GB2454209A - Suspended ceilings - Google Patents

Suspended ceilings Download PDF

Info

Publication number
GB2454209A
GB2454209A GB0721382A GB0721382A GB2454209A GB 2454209 A GB2454209 A GB 2454209A GB 0721382 A GB0721382 A GB 0721382A GB 0721382 A GB0721382 A GB 0721382A GB 2454209 A GB2454209 A GB 2454209A
Authority
GB
United Kingdom
Prior art keywords
ceiling
bracket
plasterboard
bracket according
brackets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0721382A
Other versions
GB2454209B (en
GB0721382D0 (en
Inventor
John Anthony Maltby Stapleford
Julian Darren Kendrick
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OAKWOOD HOMES
Original Assignee
OAKWOOD HOMES
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OAKWOOD HOMES filed Critical OAKWOOD HOMES
Priority to GB0721382A priority Critical patent/GB2454209B/en
Publication of GB0721382D0 publication Critical patent/GB0721382D0/en
Priority to PCT/GB2008/003089 priority patent/WO2009056785A1/en
Publication of GB2454209A publication Critical patent/GB2454209A/en
Application granted granted Critical
Publication of GB2454209B publication Critical patent/GB2454209B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)
  • Building Environments (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

A bracket for use in suspended ceiling construction comprises a length of metal angle of L-shaped section with an end portion 5 of a rear face 3 folded over to overlie a folded-over end portion 4 of a side face 2 to bring punched apertures in the two end portions 4, 5 into alignment to form a continuous through-hole 6 through the overlapping end portions 4, 5 for securing the metal angle to the underside of a horizontal support surface for the suspended ceiling. The ceiling is attached to the bottom ends of the depending metal angles in conventional manner, but the bracket is more rigid and quicker and easier to fix in position than conventional ceiling support structures.

Description

TITLE
Suspended Ceilings
DESCRIPTION
Field of the Invention
The invention relates to a method for fitting suspended ceilings, and provides a novel bracket for use in such a method.
Background Art
Modern building methods often involve the use of solid concrete floors, either cast as a single slab across an entire room, for example supported on a corrugated or profiled metal support or laid in place as a pre-cast unit or array of pre-cast subunits. The pre-cast subunits may be pre-cast concrete beams laid side by side to create the entire concrete floor and then covered with a skim layer of mortar or levelling compound, or a thin bituminous layer. Above ground-floor level, however, every concrete floor also presents a rough and unfinished ceiling to the room below. To cover that rough underside of the floor above, it is usual to provide a suspended ceiling spaced slightly below :. the underside of that floor. Such ceilings may be tiled ceilings, in which :..::: 20 rectangular ceiling tiles rest on a lattice of metal angle rnouldings which ***.
provide edge support for individual tiles. In such tiled ceilings the metal angle mouldings are visible, around the edge of each ceiling tile, from the room below. Alternatively the ceilings may use plasterboard screwed to an array of parallel ceiling channels suspended from the floor above, and the plasterboard coated with a skim of gypsum-based plaster to give the smooth * appearance of a traditional plaster ceiling. Such ceilings are referred to herein as suspended plasterboard ceilings.
To fit a suspended plasterboard ceiling, first a laser level is used to draw or display a continuous horizontal line around the entire periphery of a room, about 80 to 100 mm below the solid concrete floor above. This results in a space between the solid concrete and what will eventually be the suspended plasterboard ceiling for services such as cabling, pipework and insulation etc. Edge channel members are then screwed to the walls along that horizontal line, around the complete periphery of the room. Soffit cleats are then secured to the rough underside of the floor above, in a regular array that is typically at 1200 mm spacings in mutually perpendicular directions. The fixings for the soffit cleats are typically drive-in expanding fasteners inserted into holes drilled into the underside of the floor above. If such a fastener is inserted into a drilled hole and then an expansion pin portion of the fastener hammered into a tapering bore in the fastener, the fastener expands within the drilled hole and creates a secure anchorage for the soffit cleat.
When the entire array of soffit cleats at regular 1200 mm intervals has been secured in position, either a flexible strap hanger or a rigid metal angle suspension member is cut to size and then bolted to the soffit cleat. All the flexible strap hangers or rigid metal angle suspension members are the same length so that when bolted to their soffit cleats they hang down to the same height, which is marginally above the height of the edge channel members.
:. An array of parallel primary channel members, of generally C-section, is then :..::: 20 secured to the bottom ends of the array of depending strap hangers or metal S...
angle suspension members, at precisely the height of the edge channels around the periphery of the room. Generally the primary channel members are secured to the flexible strap hangers or metal angle suspension members by large pan head self-tapping or self-drilling screws.
* Finally at mutual spacings of typically 400 or 450 mm, ceiling channel * members of top hat section are clipped perpendicularly across the primary channel members, and full sized sheets of ceiling plasterboard are screwed to the ceiling channel members using large headed self- tapping plasterboard screws. That creates a continuous plasterboard suspended ceiling which can be finished with a smooth or textured skim of ceiling plaster.
A major time-consuming element of the above method of creating a suspended plasterboard ceiling is involved in the securing of the soffit cleats to the underside of the floor above, followed by bolting the flexible strap hangers or metal angle suspension members to vertical depending flange portions of the soffit cleats. This is however a necessary part of the installation process, as the strap hangers or the metal angle suspension members are cut to length on site and cannot be secured to the underside of the floor above except by using pre-installed soffit cleats. There is therefore a need for a quick and reliable method of providing support for the primary channels across the length and width of the room, without the need to fasten in place the array of soffit cleats as a first step. To date, however, no commercial product exists to provide that support in the absence of the array of soffit cleats.
The Invention The invention provides a bracket for use in suspension ceiling construction, substantially as described in claim I herein.
:. The invention also provides a method for fitting a suspended ceiling using such a bracket, substantially as described in claim 7 herein.
It will be understood that the method corresponds closely to the prior art method described above except for the use of the brackets of the invention.
. : The brackets are pre-formed and require no on-site preparation except on * 25 occasions to be trimmed on-site to a shorter length. Such trimming can be by * hacksaw or by tin-snips. The pre-formed apertures may be punched, preferably before the bracket is cold-pressed or cold-rolled into its L-section.
The end portions are preferably bent over to overlie one another in a separate cold-pressing operation.
Because the brackets are pre-formed to a fixed design they can be tested and guaranteed to meet specific loading requirements, particularly when used in combination with an approved fixing for securing the brackets to the underside of the floor.
The bracket material is preferably steel, which may be of 0.6 to 0.9 mm thickness, preferably about 0.8 mm thickness. It may be galvanised, preferably electro-galvanised.
The brackets may be formed in a range of standard lengths such as 250 mm, 450 mm and 650 mm, for example.
DRAWl NGS Figure 1 is a perspective view of a bracket according to the invention, viewed from the rear and one side; Figure 2 is a side elevation of the bent-over end portions of the side and rear walls of the bracket of Figure 1; Figure 3 is an enlarged perspective view of the end portion of the bracket of Figure 1, but viewed from the front and one side; and Figure 4 is a vertical section through a suspended ceiling incorporating brackets as shown in Figures 1 to 3.
S * S
. : Figure 1 shows the complete bracket 1. It has a side wall 2 and a rear wall 3.
* 25 At its top end an end portion of the side wall 2 is folded perpendicularly to fill *.**.S * the angle between the two walls, and an end portion 5 of the rear waIl 3 is folded perpendicularly to overlie the end portion of the side wall 2. The end portion of the side wall 2 is obscured and therefore not visible in Figure 1 but is numbered 4 in Figures 2 and 3.
Apertures are pre-formed by punching in the end portions 4 and 5, and overlie one another to create a continuous through-hole 6 which is used as described below. When the bracket 1 is secured to the underside of a floor with a fastener through the hole 6 created by the aligned punched apertures, that establishes a rapid rigid connection between the bracket 1 and the floor which provides the support for the suspended ceiling, dramatically reducing the time needed to complete the installation as compared to the prior conventional use of soffit cleats, bolts and metal angle. Not only is the installation time dramatically reduced, also the rigidity of the bracket I is superior to that of the conventional soffit cleats and metal angle, since the overlapping of the end portions 4 and 5 of the side and rear faces 2 and 3 of the bracket creates a rigid and accurate connection to the underside of the floor.
Figure 4 illustrates the method of fitting a plasterboard suspended ceiling according to the invention. In Figure 4, 7 illustrates two opposite walls of an internal room of a building, and 8 illustrates a solid floor the underside of which is to be covered and concealed by the suspended ceiling.
First, using a laser guide, edge channels 9 are screwed to the walls 7 at a single level all around the periphery of the room, at the intended height of the :. suspended ceiling. Figure 4A shows the section of a typical edge channel 9.
:..::: 20 Next, brackets I according to the invention secured to the underside of the S...
floor 8 at regular spacings of 1200 mm in mutually perpendicular directions.
To fix the brackets 1 to the underside of the floor 8 holes are drilled at the desired centres and then a spread sleeve pin anchor is passed through the : aperture 6 in each bracket 1 and into the corresponding drilled hole, and * 25 locked in place by driving home the pin to spread the sleeve inside the drilled * hole. Other concrete fixings may of course be used, but spread sleeve pin anchors are rapid and efficient.
A row of primary channel members 10 is then placed, wall to wall, across each row of depending brackets 1 and secured to the brackets 1 using self-drilling or self-tapping screws 11. The brackets 1 can be trimmed to length if necessary, either before or after the primary channel members 10 are secured. Figure 4B shows the section of a typical primary channel member 10. Next, parallel rows of ceiling channel members 12 are clipped to the primary channel members 10 using proprietary clips, and plasterboard panels 13 are screwed to the ceiling channel members 12 using plasterboard self-tapping screws. Figure 4C shows the section of a typical ceiling channel member 12. Finally, a conventional plaster skim across the underside of the plasterboard panels 13 finishes the suspended ceiling. * * * .1* *I.. * * ***. *
****.. * S *
*S*. .S * S S. * * . S * S.
S
* S.... S *

Claims (8)

  1. CLAIMS: 1. A bracket for use in suspended ceiling construction, comprising a length of folded or cold-rolled metal angle of L-shaped section, having one side face and one rear face with an end portion of the side face having a pre-formed aperture therein being folded over perpendicularly to fill the angle between the rear and side faces, and a corresponding end portion of the rear face having a pre-formed aperture therein being folded over perpendicularly, closely to overlie the folded-over end portion of the side face, with the pre-formed apertures being aligned to form a continuous through-hole to receive the stem of a fastener for fastening the bracket to the underside of a horizontal support surface which is to provide the support for the suspended ceiling.
  2. 2. A bracket according to claim 1, wherein pre-formed apertures are punched apertures.
  3. 3. A bracket according to claim 1 or claim 2, wherein the bracket is made from cold-pressed or cold-rolled steel.
  4. 4. A bracket according to claim 3, wherein the steel is of thickness from 0.6 to 0.9 mm. * I S...
  5. 5. A bracket according to claim 4, wherein the steel is about 0.8 mm thick.
    I
    *..... * *
    6. A bracket according to any of claims 3 to 5, wherein the steel is electro-galvanised.
    * SS.SI * . 7. A method for fitting a plasterboard suspended ceiling, which comprises the steps: * securing to the wall of a room at finished ceiling height a horizontal edge channel around the periphery of the room; * securing to the underside of the floor above a regular array of brackets according to any of claims 1 to 6, the brackets being secured through their aligned apertures to the floor above; * attaching a row of parallel primary channels to the depending lower end portions of the brackets by self-tapping or self-drilling screws, with the primary channels being level at the same height as the edge channel; * clipping a row of parallel ceiling channels perpendicularly across the primary channels; * screwing plasterboard boards to the undersides of the ceiling channels; and * applying a finishing skim of ceiling plaster to the undersides of the plasterboard boards. * * * *** **** * 0 *.*
    ****** * * * ** **** * * S. S * SS * S. * *SS*SS
    S
    Amendments to the claims have been filed as follows Cl CLAIMS: 1. A bracket for use in suspended ceiling construction using plasterboard, comprising a length of folded or cold-rolled metal angle of L-shaped section, having one side face and one rear face with an end portion of the side face having a pre-formed aperture therein being folded over perpendicularly to fill the angle between the rear and side faces, and a corresponding end portion of the rear face having a pre-formed aperture therein being folded over perpendicularly, closely to overlie the folded-over end portion of the side face, with the pre-formed apertures being aligned to form a continuous through-hole to receive the stem of a fastener for fastening the bracket to the underside of a horizontal support surface which is to provide the support for the suspended ceiling.
    2. A bracket according to claim 1, wherein pre-formed apertures are punched apertures.
    3. A bracket according to claim I or claim 2, wherein the bracket is made from cold-pressed or cold-rolled steel.
    4. A bracket according to claim 3, wherein the steel is of thickness from 0.6 .... to0.9mm. * S. S... * S I...
    : 5. A bracket according to claim 4, wherein the steel is about 0.8 mm thick.
  6. 6. A bracket according to any of claims 3 to 5, wherein the steel is electro-galvanised. S..
  7. 7. A method for fitting a plasterboard suspended ceiling, which comprises the steps: * securing to the wall of a room at finished ceiling height a horizontal edge channel around the periphery of the room; lO * securing to the underside of the floor above a regular array of brackets according to any of claims 1 to 6, the brackets being secured through their aligned apertures to the floor above; * attaching a row of parallel primary channels to the depending lower end portions of the brackets by self-tapping or self-drilling screws, with the primary channels being level at the same height as the edge channel; * clipping a row of parallel ceiling channels perpendicularly across the primary channels; * screwing plasterboard boards to the undersides of the ceiling channels; and * applying a finishing skim of ceiling plaster to the undersides of the plasterboard boards. *...
    I *..
    I
    .. I.. * I
    S
  8. S.... * S S. S I. * S. *S.*. * *
GB0721382A 2007-10-31 2007-10-31 Suspended ceilings Expired - Fee Related GB2454209B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB0721382A GB2454209B (en) 2007-10-31 2007-10-31 Suspended ceilings
PCT/GB2008/003089 WO2009056785A1 (en) 2007-10-31 2008-09-12 Suspended ceilings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB0721382A GB2454209B (en) 2007-10-31 2007-10-31 Suspended ceilings

Publications (3)

Publication Number Publication Date
GB0721382D0 GB0721382D0 (en) 2007-12-12
GB2454209A true GB2454209A (en) 2009-05-06
GB2454209B GB2454209B (en) 2009-09-23

Family

ID=38834609

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0721382A Expired - Fee Related GB2454209B (en) 2007-10-31 2007-10-31 Suspended ceilings

Country Status (2)

Country Link
GB (1) GB2454209B (en)
WO (1) WO2009056785A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3495796A (en) * 1966-10-29 1970-02-17 Frueh Friedrich Hanger for suspended ceilings
FR2581407A1 (en) * 1985-05-03 1986-11-07 Lafarge Platres Device for hanging a member having a horizontal lower face
DE9001235U1 (en) * 1990-02-03 1990-12-20 Mertens, Klaus, 7852 Binzen, De
DE4430292A1 (en) * 1994-08-26 1996-02-29 Illbruck Gmbh Ceiling system or ceiling system
RU2178484C2 (en) * 2000-03-17 2002-01-20 Дорошевич Сергей Эдуардович Device for fastening suspended ceilings

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3049346A1 (en) * 1980-12-29 1982-07-29 Wilhelm Bögle KG, 7410 Reutlingen Suspended panelled under-ceiling support structure - has grouped hanger holes in U-rails with downward facing bent shank ends
DE3409992A1 (en) * 1983-05-02 1985-10-03 Kimmel, Georg, 4050 Mönchengladbach Device for suspending a false ceiling
AU635164B2 (en) * 1990-10-19 1993-03-11 Rondo Building Services Pty Limited A clip
DE19623956C1 (en) * 1996-06-15 1997-12-18 Rieth & Co Boom manufactured as a sheet metal part
ITTO20030342A1 (en) * 2003-05-09 2004-11-10 Legrand Spa SHELF UNIT FOR THE SUPPORT OF CABLE HOLDER SYSTEMS IN INDUSTRIAL DUCTS

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3495796A (en) * 1966-10-29 1970-02-17 Frueh Friedrich Hanger for suspended ceilings
FR2581407A1 (en) * 1985-05-03 1986-11-07 Lafarge Platres Device for hanging a member having a horizontal lower face
DE9001235U1 (en) * 1990-02-03 1990-12-20 Mertens, Klaus, 7852 Binzen, De
DE4430292A1 (en) * 1994-08-26 1996-02-29 Illbruck Gmbh Ceiling system or ceiling system
RU2178484C2 (en) * 2000-03-17 2002-01-20 Дорошевич Сергей Эдуардович Device for fastening suspended ceilings

Also Published As

Publication number Publication date
WO2009056785A1 (en) 2009-05-07
GB2454209B (en) 2009-09-23
GB0721382D0 (en) 2007-12-12

Similar Documents

Publication Publication Date Title
US9909312B2 (en) Free span ceiling grid system
US5848512A (en) Structural member for wall assembly
US7441382B2 (en) Clapboard siding installation clip and method of installing clapboard siding
US4567706A (en) Edge attachment clip for wall panels
US3948011A (en) Partition system for a building
US9091053B2 (en) Clip assembly for use with a suspended ceiling
AU2010300485B2 (en) Bracket useful with sloped suspended ceiling systems
US4541219A (en) Clip for attaching sheets of wall material to columns and other structural members
US9528281B1 (en) System and method for installation of decorative molding
AU2011250600B2 (en) Evolving building structures improvements
US6634148B2 (en) Insulated poured wall system
US20210164234A1 (en) Clip for cast stone wall system
KR101406097B1 (en) Indoor molding to be installed to finish as finishing materials the indoor of architecture and installation method of indoor molding
RU89552U1 (en) KLAMMER AND THE CARRIER FOR ITS FASTENING
US9103108B2 (en) Drywall backing connector for steel studs
GB2454209A (en) Suspended ceilings
WO2009059392A1 (en) Apparatus and method for installing cladding to structures
RU2771308C2 (en) Suspension system
RU67134U1 (en) DEVICE FOR FASTENING FRONT PLATES
CZ2001800A3 (en) Attaching section member for a ceiling cladding
WO2010089590A1 (en) Door frame assembly and method of installation of doors
WO2014075147A1 (en) Concealed panel connections
AU2012201796B2 (en) Improved Corner Member
JPH02217561A (en) Mounting construction of plate-like building materials in building
JP7368574B1 (en) ceiling structure

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 20111031