GB2420365A - Method of repairing, reinforcing or reinstating a bridge - Google Patents

Method of repairing, reinforcing or reinstating a bridge Download PDF

Info

Publication number
GB2420365A
GB2420365A GB0425454A GB0425454A GB2420365A GB 2420365 A GB2420365 A GB 2420365A GB 0425454 A GB0425454 A GB 0425454A GB 0425454 A GB0425454 A GB 0425454A GB 2420365 A GB2420365 A GB 2420365A
Authority
GB
United Kingdom
Prior art keywords
bridge
plate
girder
reinforcing
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0425454A
Other versions
GB2420365B (en
GB0425454D0 (en
Inventor
Stephen John Kennedy
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Intelligent Engineering Bahamas Ltd
Original Assignee
Intelligent Engineering Bahamas Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Intelligent Engineering Bahamas Ltd filed Critical Intelligent Engineering Bahamas Ltd
Priority to GB0425454A priority Critical patent/GB2420365B/en
Publication of GB0425454D0 publication Critical patent/GB0425454D0/en
Priority to PCT/GB2005/004116 priority patent/WO2006054041A1/en
Priority to EP05797698A priority patent/EP1812648A1/en
Priority to CNA2005800391362A priority patent/CN101091023A/en
Priority to JP2007542078A priority patent/JP2008520867A/en
Priority to US11/665,018 priority patent/US20090013482A1/en
Publication of GB2420365A publication Critical patent/GB2420365A/en
Application granted granted Critical
Publication of GB2420365B publication Critical patent/GB2420365B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The method, particularly for use with all-steel orthotropic bridges, all-steel railroad bridges and composite concrete-deck, steel-girder bridges, comprises fixing a reinforcement plate 331 in a spaced relationship with an existing plate or girder of the bridge to form a closed cavity and injecting plastics or polymer material 332 into the cavity in liquid form, whereby the plastic/polymer material sets or cures so as to bond to the reinforcing and existing plate/girder with sufficient strength to transfer shear forces therebetween. The existing plate or girder is preferably on the underside of the bridge, which may have a number of trough-shaped stiffeners 21 with the reinforcing plates spanning between the bottom of the stiffeners and lightweight forms 333 being provided in the space between the troughs prior to the injection of the core material. The lightweight forms preferably have a lower density than the core material and hollow elongate bodies that can telescope together and which are closed at the ends with end caps. The prisms preferably have a cross-section arranged to fit the space between the troughs. A number of plates may span between girders with a first plate being fixed to a first girder and a second plate being fixed to a second girder so that the first and second plates cooperate to span the distance between the girders, with the plates preferably overlapping in a lap joint and being curved to match the curvature of existing plates. The plates are preferably formed from metal such as steel or aluminium while the plastic or polymer core is preferably an elastomer such as polyurethane. Also claimed is a bridge.

Description

METHOD OF REINFORCING A BRIDGE
The present invention relates to the repair or reinforcement of bridges, in particular, all-steel orthotropic bridges, all-steel railroad bridges and composite concrete-deck, steel- girder bridges.
Structural sandwich plate members which comprise two outer metal plates and a core of plastics or polymer material, e.g. unfoamed polyurethane, bonded to the outer plates with sufficient strength to substantially contribute to the structural strength of the member are described in US 5, 778,813 and US 6,050,208, which documents are hereby incorporated by reference. These sandwich plate systems (SPS) may be used in many forms of construction to replace stiffened steel plates, formed steel plates, reinforced concrete or composite steel-concrete structures and greatly simplify the resultant structures, improving strength and structural performance (e.g. stiffness, damping characteristics) while saving weight. Further developments of these structural sandwich plate members are described in WO 01/32414, also incorporated hereby by reference. As described therein, foam forms or inserts may be incorporated in the core layer to reduce weight and transverse metal shear plates may be added to improve stiffness.
According to the teachings of WO 01/32414 the foam forms can be either hollow or solid. Hollow forms generate a greater weight reduction and are therefore advantageous.
The forms described in that document are not confined to being made of light weight foam material and can also be make of other materials such as wood or steel boxes, plastic extruded shapes and hollow plastic spheres.
As well as new build applications, the principles of Si's construction have been applied to the repair of maritime structures, in particular vehicle decks of RoRo ferries. l'his procedure, known as overlay, is described in WO 02/20341, which document is hereby incorporated in its entirety by reference. Briefly, the existing metal panel is cleaned and prepared, e.g. by grit blasting, then a reinforcement plate is welded above the existing metal panel so that a cavity is formed. The cavity is then filled with a hqmd thertnoset polymer, such as polyurethane, which sets and bonds the reinforcement plate to the existing panel with sufficient strength to transfer shear forces between the existing panel and reinforcement plate. This repair method can be performed in much less time than a traditional cut-and- replace repair, reducing the period for which the vessel is out of action, and can provide a deck with improved structural and wear characteristics.
It has also been proposed to use SPS panels to form the deck of D-bridges, Bailey bridges and girder bridges, as described in WO 02/29160.
Many road and rail bridges are made of steel or composite (steel & concrete) construction. A transverse cross-section through a typical composite road bridge is shown in Figure 1 of the accompanying drawings. As can be seen, a concrete deck 10 is supported by longitudinal steel girders 11. The size, spacing and number of girders depend on the size of the bridge, loads to be carried and the designer's choices. Traditional repair methods associated with concrete deck deterioration vary from resurfacing to complete deck replacement. Deck replacement requires the old concrete deck to be removed and is generally replaced with precast prestressed concrete planks that span across several girders. The planks contain block outs for continuity reinforcing steel, shear connectors, guard rails, traffic barriers and abutting joints. Subsequently to being placed these planks are post-tensioned and grouted to make them continuous and composite with the existing girders. The durability of
the in-field grouted joints is questionable.
An all-steel orthotropic bridge is shown in Figure 2 of the accompanying drawings.
In this bridge, the steel deck 20, which may for example carry an asphalt road, is stiffened by a number of longitudinal troughs, also of steel. A steel box girder 22 spans between piers to support transverse beams and the orthotropic deck. Bridges of this type are susceptible to fatigue, with cracks forming in the deck plate at or near welds joining the trough stiffeners to the deck plate or in the webs or transverse beams/diaphragms where the trough stiffeners pass through the web. Traditional repair methods requires identification of the fatigue cracks, back gouging and (re)welding of the cracks. Additional local reinforcement may be applied, or modifications to the geometry or weld groups made, to lessen the stress range locally and the probability of the reformation of these cracks.
In the elevated steel railway bridge shown in Figure 3 of the accompanying drawings, the steel panels 30 are used to hold ballast 31 which in turn supports sleepers (railway ties) and rails 32. The steel deck plate is pre-formed in double curvature and rivetted to transverse beams 33. Repeated dynamic loads cause fatigue cracks to form through the plate within the cantilever section that protrudes beyond the flange tip of the transverse beams. With old structures, the steel grade may not be weldable, in which case the only known method of repair is to replace the pre-formed steel deck and transverse beams with new steel construction.
The methods of repair to rehabilitate the bridge types described disrupt traffic flow and adversely affect the local economy. As a result repair times are minimised and are often conducted with kmit-ed night-time or off-peak closures. However, complete closures may be required in some cases. Re-routing traffic also adds costs.
It is an aim of the present invention to provide a method by which a bridge may be repaired, reinstated or improved, e.g to increase load carrying capacity or to enhance structural performance, in particular shear resistance and reduce structural borne noise.
According to a first aspect of the present invention existing concrete deck composite steel girder bridges can be rehabilitated by either replacing the existing concrete deck with prefabricated Si's deck panels, which are subsequently made composite with the steel girders by bolting and welding between panels, or by completely replacing the superstructure with SPS panels with integrated girders. In either case the use of prefabricated SPS deck panels offers simplicity in deck replacement which translates into shorter construction schedules that can be accommodated by limited closures. Prefabricated SPS deck panels offer further advantages of factory quality control and a limited amount of field fabrication which is well understood and widely used, thus providing a deck structure with a service hfe similar to the steel superstructure.
In additional the first aspect of the present invention can provide a deck of equivalent or greater strength and stiffness whilst weighing up to 75% less than the original corresponding reinforced concrete deck. Deck weight savings of this order of magnitude allow for either increase load carrying capacity or an increased number of traffic lanes without need to reinforce the substructure or to add additional girders.
According to a second aspect of the present invention there is provided a method of repairing, reinforcing, or enhancing the structural performance of an existing bridge comprising fixing a reinforcing plate in a spaced relationship with an existing plate or girder of the bridge structure to form a closed cavity, and injecting plastics or polymer material into said cavity in liquid form, whereby said plastics or polymer material sets or cures so as to bond to said reinforcing and existing plates with sufficient strength to transfer shear forces therebetween.
By fixing the reinforcing plate to the underside of the bridge structure, minimum disruption to the load-carrying deck is caused and in many cases traffic may continue to flow throughout the repair process. The completed repair provides structural sandwich plates which have increased stiffness and provided better vibration damping characteristics.
Increased transverse stiffness aids in lateral load sharing of concentrated wheel loads between adjacent trough stiffeners, and advantageously lessons the stress ranges at critical weld groups joining the trough stiffeners to the deck plate and where the troughs pass through either diaphragms or transverse beams, resulting in substantially increased fatigue resistance and service life.
The materials, dimensions and general properties of the reinforcing plates or the invention may be chosen as desired for the particular bridge to which the invention is to be applied and in general may be as described in US-5,778,813 and US-6,050,208. Steel or stainless steel is commonly used in thicknesses of 0.5 to 20mm and aluminium may be used where light weight is desirable. Similarly, the plastics or polymer core may be any suitable material, for example a compact elastomer such as polyurethane, as described in US-5,778,813 and US-6,050,208.
In the second aspect of the invention where the repair is applied to the underside of a bridge having a plurality of trough-shaped stiffeners, the reinforcing plate spans between the bottoms of the trough-shaped stiffeners and a lightweight form is provided in the space between the troughs, prior to injection of the core material. The lightweight forms or inserts should have a lower density than the core material and should resist sufficiently temperatures and pressures experienced in the injection and setting of the core material but otherwise their mechamcal properties are not particularly important as they do not significantly contribute to the strength of the repaired structure. The lightweight forms should not completely fill the space between the troughs but should allow a layer of the core material all around them.
Convenienfly, the lightweight forms may be hollow elongate bodies. In one particular embodiment, the lightweight forms are made of telescoping hollow prisms closed by end caps. The prisms may have trapezoidal crosssections arranged to fit the space between the stiffening troughs.
In the second aspect of the present invention, the repair may instead be applied to the deck surface. In this case it may be advantageous to use heat resistant adhesives to fix the perimeter bars of an SPS overlay cavity to the existing structure. Subsequent welding of the new deck faccplates to the perimeter bars and to each other will not damage the paint or corrosion protective coatings on the underside surface.
The present invention will be described below with reference to exemplary embodiments and the accompanying schematic drawings, in which: Figure 1 is a cross-sectional view of a typical concrete deck composite steel girder bridge; Figure 2 is an isotropic view of a typical steel orthotropic bridge with box girders; Figure 3 is an isotropic view of a railway bridge with preformed steel panels; Figure 4 is a cross-sectional view of the deck of a composite steel girder bridge according to a first embodiment of the invention; Figure 5 is an isotropic view of the deck of a composite steel girder bridge according to a second embodiment of the invention; Figure 6 is an isotropic view of the bridge depicted in Figure 2 to which a method according to a third embodiment of the present invention has been applied to rehabilitate and reinforce the deck structure from the underside; Figure 7 is an expanded view of the repaired bridge of Figure 6; Figure 8 is an isotropic view of the bridge depicted in Figure 2 to which a method according to a fourth embodiment of the present invention has been applied, from above; Figure 9 is an isotropic view of the railway bridge depicted in Figure 3 to which a method according to a fifth embodiment of the present invention has been applied; Figure 10 is a longitudinal section of the repaired bridge of Figure 9; Figure 11 is a cross-section view illustrating a drain detail of the repaired bridge of Figure 9; Figure 12 is an expanded view of the panel of the repaired bridge of Figure 9; Figure 13 is an isotropic view of a typical box girder bridge (without deck for clarity with structurally enhanced webs according to a sixth embodiment of the present invention; and Figure 14 is an isotropic view of stiffened plate girder with structurally enhanced webs according to a sixth embodiment of the present invention.
In the various drawings, like parts are indicated by like reference numerals.
According to a first embodiment of the present invention existing concrete deck composite steel girder bridges is rehabilitated by replacing the existing concrete deck with prefabricated SPS deck panels 101, as illustrated in Figure 4. The SPS deck panels arc subsequently made composite with the existing steel girders 102 by bolting and welding between panels 101. The replacement SPS panels 101 are made continuous by welding them together at abutting edges. The existing, or a new, steel guard rail 103 may be bolted to the SPS deck panels.
The SPS panels 101 each comprise outer metal faceplates 104, 106 bonded together by an intermediate, or core, layer 105 of plastics or polymer material. The faceplates may be steel plates with a thickness in the range of from 2 to 20mm, as required for the particular application. For the plastics or polymer material, preferably a compact therrnosetting material such as polyurethane elastomer, is used. Core layer 105 may have a thickness in the range of from 15 to 200mm and is bonded to the faceplates 104, 106 with sufficient strength and has sufficient mechanical properties to transfer shear forces expected in use between the reinforcement and existing structure. The bond strength should be greater than 3MPa, preferably 6MPa, and the modulus of elasticity of the core material should be greater than 200MPa, preferably greater than 25OMPa, especially if expected to be exposed to high te!-nperatures in use. By virtue of the core layer, the reinforced structure has a strength and load bearing capacity of a stiffened steel plate having a substantially greater plate thickness and significant additional stiffening. The replacement panels 101, of course, need not be flat but may take whatever form is required to fit to the existing structure.
The use of prefabricated SPS deck panels offers simplicity in deck replacement which translates into shorter construction schedules that can be accommodated by limited closures. Prefabricated SPS deck panels offer further advantage of factory quality control and a limited amount of field fabrication which is well understood and widely used, thus providing a deck structure with a service life similar to the steel superstructure.
In a second embodiment of the invention the superstructure is completely replaced with SPS panels 201 with integrated girders 202, as illustrated in Figure 5. The SPS panels 201 are essentially the same as the panels 101 of the first embodiment but the longitudinal and/or transverse girders 202 are integrated into the panels during off-site fabrication. The webs of the girders may form parts of the side walls to the cavities into which the core material is injected whilst one or both faceplates may act as the flanges of the beams. As in the first embodiment, the use of prefabricated SPS deck panels offers simplicity in deck replacement, factory quality control and a limited amount field fabrication with attendant advantages.
In addition, the first and second embodiments of the present invention provide a deck of equivalent or greater strength and stiffness than the original corresponding reinforced concrete deck whilst weighing up to 75% less. Deck weight savings of this order of magnitude allow for either increase load carrying capacity or an increase number of traffic lanes without need to reinforce the substructure or to add additional girders.
In a third embodiment of the invention, shown in Figure 6, the existing structure of a bridge comprising load carrying deck 20 and stiffening troughs 21 has been repaired or reinforced by the addition of a reinforcing plate 331 which spans between the bottoms of stiffening troughs 21. The reinforcing plate 331 may be a steel plate with a thickness in the range of from 2 to 20nm, as required for the particular application. To bond the reinforcing plate 331 to the existing structure, a core layer 332 of plastics or polymer material, preferably a compact thermosettmg material such as polyurethane elastomer, is used. This core may have a thickness in the range of from 15 to 200mm. The core 332 is bonded to the reinforcing plates 331 and the existing structure 20, 21 with sufficient strength and has sufficient mechanical properties to transfer shear forces expected in use between the reinforcement and existing structure. The bond strength should be greater than 3MPa, preferably 6MPa, and the modulus of elasticity of the core material should be greater than 200MPa, preferably greater than 25OMPa, especially if expected to be exposed to high temperatures in use. By virtue of the core layer, the reinforced structure has a strength and load bearing capacity of a stiffened steel plate having a substantially greater plate thickness and significant additional stiffening. The reinforcing plate, of course, need not be flat but may take whatever form is required to fit to the existing structure.
To reduce the volume of core material required to bond the reinforcement to the existing structure, lightweight forms or inserts 333 are provided in the space between stiffening troughs 21. The forms 333 preferably have a cross-sectional shape matching that of the space between troughs but sized so as to leave a layer of core material of thickness in the range of from 15 to 200mm all around. The forms are preferably elongate hollow bodies of the appropriate cross-section but may also be made of lightweight materials such as foam.
Each insert may also be made up from a plurality of elongate parts of standard cross-section, to avoid the need to manufacture special forms for each bridge.
As more clearly shown in Figure 7, which is an expanded view of the repaired bridge, each form 333 is preferably made of two parts 334 which fit Into a sleeve 335 SO that the length of the form may be adjusted by sliding the parts 334 into or out of the sleeve 335.
End caps 336 close the two ends of the form. This arrangement suits bridges where the profile and spacing of the stiffening troughs is constant but the spacing between transverse girders may vary.
Especially when hollow, the forms may be fitted around any utilities, e.g. water or gas pipes, power or communications cables, that may be attached to the underside of the bridge. Hollow forms can also serve as trunking for the later addition of utthties if suitable access points and throughholes in transverse girders are provided.
To effect the repair, firstly the undersurfaces of all troughs 21 and exposed plates of the deck 20 are grit blasted to provide a clean surface to which the core material can adhere.
Then the forms 333 are fixed in place, e.g. by tack welding, and the use of suitable spacers as required. Once this has been completed, landing bars are welded in place at the positions of the edges of the reinforcing plates so that the reinforcing plates can be welded in place. The cavities defined by the reinforcing plates and existing structure are sealed, leaving injection ports and vent holes as required. Core material is then injected and allowed to cure to form a strong bond between the reinforcing plates and existing structure. To finish off the injection ports and vent holes can be scaled and ground flush before any desired surface treatment, e.g. paint, is applied to prevent corrosion or for aesthetic reasons.
The same bridge may be repaired by the addition of an overlay to the top surface, as shown in Figure 8, which illustrates a fourth embodiment of the invention. In this embodnnent, a reinforcing plate 401 is fixed above the existing plate 20 50 as to form a cavity.
The cavity is then filled by injection of plastic or polymer material 402 which, when set, bonds the rcmfi:rcing plate 401 to the existing plate 20 with sufficient strength to transfer shear forces expected in use. In this respect, the fourth embodiment is the same as the other embodiments of the invention and the reinforcing plate and core material may be as described above. An asphalt road surface 403 is laid on top of the reinforcing plate once the core layer is fully cured.
To fix the reinforcing plate 401 in place prior to the injection of the core, welded or adhered perimeter bars may be used to define the cavity to be filled. Spacers and lightweight forms or inserts may also be employed, as in the other embodiments of the invention.
In a fifth embodiment of the present invention a repair is applied to the underside of prc-forrned steel plate of an elevated railway bridge to enhance the fatigue resistance and to extend the service hfe of the structure. The repair, illustrated in Figure 9, is consistent in shape and construction with the existing structure and does not detract from its historic nature.
Applied from below without disrupting rail services, two preformed plates 501, 502 of matching shapes to the existing structure are bolted to the webs of transverse beams of the existing structure and rivetted with onesided rivets to each other, forming a lap joint 503 at mid panel length that extends across the bridge as shown in Figure 10. The lap joint provides a simple connection detail that will allow for dimensional variations that will occur in each panel along the length of the bridge. Subsequently drains 504 are re-established as shown in Figure 11.
A combination of flexible, closed-cell foam-like material and caulking is used to seal the ends of the cavity. The cavity is subsequently injected from below, first through the central region and then at either end, to ensure complete filling with core material 505. This method of repair not only lessens the stress range in the existing pre-formed steel panel (at or near the leading edge where the cantilever plate section passes over the flange tip of the transverse beams) thereby increasing the fatigue resistance, it also provides a visco-elastic layer to absorb structuralborne noise, an added benefit for urban centres where elevated railway systems like this exist.
A sixth embodiment of the present invention is a modification to the existing structures by the application of SPS overlay 601 to webs 602 of box and plate girders 603, 604, as shown in Figures 13 and 14, with the prime objective to reduce structural-borne noise associated with vibrations induced by the traffic (road or rail) which the bridge carries. A by- product is a structural enhancement, increased shear resistance and fatigue resistance for weld groups joining the stiffeners to the web.
In the fifth aiid sixth embodiments the materials and dimensions of the reinforcing plates and the core layer may be the same as in the previously described embodiments.
It wUl be appreciated that the above descnpfion is not thtended to be limiung and that other modifications and variations fall within the scope of the present mvention, wlMch is defined by the appended claims.

Claims (17)

1. A method of repairing, reinforcing or reinstating a bridge, comprising fixing a reinforcement plate in a spaced relationship with an existing plate or girder of the bridge structure to form a closed cavity, and injecting plastics or polymer material into said cavity in liquid form, whereby said plastics or polymer material sets or cures so as to bond to said reinforcing and existing plates with sufficient strength to transfer shear forces therebetween.
2. A method according to claim 1 wherein the existing plate or girder is on the underside of the bridge.
3. A method according to claim 2 wherein the bridge has a plurality of trough-shaped stiffeners, the reinforcing plate spans between the bottoms of the trough-shaped stiffeners and a lightweight form is provided in the space between the troughs prior to injection of the core material.
4. A method according to claim 3 wherein the lightweight form has a lower density than the core material.
5. A method according to claim 3 or 4 wherein the lightweight forms are hollow elongate bodies.
6. A method according to claim 5 wherein the lightweight forms are made of telescoping hollow prisms closed by end caps.
7. A method according to claim 6 wherein the prisms have trapezoidal cross-sections arranged to fit the space between the stiffening troughs.
8. A method according to claim 2 wherein the bridge has a plurality of plates spanning between girders and said step of frxing a reinforcing plate comprises fixing a first reinforcing plate to a first girder and a second reinforcing plate to a second girder adjacent the first girder, the first and second reinforcing plates cooperating to span the distance between said girders.
9. A method according to claim 8 wherein said first and second reinforcing plates overlap in a lap joint.
10. A method according to claim 8 or 9 wherein the first and second reinforcing plates are curved to match the curvature of the existing plates.
11. A method according to claim 1 wherein the existing plate is a web of a box or plate girder.
12. A method according to any one of the preceding claims wherein the reinforcing plate is metal, e.g. steel, stainless steel or aluminium.
13. A method according to any one of the preceding claims wherein the reinforcing plate has a thicknesses in the range of from 0.5 to 20mm.
14. A method according to any one of the preceding claims wherein the plastics or polymer core is an elastomer such as polyurethane.
15. A method according to claim 14 wherein the elastomer is compact.
16. A method of reinforcing, repairing or reinstating a bridge substantially as hcreinbeforc described with reference to Figures 3 to 14 of the accompanying drawings.
17. A bridge comprising an existing structure adjacent which is provided a reinforcing plate, the reinforcing plate being bonded to the existing structure by an intermediate layer of plastics or polymer material that is bonded to the reinforcing plate and the existing structure with sufficient strength to transfer shear forces therebetween.
GB0425454A 2004-11-18 2004-11-18 Method of reinforcing a bridge Expired - Fee Related GB2420365B (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
GB0425454A GB2420365B (en) 2004-11-18 2004-11-18 Method of reinforcing a bridge
JP2007542078A JP2008520867A (en) 2004-11-18 2005-10-25 Bridge reinforcement method
EP05797698A EP1812648A1 (en) 2004-11-18 2005-10-25 Method of reinforcing a bridge
CNA2005800391362A CN101091023A (en) 2004-11-18 2005-10-25 Method of reinforcing a bridge
PCT/GB2005/004116 WO2006054041A1 (en) 2004-11-18 2005-10-25 Method of reinforcing a bridge
US11/665,018 US20090013482A1 (en) 2004-11-18 2005-10-25 Method of reinforcing a bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB0425454A GB2420365B (en) 2004-11-18 2004-11-18 Method of reinforcing a bridge

Publications (3)

Publication Number Publication Date
GB0425454D0 GB0425454D0 (en) 2004-12-22
GB2420365A true GB2420365A (en) 2006-05-24
GB2420365B GB2420365B (en) 2009-11-11

Family

ID=33548513

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0425454A Expired - Fee Related GB2420365B (en) 2004-11-18 2004-11-18 Method of reinforcing a bridge

Country Status (6)

Country Link
US (1) US20090013482A1 (en)
EP (1) EP1812648A1 (en)
JP (1) JP2008520867A (en)
CN (1) CN101091023A (en)
GB (1) GB2420365B (en)
WO (1) WO2006054041A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2445740A (en) * 2007-01-18 2008-07-23 Intelligent Engineering Flooring panels
WO2017194986A1 (en) * 2016-05-10 2017-11-16 Soletanche Freyssinet An improved reinforcement apparatus for reinforcing a structure comprising a pier and a cross- beam

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MX2011009084A (en) 2009-03-06 2012-01-25 Biopolymer Technologies Ltd Protein-containing foams, manufacture and use thereof.
US8519031B2 (en) 2009-03-06 2013-08-27 Biopolymer Technologies, Ltd. Protein-containing emulsions and adhesives, and manufacture and use thereof
WO2011156380A2 (en) 2010-06-07 2011-12-15 Biopolymer Technologies, Ltd. Protein-containing adhesives, and manufacture and use thereof
US9322508B2 (en) 2011-09-01 2016-04-26 University Of South Florida Systems and methods for applying reinforcement material to existing structures
WO2013036744A1 (en) 2011-09-09 2013-03-14 Biopolymer Technologies, Ltd. Protein-containing adhesives, and manufacture and use thereof
WO2013036739A1 (en) 2011-09-09 2013-03-14 Biopolymer Technologies, Ltd. Protein-containing adhesives, and manufacture and use thereof
CN102535355B (en) * 2012-02-21 2013-09-04 朔黄铁路发展有限责任公司 Method for reinforcing bridge structure separated steel-concrete combined truss
CN102635060B (en) * 2012-05-02 2014-12-31 周劲宇 Concrete hollow slab bridge reinforced by transverse steel beams
EP3666845A1 (en) 2012-07-30 2020-06-17 Evertree Protein adhesives containing an anhydride, carboxylic acid, and/or carboxylate salt compound and their use
JP6382091B2 (en) * 2014-12-11 2018-08-29 公益財団法人鉄道総合技術研究所 Reinforcement method of overhang slab
JP6224641B2 (en) * 2015-03-13 2017-11-01 株式会社横河ブリッジ Steel member with anti-rust coating and method for attaching steel member to steel structure
NL2016551B1 (en) * 2015-04-07 2018-04-13 Volkerrail Nederland Bv Mobile robot station and repair methodology
CN105088973B (en) * 2015-08-11 2017-08-11 交通运输部公路科学研究所 A kind of method reinforced to Hollow Slab Beam Bridge
CN105714699B (en) * 2016-04-12 2017-05-03 沈阳建筑大学 Reinforcing structure for main girder top plate of wide box girder bridge and construction method of reinforcing structure
IT201700105273A1 (en) * 2017-09-20 2019-03-20 Nuovo Pignone Tecnologie Srl BASIC PLATE FOR TURBOMACCHINA AND METHOD FOR PRODURLA
CN110582609B (en) * 2018-04-11 2021-04-27 潘迪 维拉萨米·塔瓦马尼 Construction system and method for combined U-shaped reinforcing beam bridge floor
JP7003008B2 (en) * 2018-07-09 2022-01-20 株式会社横河ブリッジ Layered panel floor slab bridge construction method
CA3121143C (en) * 2018-11-30 2023-06-27 THAVAMANI PANDI, Vellaisamy System for construction of double u and single u steel concrete composite structure for bridges.
CN110632080A (en) * 2019-09-12 2019-12-31 无锡金诚工程技术服务有限公司 Intelligent detection method for weld joint of steel box girder
CN111663459A (en) * 2020-05-21 2020-09-15 大连理工大学 Bridge reinforcing device based on high-molecular metal composite material plate and manufacturing method thereof
CN112431105B (en) * 2020-11-30 2022-06-21 湖南书堂山建设有限公司 Asphalt crack pouring device for pavement repair
CN113047186B (en) * 2021-03-24 2022-08-30 华东交通大学 Bridge reinforcing apparatus
CN113761772B (en) * 2021-09-17 2022-06-24 华南理工大学 Computing method of orthotropic steel bridge deck
CN114319113B (en) * 2021-12-14 2024-03-22 中铁建大桥工程局集团靖江重工有限公司 Method for transversely butt-jointing adjustable elevation and counterpoint of split diaphragm plates of steel box girder
CN114592440B (en) * 2022-03-21 2024-03-19 武汉市规划设计有限公司 Upper structure of assembled steel-concrete combined bridge and construction process thereof
CN114991024B (en) * 2022-05-23 2023-07-07 袁莉莉 Road and bridge crack repairing process
US11746484B1 (en) * 2022-07-14 2023-09-05 The Florida International University Board Of Trustees Connection systems and methods for skewed frames

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2374038A (en) * 2001-04-02 2002-10-09 Intelligent Engineering Structural sandwich plate members
US20030230375A1 (en) * 2000-09-08 2003-12-18 Intelligent Engineering (Bahamas) Limited Method of reinforcing an existing metal structure, method of reinforcing pipes and method of addition or spur lines to pipelines

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1684614A (en) * 1926-10-25 1928-09-18 Barton Spider Web System Form for concrete
US2335303A (en) * 1941-10-13 1943-11-30 Anders C Olsen Building structure
US2618960A (en) * 1946-03-23 1952-11-25 Orzel Paul Reinforced plastic structural unit
US2966542A (en) * 1957-09-04 1960-12-27 Fed Pacific Electric Co Prefabricated bus duct
US3562985A (en) * 1969-01-13 1971-02-16 Joseph A Nicosia Reinforced synthetic resin structural panels
LU61734A1 (en) * 1969-12-13 1971-01-18
GB1490102A (en) * 1975-09-08 1977-10-26 Balfour Beatty Ltd Artificial and natural structures
US4524174A (en) * 1975-09-24 1985-06-18 Watson Bowman Associates Reinforced elastomer products
US6023806A (en) * 1996-09-30 2000-02-15 Martin Marietta Materials, Inc. Modular polymer matrix composite support structure and methods of constructing same
GB2367526B (en) * 2000-10-03 2004-09-15 Intelligent Engineering Sandwich plate panels
IL123543A (en) * 1998-03-04 1999-12-31 Meiranz Benjamin Composite bridge superstructure with precast deck elements
JP2000240297A (en) * 1999-02-22 2000-09-05 Japan Bridge Corp Thickening and reinforcing structure of concrete structure and its construction method
US6170105B1 (en) * 1999-04-29 2001-01-09 Composite Deck Solutions, Llc Composite deck system and method of construction
GB2399540B (en) * 2003-03-18 2005-10-26 Intelligent Engineering Improved method for reinforcing or reinstating existing structures
JP4037862B2 (en) * 2004-01-30 2008-01-23 三菱重工橋梁エンジニアリング株式会社 Steel slab and method of reinforcing the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030230375A1 (en) * 2000-09-08 2003-12-18 Intelligent Engineering (Bahamas) Limited Method of reinforcing an existing metal structure, method of reinforcing pipes and method of addition or spur lines to pipelines
GB2374038A (en) * 2001-04-02 2002-10-09 Intelligent Engineering Structural sandwich plate members

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2445740A (en) * 2007-01-18 2008-07-23 Intelligent Engineering Flooring panels
WO2017194986A1 (en) * 2016-05-10 2017-11-16 Soletanche Freyssinet An improved reinforcement apparatus for reinforcing a structure comprising a pier and a cross- beam
US10655287B2 (en) 2016-05-10 2020-05-19 Soletenche Freyssinet Reinforcement apparatus for reinforcing a structure comprising a pier and a cross-beam

Also Published As

Publication number Publication date
GB2420365B (en) 2009-11-11
WO2006054041A1 (en) 2006-05-26
EP1812648A1 (en) 2007-08-01
JP2008520867A (en) 2008-06-19
US20090013482A1 (en) 2009-01-15
CN101091023A (en) 2007-12-19
GB0425454D0 (en) 2004-12-22

Similar Documents

Publication Publication Date Title
US20090013482A1 (en) Method of reinforcing a bridge
RU2259439C2 (en) Bridge deck panel, combination including at least two panels with h-shaped clamp, panel production methods (variants), bridge and bridge designing method
AU2001284240A1 (en) Bridge deck panels, fabrication methods and use
WO1997018356A1 (en) Modular bridge deck system including hollow extruded aluminum elements securely mounted to support girders
CN108797228B (en) Spliced continuous supporting rail structure and construction and maintenance method thereof
Kennedy et al. The sandwich plate system for bridge decks
JP2013060710A (en) Bridge joint structure
US10577760B2 (en) Joint forms and associated techniques for repairing and sealing concrete expansion joints
Feldmann et al. A system of steel-elastomer sandwich plates for strengthening orthotropic bridge decks
BG65054B1 (en) Method of reinforcing a panel from an existing metal structure
Lin et al. Preventive maintenance on welded connection joints in aged steel railway bridges
JP6642884B2 (en) Bridge steel deck slab reinforcement structure and bridge steel deck slab reinforcement method
Hollaway Using fibre-reinforced polymer (FRP) composites to rehabilitate differing types of metallic infrastructure
Hanswille Composite bridges in Germany designed according to Eurocode 4-2
Hollaway Advanced fibre polymer composite structural systems used in bridge engineering
Bettigole Designing bridge decks to match bridge life expectancy
Kennedy et al. SPS bridge decks for new bridges and strengthening of existing bridge decks
Hollaway Chapter 58: Applications of fibre-reinforced polymer composite materials
CN210684463U (en) Simply supported beam steel sheet bridge floor continuous structure
KR100806711B1 (en) The structure and the construction method which are changed in nothing ballast plate girder bridge to a ballast steel composition reinforced concrete slab bridge
JP2003147726A (en) Construction method for composite floor system and floor system panel used in the same
Jara et al. Strengthening and Retrofitting of Steel Bridges
Hollaway Applications of advanced fibre-reinforced polymer (FRP) composites in bridge engineering: rehabilitation of metallic bridge structures, all-FRP composite bridges, and bridges built with hybrid systems
WO2002075056A1 (en) Integrally bonded fiber reinforced composite deck of adjustable alignment, method for fabrication and connection thereof
Gorga et al. Bridge design and rehabilitation using new Sandwich Plate System (SPS)

Legal Events

Date Code Title Description
732E Amendments to the register in respect of changes of name or changes affecting rights (sect. 32/1977)

Free format text: REGISTERED BETWEEN 20141009 AND 20141015

PCNP Patent ceased through non-payment of renewal fee

Effective date: 20161118