GB2446497A - Subsea intervention with compliant guide - Google Patents

Subsea intervention with compliant guide Download PDF

Info

Publication number
GB2446497A
GB2446497A GB0801718A GB0801718A GB2446497A GB 2446497 A GB2446497 A GB 2446497A GB 0801718 A GB0801718 A GB 0801718A GB 0801718 A GB0801718 A GB 0801718A GB 2446497 A GB2446497 A GB 2446497A
Authority
GB
United Kingdom
Prior art keywords
intervention
compliant guide
subsea
conveyance
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0801718A
Other versions
GB2446497B (en
GB0801718D0 (en
Inventor
Eric Smedstad
Yves Le Moign
Andrea Sbordone
Rene Schuurman
Pascal Panetta
Axel Destremau
Alan Johnston
Lars Mangal
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gemalto Terminals Ltd
Schlumberger Holdings Ltd
Original Assignee
Gemalto Terminals Ltd
Schlumberger Holdings Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gemalto Terminals Ltd, Schlumberger Holdings Ltd filed Critical Gemalto Terminals Ltd
Publication of GB0801718D0 publication Critical patent/GB0801718D0/en
Publication of GB2446497A publication Critical patent/GB2446497A/en
Application granted granted Critical
Publication of GB2446497B publication Critical patent/GB2446497B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • E21B17/015Non-vertical risers, e.g. articulated or catenary-type
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0007Equipment or details not covered by groups E21B15/00 - E21B40/00 for underwater installations

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

An intervention system 20 comprises a spoolable compliant guide 22 coupled between a subsea well installation 24 on the seabed 30 and a surface vessel 26. Guide 22 is arranged in curvilinear shapes to facilitate the passage of intervention tools 32 by means of cable type conveyance 34 such as wireline. The flexibility of the guide allows the shape configuration to be adjusted so that bends or deviations which may interfere with the gravity induced passage of tool string 32 by moving the vessel in an appropriate direction 36 and 38. Figure 1 shows the installation of a subsea well 44 with a dynamic seal 46 (to prevent incursion of fluids into an interior 48 of the guide), a lubricator 52, a blowout preventer 56 and an emergency disconnect device 64. Other devices such as flotation devices 82, bend restrictors 84, return hoses 86 may also be with the compliant guide 22.

Description

SUBSEA INTERVENTION WITH COMPLIANT GUIDE
BACKGROUND
The retrieval of desired fluids, such as hydrocarbon based fluids, is pursued in subsea environments. Production and transfer of fluids from subsea wells relies on subsea installations, subsea flow lines and other equipment. Additionally, preparation and servicing of the subsea well relies on the ability to conduct subsea intervention Subsea intervention work involves numerous challenges not normally faced when working on land wells or offshore platforms. In most cases, intervention in subsea wells is performed from a floating platform or ship by extending the borehole to a surface location by a tensioned riser. However, the cost of platforms is high and the availability of vessels capable of adequately performing intervention work is limited.
A variety of existing techniques are currently used for intervention work. In shallow waters, for example, subsea intervention work can be performed with a specially equipped vessel having subsea lubricators, subsea pressure control equipment, and wave motion compensating systems. In most cases, guide wires extending from a welihead all the way to the vessel combined with the aid of professional divers is required. Additionally, this approach requires that equipment is conveyed and guided from the vessel to the subsea installation through open waters.
Once the subsea lubricator is connected to the subsea installation and the tools are inside, the conveyance cable remains exposed to open waters. Because existing non-rig intervention capability is limited to shallow water wireline and slick line operations, most intervention on subsea wells is currently performed with expensive and scarce heavy drilling units.
SUMMARY
In general, the present invention provides a technique for subsea intervention operations. An intervention vessel is coupled with a subsea well system via a compliant guide. The structure and arrangement of the compliant guide enables passage of a variety of intervention tools and a variety of conveyance mechanisms to facilitate performance of intervention operations. The intervention operations can be performed on, for example, a subsea well or a subsea flowline.
BRIEF DESCRIPTION OF THE DRAWINGS
Certain embodiments of the invention will hereafter be described with reference to the accompanying drawings, wherein like reference numerals denote like elements, and: Figure 1 is a schematic front elevation view of a subsea intervention system, according to an embodiment of the present invention; and Figure 2 is a schematic front elevation view of another configuration of the subsea intervention system, according to an alternate embodiment of the present invention.
DETAILED DESCRIPTION
In the following description, numerous details are set forth to provide an understanding of the present invention. However, it will be understood by those of ordinary skill in the art that the present invention may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible.
The present invention generally relates to a technique for intervening in subsea installations, such as subsea wells or subsea flowlines. The technique enables intervention tools to be conveyed via different methods of conveyance through a compliant guide, such as a spoolable compliant guide, that is coupled between the subsea installation and a vessel on the sea surface. The technique also enables the use of a variety of conveyances in non-rig deep water interventions.
Intervention tools are conveyed from the surface vessel and through the compliant guide to an entry point of the subsea installation which may be located on the seabed. For tools or completion components having a larger outside diameter, a subsea lubricator can be used for deployment. A dynamic seal is positioned to prevent well fluids from entering the compliant guide, thus reducing concerns related to incursion of hydrocarbons into the compliant guide. The technique and utilization of the compliant guide enables subsea intervention in a variety of different scenarios, with a variety of different intervention tools, and with a variety of interchangeable conveyance systems.
The compliant guide is arranged to accommodate flexible conveyance systems of the type that are generally unsuitable for transmitting a pushing force, e.g. a cable-type conveyance system. This enables the use of cable-type conveyance systems, e.g. wireline or slickline conveyance systems, in deep water intervention operations. The compliint guide is flexible and can undergo dynamic and temporaiy (or long-term) changes in shape to facilitate tool string passage when the tool string is coupled to a flexible conveyance system.
The ability to use different conveyances or to interchange conveyances during a given operation greatly enhances the adaptability of the present system to a variety of intervention environments and operations. When starting an intervention job, the execution of certain operations depends on the real state of the subsea installation determined once access is gained to the installation. During the planning stage of the intervention, an intervention team considers all possible scenarios and defines contingency plans to handle unexpected conditions. The present compliant guide intervention technique provides the intervention team with great flexibility in conveying a variety of intervention tools with a variety of conveyances to the subsea installation.
By way of example, a conventional seabed "carousel system" would require that all intervention tools for the carousel be identified and loaded into the system before the system is lowered to the bottom of the sea. The present technique, however, provides a relatively simple way of conveying tools, thereby enabling the changing of intervention tools at the surface and the conveyance of those tools through the compliant guide to the subsea installation. This provides intervention operations that axe faster and more efficient while reducing the risks involved with subsea connections and disconnections. Additionally, the ability to change conveyances also can greatly increase the efficiency of the overall intervention operation. For example, if after gaining access to the subsea well and attempting an intervention operation with one type of conveyance, the intervention team may determine the operation would be more successful with another type of conveyance.
In this scenario, the present technique allows the conveyance to simply be changed and used with the same compliant guide rather than requiring changing out all of the equipment involved. The use of a single system for different conveyances also reduces deck space requirements for the surface vessel.
Coupling a compliant guide between the subsea installation and the surface vessel also eliminates the need for motion compensation systems often otherwise required to compensate for the relative movement of the surface vessel with respect to the subsea installation. This again simplifies the operating procedures and further reduces the deck space requirements of the surface intervention vessel.
The use of an enclosed compliant guide also enables faster run-in of intervention tools. The operator can run the intervention tools to the subsea installation at higher speeds without having to worry about the actual path followed by the tool string and the conveyance and without having to deploy remotely operated vehicles to guide the tool string into a lubricator of the subsea installation.
Furthermore, placement of a dynamic seal at the bottom of the compliant guide reduces the risk of environmental contamination. In the event a small leak passes through the dynamic seal, the fluid is contained and isolated within the compliant guide. Additionally, the enclosed compliant guide allows control over the pressure within the guide through the use of surface pressure control equipment so as to reduce the pressure differential across the dynamic seal. This enables the construction of a simpler dynamic seal.
The compliant guide system also lowers the risk of pollution because the operator does not need to disconnect for each tool change out. Furthermore, the compliant guide is capable of resolving the problem of subsea grease injection as the use of the compliant guide under pressure allows an operator to benefit from a low pressure differential and thus work with a much simpler seal below the surface. On-surface grease injection can be utilized to seal in high pressure differential applications.
Referring generally to Figure 1, an intervention system 20 is illustrated according to an embodiment of the present invention. In this embodiment, system 20 comprises a compliant guide 22 which may be a spoolable compliant guide.
Compliant guide 22 is coupled between a subsea installation 24 and a surface vessel 26, such as an intervention vessel located at a surface 28 of the sea. Subsea installation 24 may be located on or at a seabed floor 30.
Compliant guide 22 is flexible and may be arranged in a variety of curvilinear shapes extending between intervention vessel 26 and subsea installation 24. For example, compliant guide 22 may be arranged generally in a serpentine or S-shape that curves along radii selected to facilitate the passage of intervention tools and conveyances. Compliant guide 22 also may be constructed as a tubular member formed from a variety of materials that are sufficiently flexible, including metal materials of appropriate cross-section and composite materials.
Once compliant guide 22 is coupled between subsea installation 24 and intervention vessel 26, intervention tools 32 may be conveyed from intervention vessel 6 down through compliant guide 22 and subsea installation 24 via a conveyance 34. The compliant guide 22 also provides the path along which the intervention tool or tools 32 can be retrieved to the surface. For example, an intervention tool or tool string 32 can be delivered to the subsea installation and upon completion of a specific intervention operation, the tool 32 can be retrieved to the surface and interchanged with another intervention tool or tool string. This process is readily repeated as many times as necessary to complete the entire intervention operation.
Conveyance 34 may be a flexible, cable-type conveyance, such as a wireline or slickline. However conveyance 34 also may comprise stiffer mechanisms including coiled tubing and coil rod. When a cable-type conveyance 34 is used to convey intervention tool string 32, compliant guide 22 is arranged to facilitate passage of the intervention tool string 32 without requiring a pushing force. In other words, the curvilinear configuration of compliant guide 22 is readily adjustable via, for example, locating intervention vessel 26 so as to avoid bends or deviated sections that could interfere with the gravity induced passage of intervention tools 32. The flexibility of compliant guide 22 enables its configuration to be adjusted, if necessary, simply by moving intervention vessel 26 in an appropriate direction, e.g. a direction as indicated by one of the arrows 36 or 38. Dynamic changes can temporarily be made to compliant guide 22 to change the shape of the compliant guide for facilitating the passage of a tool string. In some applications, a tractor 40 also can be used to pull the conveyance through compliant guide 22. The tractor 40 can be included in tool string 32.
Although a variety of subsea installations 24 can be utilized depending on the particular environment and type of intervention operation, one example is illustrated in Figure 1. In this example, the subsea installation 24 comprises a subsea wellhead 42, sometimes referred to as a Christmas tree, coupled to a subsea well 44.
Additionally, a subsea dynamic seal 46 is positioned generally at the bottom of compliant guide 22 to help block incursion of well fluids into an interior 48 of the compliant guide. It should be noted that the interior 48 can be filled with a fluid 50 which can be used, for example, to regulate the pressure differential acting on dynamic seal 46. Also, dynamic seal 46 can be mounted as a retrievable seal or a stationary seal that selectively opens for passage of the tool string and selectively closes on conveyance 34 to provide the desired seal.
In the embodiment illustrated, dynamic seal 46 is generally positioned at the top end of a subsea lubricator 52 of subsea installation 24. In some applications, a lower portion of compliant guide 22 also can be utilized as part of the lubricator to enable the use of much longer tool strings and/or a reduction in length of subsea lubricator 52. By way of example, the dynamic seal 46 can be attached at the lower end of compliant guide 22, or it can be mounted at the top of the subsea lubricator 52.
In some embodiments having the dynamic seal combined with a closed environment of the compliant guide 22 reduces or eliminates the need for a subsea grease injection system when using a flexible conveyance 34, e.g. an electric line or braided line conveyance. It also should be noted that subsea lubricator 52 can be used to deploy tools that have a relatively large outside diameter.
Subsea installation 24 also may comprise a variety of additional components.
As illustrated, subsea installation 24 comprises a lubricating valve 54 that may be deployed directly above subsea welihead 42. Lubricating valve 54 can be used to close the borehole of subsea well 44 during certain intervention operations, such as tools change outs. A blowout preventor 56 may be positioned above lubricating valve 54 and may comprise one or more cut-and-seal rams 58 able to cut through the interior of the subsea installation and seal off the subsea installation during an emergency disconnect. The subsea installation 24 also may comprise a second blowout preventor 60 positioned above blowout preventor 56 and comprising one or more sealing rams 62 able to seal against the conveyance 34. Additionally, an emergency disconnect device 64 may be located at a suitable location above blowout prevent or 60. Emergency disconnect device 64 can be used when the operator desires to perform an emergency disconnection at the subsea installation 24.
The compliant guide 22 also can be used in cooperation with a variety of components that facilitate intervention operations. Some of these components facilitate the conveyance and retrieval of intervention tools 32 from, for example, deep water locations with a variety of conveyances, including cable-type mechanisms.
Other components improve the longevity of the system or aid in carrying out emergency procedures.
For example, a dynamic seal 66 can be positioned at or above an upper end 68 of compliant guide 22. Dynamic seal 66 enables the selective pressurization of fluid disposed in interior 48 of compliant guide 22. As described above, the ability to pressurize fluid 50 enables, for example, control over differential pressures exerted on subseadynamic seal 46, thereby improving the life of the seal and/or lowering the
required functional specifications for the seal.
An emergency disconnection device 70 also can be disposed at upper end 68 of compliant guide 22. The emergency disconnection device 70 comprises cut and seal capabilities to enable disconnection from the compliant guide 22 while providing positive pressure sealing at the upper end of the compliant guide. In this embodiment, the emergency disconnection device 70 comprises a buoyant member 72. A buoyant member 72 maintains upper end 68 of compliant guide 22 suspended in the water for later retrieval by intervention vessel 26 once the emergency disconnection situation is over and intervention operations can resume.
One or more swivel connections also can be formed along compliant guide 22.
For some applications, the swivel connections can be used to reduce or eliminate torque applied by compliant guide 22 to the subsea installation 24. Additionally, the one or more swivel connections extend the operating envelope for intervention vessel 26. For example, the ability of compliant guide 22 to swivel enables intervention vessel 26 to adjust the configuration of compliant guide 22 and/or to orient itself in a desired direction. The intervention vessel can be turned to orient itself with its bow against the wind, waves and currents and to deploy the serpentine, i.e. S-shaped, compliant guide 22 in any direction with respect to subsea installation 24. The desired orientation of the compliant guide may change from one intervention operation to another or during a given intervention operation depending parameters, such as current, subsea obstacles, surface obstacles and other environmental factors.
By way of example, a swivel 74 can be located proximate a bottom end 76 of compliant guide 22, and a swivel 78 can be positioned proximate upper end 68 of compliant guide 22. One alternative configuration is to locate a single swivel 80 generally in a middle region of compliant guide 22.
In one embodiment, compliant guide 22 is arranged to facilitate conveyance of intervention tools 32 with cable-type conveyances 34 by connecting upper end 68 to intervention vessel 26 and suspending a relatively long section of the compliant guide below the intervention vessel. Closer to the bottom end 76 of compliant guide 22, a flotation device 82 is attached to the compliant guide to provide an upward, buoyant force. This maintains compliant guide 22 in a generally serpentine or S-shaped configuration conducive to the passage of intervention tools 32 to a deep water location or other subsea installation location. The flotation device or devices 82 maybeclamped or otherwise fastened to the compliant guide to maintain the curvature of the compliant guide within a desired range without creating any bends having radii shorter than desired for suitable passage of intervention tools 32. The flotation device or devices 82 can be designed as bending stiffeners to further maintain a desired curvature through at least a section of compliant guide 22. One or more bend restrictors 84 also can be combined with compliant guide 22 to help prevent undue bending of the compliant guide. For example, a bend restrictor 84 can be installed on the vessel side of compliant guide 22 proximate, for example, upper end 68. In configurations such as those illustrated, the compliant guide 22 can be utilized in a variety of environments without requiring tethers.
For some intervention operations, a return hose 86 (shown in dashed lines) can be used to enable procedures that benefit from movement of fluids. For example, return hose 86 can be used to circulate fluids through compliant guide 22, to flush the compliant guide, to pump tools up or down within the compliant guide, and for other fluid based procedures. In many of these applications, the return hose 86 is connected between the Christmas tree 42 and appropriate fluid tanks and/or manifolds on the intervention vessel 26.
In the embodiment illustrated in Figure 1, compliant guide 22 is used to facilitate intervention operations in a subsea well. However, system 20 can comprise a variety of other components and can be used in a variety of other intervention operations, e.g. an intervention operation in a subsea flowline as illustrated in Figure 2. In this latter embodiment, subsea installation 24 comprises a subsea flowline head 88 instead of the subsea wellhead 42. Subsea flowline head 88 is coupled to an appropriate subsea flowline 90. Depending on the environment and the specific intervention operations, a variety of other components can be incorporated into the subsea installation 24 and or used with compliant guide 22. For example, flotation devices 82, bend restrictors 84, return hoses 86, and other components can be used with compliant guide 22, as described above. Additionally, a variety of other components can be used with subsea installation 24, as illustrated in Figure 2 and as described above with reference to Figure 1.
Intervention system 20 and compliant guide 22 can be adapted to a variety of intervention operations and environments. In each of these cases, the system enables a more efficient overall operation and adaptation to changing parameters. The intervention system 20 enables the interchangeability of a variety of intervention tools and mtervention conveyances. Additionally, the system facilitates the use of cable-type conveyances and other flexible conveyances for conveying intervention tools to a variety of locations, including deep water locations. The configuration of the compliant guide also can be adjusted during or between intervention operations.
Accordingly, although only a few embodiments of the present invention have been described in detail above, those of ordinary skill in the art will readily appreciate that many modifications are possible without materially departing from the teachings of this invention. Accordingly, such modifications are intended to be included within the scope of this invention as defined in the claims.

Claims (29)

  1. I. A method for subsea intervention, comprising: coupling an intervention vessel and a subsea well system with a compliant guide; conveying intervention tools through the compliant guide with a cabletype conveyance; and utilizing the intervention tools to perform an intervention operation.
  2. 2. The method of claim 1, wherein utilizing comprises utilizing the intervention tools to perform an intervention operation in a subsea well.
  3. 3. The method of claim 1, wherein utilizing comprises utilizing the intervention tools to perform an intervention operation in a subsea flowline.
  4. 4. The method of claim 1, further comprising deploying a fluid into an interior of the compliant guide; and maintaining the fluid separate from well fluids.
  5. 5. The method of claim 4, further comprising applying pressure to the fluid.
  6. 6. The method of claim 1, further comprising changing the cable-type conveyance to another type of conveyance for movement through the compliant guide.
  7. 7. The method of claim 6, wherein changing comprises changing the cable-type conveyance to a coiled tubing conveyance.
  8. 8. The method of claim 6, wherein changing comprises changing the cable-type conveyance to a coiled rod conveyance.
  9. 9. The method of claim I, further comprising arranging the complaint guide in a generally S-shaped pattern.
  10. 10. The method of claim 1, further comprising temporarily moving the intervention vessel to change the configuration of the compliant guide for facilitating passage of intervention tools.
  11. 11. The method of claim 1, further comprising performing grease injection operations on the surface.
  12. 12. A method for subsea intervention, comprising: coupling an intervention vessel and a subsea well system with a spoolable compliant guide extending untethered between the intervention vessel and the subsea well system; isolating an interior of the spoolable compliant guide from well fluids; and arranging the spoolable compliant guide to accommodate passage of a plurality of conveyance types.
  13. 13. The method of claim 12, wherein arranging comprises accommodating passage of cable-type conveyances, coiled tubing, or coiled rod.
  14. 14. The method of clam, 12, further comprising filling the spoolable compliant guide with a fluid separated from well fluids.
  15. 15. The method of claim 12, further comprising enabling swiveling of the spoolable compliant guide.
  16. 16. The method of claim 12, further comprising temporarily moving the intervention vessel to change the configuration of the compliant guide for facilitating passage of an intervention tool.
  17. 17. The method of claim 12, further comprising connecting a lower end of the spoolable compliant guide to a subsea lubricator.
  18. 18. A system, comprising: a deep water subsea well system;
    -II-
    a compliant guide coupled to the deep water subsea well system, the compliant guide being arranged to accommodate passage of a variety of intervention tools and conveyance systems; and a seal positioned to limit incursion of well fluid into the compliant guide.
  19. 19. The system of claim 18, wherein the deep water subsea well system comprises a subsea lubricator and a blowout preventer.
  20. 20. The system of claim 18, wherein the deep water subsea well system comprises a disconnect device to enable an emergency disconnect.
  21. 21. The system of claim 18, further comprising a swivel connection positioned to enable swiveling of the compliant guide.
  22. 22. The system of claim 18, further comprising a buoyancy device positioned to facilitate placement of the compliant guide into a desired configuration.
  23. 23. The system of claim 18, further comprising a bend restrictor coupled to the compliant guide.
  24. 24. The system of claim 18, wherein the compliant guide is coupled to an intervention vessel located at the surface.
  25. 25. The system of claim 18, further comprising a conveyance system and an intervention tool coupled to the conveyance system for movement through the compliant guide.
  26. 26. The system of claim 24, further comprising a return hose coupled between the intervention vessel and the deep water subsea well system.
  27. 27. A method for subsea intervention, comprising: locating a subsea well system in deep water; coupling a compliant guide between an intervention vessel and the subsea well system; and passing an intervention tool through the compliant guide via a conveyance system of the type unable to transmit a pushing force.
  28. 28. The method of claim 27, wherein locating the subsea well system comprises engaging the subsea well system with a subsea well.
  29. 29. The method of claim 27, wherein locating the subsea well system comprises engaging the subsea well system with a subsea flowline.
GB0801718A 2007-02-07 2008-01-31 Subsea intervention with compliant guide Active GB2446497B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/672,194 US20080185153A1 (en) 2007-02-07 2007-02-07 Subsea intervention with compliant guide

Publications (3)

Publication Number Publication Date
GB0801718D0 GB0801718D0 (en) 2008-03-05
GB2446497A true GB2446497A (en) 2008-08-13
GB2446497B GB2446497B (en) 2010-08-04

Family

ID=39186602

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0801718A Active GB2446497B (en) 2007-02-07 2008-01-31 Subsea intervention with compliant guide

Country Status (5)

Country Link
US (1) US20080185153A1 (en)
BR (1) BRPI0800766A (en)
GB (1) GB2446497B (en)
MX (1) MX2008001698A (en)
NO (1) NO20080651L (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100236786A1 (en) * 2007-03-26 2010-09-23 Andrea Sbordone System and method for performing intervention operations with a subsea y-tool
GB2456772A (en) * 2008-01-22 2009-07-29 Schlumberger Holdings Deployment of a dynamic seal in an intervention procedure
US7798232B2 (en) * 2008-01-25 2010-09-21 Schlumberger Technology Corporation Connecting compliant tubular members at subsea locations
GB2474211B (en) * 2008-08-13 2012-05-02 Schlumberger Holdings Umbilical management system and method for subsea well intervention
BRPI0917254A2 (en) 2008-08-13 2015-11-10 Prad Res & Dev Ltd Method to Remove a Buffer, System, and Appliance
US8316947B2 (en) * 2008-08-14 2012-11-27 Schlumberger Technology Corporation System and method for deployment of a subsea well intervention system
US20100314122A1 (en) * 2009-03-11 2010-12-16 Andrea Sbordone Method and system for subsea intervention using a dynamic seal
US8875798B2 (en) * 2009-04-27 2014-11-04 National Oilwell Varco, L.P. Wellsite replacement system and method for using same
GB2483601B (en) 2009-07-01 2014-01-22 Nat Oilwell Varco Lp Wellsite equipment replacement system and method for using same
CN102900403B (en) * 2012-11-01 2014-05-07 中国海洋石油总公司 Method for establishing artificial natural gas migration channel between gas reservoirs
US9441444B2 (en) 2013-09-13 2016-09-13 National Oilwell Varco, L.P. Modular subsea stripper packer and method of using same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1206417A (en) * 1966-12-28 1970-09-23 Inst Francais Du Petrole Device for introducing tools or instruments into an underwater well from a floating installation
GB2145135A (en) * 1983-08-15 1985-03-20 Conoco Inc Method and apparatus for production of subsea hydrocarbons using a floating vessel
GB2199056A (en) * 1986-12-22 1988-06-29 Otis Eng Co Method and system for maintenance and servicing of subsea wells
GB2297337A (en) * 1995-01-27 1996-07-31 Philip Head A riser assembly
GB2334049A (en) * 1998-02-06 1999-08-11 Philip Head Heave compensating riser system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6321846B1 (en) * 2000-02-24 2001-11-27 Schlumberger Technology Corp. Sealing device for use in subsea wells

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1206417A (en) * 1966-12-28 1970-09-23 Inst Francais Du Petrole Device for introducing tools or instruments into an underwater well from a floating installation
GB2145135A (en) * 1983-08-15 1985-03-20 Conoco Inc Method and apparatus for production of subsea hydrocarbons using a floating vessel
GB2199056A (en) * 1986-12-22 1988-06-29 Otis Eng Co Method and system for maintenance and servicing of subsea wells
GB2234771A (en) * 1986-12-22 1991-02-13 Otis Eng Co Risers for subsea well servicing
GB2297337A (en) * 1995-01-27 1996-07-31 Philip Head A riser assembly
GB2334049A (en) * 1998-02-06 1999-08-11 Philip Head Heave compensating riser system

Also Published As

Publication number Publication date
BRPI0800766A (en) 2008-10-07
MX2008001698A (en) 2009-02-24
GB2446497B (en) 2010-08-04
GB0801718D0 (en) 2008-03-05
US20080185153A1 (en) 2008-08-07
NO20080651L (en) 2008-08-08

Similar Documents

Publication Publication Date Title
US7845412B2 (en) Pressure control with compliant guide
US20080185153A1 (en) Subsea intervention with compliant guide
US8973665B2 (en) System and method for performing intervention operations with a compliant guide
AU2005202612B2 (en) Dry tree subsea well communications apparatus and method using variable tension large offset risers
US7748464B2 (en) Subsea well communications apparatus and method using variable tension large offset risers
US6042303A (en) Riser system for sub sea wells and method of operation
AU2008235506B2 (en) Intervention system dynamic seal and compliant guide
EP1893843B1 (en) Apparatus and method for transferring fluids from a floating vessel to a subsea intervention module
US4367055A (en) Subsea flowline connection yoke assembly and installation method
US20080302535A1 (en) Subsea Intervention Riser System
GB2334049A (en) Heave compensating riser system
US6367554B1 (en) Riser method and apparatus
CN111819338A (en) Plug and play connection system for a controlled pressure drilling system below a tension ring
GB2412130A (en) Arrangement and method for integrating a high pressure riser sleeve within a low pressure riser
CN215860078U (en) Underwater small-sized wellhead coiled tubing drilling system
Moreira et al. Guideline/ess Completions Offshore Brazil
US20100314122A1 (en) Method and system for subsea intervention using a dynamic seal
CN113464053A (en) Underwater small-sized wellhead coiled tubing drilling system
Simpson et al. Downhole maintenance of subsea completions
Sons PD 11 (4) Seafloor Production with Safety and Reliability

Legal Events

Date Code Title Description
732E Amendments to the register in respect of changes of name or changes affecting rights (sect. 32/1977)

Free format text: REGISTERED BETWEEN 20231102 AND 20231108