GB2399413A - Monitoring element alignment - Google Patents

Monitoring element alignment Download PDF

Info

Publication number
GB2399413A
GB2399413A GB0305899A GB0305899A GB2399413A GB 2399413 A GB2399413 A GB 2399413A GB 0305899 A GB0305899 A GB 0305899A GB 0305899 A GB0305899 A GB 0305899A GB 2399413 A GB2399413 A GB 2399413A
Authority
GB
United Kingdom
Prior art keywords
plan position
rigid
alignment
taut
taut connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0305899A
Other versions
GB0305899D0 (en
GB2399413B (en
Inventor
Peter Gilbert Shotton
Ronald Peter Payne
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cementation Skanska Ltd
Original Assignee
Cementation Foundations Skanska Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cementation Foundations Skanska Ltd filed Critical Cementation Foundations Skanska Ltd
Priority to GB0305899A priority Critical patent/GB2399413B/en
Publication of GB0305899D0 publication Critical patent/GB0305899D0/en
Priority to PCT/GB2004/000948 priority patent/WO2004081294A1/en
Priority to US10/549,363 priority patent/US7530176B2/en
Priority to EP04718348A priority patent/EP1604068A1/en
Publication of GB2399413A publication Critical patent/GB2399413A/en
Application granted granted Critical
Publication of GB2399413B publication Critical patent/GB2399413B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B7/00Measuring arrangements characterised by the use of electric or magnetic techniques
    • G01B7/30Measuring arrangements characterised by the use of electric or magnetic techniques for measuring angles or tapers; for testing the alignment of axes
    • G01B7/31Measuring arrangements characterised by the use of electric or magnetic techniques for measuring angles or tapers; for testing the alignment of axes for testing the alignment of axes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/10Plumb lines
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C9/00Measuring inclination, e.g. by clinometers, by levels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/06Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers for observation while placing

Abstract

The present invention relates to a method of measuring the difference in alignment between a first plan position of an element and a second plan position of an element, the method comprising the use of: i) at least one rigid or taut connection 4 extending between a first point at the level of the first plan position and a second point at the level of the second plan position, the first and second points being at an identical displacement from the element; and ii) one or more electrolevel gauges 5 provided on the or each rigid or taut connection, so as to measure the inclination of the rigid or taut connection. A system is also included for positioning an element within a borehole to adjust its alignment using upper and lower positioning means.

Description

1 2399413 Method and Apparatus for Monitoring Element Alignment The
present invention relates to a method and apparatus for measuring the alignment of an element.
There are many instances, particularly in the construction industry, where it is necessary to determine the so-called verticality of an element.
Often the elements are not 100% straight, for example steel sections are supplied to certain rolling tolerances, and may therefore be slightly bowed.
Therefore, it is not strictly accurate Lo refer to the verticality of an element) it is more appropriate to refer to the alignment of two (or more) levels of the element. Within the trade, the use of the word "vertical" is often interpreted as meaning that the location of two plan positions (i.e. the 2-D cross- section of the element at two different levels), are in vertical alignment.
Examples of instances where there exists a requirement to measure the alignment include the following: 1) Monitoring the alignment or "verticality" of a mast during continuous flight auger (CEA) piling techniques, or of a leader (typically a longitudinal frame fitted to the jibs of crawler base machines) during driven piling operations; , 2) Monitoring the alignment of stop-ends placed in diaphragm wall panels both in and out of the plane of the diaphragm walls 3) To monitor the verticality of pile bores and diaphragm wall panels; 4) During driven techniques to monitor the installation of the tube of a cast-in-situ pile, a pre-cast pile section, a steel section or sheet pile etc.; 5) To ensure that a lift ram liner or bore for lift ram is plumb; 6) In continuous flight auger (CFA) piling operations, the verticality of the auger should be measured during; the setting up of the rig and also once the auger has reached the founding depth; ; 7) To monitor casings which may be vibrated or driven to depth.
8) During the placement of columns to structural steel -tolerances, within pile bores and diaphragm wall panels.
Although in the majority of instances there is a requirement for the two (or more) plan positions of the element to be in vertical alignment (i.e. the "x" and "y" co-ordinates of the element cross-sections at two levels are the same) , there are also occasions where it is necessary to ensure that an element is positioned at a predetermined angle, so that a plan position at or near the top of the element is at an angle (in either/both the x- or y-direction) with respect to the ?5 plan position at or near the bottom of the element. For example, elements which provide foundation support for bridges are normally installed at a predetermined' angle. It should therefore be noted that references to alignment or desired alignment should not be interpreted as necessarily being in vertical alignment, but may also be interpreted as encompassing a deliberate mix-alignment in either or both the x or y direction.
A number of techniques have been developed which allow the plan position of the lower level of an element to be brought into the desired alignment with the plan position of the upper level. Known surveying techniques suffer from the disadvantage that the equipment employed (for example, a theodolite) requires skilled; technicians. Furthermore, it is necessary to locate the equipment at a significant distance from the element so; that the base and head of the element can be viewed.
Another method involves the use of a simple plumb-bob or, alternatively, a laser plumb device. This comprises a laser emitting means fitted at or near the upper level and a -arget positioned at or near the lower level. The centre-line of the laser and the target are usually located at a fixed offset from the true centre- line of the element. A remote camera or binoculars may be needed to view the laser spot on the target.
However, laser plumb bobs require regular calibration to ensure accuracy, a process which is time-consuming and involves the use of a frame of substantial length.
All of the above methods are of limited use when only one end of the element is visible. Moreover, none of the methods above can be applied when the element is hidden, for example, if the element is lowered down a hole filled with fluid.
According to one aspect of the present invention there is provided a method of measuring the difference in alignment between a first plan position of an clement and a second plan position of an element, the method comprising the use of: i) at least one rigid or taut connection extending between a first point at the level of the first plan position and a second point at the level of the second plan position, the first and second points being at an identical displacement from the element) ii) one or more electrolevel gauges provided on the or each rigid or taut connection, so as to measure the inclination of the rigid or taut connection.
An advantage of the present invention is that the plan position of two cross sections of an element can be measured over a greater length than any of the other alignment measurement techniques would allow. Thus by attaching the rigid or taut connection to a bracket positioned at or near the bottom of the element, the plan position of two levels of significant distance apart can be monitored. Furthermore, the present method can be advantageously employed even in situations where the element is partially or totally hidden, or is to be positioned under fluid.
It is important that the points of contact are provided at an identical displacement from the element.
Identical displacement is intended to mean that the points of contact have the same displacement in booth an x- and y-direction from the element. Preferably, the displacement is measured from the centre-line of the element.
The rigid or taut connection may comprises a wire, a bar or a tube. In one embodiment two electrolevel gauges are provided on a rigid or taut connection so as to measure the inclination of the connection in mutually orthogonal directions. In other embodiments, it may be preferable to employ the use of two rigid or taut connections, each having an electrolevel gauge to measure the tilt in either the X or the Y direction.
A support bracket may be used which extends from the element to a predetermined displacement there from to provide each point of contact for the rigid or taut connection at a convenient distance from the element.
Preferably, the or each electrolevel gauge is connected to an output metre so that the output of the gauge can be monitored and the element verticality adjusted as desired. To cases where the present invention is employed to ensure a predetermined mLs-alignment between the upper and lower plan positions, i.e. where the element is to be positioned at an angle, the electrolevel gauge must be calibrated so that it can monitor the inclination of the rigid or taut connection within the required range.
The present invention may be usefully applied to a particular technique often referred to in the trade as plunged column piles'. This technique involves a process by which columns are embedded in concrete. It should be noted that although this technique is generally referred to as 'plunged column piles', in actual fact the columns can be either 'plunged' into unset concrete, or they may first be positioned at the correct level and location within the bore, and the concrete subsequently placed into the bore. The end result is the same, namely that the and of a section is embedded in concrete.
Embedded or 'plunged' columns are often used in a technique known in the trade as 'top-down' construction. This type of construction can be used advantageously for a variety of structures below ground, e.g. basements to new buildings, below ground cofferdams, cut & cover tunnels, and the like. During top-down construction techniques it is necessary to position an element, such as a steel section or stanchion, within a pile shaft. Subsequently the element, which is generally positioned vertically above a load bearing pile, may be used to support loads from an above ground structure and to transmit load from ground level to the head of a load bearing pile/concrete column.
Briefly, top-down construction involves the following steps: i) construction of a perimeter wall which is installed from the prevailing ground level; ii)installation of load-bearing piles within the cartilage of the perimeter wall. To construct each load bearing pile, a pile shaft of required depth is excavated and may be partially filled with concrete or grout. If the shaft is partially filled at this stage, the concrete of the pile is terminated at a distance below ground that generally corresponds to the level of the (future) basement slab; iii) insertion and positioning of an element, which may be a steel column, hollow steel section, precast concrete, or any suitable member, in-to the 'empty' bore of the pile shaft, above the level of the concrete or "pile head". The element is designed to transmit load from ground level to the pile head. Generally the requirement is for the element to be positioned vertically, although other orientation requirements may be required for specific applications; iv) Once the element column has been positioned within the bore, it is either lowered onto the top of the set concrete in the pile, so that load transmission between the element and the pile is by end-bearing onto the concrete head, or it is plunged some distance into the concrete to become embedded in the pile before it sets.
Several methods have been used in the past for positioning vertical element columns, such as the steel columns or sections, mentioned above.
Traditionally steel casings have been used, extending down to the future low level of concrete cast into the pile. After the bore has been completed, reinforcement and concrete are placed into the pile in the conventional manner. At a later stage, after the concrete has set, an operative descends the casing, in order to clean the concrete surface, cast a reinforced pile cap, and fit a base plate to the head of the pile cap. Following Chat the element is positioned within the bore, and fixed to the base plate by an operative lowered down inside the casing. Generally, the casing, which is installed to protect the manned descent, is left in place. This traditional method requires a large diameter casing, in order to allow the operative room to work. The cost of the casings is substantial.
Additionally, because operatives were lowered into the bore, it was required that special measures be taken to afford complete safety.
More recently, a variety of tools (e.g. EP 0302717) have been used to adjust the position the element by a variety of means: manual adjustment, and electrical and/or hydraulic methods.
In any case, for all of these methods it is necessary to (]) be able to monitor the position of the element at ground level and also (2) have a know ledge of the position of the element at the (low) Jevel of the top of concrete in the pile.
The first requirement can be accommodated by surveying methods. The second requirement - determining the position of the column at a position several metres below ground - presents difficulties. This is because all column sections have inherent tolerances, for example that of 'bow', i.e. the column is not precisely straight. Thus it is not sufficient to use a 'spirit level' to measure the verticality of the column.
A number of means have been used to achieve this. For example, temporary fixings can be placed on the eleemnt itself:- e.g. a long 'inverted' plumb bob or a laser plumb and target etc. However, none of the previously proposed methods are ideal. They involve the steps of first surveying the plumb of the casing, and then fixing offsets directly to the column so as to allow the plump bob or laser system to be attached. Unfortunately, these steps are time-consuming and require that the chosen method of determining the position the column is accurately placed on to the column. Since most temporary casings are not of uniform section, and there must be clearance between the offsets and the bore of the casing, the proper functioning of the alignment measuring system has depended, to a large extent, on the conditions of each bore/casing and the skill of the operative responsible for fixing the offsets to the element. Consequently, the alignment of the element has often been inaccurate, primarily as a result of the deficiencies in the use and application of the known alignment measurement systems, rather than the limitations of the measurement system per se.
According to a second aspect of the present invention, there is provided an apparatus for positioning an element in a borehole, the apparatus comprising an upper positioning means and a lower positioning means for adjusting the plan position of the element at upper and lower levels respectively, the apparatus being provided with a means to measure the difference in alignment between the first plan position of the element and the second plan position of the element.
The apparatus for positioning the element in the bore, preferably comprises a locating frame having at least one pair of adjustable guide frames at either end of the frame. The guide frames preferably comprise a first and a second pair of rollers which are moveable in mutually orthogonal directions across the interior space. The apparatus is placed into a borehole so as to define an interior space through which the element is lowered, and is braced against the inner wall of a temporary casing which lines the pile shaft. The rollers, which bear against the sides of the element, are remotely adjustable and can be operated to locate the element at that level. Once the rollers at the upper level have been adjusted, the rollers at the lower level are also adjusted so as to adjust the plan position of the column at the lower level.
Preferably the means for measuring the difference in alignmont between the first plan position of the element and the second plan position of the element extends between the rollers at either end of the apparatus.
An advantage of this aspect of the present invention is that the alignment measuring system forms an integral part of the tool employed to position the element within the bore hole. As a consequence, the alignment measurement system need not be sacrificed after the alignment adjustment has taken place since, in contrast to the element (and thus the measurement system attached thereto), the tool:is removed after each operation. Furthermore, the accuracy of positioning methods is significantly improved since the positioning of the alignment measurement device need not be repeated for every operation, but may be carefully and accurately positioned on the apparatus itself.
Preferably, but not essentially, the means to measure the difference in alignment between the first plan position of the element and the second plan position of the element comprises at least one rigid or taut connection which extends between the upper and lower positioning means, and one or more electrolevel gauges provided on the or each rigid or taut connection.
A particular advantage of this embodiment is that the plan position of two cross sections of the element can be measured to a greater depth than any of the other alignment measurement techniques would allow. Thus by attaching the rigid or taut connection to a bracket positioned at or near the bottom of the element, the plan position of two levels of significant distance apart can be monitored. Furthermore, the present method can be advantageously employed even in situaticns where the element is partially or totally hidden, or is to be positioned under fluid.
For a better understanding of the present invention, and to show how the same maybe carried into effect, reference will now be made, by way of example, to the accompanying drawings in which: Figure 1 illustrates a method embodying the present invention; and Figure 2 and 3 illustrate an apparatus embodying the present invention as applied to an apparatus for positioning an element in a borehole.
Figure 1 shows an element 1, upper and lower support brackets 2 and 3 respectively, a wire 4, an electrolevel gauge housing 5 connected by a cable 6 to an output metre 7.
The element 1 is to he aligned vertically, that is, the plan positions of the element at an upper and lower position are to be brought into vertical alignment. An upper support bracket 2 is fitted on the centre- line C near the Lop of the element 1. A lower support bracket 3 is fitted on the centre-line C near the bottom of the element 1. A wire 4 is fitted to a connection point 8 of the upper bracket 2 at a distance 'D' from the face of the element 1. The free end of the wire 4 is fitted under tension to a connection point 9 of the lower support bracket 3 at a distance 'D' from the face of the element 1. An electrolevel monitor housing 5 is attached to the taut wire 4. 'l'he housing contains two orthogonally positioned electrolevel gauges (not shown). The gauges are connected by an electrical cable 6 to an output meter 7. Because the wire 4 is at an identical displacement relative to the element 1, both at the upper and lower connection points, the inclination of the wire 4 reflects the difference in alignment between the upper and lower plan positions of the element 1. By monitoring the output of the electrolevels it is possible to bring the two positions into vertical alignment.
Therefore by aligning the plan position of an upper and lower cross section of the element, the "bow" in the element becomes irrelevant since the vertical alignment of the two predetermined levels can be assured. !
Figure 2 shows an apparatus 10 which is used to position an element 21 within a borehole. The apparatus comprises an upper positioning means]5 and a lower positioning means 16 (otherwise known as upper and lower steering modules). Each of the positioning means comprises a rigid frame which defines an interior space through which the column to be positioned may be lowered, and a pair of rollers 17, 18 and 19, 20. The rollers may be moved horizontally in mutually orthogonal directions by means of mechanical, electrical or hydraulic means. Any roller can be moved independently in the horizontal plane. A rigid beam 22 is attached between one end of the roller 17 at the upper steering module 15, and the end of the corresponding roller 19 at the lower steering module 16. A similar beam 23 is attached to the end of roller 18 and roller 20. On each beam 22 and 23 there is attached a sensitive electrolevel device 24 and 25.
The following explanation describes the steps involved in posi.ti.oning an element within a pile shaft, when the lower part of the bore has been partially filled with concrete. As previously discussed, techniques whereby concrete is placed to a lower [eve]. within the bore after the element has been positioned, are equally applicable to the present invention.
In use, the apparatus 10 is lowered into a temporary casing 11 within the borehole and the plan orientation of the apparatus its determined by a pair of dowels 12 temporarily fitted to the top of the casing. The upper and lower positioning means, 15 and 16 respectively, are secured in place by means of orthogonal locking rams 13 and 14 (shown in figure 3) wh.i ch are braced against the temporary casing ll.
A column 21, in the form of a steel "I" section, is lowered through the interior space defined by the upper and lower positioning means 15 and 16 respectively to a level just above the head of the concrete of the load hearing pile 26. The rollers in the upper and lower positioning means, which are conveniently moved as far apart as possible before use, are moved horizontally so as to bear on the four outer edges of the column 21.
They may then used to adjust the plan position of the at the upper and lower level as necessary.
The plan position at the upper level of the column can be determined by means of conventional surveying techniques. The electroleve] devices 24 and 25 give a voltage output that varies with the:inclination of the beams 22 and 23. Therefore, by means of the rollers, the position of the element can be adjusted so as to give a zero reading when the beams 22 and 23 are vertical. Given that the beams are attached to the centre of the rollers, and the rollers bear directly on to the column 21, then the centre of the column at the lower steering module is precisely below (i.e. vertically beneath) the centre of the column at the upper steering module when the beams are confirmed to he vertical. Note that if there is a 'bow' in the column, it is irrelevant - the mechanism described confirms that the p]an position of the column at the two levels is in vertical alignment.
The above relates to column sections; the system will cater for any other section without departing from the scope of the present invention.

Claims (20)

  1. Claims 1. A method of measuring the difference in alignment between a
    first plan position of an element and a second plan position of an element, the method comprising the use of: i) at least one rigi d or taut connection extending between a first point at the level of the first plan position and a second point at the level. of the second 1() plan position, the first and second points being at an identical displacement from the element; ii) one or more electrolevel gauges provided on the or each rigid or taut connection, so as to measure the inclination of the Pi gid or taut connection.
  2. 2. A method as claimed in claim 1, where:) n the rigid or taut connection comprises a wire.
  3. 3. A method as claimed in claim 1, wherein tile rigid or taut connection comprises a bar or tube.
  4. 4. A method as claimed in claim 1, 2 or 3, whet ein two e.l ectrolevel gauges are provided which are arranged so as to measure the inclination of the rigid or taut connection in muLual].y orthogonal directions.
  5. 5. A method as claimed in claim 4, wherein both of the electrolevel gauges are provided on a single rigid or taut connection.
  6. 6. A method as claimed in any preceding claim, wherein two rigid or taut connections are provided.
  7. 7. A method as claimed in any preceding claim, wherein the or each electro]evel gauge is connected to an output metre.
  8. S. An apparatus for positioning an element in borehole, the apparatus comprising an upper positioning means and a lower positioning means for adjusting the plan position of the element at upper and lower levels respectively, the apparatus being provided with a means to measure the difference in alignment between the first plan position of the element and the second plan position of the element.
  9. 9. An apparatus as claimed in claim 8, wherein the means to measure the difference in alignment between the first plan position of the element and the second plan position of the element extends between the upper and lower positioning means
  10. 10. An apparatus as claimed in claim 8 or 9, wherein the means to measure the difference in alignment between the first. plan position of the element and the second plan position of the element, comprises at]east one rigid or taut connection and one or more electrolevel gauges provided on the or each rigid or taut connection.
  11. 11. An apparatus as claimed in claim 10, wherein the rigid or taut connection comprises a wire.
  12. 12. An apparatus as claimed in claim 10, wherein the rigid or taut connection comprises a her or tube.
  13. 13. An apparatus as claimed in Claire 10, 11 or 12, wherein two electrolevel gauges are provided which are arranged so as to measure the inclination of the rigid or taut connection in mutually orthogonal directions.
  14. 1.4. An apparatus as claimed in claim 13, wherein both Of the electrolevel gauges are provided on a singl rigid or taut connection.
  15. 15. An apparatus as claimed in any one of claims 8 to 14, wherein two rigid or taut connections are provided.
  16. 16. An apparatus as claimed in any one of claims 8 to 15, wherein the upper and dower positioning means each comprise a guide means for adjusting the plan position of an element within the interior space.
  17. 17. An apparatus as claimed in claim 16, wherein the guide means comprises a first and a second pair of rollers which are moveable in mutually orthogonal directions across the interior space.
  18. ].8. A Method of positioning an element in a borehole, the method comprising the steps of: i) placing into the borehole an apparatus comprising an upper positioning means and a lower positioning means for adjusting the plan position of the element at upper and Jower levels respectively, the apparatus being provided with a means to measure the difference in alignment between the first plan position of the element and the second plan position of the element; ii) lowering the element into an interior space defined by the apparatus to a required depth within the horehole; and iii) measuring the difference in alignment between the first plan position of the element and the second plan position of the element by means of the or each electrolevel gauge; and iii) adjusting the upper and lower positioning means to achieve the desired alignment between the first and second plan positions of the element.
  19. 19. An apparatus substantially as herein described with reference to the accompanying drawings.
  20. 20. A method substantially as herein described with reference to the accompanying drawings.
GB0305899A 2003-03-14 2003-03-14 Method and apparatus for positioning an element in a borehole Expired - Fee Related GB2399413B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
GB0305899A GB2399413B (en) 2003-03-14 2003-03-14 Method and apparatus for positioning an element in a borehole
PCT/GB2004/000948 WO2004081294A1 (en) 2003-03-14 2004-03-08 Method and apparatus for monitoring element alignment
US10/549,363 US7530176B2 (en) 2003-03-14 2004-03-08 Method and apparatus for monitoring element alignment
EP04718348A EP1604068A1 (en) 2003-03-14 2004-03-08 Method and apparatus for monitoring element alignment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB0305899A GB2399413B (en) 2003-03-14 2003-03-14 Method and apparatus for positioning an element in a borehole

Publications (3)

Publication Number Publication Date
GB0305899D0 GB0305899D0 (en) 2003-04-23
GB2399413A true GB2399413A (en) 2004-09-15
GB2399413B GB2399413B (en) 2006-10-18

Family

ID=9954802

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0305899A Expired - Fee Related GB2399413B (en) 2003-03-14 2003-03-14 Method and apparatus for positioning an element in a borehole

Country Status (4)

Country Link
US (1) US7530176B2 (en)
EP (1) EP1604068A1 (en)
GB (1) GB2399413B (en)
WO (1) WO2004081294A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2006477C2 (en) * 2011-03-28 2012-10-01 Ihc Holland Ie Bv Measurement system for a pile.

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7735273B2 (en) 2006-01-17 2010-06-15 Morton Buildings Poured concrete column hole
US7360315B2 (en) 2006-01-17 2008-04-22 Morton Buildings Poured concrete column alignment and plumbing tool
CN100465388C (en) * 2007-03-23 2009-03-04 中铁大桥局集团第二工程有限公司 Positioning device for bridge steel cofferdam waterborne tie-high and positioning method thereof
US8122974B2 (en) * 2008-07-10 2012-02-28 Dragan Kosoric Apparatus for drilling machine alignment
JP4677059B2 (en) * 2009-07-09 2011-04-27 新日本製鐵株式会社 Rolled H-section steel
EP2775089A1 (en) * 2013-03-04 2014-09-10 Bauer Spezialtiefbau GmbH Construction device and method for determining the position of a drill drive
JP6264745B2 (en) * 2013-05-10 2018-01-24 株式会社大林組 Adjusting method for erection of reverse strut and adjustment system for erection of reverse strut
US11053655B2 (en) * 2013-09-03 2021-07-06 Lawrence S. Maxwell Modular grid foundation
US9593487B2 (en) * 2014-09-05 2017-03-14 James F. Harvey Modular building system
JP6538427B2 (en) * 2015-05-27 2019-07-03 藤村クレスト株式会社 Yatko with measuring rod and embedding method of pile using this
CN114657972A (en) * 2022-04-06 2022-06-24 南通苏中建设有限公司 Centering device for precast tubular pile and mounting method thereof
CN114718097B (en) * 2022-04-25 2023-09-22 中交第二航务工程局有限公司 Quick positioning method for deepwater steel cofferdam or open caisson
CN115110528B (en) * 2022-05-23 2023-05-02 中建八局发展建设有限公司 Real-time monitoring system and method for verticality adjustment of pile foundation steel upright post
CN115014302B (en) * 2022-06-17 2024-04-23 中国三冶集团有限公司 Installation and measurement method for continuous metallurgical process equipment
CN114991124B (en) * 2022-06-30 2023-08-22 安徽省交通规划设计研究总院股份有限公司 Quick blind connection method for quick connection of prefabricated pile cap and prefabricated pile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4627170A (en) * 1984-10-17 1986-12-09 Vaal Reefs Exploration And Mining Co. Shaft guide alignment measurement
EP0302707A1 (en) * 1987-08-04 1989-02-08 CEMENTATION PILING & FOUNDATIONS LIMTED Method and equipment for accurately positioning items in shafts or piles
GB2296569A (en) * 1994-12-23 1996-07-03 Monitoring Sys Ltd Electronic spirit level
US6246244B1 (en) * 1995-11-13 2001-06-12 Nanotec Solution Method and device for measuring axial deviation in a taut wire alignment system

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3077670A (en) * 1959-09-23 1963-02-19 Pgac Dev Company Method and apparatus for making a dipmeter survey of a borehole
US3544957A (en) * 1969-02-11 1970-12-01 Alexandr Georgievich Smetanin Electronic inclinometer for electric drills
US3693142A (en) * 1969-11-21 1972-09-19 Jack W Jones Borehole orientation tool
US4022284A (en) * 1975-03-17 1977-05-10 Dresser Industries, Inc. Automatic alignment system for earth boring rig
US4130942A (en) * 1977-05-26 1978-12-26 The Laitram Corporation Borehole surveying apparatus
US4434558A (en) * 1981-09-18 1984-03-06 Face Jr Samuel A Surface profile measuring apparatus and method
US4459759A (en) * 1982-08-04 1984-07-17 Sundstrand Data Control, Inc. Angular rate and position transducer for borehole survey instrument
JPS60141924A (en) * 1983-12-28 1985-07-27 Mitsui Constr Co Ltd Erecting device for structure embedded in ground
US4625423A (en) * 1985-09-24 1986-12-02 Sackett Robert R Electronic inclination gauge
EP0302717A1 (en) 1987-08-04 1989-02-08 Ion Tech Limited Body implant
JPH093894A (en) * 1995-06-26 1997-01-07 Hazama Gumi Ltd Permanent substructural column erection control device
GB2399376B (en) * 2003-03-14 2005-11-02 Cementation Found Skanska Ltd Placing elements in piles

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4627170A (en) * 1984-10-17 1986-12-09 Vaal Reefs Exploration And Mining Co. Shaft guide alignment measurement
EP0302707A1 (en) * 1987-08-04 1989-02-08 CEMENTATION PILING & FOUNDATIONS LIMTED Method and equipment for accurately positioning items in shafts or piles
GB2296569A (en) * 1994-12-23 1996-07-03 Monitoring Sys Ltd Electronic spirit level
US6246244B1 (en) * 1995-11-13 2001-06-12 Nanotec Solution Method and device for measuring axial deviation in a taut wire alignment system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2006477C2 (en) * 2011-03-28 2012-10-01 Ihc Holland Ie Bv Measurement system for a pile.
WO2012134279A1 (en) * 2011-03-28 2012-10-04 Ihc Holland Ie B.V. Measurement system for a pile
US9080302B2 (en) 2011-03-28 2015-07-14 Ihc Holland Ie B.V. Measurement system for a pile
AU2012233801B2 (en) * 2011-03-28 2017-05-04 Iqip Holding B.V. Measurement system for a pile

Also Published As

Publication number Publication date
US20060254068A1 (en) 2006-11-16
GB0305899D0 (en) 2003-04-23
WO2004081294A1 (en) 2004-09-23
US7530176B2 (en) 2009-05-12
EP1604068A1 (en) 2005-12-14
GB2399413B (en) 2006-10-18

Similar Documents

Publication Publication Date Title
US7530176B2 (en) Method and apparatus for monitoring element alignment
JP5585059B2 (en) Measuring method of steel pipe installation error
CN107034931B (en) Steel pipe pile verticality detection device and deepwater steel pipe pile construction method
JP5486863B2 (en) Vertical accuracy control method for structural pillars
CN111998839B (en) Support column positioning and verticality detection system based on reverse construction method
US7484913B2 (en) Placing elements in piles
CN111851517A (en) Accurate installation method of steel lattice column applied to foundation pit supporting engineering
KR101009195B1 (en) Verticality measuring method
CN116592838A (en) Underground component lowering installation verticality measuring and monitoring method
CN114277803B (en) Post-insertion method positioning construction method for reverse construction method steel pipe structural column
JP2000304536A (en) Install mount for measuring device and measuring method
CN112284301B (en) Verticality detection system with telescopic circular pipe column circle center self-positioning function
JPH03295931A (en) Construction method for frame straight pillar
JP3616895B2 (en) Construction pillar erection device
CN113832966B (en) Accurate positioning device for large-diameter ultra-long steel casing and accurate installation method thereof
CN216194782U (en) Steel pipe column positioning system
JP3062976B2 (en) Supporting steel frame mounting base
CN115573333B (en) Calibration pile casing of mini-type steel pipe mixing pile for soft sea Liu Jiaohu phase sediment silt layer and construction method of mixing pile
CN111042107B (en) Large-size precast pile enclosure construction system and construction method
CN215669529U (en) Open cut foundation pit continuous beam capable of being rapidly installed with steel support
JPH0532536B2 (en)
CN116770813B (en) Perpendicularity adjusting structure for prefabricated underground continuous wall installation process and construction method thereof
CN211573507U (en) Drilling depth and verticality measuring device
JP2023008648A (en) building construction method
CN117005473A (en) Precast pile construction perpendicularity detection method

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 20210314