GB2493337A - Framework walkway - Google Patents

Framework walkway Download PDF

Info

Publication number
GB2493337A
GB2493337A GB201112913A GB201112913A GB2493337A GB 2493337 A GB2493337 A GB 2493337A GB 201112913 A GB201112913 A GB 201112913A GB 201112913 A GB201112913 A GB 201112913A GB 2493337 A GB2493337 A GB 2493337A
Authority
GB
United Kingdom
Prior art keywords
text
walkway
panels
framework
walkway according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB201112913A
Other versions
GB201112913D0 (en
GB2493337B (en
Inventor
Colin Munnelly
Matthew Robinson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to GB201112913A priority Critical patent/GB2493337B/en
Publication of GB201112913D0 publication Critical patent/GB201112913D0/en
Priority to PCT/GB2012/051781 priority patent/WO2013014446A1/en
Publication of GB2493337A publication Critical patent/GB2493337A/en
Application granted granted Critical
Publication of GB2493337B publication Critical patent/GB2493337B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3209Temporary tunnels specially adapted against falling objects
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)

Abstract

A walkway 10, which is adapted to be readily dismantled, comprises a framework 12 and a plurality of substantially rigid panels 14, wherein the framework comprises a plurality of releasably connecting parts, which includes a plurality of substantially vertical stanchions 16, wherein the panels are positioned to at least one side of, or above, the intended thoroughfare of the walkway, and are releasably retained within the framework, and wherein the releasably connecting parts of the framework engage one another. Preferably, some of the panels are held in place between at least one securing member on one side and a backing member on the opposite side. The securing member and backing member are connected via a releasable holding member and wherein the securing member and the backing member clamp the panel securely in place. The releasable holding member is preferably a threaded member. The backing member may be a stanchion of the framework. Preferably the panels comprise fire resistant board.

Description

Improved Walkway
Field of the Invention
This invention relates to an improved walkway.
Bac1qround to the Invention Generally, existing walkways comprise scaffold framework structures, to which double layered plaster board is affixed.
A problem with existing walkways is that they take a considerable amount of time to construct because bolts need to be threaded through each part of the framework to secure the framework in place. Additionally, the wall panels arc bolted to the framework in order to secure them with the bolts passing through the panels. The resulting holes in the panels render them subsequently unusable once the walkway is dismantled because the fife resistance and structural integrity in compromised. Because of all of the bolts, such walkways are known to take a considerable amount of man-power and time to assemble, which increases the cost of the walkway. Due to time restrictions on when the walk can be carried out, for example on public transport facilities where only a small window during the night is available for assembly of walkways, works can be delayed, thereby leading to increased cost and public risk.
Furthermore, existing configurations have limited fire resistance which is generally less than two hours. This presents a significant safety issuc, especially considering that inflammable materials are often present on construction sites. Further consideration to the fire resistance must be given to structures located in subterranean locations, for example the London Underground network and the New York Subway.
Summary of the Invention
Accordingly, the present invention is directed to a walkway, which is adapted to be readily dismantled, comprising a framework and a plurality of substantially rigid panels, wherein the framework comprises a plurality of releasably connecting parts, including a plurality of substantially vertical stanchions, wherein the panels are positioned to at least one side of, or above, the intended thoroughfare of the walkway, and are releasably retained within the framework, and wherein the releasably connecting parts of the framework engage one another.
The releasably connecting parts can be slotted together, and/or engaged, such that they connect to one another and are readily releasable by un-slotting, or disengaging them.
This provides a walkway that can be readily dismantled in a relatively short time-period, thereby requiring fewer people to erect and dismantle the assembly. Additionally, unlike existing structures that damage the panels upon installation, the framework and panels are reusable and once disassembled can be moved to a new location and reassembled.
Therefore, the present invention provides very quickly assembled and disassembled protection for a thoroughfare that can be reused without compromising on structural safety and fire resistance.
Such an arrangement may take the form of a hoarding, protecting a pathway from a construction or maintenance site and adjacent thereto, providing an improved level of fire resistance and acoustic insulation. Additionally, the walkway may protect those passing within from falling debris and/or tools and equipment and reduce the level of dirt and dust that would otherwise be present.
Preferably, at least some of the panels are held in place between at least one securing member on one side and a backing member on the opposite side. By clamping the pancth, the structural strength and fire resistance is not compromised and the panels can be retained without being damaged.
Advantageously, the securing member and backing member are connected via a rccasahle holding member and the securing member and the backing member clamp the panel securely in place. By clamping the panel between the backing member and the securing member, the panel can be held securely in place without damaging the panel itself.
Therefore, all of the parts of the walkway could, if required, be used again without putting the structural integrity or fife resistance at risk. Thus, the walkway is more economical compared to existing structures that damage the panels upon installation.
It is preferable that the releasable holding member is a threaded member. The securing member and backing member can be held together using a threaded member, for example, a bolt. The threaded member can pass between adjacent panels, thereby not damaging them. Alternatively, the securing member and backing member may be connected by a retaining pin, allowing the assembly to be readily taken apart and simultaneously, providing a securing clamping of the panels.
In an advantageous construction, the backing member is a stanchion ofthe framework.
This reduces the number of parts required when constructing the walkway and reduces the time required for assembling the walkway.
Advantageously, the framework further comprises a plurality of cross-members arranged substantially perpendicular to the stanchions. The cross-members provide structural strength and rigidity to the walkway and allow for further parts to be connected to the framework.
Preferably, the walkway comprises at least one substantially vertical side, constituting a first wall, and at least one roofpanel. Such an arrangement may be placed alongside, and may be attached to, an existing wall to reduce cost and time in assembling the overall walkway. Additionally, the roof panels may provide a platform upon which person may stand and undertake work.
In one construction, the walkway comprises a second substantially vertical side, constituting a second wall, thereby creating a tunnel. A tunnel construction can provide fire resistance and insulation, including sound insulation, on three sides, thereby making the walkway more protected from any work taking place in the surrounding area.
Advantageously, a bottom rail is positioned substantially perpendicularly to the stanchions and adjacent to the intended lower end of the stanchions, and wherein the bottom rail comprises a lip and the panels are held in place between the lip of the bottom rail and the stanchion. The lip retains the panels in place and reduces the risk of them becoming dislodged from the framework. The lip also reduces the number of parts required to attach the panels to the framework.
In a preferred arrangement, the panels comprise a material such that they are fire resistant for at least two hours and, preferably, wherein the panels comprise fire resistant board.
By providing the framework with panels that are fire resistant for at least two hours increases the safety of the users of the walkway and allows for more rigorous regulations for fire safety on installations. The likelihood of a person surviving a fire where the panels can resist fire for more than two hours is increased where such an installation is used. Additionally, it may reduce the insurance costs required for the site surrounding the walkway. BS 476 part 22 and BS EN 1364-1 are regulations relating to fire safety that it is intended the present invention meets.
Advantageously, the panels comprise at least one material selected from a group comprising: mild steel; calcium silicate; aluminium polyethylene composite; and reinforced fibre cement formed between punched steel sheet composite. Panels constructed from at least one of the above materials can greatly increase the fire resistance and thereby reduce the risk to the workers on site and pedestrians using the walkway.
Kemwell impact boards, made by Kemwell Thermal Limited, a British company, may be used.
Preferably, the walkway is assembled so as to provide at least one conduit extending at least part of the length of the walkway. By providing a conduit along at least part of the length of the walkway, facilities such as electricity, temperature regulation and pipe-work can be run along at least part of the walkway. This allows for a more compact walkway and reduces the risk of cables and pipes becoming a tripping hazard. It is advantageous that at least some of the framework and/or the panels are adapted to engage one another and wherein the conduit is formed at the position where the panels engage. The resulting conduit maybe used for containing services, such as electricity, water and the 111cc.
It is preferable that at Least some of the parts of the framework, when engaged with one another, are provided with retaining means to reduce the risk of the parts becoming separated when the walkway is in use. Retaining pins, hooks or the like may be used to reduce the risk of unintentional disengagement of the parts of the framework.
In one particular embodiment, the walkway comprises an outwardly facing fire suppression system. The system may be facing away from the walkway on the external periphery. A fire suppression system, such as extinguishing means may incorporated in, or attached to, the walkway, which may be manually or automatically operated. In providing fire suppression means, the walkway is more protective and provides an increased level of safety. Additionally, or alternatively, where work is conducted that might lead to dust or fine particles being produced, a water-based dust control system may be provided to reduce the level of particles in the air. This reduces the risk of health problems, such as an asthma attack, due to the particles and also reduces the likelihood of the site operator having to compensate those adversely affected by the dust and/or particLes.
The invention extends to a method of assembling and disassembling the walkway disclosed herein.
Brief Deseri ytion of the Drawinzs An embodiment of the invention will now be described, by way of example only, and with reference to the accompanying drawings, in which: Figure 1 is an exploded perspective view of a walkway according to the present invention in the form of a tunnel; and Figure 2 is an exploded view of a hoarding according to the present invention.
Detailed Description of Exemplary Embodiments
Figure 1 shows a tunnel 10 comprising a framework 12 having panels 14 connected thereto. The framework 12 comprises a series of protrusions and corresponding recesses, so as to allow it to be readily assembled and dismantled without the need for bolts at every joint. The framework 12 has two columns of substantially vertical stanchions 16 each side of the intended covered area. Connected to the stanchions 16, in a substantially perpendicular manner, are a bottom rail I 8a, a middle rail 1 8b and a top rail lSc, all of which are substantially parallel to one another. Connected to the top of stanchions 16 are roof beams 20, which extend from one column of stanchions to the other, thereby spanning the intended covered area. The roof beams 20 are further provided with support members 22a and 22b, which run substantially parallel to the rails 18, to provide structural rigidity to the roof of the framework 12. The roof beams 22 further assist with extending the span of the walkway 10.
The stanehions 14 are provided with a series of recesses 24 in its sides that face neighbouring stanchions 14, adjacent its lower and upper ends and at its mid-point. The rails 18 are provided with a series of corresponding hook protrusions (not shown). The protrusions are positioned within the recesses 24 and the rails lowered in order to engage the hook portion within the stanchion 14. Gravity, and the subsequent addition of the panels 14, provides a resistance to the hook protrusions raising up and disengaging. The join can be readily released by un-hooking the cross rail 18 from the stanchion 14; thus, no bolts are required.
The stanchions 16 arc ftirthcr provided with foot portions 26 having a recess therein. The recess in the foot 26 may be used for securing the stanchion 14 to the ground.
The bottom rail I 8a and top rail 1 Sc are provided with lip portions extending towards one another and positioned on the edge of the rail closest to the intended inside of the tunnel, that is, away from the stanchions 16. The lip portions effectively creating a channel in which the panels 14 can rest. The height of the lip of the bottom rail 1 8a is 4mm or less.
The distance between the top rail 1 Sc and the bottom nil 1 8a is 5mm larger than the height of the panel 14 to be located therein. To install the substantially vertical panel 14, the panel 14 is positioned with its top edge against the vertical stanchion 16 and it is slid underneath the lip of the top rail I 8e. The panel is then pushed back so that it is fully against the stanchion 16, and then lowered to rest on the bottom rail iSa. Due to the difference between the height of the panel 14 and the distance between the rails ISa and 18c, a 5mm gap is introduced between the top rail 18c and the panel 14. It may be desirable to use this gap, constituting a conduit, to run a cable, thereby providing electricity or other facilities.
Wherc a plurality of panels 14 are aligned along the length of the tunnel 10, securing strips (not shown) may be used to secure the panels 14 firmly against the stanchions 16.
Clearly, the gap between the panel 14 and the top rail 18c can be varied if required, for example, so as to create a larger conduit thmugh which to pass facilities. Additionally, where the conduit is used for running services, a sealing strip (not shown) may be provided, advantageously connected to the securing strip, so as to shield the facilities fix,m exposure to the walkway area. The sealing strip is intended to abut the lip of the top rail 18c, thereby effectively closing the conduit and preventing access to the services from within the tunnel.
The roof section 1 4a of the tunnel 10 is sufficiently strong to allow work to be performed above the tunnel 10 by personnel standing on the framework 12 and/or the panels 14a.
Figure 2 shows a hoarding 50 comprising a framework 52 and panels 54. The framework compriscs a plurality of stanchions 56 having a foot portion 58, a mid-rail 60 and a top rail 62. A base rail 59 is provided adjacent the lower end of the stanchions 56 which so connects the adjacent stanehions 56. The mid rail 60 and top rail 62 connects the stanehions 56 at a mid-point and at the top respectively, providing structural strength and rigidity to the framework 52. Additionally, reinforcing members 64 are located by a first end at a position substantially half-way up each stanchion 56. The reinforcing members 64 extend away from the hoarding with the other end being connected to anchor rails 66 spaced from, and substantial ly parallel to, the bottom rail 59. An adjustable vertical post 68 is positioned on the top of each stanchion 56, which allows for the hoarding 50 to be extended vertically and allows for the application of further panels 54a.
The rails 60 and 62 are provided with substantially flat hook-shaped protrusions 70 and the stanchions 56 are provided with corresponding slots 72. The protrusions 70 are positioned within the slots 72 and lowered so that the hook of the protrusion 70 of the rails 60 and 62 engage the stanchions 56. Due to the weight of the rails 60 and 62, the protrusions 70 are retained within the stanchions until a user actively lifts the rails 60 and 62, thus enabling the hooked portion 70 to disengage from the slot 72 and the rails 60 and 62 to be withdrawn. The reinforcing members 64 are connected to both the stanchions 56 and the anchor rails 66 in a similar fashion using protrusions and corresponding slots.
The base board 59 is provided with a lip portion (not shown) and the top rail 62 is also provided with a lip portion 62a. The lip portion of the base board is shorter than that of the top rail 62a. The lip portions of the rails 59 and 62 are positioned adjacent the furthest edge from the anchor rail 66 and extend towards one another. The panels 54, which are slightly shorter than the distance between the top rail 62 and the base board 59, are positioned with their top edge between the lip portion of the top rail 62 and the stanchion 56. The panel 54 is then located with its rear face adjacent to the stanchion 56 and its side edge positioned fully against the stanchion 56. The panel 54 is then lowered so that its lower edge engages the lip of the base board 59. This introduced a short gap between the top rail 62 and the top edge of the panel 54, which may be used to house facilities.
Alternatively, the gap may be filled using a filler, such as a foam.
When the panels 54 are in the correct position against the framework 52, their edges are located at the positions of the stanchions 56. A steel securing, or joining, strip 74 is applied to the opposite side of the panels 54 to that on which the stanchions 56 are located. The securing strip 74 is then secured in place by attaching it to the stanchion 56 by means of bolts (not shown) and corresponding holes in the securing strips 74 and the stanchions 56. Adjacent panels 54 are positioned to have a gap between them so as to allow the bolt to pass between them without damaging the panels 54. The securing strip 74 covers any gap between the panels 54 and reduces the risk of the edges of the panels 54 being exposed. The panels 54 are thus clamped, or sandwiched, in place on the framework. Retaining means other than bolts may be used for aftaching the securing strips 70 to the stanchions 56.
The foot portions 55 of the stanchions 56 may be LLsed to secure the framework to the ground.
The joining strips 74 of the hoarding showa in Figure 2 can equally be used in the tunnel system of Figure 1 for retaining the panels on the framework.
Both the walkway and the hoarding constitute a modular system that can be extended by the addition of further modules according to the user's requirements.
Otherjoining mechanisms may be employed, such as sprung push button mechanisms wherein a pin or hook portion is displaced upon being pressed. Such mechanisms can allow for the parts of the framework to be readily assembled and unassembled.
The lip portion of the bottom rail, or board, may be omitted and the board held in place using a single lip on the top rail. Alternatively, the lip of the top rad may be omitted and the panels held in place using a bottom lip.
The panels may be provided with acoustic separation, insulation and/or protection in order to reduce the noise from the surrounding site. This may be particularly advantageous where the walkway leads to a retail outlet.
The walkway may be provided with heat insulation or heating apparatus for use in cold environments. Additionally, doors may be applied to at least part of the assembly to reduce air flow through the walkway and/or to shelter the users.
The walkway may be provided with security systems, CCTV, safety equipment and/or systems, air conditioning, mechanical and/or electrical systems as well as fire escape doors. The panels and framework may be relatively lightweight and reinforced, where necessary, to provide protection against mechanical damage and support for bearing weight of equipment and personnel. Additionally, materials may be varied according to the proposed use and, in addition to all of the parts being reusable, the walkway may comprise recyclable materials. The walkway is fire-rated and may be provided with additional fire resistance and fire suppression systems.
As an example, the walkway may be a tunnel spanning from 2400mm to 6000mm and may be weather proofed and fire rated. So as to meet the aforementioned test requirements, the tunnel may be fire resistant for at least one hour and may be fire resistant for over four hours.
Where materials have been specified, appropriate alternative materials may be used in their place.

Claims (1)

  1. <claim-text>Claims 1. A walkway, which is adapted to be readily dismantled, comprising a framework and a plurality of substantially rigid panels, wherein the framework comprises a plurality of releasably connecting parts, including a plurality of substantially vertical stanchions, wherein the panels are positioned to at least one side of, or above, the intended thoroughfare of the walkway, and are releasably retained within the framework, and wherein the releasably connecting parts of the framework engage one another.</claim-text> <claim-text>2. A walkway according to claim 1, wherein at least some of the panels are held in place between at least one securing member on one side and a backing member on the opposite side.</claim-text> <claim-text>3. A walkway according to claim 2, wherein the securing member and backing member are connected via a releasable holding member and wherein the securing member and the backing member clamp the panel securely in place.</claim-text> <claim-text>4. A walkway according to claim 3, wherein the releasable holding member is a threaded member.</claim-text> <claim-text>5. A walkway according to any one of claims 2 to 4, wherein the backing member is a stanchion of the framework.</claim-text> <claim-text>6. A walkway according to any preceding claim, wherein the framework further comprises a plurality of cross-members arranged substantially perpendicular to the stanchions.</claim-text> <claim-text>7. A walkway according to any preceding claim, wherein the walkway comprises at least one substantially vertical side, constituting a first wall, and at least one roof panel.</claim-text> <claim-text>8. A walkway according to claim 7, wherein the walkway comprises a second substantially vertical side, constituting a second wall, thereby creating a tunnel.</claim-text> <claim-text>9. A walkway according to any preceding claim, wherein a bottom rail comprising a lip and the panels are held in place between the lip of the bottom rail and the stanchion.</claim-text> <claim-text>10. A walkway according to any preceding claim, wherein the panels comprise a material such that they are fife resistant for at least two hours.</claim-text> <claim-text>11. A walkway according to any preceding claim, wherein the panels comprise fire resistant board.</claim-text> <claim-text>2. A walkway according to claim 10 or claim 11, wherein the panels comprise at least one material selected from a group comprising: mild steel; calcium silicate; aluminium polyethylene composite; and reinforced fibre cement formed between punched steel sheet composite.</claim-text> <claim-text>13. A walkway according to any preceding claim, wherein the walkway is assembled so as to provide at least one conduit extending at least part of the leagth of the walkway.</claim-text> <claim-text>14. A walkway according to claim 13, wherein at least some of the panels are adapted to engage one another and wherein the conduit is formed at the position where the panels engage.</claim-text> <claim-text>15. A walkway according to any preceding claim, wherein at least some of the parts of the framework, when engaged with one another, are provided with retaining means to reduce the risk of the parts becoming separated when the walkway is in use.</claim-text>
GB201112913A 2011-07-27 2011-07-27 Improved walkway Expired - Fee Related GB2493337B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB201112913A GB2493337B (en) 2011-07-27 2011-07-27 Improved walkway
PCT/GB2012/051781 WO2013014446A1 (en) 2011-07-27 2012-07-25 Improved walkway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB201112913A GB2493337B (en) 2011-07-27 2011-07-27 Improved walkway

Publications (3)

Publication Number Publication Date
GB201112913D0 GB201112913D0 (en) 2011-09-14
GB2493337A true GB2493337A (en) 2013-02-06
GB2493337B GB2493337B (en) 2014-10-08

Family

ID=44676252

Family Applications (1)

Application Number Title Priority Date Filing Date
GB201112913A Expired - Fee Related GB2493337B (en) 2011-07-27 2011-07-27 Improved walkway

Country Status (2)

Country Link
GB (1) GB2493337B (en)
WO (1) WO2013014446A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10739453B2 (en) 2016-02-17 2020-08-11 Elmos Semiconductor Aktiengesellschaft Ultrasonic measuring system, in particular for measuring distance and/or as a parking aid in vehicles

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100404A (en) * 2017-05-18 2017-08-29 大庆盈堃科技有限公司 Fire-proof and explosion-proof sump oil cesspool removable cover

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3416482A1 (en) * 1984-05-04 1985-11-07 Mader & Conrads oHG, 5190 Stolberg Covered footpath which can be dismantled
DE4201887A1 (en) * 1992-01-24 1992-05-27 Peter Dressler Building fence with pedestrian covering - comprises width-adjustable support frame with roof component width unalterable
DE20121225U1 (en) * 2001-05-04 2002-05-02 Niemeier, Andreas, 14193 Berlin Modular protection aisle with transparent elements
AU2005242208A1 (en) * 2005-12-12 2007-06-28 Modular Canopies Pty Ltd A modular covered walkway
AU2008100975A4 (en) * 2008-10-03 2008-11-13 Royal Wolf Trading Australia Pty Limited Hoardings
GB2453258A (en) * 2007-09-29 2009-04-01 Matthew Robinson Modular pedestrian tunnel
US20090226253A1 (en) * 2008-02-01 2009-09-10 Towell Dennis K Method and Apparatus for Providing a Walkway
EP2322741A1 (en) * 2009-11-16 2011-05-18 Big Astor S.r.l. Modular covering element preferably for protecting pedestrians

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4667579A (en) * 1985-10-03 1987-05-26 Daw, Incorporated Cleanroom structure
CA2292262C (en) * 1999-12-16 2003-07-15 The Fence People Limited Modular hoarding system
WO2008039803A2 (en) * 2006-09-25 2008-04-03 Vanelverdinghe Jeffry L Beam and truss structure for a canopy
JP2008291463A (en) * 2007-05-23 2008-12-04 Nikko Planning Kk Temporary enclosure board
KR100945461B1 (en) * 2007-11-26 2010-03-05 (주)신아이엔피 Soundproofing Walls
US20090133354A1 (en) * 2008-06-20 2009-05-28 Spear Douglas B Reusable and Recyclable Modular Wall System for a Construction Barrier

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3416482A1 (en) * 1984-05-04 1985-11-07 Mader & Conrads oHG, 5190 Stolberg Covered footpath which can be dismantled
DE4201887A1 (en) * 1992-01-24 1992-05-27 Peter Dressler Building fence with pedestrian covering - comprises width-adjustable support frame with roof component width unalterable
DE20121225U1 (en) * 2001-05-04 2002-05-02 Niemeier, Andreas, 14193 Berlin Modular protection aisle with transparent elements
AU2005242208A1 (en) * 2005-12-12 2007-06-28 Modular Canopies Pty Ltd A modular covered walkway
GB2453258A (en) * 2007-09-29 2009-04-01 Matthew Robinson Modular pedestrian tunnel
US20090226253A1 (en) * 2008-02-01 2009-09-10 Towell Dennis K Method and Apparatus for Providing a Walkway
AU2008100975A4 (en) * 2008-10-03 2008-11-13 Royal Wolf Trading Australia Pty Limited Hoardings
EP2322741A1 (en) * 2009-11-16 2011-05-18 Big Astor S.r.l. Modular covering element preferably for protecting pedestrians

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10739453B2 (en) 2016-02-17 2020-08-11 Elmos Semiconductor Aktiengesellschaft Ultrasonic measuring system, in particular for measuring distance and/or as a parking aid in vehicles

Also Published As

Publication number Publication date
WO2013014446A1 (en) 2013-01-31
GB201112913D0 (en) 2011-09-14
GB2493337B (en) 2014-10-08

Similar Documents

Publication Publication Date Title
US8793946B2 (en) Means for firestopping a curtain wall construction
US8714306B2 (en) Perimetric protection system for buildings undergoing construction
JP7397062B2 (en) Facade panel system and method for constructing multi-story structures and facades
WO2013122478A1 (en) Cantilever system
US20080028694A1 (en) Construction weather shield and shelter system
CN113015830A (en) Balcony system and method
NZ563830A (en) Safety barrier for spanning an opening in a building under construction to prevent workman from falling through
AU2006100471A4 (en) Guard Panel
GB2493337A (en) Framework walkway
EP1025320B1 (en) A fire-retardant roof construction
WO2023225689A2 (en) Methods and apparatuses for constructing high-rise buildings
WO2009044193A1 (en) Modular assembly
AU2017268495A1 (en) Scaffolding System
WO2009056883A1 (en) Improvements in and relating to construction
EP2453074A2 (en) Post and panel assembly and method, e.g. for glazed parapet
GB2311090A (en) Enclosure devise providing a protected walkway through scaffolding
JP4680078B2 (en) Temporary ceiling and method for constructing ceiling space using the same
KR200251745Y1 (en) Horizontal safety nets equipment
CA2734994C (en) Perimetric protection system for buildings undergoing construction
JP7265709B2 (en) Equipment frame structure and building equipped with this
GB2431192A (en) Safety apparatus
AU2016204379B2 (en) An electrically insulated screen and method of erecting an electrically insulated screen
AU2011100248B4 (en) Safety Barrier
GB2596635A (en) Improvement in or relating to barriers and barrier assemblies
KR20030001996A (en) Horizontal safety nets equipment

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 20190727