GB2483526A - Wellbore cap - Google Patents
Wellbore cap Download PDFInfo
- Publication number
- GB2483526A GB2483526A GB1102297.7A GB201102297A GB2483526A GB 2483526 A GB2483526 A GB 2483526A GB 201102297 A GB201102297 A GB 201102297A GB 2483526 A GB2483526 A GB 2483526A
- Authority
- GB
- United Kingdom
- Prior art keywords
- pipe
- pile
- objects
- accordance
- well head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000003129 oil well Substances 0.000 claims abstract description 16
- 238000000034 method Methods 0.000 claims abstract description 13
- 239000004568 cement Substances 0.000 claims abstract description 7
- 239000012528 membrane Substances 0.000 claims abstract description 5
- 238000010276 construction Methods 0.000 claims description 6
- 239000008187 granular material Substances 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 229910001385 heavy metal Inorganic materials 0.000 claims 1
- 239000011159 matrix material Substances 0.000 claims 1
- 239000000203 mixture Substances 0.000 abstract description 4
- 239000003921 oil Substances 0.000 description 28
- 239000010779 crude oil Substances 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000005553 drilling Methods 0.000 description 3
- 239000002184 metal Substances 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 150000002739 metals Chemical class 0.000 description 2
- 230000000750 progressive effect Effects 0.000 description 2
- 230000000284 resting effect Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 108020004566 Transfer RNA Proteins 0.000 description 1
- 102100029469 WD repeat and HMG-box DNA-binding protein 1 Human genes 0.000 description 1
- 101710097421 WD repeat and HMG-box DNA-binding protein 1 Proteins 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000001747 exhibiting effect Effects 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000005067 remediation Methods 0.000 description 1
- 150000003839 salts Chemical class 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/0122—Collecting oil or the like from a submerged leakage
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Earth Drilling (AREA)
Abstract
An apparatus and method for capping an oil well such as an underwater oil well comprising a pipe 18 extending from the vicinity of the oil well head 14 to the sea surface 20. Optionally, the pipe is equipped with a pump 24. A pile 32 of large objects 34 such as boulders is disposed around the lower end of the pipe. Preferably, smaller objects 38 are disposed around the larger objects forming a first canopy. Additional canopies of progressively smaller objects , 42, 48 are disposed about the first canopy, defining a pile which buries the lower end of the pipe. One or more of the canopies may include a cement mixture. An impermeable membrane 50 may be included within to the pile. The size and weight of the pile is sufficient to prevent oil leakage to the sea. The entire flow from the well head thus may be drawn through the pipe by an optional pump, or the well may be shut off by closing the pipe using valve 54.
Description
APPARATUS AND METHOD FOR CAPPING AN UNDERWATER OIL WELL
RELATIONSHIP TO OTHER APPLICATiONS AND PATENTS This application claims the benefit of US Provisional Patent Application, Serial No. 611344,352, filed July 6, 2010.
TECHNICAL FIELD
The present invention relates to underwater drilling of oil wells in fresh or salt water (referred to herein collectively as "sea"); more particularly, to methods for dealing generally with an oil well exhibiting uncontrolled flow into the sea; and most particularly, 1.5 to a method and apparatus for capping such a well to stop leakage into the sea whilst optionally continuing to produce crude oil from the well.
BACKGROUND OF THE INVENTION
In petroleum exploration and production, ft is well known to drill for oil in a sub-se environment. It is also known that during drilling or production, unanticipated pressure surges may occur at the well head, leading to an uncontrolled flow condition known in the art as a "blow-out" wherein flow control of the emerging crude oil is lost.
Such blow-outs are costly at least in terms of lost time and production; and when a blow-out continues for an extendS period of time or in very deep water, as has been seen recently in the BP blow-out incident in the Gulf of Mexico on April 20, 2010, the environmental and financial consequences can be catastrophic.
Typically, wells that are drilled on land or underwater are drilled through a generally cylindrical safety device mounted at the well head known as a blow-out preventer (BOP). A typical BOP includes a cDrnpressible collar that can be clamped about a drill stem to seal the well should a potential blow-out occur with the drill stem ir place, and further includes a plurality of redundant valves that can be closed to shut off a blow-out or other leakage from a producing or exhausted welt. However, in blow-out instances wherein no BOP was employed or wherein the BOP was inoperative, additional control is required, For land-based drilling operations, it is well known to seal a blown-out well with heavy equipment andlor explosives. For underwater blow-outs, these options are not generally available, especially in very deep water where all remediation must be conducted remotely, in darkness, and at greatly elevated pressures.
What is needed in the art is a simple method and apparatus to shut off uncontrolled flow of crude oil from an underwater oil well, preferably to allow continued production to the sea surface from the welt.
it is a principal abject of the present invention to stop the uncontrolled flow of is crude oil from an underwater oil well into the surrounding sea environment.
It is a further object of the invention to capture and recover crude oil continuing to flow from the well.
SUMMARY OF THE INVENTION
Briefly descilbed, in accordance with the present invention an apparatus and method for capping an underwater oil well comprises a pipe equipped with a pervious collection head extending from the vicinity of the oil well head to the sea surface.
Optionally, the pipe may be further equipped with a pump for lifting oil collected by the pervious collection head from the well head to a point of controllable discharge at the sea surface.
A pile of objects, which may be rocks or metals, orcombinations thereof, is disposed around the pervious coUection head and the lower end of the pipe. In a presently preferred embodiment1 a mix of smaller objects is disposed on and around larger objects1 forming a first canopy. Still a mix of smaller objects is disposed on and around the flrst canopy to form a second canopy. A plurality of additional canopies of progressively smaller objects, such as for example, smaller boulders, cobbles, pebbles, granules, and sand are disposed in substantially concentric layers about the second canopy, defining a graded pile. A mixture of cement that is seltable under water may be included in one or more of the successive canopy mixes. An impermeable membrane may be included within or on the outer surface of the graded pile. The size and weight * of the graded pile is sufficient to prevent leakage of oil to the sea. The entire flow from the well head thus may be drawn through the pipe by the optional pump, or the well may be 5hut in by closing one or mare valves in the flow path.
BRIEF DESCRIPTION OF THE DRAWINGS
The present invention will now be described, by way of example, with reference to the accompanying drawing, in which: FIG. I is an elevatlonal cross-sectional view (not to scale) of a presently preferred embodiment of an apparatus for capping an underwater oil well in accordance with the present invention.
The exemplification set äut herein illustrates one preferred embodiment.of the invention, in one form, and such exemplification is not to be construed as limiting the scope of the invention in any manner.
IJESCR1PTION OF THE PREFERRED EMBODIMENTS Referring to FIG. 1, an apparatus 10 in accordance with the present invention is shown resting on the sea floor 12 and surrounding the well head 14 of an oil well 16.
Apparatus 10 comprises a pipe 18 extending from the vicinity of welt head 14 at a first end to a point of controllable discharge, such as above the surface 20 of the sea 22, at *1' a second end. Oplionaily, a pump 24 is coupled to pipe 18 and shown at the upper pipe end 26 but may be installed anywhere in pipe 18 in accordance with the invention. A pervious collection head 28 may be connected to the lower pipe end 30 in proximity to well head 14. A pile 32 of objects surrounds well head 14, pervious collection head 28, and the lower portion of pipe 18. Preferably, pile 32 is graded in size with the largest objects 34 emplaced first to form a core pile 36, then smaller objects 38 emplaced in a first canopy 40 over and around pile 36, then still smaller objects 42 emplaced in a second canopy 44 over and around first canopy 40. A plurality of additional canopies, exemplified by a third canopy 46, may be emplaced sequentially in the same fashion, :o terminating in a canopy of finest objects 48. The number of canopies, the progressive gradation in size of the objects, and the relative size of the objects may be varied at wUl within the scope of the present inventiorn Optionally, one or more impermeable membranes 50 may be incorporated in pile 32, either on the outside as shown in FIG. 1, or internally between successive canopies.
In a presently preferred embodiment, at least some of objects 34,3842,48 are formed of rock, metals, or other suitable materials. Preferred sizes of progressive canopy objects are selected from the group consisting of boulders, cobbles, pebbles1 granules, and sand in accordance with the internation Wentworth scale of sizes. It will be seen that as additional canopies are formed, the newly-emplaced smaller objects will settle into some of the interstices of the previous canopy, thereby partially blocking oil flow and creating additional desirable pressure drops to inhibit oil flow radially through pile 32 and to help redirect the flow of oil upward through pipe 18 toward surface 20.
Optionally, wet concrete 52 may be included within pile 32 during construction thereof to fill interstices and further reduce the permeability of pile 32. Optionally, a choke valve 54 may be induded at an appropriate location along pipe 18 to eventuaily cut off the flow of oil upward through pipe 18, if so desired.
As succcssive canopies are added to form pile 32, th pile creates an increasing back pressure of oil in the immediate vicinity of well head 14 and pervious collection head 28. Preferably optional pump 24 is energized during constmction of pile 32 to remove at least a part of the oil flowing from well head 14, along with surrounding sea water, thereby reducing any tendency for oil to flow radially through or around pile 32 before construction of the pile is flnished. Preferably! the capacity of optional pump 24 and the size of pipe 18 are selected to be able to pump at the flow rate of oil flowing from well head 14.
The following description is believed to explain the basis for success of the present invention in capping an undersea oil well.
Pipe 18 is necessary for apparatus 10 to function successfully. Initially during construction, pipe 18 is placed near well head 14. Without anything further being done, oil will continue to spew uncontrolled from the well head to the surface 20; and some of the oil may rise by density difference to the surface through pipe 18. Placement of large objects 34, such as boulders, around well head 14 and pipe 18 begins to create some back pressure above the well head such that pipe 18 offers a path of lesser resistance for the oil to flow. Some oil will flow up pipe 18 but most of the oil will continue to flow around the large-size objects 34 during the initial stages of build of pile 32. As more canopies of smaller-sized objects are added on top of the larger objects, more back pressure is created around the well head and more of the oil will flow through the pipe as the path of less resistance, Eventually, as more and more objects of even smaller size are place or the pile 32, most of the oil will flow through pipe 18 because of the increased back pressure through pile 32 and1 if necessary, the operation of pump 24.
At that point, if pipe 18 were choked off(Le., dead-headed), the pressure inside pOe 32 will eventually equal the pressure at the well head and, unless pile 32 is made essentially impermeable, oil will again begin seeping out through pile 32 uncontrollably.
However, if pile 32 can be made impermeable, the pile by itself can stop the oil leakage without resort to optional pump 24. That is, pipe 18 may be dosed off entirely thereby sealing the well. Cement mixed with the objects, or a membrane of plastic or rubber of sufficient thickness, can help to make the pile monolithic and impermeable. If a cement is used, It can be added during application of subsequent layers of objects when the pipe 18 is capable of carrying a sufficient amount of the well head flow in the
S
pile. Until pile 32 is made impermeable, the vent pipe may need an optional choke valve 54. The valve may remain open during the early stages of object piling; then, as the pile bccomes less permeable wfth the additional of srna!!er objects and with setting of the cement, pipe 18 may be gradually choked off. If pile 32 can contain the full s pressure of well head 14, the pipe 18 may be choked off completely, thereby shutting off the flow of oil from the well in accordance with the primary object of the present invention. If some leakage remains through pile 32, valve 54 may be rn-opened and oil pumped to the surface so that no oil flows through pile 32. This may continue until the well itself is tapped down by the vent pipe to a head pressure that pile 32 can accommodate with pipe 18 closed1 until another well head can be installed into the existing well or until pile 32 can be made impermeable. Alternatively, the well may be placed into production through pipe 18, thereby reducing the well head pressure and forestalling further leakage through pile 32 into the sea.
Whether pile 32 has been made impermeable can be determined by a simple calculation based on measurable factors such as the oil pressure at the well head, the depth of the water, and the oil pressure at the top of the pipe.
A method in accordance with the present invention for capping an underwater oil well comprises the steps of: a) providing a pipe extending from the immediate vicinity of the well head to the surface; and b) forming a pile of objects resting on the sea floor and surrounding the lower end of the pipe, wherein the pile is graded in she and weight of the objects progressively outward from the well head, the largest of the objects being placed nearest the well head and the smallest of the objects being placed farthest from the well head.
The method may comprise the further step of shutting off oil flow through the pipe when the pile has been made impermeable enough to offset the oil pressure at the well head.
The method may also comprise the further step of passing oil through the pipe during and after completion of construction of the pile.
It is believed that by providing a thick impermiable layer at the top-side of the pile, a large surface area is provided to oppose the pumping pressures at the well head.
While the invention has been described by reference to various specific embodiments, it should be understood that numerous changes may be made within the S spirit and scope of the inventive concepts described. Accordingly, it is intended that the invention nol be limited to the described embodiments, but wilt have full scope defined by the language of the following claims.
Claims (15)
- CLAI1V1S Wh't is daimed is; 1. An apparatus for capping an oil well, comprising: a) a pipe extending from the immediate vicinity of a welt head to a point of controlled discharge, said pipe comprising a first end and a second end opposite said first end and proximate said point of controllable discharge: b) a pile of objects surrounding said first end of said pipe.
- 2. An apparatus in accordance with Claim 1 wherein at least some of said objects are selected from the group consisting of boulders and heavy metals.
- 3. An apparatus in accordance with Claim 1 further comprising a pervious collection head disposed in proximity to said well head and attached to said first end of said pipe.
- 4. An apparatus In accordance with Claim I further comprising a pump disposed in said pipe.
- 5. An apparatus in accordance with Claim 4 wherein said pump is disposed in said pipe proximate said point of discharge.
- 6. An apparatus in accordance with Claim. I further comprising a choke valve disposed in said pipe.
- 7. An apparatus in accordance with Claim I further comprising a membrane disposed in or on said pile.S
- 8. An apparatus in accordance with Claim I further comprising cement emplaced as a wet cement matrix during construction of said pile.
- 9. An apparatus in accordance with Claim I wherein said pile is graded in size and weight of said objects progressiv&y outward from said well head, the larger and heavier of said objects being generally placed nearer said weD head and the smaller and lighter of said objects being generally placed farther from said welt head.
- 10. An apparatus in accordance with Claim 9 wherein the size of said objects ranges in a series including boulders, cobbles, pebbles, granules, and sand.
- II, An apparatus in accordance with Claim I wherein the size of said pile is configured to offset the pressure difference between a pressure within said well head and a pressure immedIately outside said well head.
- 12. A method for capping an oil well, comprising The steps of: a) providing a pipe including a first end and a second end, said pipe extending from said first end in the Immediate vicinity of the well head to said second end disposed at a point of controllable discharge; and b) forming a pile of objects surrounding first end said pipe.
- 13. A method in accordance with Claim 12 wherein said pile is graded in size and weight of said objects progressively outward from said well head, the larger of said objects being placed nearer said well head and the smaller of said objects being placed farther from said well head.
- 14. A method in accordance with Claim 12 further comprising the step of shutting off oil flow through said pipe when said pile has been made large enough to offset the oil pressure at said well head.
- 15. A method in accordance with Claim 12 further comprising the step of passing oil through said pipe during and after construction of said pile.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US34435210P | 2010-07-06 | 2010-07-06 | |
US12/843,936 US8413729B2 (en) | 2010-07-06 | 2010-07-27 | Apparatus and method for capping an underwater oil well |
Publications (3)
Publication Number | Publication Date |
---|---|
GB201102297D0 GB201102297D0 (en) | 2011-03-23 |
GB2483526A true GB2483526A (en) | 2012-03-14 |
GB2483526B GB2483526B (en) | 2012-08-15 |
Family
ID=43836492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB1102297.7A Expired - Fee Related GB2483526B (en) | 2010-07-06 | 2011-02-09 | Apparatus and method for capping an underwater oil well |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB2483526B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2933032A1 (en) * | 1979-08-16 | 1981-02-26 | Edgar Rathsburg | Collecting and damming arrangement for sea-bed oil leak - includes preliminary collecting cone and truncated cone positioned later |
US4741395A (en) * | 1986-12-08 | 1988-05-03 | Reed Robert W | Vent-well system |
FR2676088A1 (en) * | 1991-04-30 | 1992-11-06 | Gilles Pierre | Method and device for controlling an oil well during blow-out |
-
2011
- 2011-02-09 GB GB1102297.7A patent/GB2483526B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2933032A1 (en) * | 1979-08-16 | 1981-02-26 | Edgar Rathsburg | Collecting and damming arrangement for sea-bed oil leak - includes preliminary collecting cone and truncated cone positioned later |
US4741395A (en) * | 1986-12-08 | 1988-05-03 | Reed Robert W | Vent-well system |
FR2676088A1 (en) * | 1991-04-30 | 1992-11-06 | Gilles Pierre | Method and device for controlling an oil well during blow-out |
Also Published As
Publication number | Publication date |
---|---|
GB201102297D0 (en) | 2011-03-23 |
GB2483526B (en) | 2012-08-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2161404B1 (en) | Underbalanced well drilling and production | |
US7314091B2 (en) | Cement-through, tubing retrievable safety valve | |
CN109736737B (en) | Method for snubbing tripping of reservoir gas drilling well | |
NO331536B1 (en) | Process for generating a regulating stream of wellbore fluids in a wellbore used in hydrocarbon production, and valve for use in an underground wellbore | |
US10260288B2 (en) | Pre-positioned capping device on high pressure wells | |
US7258508B2 (en) | Annular safety and flow control system for underground gas storage | |
US10113382B2 (en) | Enhanced hydrocarbon well blowout protection | |
US8413729B2 (en) | Apparatus and method for capping an underwater oil well | |
US20120024533A1 (en) | Apparatus for collecting oil escaped from an underwater blowout | |
US8490701B2 (en) | Methods of releasing at least one tubing string below a blow-out preventer | |
US7513309B2 (en) | Apparatus for connecting underwater tubular members | |
CN104763371A (en) | Fishable free falling tubing plug and use method thereof | |
US20120181040A1 (en) | Well-riser Repair Collar with Concrete Seal | |
CA2777334C (en) | Velocity strings | |
EP2881537B1 (en) | Hydraulic flushing system | |
US8430167B2 (en) | Arcuate control line encapsulation | |
GB2483526A (en) | Wellbore cap | |
GB2588029A (en) | Annular controlled safety valve system and method | |
AU2012249434B2 (en) | Annular pressure release sub | |
US9850729B2 (en) | Blow-out preventer, and oil spill recovery management system | |
CN204457583U (en) | The tubing plug that freely glides can be dragged for | |
US8534363B1 (en) | Methods and devices for restoring control and resuming production at an offshore oil well following an uncontrolled fluid release after an explosion | |
US20230220739A1 (en) | Rigless method to partially lift or retrieve wellbore tubing strings from platform and subsea wells | |
Goodman et al. | Pressure investigation accomplished with hydraulic snubbing and pressure control concentric tubular string | |
WO2014189697A1 (en) | Methods and devices for restoring control and resuming production at an offshore oil well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PCNP | Patent ceased through non-payment of renewal fee |
Effective date: 20220209 |