour interface 23 and a nitrogen interface 24. When the bunker vessel is docked, LNG may be provided to the LNG storage tanks 10 via the LNG interfaces 21, 22 while natural gas vapour may be returned to shore via the gas vapour interface 23. Liquid nitrogen may also be provided to the liquid nitrogen tank 30 via the nitrogen interface 24.
Figure 2 also illustrates a forcing vaporiser 211 on the line between the LNG storage tanks and connection point 205 to the engines 70. This is used to vaporise LNG to produce natural gas vapour which can be combusted by the engines 70 to generate power for the bunker vessel's propulsion and electrical systems. The system further comprises a compressor 212 for compressing gas passed through the vaporiser 211 before it reaches the engines 70. A further compressor 213 may also be provided for natural gas vapour being returned to the port and starboard manifolds 20.
Figure 3 illustrates the re-condensing unit 60 in more detail. In order to facilitate comparison with Figure 2, various functionally equivalent connections portions are shown in Figure 3 using the same reference numerals as used in Figure 2. For example, Figure 3 shows connection points 202 for providing natural gas vapour, particularly BOG, to the re-condensing unit 60. Moreover, connection points 201 for receiving the re-liquefied LNG
S
from the re-condensing unit 60 and returning this to the LNG storage tanks 10 are also shown.
Figure 3 also illustrates liquid nitrogen tank 30 and gaseous nitrogen tank 40. The liquid nitrogen tank 30 is filled from the port and starboard manifolds via connection point 209 (also shown in Figure 2) and may also be filled from bunker vessels liquid nitrogen generator 50 via connection point 301. Nitrogen which evaporates from the liquid nitrogen tank 30 may be passed to the gaseous nitrogen tank 40, from where it may be vented via connection point 302 or passed to consumers via connection point 303, Consumers in this case may include systems aboard the vessel; for example, nitrogen vapour may be used for purging of cargo/fuel lines, inerting tanks and hold spaces and so on.
The re-condensing unit 60 comprises a fist heat exchanger 62, a second heat exchanger 64 and a compressor 66. The first heat exchanger 62 is an LNG sub-cooler and is coupled to the liquid nitrogen tank 30 and to LNG outlets of the LNG tanks 10. LNG from the LNG tanks 10 is cooled using liquid nitrogen from the liquid nitrogen tank 30 to below its temperature in the LNG tanks 10. The LNG cooled in this manner is referred to as sub-cooled'.
The second heat exchanger 64 is coupled to the first heat exchanger 62 so as to receive the sub-cooled LNG therefrom. The second heat exchanger 64 is also arranged to receive natural gas vapour. The natural gas vapour may originate either at the LNG tanks or be received from another vessel via the transfer boom 80. Typically, the natural gas vapour is BOG that has occurred by evaporation of LNG.
The second heat exchanger 64 is a condenser arranged to cool the natural gas vapour using the sub-cooled LNG received from the first heat exchanger such that it is liquefied.
The second heat exchanger thus generates LNG which is returned to the LNG tanks 10.
Furthermore, once it has passed through the second heat exchanger, the sub-cooled LNG is returned to the LNG tanks 10.
The re-condensing unit also comprises a compressor 66. The compressor 66 is used to compress natural gas vapour prior to its injection into the second heat exchanger 64. This is found to increase the efficiency of heat exchange at the second heat exchanger 64.
In use, the bunker vessel comprising the system illustrated in Figure 1 is docked with another vessel which it is to re-fuel. In particular examples, this other ship is an LNG fuelled vessel.
The transfer boom 80 is used to transfer LNG from the LNG tanks 10 to the LNG carrier.
During this process, natural gas vapour is displaced from the tanks aboard the LNG carrier, and boil-off gas is also generated from the LNG tanks 10 on the bunker vessel and at other points in the system. This natural gas vapour is directed towards the re-condensing unit, where it first encounters 60 the compressor 66. The compressor 66 acts to increase the pressure within the natural gas vapour by compressing the vapour, and the compressed vapour is then passed to the second heat exchanger 64. The second heat exchanger 64 transfers heat between sub-cooled LNG and the compressed vapour, thereby cooling the compressed vapour until it condenses (i.e. liquefies), and creating LNG. This LNG is then passed to the LNG storage tanks 10.
As mentioned above, the sub-cooled LNG used in the second heat exchanger 64 is also passed to the LNG storage tanks 10 after passing through the second heat exchanger 64, Prior to this, the sub-cooled LNG is generated by cooling using liquid nitrogen at the first heat exchanger 62.
As described above, the preferred embodiment is designed for use upon a bunker vessel used to refuel another ship. However, it will be understood that variations may be proposed for alternative types of marine vessels, and indeed to shore-based transport and storage.
Other variations and modifications will be apparent to the skilled person. Such variations and modifications may involve equivalent and other features which are already known and which may be used instead of, or in addition to, features described herein. Features that are described in the context of separate embodiments may be provided in combination in a single embodiment. Conversely, features which are described in the context of a single embodiment may also be provided separately or in any suitable sub-combination.
It should be noted that the term "comprising" does not exclude other elements or steps, the term "a" or "an" does not exclude a plurality, a single feature may fulfill the functions of several features recited in the claims and reference signs in the claims shall not be construed as limiting the scope of the claims. It should also be noted that the Figures are not necessarily to scale; emphasis instead generally being placed upon illustrating the
principles of the present disclosure.
GB1311756.9A 2013-07-01 2013-07-01 Liquefaction of natural gas Withdrawn GB2515741A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB1311756.9A GB2515741A (en) 2013-07-01 2013-07-01 Liquefaction of natural gas
US13/941,045 US20150000334A1 (en) 2013-07-01 2013-07-12 Liquefaction of Natural Gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB1311756.9A GB2515741A (en) 2013-07-01 2013-07-01 Liquefaction of natural gas

Publications (2)

Publication Number Publication Date
GB201311756D0 GB201311756D0 (en) 2013-08-14
GB2515741A true GB2515741A (en) 2015-01-07

Family

ID=48999315

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1311756.9A Withdrawn GB2515741A (en) 2013-07-01 2013-07-01 Liquefaction of natural gas

Country Status (2)

Country Link
US (1) US20150000334A1 (en)
GB (1) GB2515741A (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150219391A1 (en) * 2014-02-05 2015-08-06 Air Liquide Industrial U.S. Lp Method and apparatus for recovery of condensable gases from liquid storage tanks
CN108474520B (en) * 2015-12-31 2021-08-13 国际壳牌研究有限公司 Method for filling transport equipment with liquefied gaseous fuel
JP6728025B2 (en) * 2016-11-15 2020-07-22 レール・リキード−ソシエテ・アノニム・プール・レテュード・エ・レクスプロワタシオン・デ・プロセデ・ジョルジュ・クロード Boil-off gas recondensing device and LNG supply system including the same
ES2928646T3 (en) 2016-12-23 2022-11-21 Shell Int Research Vessel for the transport of liquefied gas and method of operation of the vessel
JP6812272B2 (en) * 2017-02-14 2021-01-13 レール・リキード−ソシエテ・アノニム・プール・レテュード・エ・レクスプロワタシオン・デ・プロセデ・ジョルジュ・クロード LNG manufacturing system with recondenser
FR3066257B1 (en) * 2018-01-23 2019-09-13 Gaztransport Et Technigaz CRYOGENIC HEAT PUMP AND ITS USE FOR THE TREATMENT OF LIQUEFIED GAS
FR3066250B1 (en) * 2017-05-12 2019-07-05 Gaztransport Et Technigaz DEVICE AND METHOD FOR COOLING LIQUEFIED GAS AND / OR NATURAL EVAPORATION GAS FROM LIQUEFIED GAS
FR3066249B1 (en) * 2017-05-12 2020-11-13 Gaztransport Et Technigaz DEVICE AND METHOD FOR COOLING LIQUEFIED GAS AND / OR LIQUEFIED GAS NATURAL EVAPORATION GAS
SG11201913136XA (en) * 2017-07-07 2020-01-30 Global Lng Services As Large scale coastal liquefaction
EP3434959A1 (en) * 2017-07-28 2019-01-30 Cryostar SAS Method and apparatus for storing liquefied gas in and withdrawing evaporated gas from a container
DE102017118951B4 (en) * 2017-08-18 2019-11-14 Arianegroup Gmbh Cooling of an evaporation of liquefied petroleum gas to drive machines, plants or vehicles
FR3093785B1 (en) * 2019-03-15 2021-06-04 Gaztransport Et Technigaz Pressure control system in a liquefied natural gas tank.
FR3106874B1 (en) * 2020-02-05 2022-07-01 Air Liquide Liquefied gas delivery method
US20220113086A1 (en) * 2020-10-13 2022-04-14 Galileo Technologies Corp. Integrated modular system for transfer, storage, and delivery of liquefied natural gas (lng)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100139316A1 (en) * 2005-01-18 2010-06-10 Hyung-Su An Operating System of Liquefied Natural Gas Ship for Subcooling and Liquefying Boil-Off Gas
US20120240874A1 (en) * 2009-10-16 2012-09-27 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Ship for supplying liquified fuel gas
GB2494627A (en) * 2011-09-07 2013-03-20 Liquid Gas Equipment Ltd Method and apparatus for cooling boil off gas on a ship, barge or floating platform
US20130139544A1 (en) * 2011-12-02 2013-06-06 Fluor Technologies Corporation LNG Boiloff Gas Recondensation Configurations And Methods

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL268045A (en) * 1960-12-23
US3302416A (en) * 1965-04-16 1967-02-07 Conch Int Methane Ltd Means for maintaining the substitutability of lng

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100139316A1 (en) * 2005-01-18 2010-06-10 Hyung-Su An Operating System of Liquefied Natural Gas Ship for Subcooling and Liquefying Boil-Off Gas
US20120240874A1 (en) * 2009-10-16 2012-09-27 Daewoo Shipbuilding & Marine Engineering Co., Ltd. Ship for supplying liquified fuel gas
GB2494627A (en) * 2011-09-07 2013-03-20 Liquid Gas Equipment Ltd Method and apparatus for cooling boil off gas on a ship, barge or floating platform
US20130139544A1 (en) * 2011-12-02 2013-06-06 Fluor Technologies Corporation LNG Boiloff Gas Recondensation Configurations And Methods

Also Published As

Publication number Publication date
US20150000334A1 (en) 2015-01-01
GB201311756D0 (en) 2013-08-14

Similar Documents

Publication Publication Date Title
US20150000334A1 (en) Liquefaction of Natural Gas
CN102341303B (en) Boil-off gas treatment apparatus for electric-propelled lng carrier having re-liquefaction function and method thereof
KR101750592B1 (en) A method and arrangement for providing lng fuel for ships
KR20190105841A (en) Liquefied Petroleum Gas Fueled Ship and Fuel Supply Method of LPG Fueled Ship
KR102450533B1 (en) Volatile organic compounds treatment system and ship having the same
KR20190135982A (en) System for treating boil-off gas of a marine structure
CN105324302A (en) System and method for treating boil-off gas in ship
KR102324848B1 (en) Gas treatment system and ship having the same
KR20200056513A (en) Boil-Off Gas Treatment System And Method For Ship
CN214701458U (en) LNG boil-off gas reliquefaction system
KR20160008810A (en) Fuel Gas Supply System And Method For Ship Engine
KR102016030B1 (en) Treatment system of liquefied gas
KR102011860B1 (en) System and method for supplying fuel gas for a ship
KR102436048B1 (en) Gas treatment system and ship having the same
KR20200022870A (en) Fuel Supplying System And Method For Ship Using Liquefied Gas
KR102601315B1 (en) Regasification Operating System and Method for a Vessel
KR102153825B1 (en) Gas Treatment System, Method of Gas Treatment using the same and Ship having the same
KR102654823B1 (en) Fuel Supplying System And Method For Ship
KR102654824B1 (en) Fuel Supplying System And Method For Ship
KR102632394B1 (en) Fuel Supply System For Ship
KR102601310B1 (en) System and Method of Controlling Pressure in Cargo Tank for Vessels
KR102589463B1 (en) System and Method of Controlling Pressure in Cargo Tank for Vessels
KR102540037B1 (en) System and Method of Controlling Pressure in Cargo Tank for Vessels
KR20120042378A (en) Dense phase gas carrier using dense phase gas as fuel gas
KR20240106583A (en) Fuel Supply System For Ship

Legal Events

Date Code Title Description
WAP Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1)