GB2380509A - Unconsolidated zonal isolation and control - Google Patents

Unconsolidated zonal isolation and control Download PDF

Info

Publication number
GB2380509A
GB2380509A GB0229869A GB0229869A GB2380509A GB 2380509 A GB2380509 A GB 2380509A GB 0229869 A GB0229869 A GB 0229869A GB 0229869 A GB0229869 A GB 0229869A GB 2380509 A GB2380509 A GB 2380509A
Authority
GB
United Kingdom
Prior art keywords
gravel
unconsolidated
zones
production
zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0229869A
Other versions
GB0229869D0 (en
GB2380509B (en
Inventor
Robert Joe Coon
Michael Naquin
William Triplett
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baker Hughes Holdings LLC
Original Assignee
Baker Hughes Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baker Hughes Inc filed Critical Baker Hughes Inc
Priority claimed from GB9925903A external-priority patent/GB2343468B/en
Publication of GB0229869D0 publication Critical patent/GB0229869D0/en
Publication of GB2380509A publication Critical patent/GB2380509A/en
Application granted granted Critical
Publication of GB2380509B publication Critical patent/GB2380509B/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/14Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/04Gravelling of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/32Preventing gas- or water-coning phenomena, i.e. the formation of a conical column of gas or water around wells

Abstract

A method for enhancing hydrocarbon production from a substantially horizontal borehole 14 in an unconsolidated formation comprises setting a liner hanger or a sand control packer 10 and installing a production string having at least one seal assembly 18.

Description

<Desc/Clms Page number 1>
UNCONSOUDATED ZONAL ISOLATION AND CONTROL
eON BACKGROUND OF THE INVENTION Field of the Invention The invention relates to the oil field industry. More particularly, the invention relates to hydrocarbon production systems in horizontal wellbores.
Prior Art Horizontally disposed wellbores have been employed in growing numbers in recent years to access oil reservoirs not previously realistically producible. Where the
formation is consolidated, relatively little is different from a vertical wellbore. Where the formation is unconsolidated however, and especially where there is water closely below the oil layer or gas closely above, horizontal wells are much more difficult to produce.
Pressure drop produced at the surface to pull oil out of the formation is at its highest at the heel of the horizontal well. In an unconsolidated well, this causes water coning and early breakthrough at the heel of the horizontal well. Such a breakthrough is a serious impediment to hydrocarbon recovery because once water has broken through at the heel, all production from the horizontal is contaminated in prior art systems. Contaminated oil is either forsaken or separated at the surface. Although separation methods and apparatuses have become very effective they still add expense to the production operation. Contamination always was and still remains undesirable.
Zonal isolation has been attempted using external casing packers and open hole packers in conjunction with gravel packing techniques but the isolation of individual zones was not complete using this method and the difficulties inherent in horizontal unconsolidated formation wells have persisted.
Another inherent drawback to unconsolidated horizontal wells is that if there is no mechanism to filter the sand prior to being swept up the production tubing, a large
<Desc/Clms Page number 2>
amount of sand is conveyed through the production equipment effectively sand blasting and damaging me same. A consequent problem i that the borshols wiH continue to become larger as sand is pumped out. Cave-ins are common and over time the sand immediately surrounding the production tubing will plug off and necessitate some kind of remediation. This generally occurs before the well has been significantly depleted.
To overcome this latter problem the art has known to gravel pack the horizontal unconsolidated wells to filter out the sand and support the bore hole. As will be recognized by one of skill in the art, a gravel packing operation generally comprises running a screen in the hole and then pumping gravel therearound in known ways. While the gravel effectively alleviates the latter identified drawbacks, water coning and breakthrough are not alleviated and the horizontal well may still be effectively occluded by a water breakthrough.
Since prior attempts at enhancing productivity in horizontal wellbores have not been entirely successful, the art is still in need of a system capable of reliably and substantially controlling, monitoring and enhancing production from unconsolidated horizontal wellbores.
SUMMARY OF THE INVENTION The above-identified drawbacks of the prior art are overcome or alleviated by the unconsolidated horizontal zonal isolation and control system of the invention.
The invention teaches a zonally isolated horizontal unconsolidated wellbore where packers are not employed on the outside of the basepipe but a reliable zonal isolation is still created. Zones are created by interspersing blank basepipe with slotted or otherwise"holed"basepipe. The blank pipe is not completely blank but rather includes closeable ports therein at preselected intervals. Screens are employed over these ports and (as conventional) over the slotted basepipe. Upon gravel packing, a near 100% of pack is achieved over the blank pipe section because of the
<Desc/Clms Page number 3>
closeable ports. Only about 60% is achievable without the ports. With a full gravel pack of a preselected distance, i. e., & e distance of the Mask pipe, sud the ports closed, isolation is assured with fluid produced for a bad zone being virtually completely prevented from migrating to the next zone. By shutting off production from the undesirable zone, then, through production string seals, only the desired fluid is produced.
BRIEF DESCRIPTION OF THE DRAWINGS FIGURE 1 is a schematic cross section view of an unconsolidated zonal isolation and control system of the invention; FIGURE 2 is a schematic cross section view of a horizontal gravel packed zonal isolation system with dehydration ports in a blank pipe section ; FIGURE 3 is an enlarged schematic cross section view of a dehydration section from the invention of Figure 2; and
FIGURE 4 is a cross section view of Figure 3 taken along section line 4-4.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS D EN In order to most effectively produce from a hydrocarbon reservoir where a horizontal wellbore in an unconsolidated formation is indicated, a gravel pack is ideally constructed. Moreover, the gravel packed area is most desirably zonally isolatable for reasons discussed above. Such zonal isolation preferably is effected by creating unfavorable flow conditions in the gravel pack at selected areas. To complete the system, a number of alternatives are possible: a production string including flow control devices may be run into the hole, each zone being isolated by a locator and a seal ; production may commence directly from the base pipe and bridge plugs may be added later to seal certain offending zones; of a straddle packer which extends from blank pipe to blank pipe may be installed on an offending zone. The latter two alternatives are installed conventionally. The various components of the system are
<Desc/Clms Page number 4>
illustrated in Figure 1 wherein those of skill in the art will recognize a liner hanger or sand control packer 10 near heel 12 of horizontal wellbore 14. From liner hanger or
n r packer 10 hangs a production string including Sow control device 16 which may be hydraulic, mechanical, electrical, electromechanical, electromagnetic, etc. operated devices such as sliding sleeves and seal assemblies 18. Seal assembly 18 operates to create selectively controllable zones within the base pipe of a horizontal wellbore 14.
Seal assemblies 18 (in most cases there will be more than one though only one is depicted in Figure 1) preferably seal against a polished bore in the original gravel packing basepipe 22 which remains in the hole from the previous gravel packing operation. Although the seal assemblies on the inside of the basepipe are effective and controllable, the gravel pack is generally a source of leakage zone to zone as
hereinbefore noted.
In a preferred zonal isolation embodiment of the invention, referring to Figure 2, one will recognize the open hole wall 50 and the gravel pack 52. Centered within the packed gravel 52 are several sections of attached pipe. On the left and right sides of the drawing are standard gravel pack zones 54 and 55 which include a slotted or otherwise "holed" base pipe with screen thereover. Between these zones 54 is an elongated section of essentially blank pipe 56. The blank pipe does, however, have what is referred to herein as a dehydration zone which comprises short sections of screen 58 over at least one, preferably several, closeable port (s). The ports enable full packing of gravel around the blank pipe 56. Without the dehydration ports, only about 60% of the annular region surrounding a blank pipe will be packed. Since this provides a 40% open annulus, zonal isolation would be impossible. With a full pack (about 100%), very good zonal isolation is achieved. The isolation between zones is created by the length of blank pipe. Whatever that length be, undesired fluid would have to travel through the gravel pack in the annulus in order to get to a producing zone once the production pipe has shut off the offending zone. For example, if water had been produced from zone 55 but not from zone 54 the answer would be to shut off
<Desc/Clms Page number 5>
zone 55 from production in some conventional way and continue to produce from zone 54. Although it is possible to move flwds from zone 55 to zone 54 through, me pack 52, it requires a tremendous pressure dtSbrential to move any sigBif'cant volume of fluid. Tests have indicated that at 1500 psi of differential pressure and 40 feet of gravel packed annulus, only 0. 6 barrels of the unwanted fluid will migrate to the producing zone through the gravel pack per day. Since in reality it is unlikely that more than 200-300 psi of differential pressure could exist between the zones, the leakage is so small as to be negligible.
As stated above, gravel packing blank pipe is generally an unsuccessful venture. This is because there is no leak-off of the gravel carrier fluid. When there is no leak-off, the velocity of the fluid stays high and the gravel is carried along rather than deposited. Thus, with respect at least to the p wave of the gravel packing operation, very little sand or gravel is deposited in the annulus of the blank pipe. To slow the gravel carrier fluid down, leak-off must occur. With slower fluid, gravel deposition occurs and the desired result is obtained.
The purpose of the blank pipe is zonal isolation. If there can be leak-off in the blank pipe, the zones will be not be isolated. The inventor of the present invention solved the problem by supplying the temporary leak-off paths introduced above as dehydration zones. Referring to Figure 3, one of the dehydration zones is illustrated in an enlarged format to provide an understanding thereof to one of ordinary skill in the art. The screen 58 is an ordinary gravel pack screen employed as they are conventionally i. e. wrapped around a length of pipe to screen out particles. Under the screen is the essentially blank pipe 56 but which includes one of preferably several ports 60 which operate identically to a selected base pipe in a conventional gravel pack assembly while the ports 60 are open. Ports 60 allow for leak-off and therefore cause gravel to deposit When the gravel packing operation is complete and the otherwise conventional washpipe is withdrawn, a profile on the end thereof (not shown but any type of
<Desc/Clms Page number 6>
shifting profile is acceptable) is pulled past closing sleeve 62 to close the same. The sJeeve 62 completely shuts off port 60 with the sleeve and it seals 64 and is not permitted to open again because of any number of conventional locking mechanisms such as dogs, collet, lock ring, etc. existing preferably at 66. The locking arrangement is needed only to prevent accidental opening of the closing sleeve 62 after it has been closed. Once the closing sleeve 62 is closed, the pipe 56 is indeed completely blank pipe and is a zonal isolator.
Preferably the screen 58 is about one foot in length. Ports 60 may be distributed in many different patterns thereunder with as many ports as desired. One preferred embodiment employs four one quarter inch holes radially arranged about the circumference of the pipe. With respect to the blank pipe section length between the dehydration zones, a range of about five feet to about ten feet is preferred.
Since the provision of different zones and flow control devices in the invention allow the metering of the pressure drop in the individual zones, the operator can control the zones to both uniformly distribute the pressure drop available to avoid premature breakthrough while producing at a high rate. Moreover, the operator can shut down particular zones where there is a breakthrough while preserving the other zones'production.
After construction of one of the assemblies above described, and the washpipe has been removed, a production string is installed having preferably a plurality of the seal assemblies with at least one tool stop mechanism to locate the seal assemblies at points where the basepipe is smooth and the inner diameter is not reduced. Location may also be assured based upon the liner hanger. The seal assemblies allow different zones to be created and maintained so that selective conditions may be generated in discrete zones.
In an alternative embodiment of the dehydration ports, the closing sleeve 62'is not locked and remains operable so that if needed, individual closing sleeves may be opened. This alternative embodiment provides the invention with even more utility in
<Desc/Clms Page number 7>
that it allows the well operator to contaminate selected sections of the gravel pack to even more strongly hamper the ability of fluid to move longitudinally through the gravel pack. More specificaiiy, the sieeve 62 woui be opened by a shifting tool and Al 0/-MCL CL an injection tool (one of many known to the art) would be used to apply a koll contamination fluid through the open port 60. The contamination fluid could be cement, drilling mud, epoxy, etc. and once injected into the gravel pack through the port it would fill all interstitial spaces in the pack making it even more impermeable.
While preferred embodiments have been shown and described, various modifications and substitutions may be made thereto without departing from the spirit and scope of the invention. Accordingly, it is to be understood that the present invention has been described by way of illustration and not limitation.
Specifically, whilst the description makes reference to gravel it is to be understood that any suitable alternative substance such as gravel or sand may be used to form the pack which packs the open area. Such substances are known in the art as proppants and this term is used to encompass suitable material such as gravel or sand.

Claims (1)

1 CLAIMS 2
3 1. A method for enhancing hydrocarbon production
4 from a substantially horizontal borehole in an
5 unconsolidated formation comprising :
6 running to position one of a liner hanger and a
7 sand control packer with proppant packing
8 equipment adjacent said horizontal borehole;
9 installing said proppant packing equipment; 10 performing a proppant packing operation; 11 setting said one of said liner hanger and said 12 sand control packer; and 13 installing a production string having at least 14 one seal assembly.
GB0229869A 1998-11-03 1999-11-03 Unconsolidated zonal isolation and control Expired - Lifetime GB2380509B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10726698P 1998-11-03 1998-11-03
GB9925903A GB2343468B (en) 1998-11-03 1999-11-03 Unconsolidated zonal isolation and control

Publications (3)

Publication Number Publication Date
GB0229869D0 GB0229869D0 (en) 2003-01-29
GB2380509A true GB2380509A (en) 2003-04-09
GB2380509B GB2380509B (en) 2003-06-04

Family

ID=26316048

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0229869A Expired - Lifetime GB2380509B (en) 1998-11-03 1999-11-03 Unconsolidated zonal isolation and control

Country Status (1)

Country Link
GB (1) GB2380509B (en)

Also Published As

Publication number Publication date
GB0229869D0 (en) 2003-01-29
GB2380509B (en) 2003-06-04

Similar Documents

Publication Publication Date Title
CA2288492C (en) Unconsolidated zonal isolation and control
US6619397B2 (en) Unconsolidated zonal isolation and control
US6311772B1 (en) Hydrocarbon preparation system for open hole zonal isolation and control
US4945991A (en) Method for gravel packing wells
US6719051B2 (en) Sand control screen assembly and treatment method using the same
US7367395B2 (en) Sand control completion having smart well capability and method for use of same
US6857476B2 (en) Sand control screen assembly having an internal seal element and treatment method using the same
US6675891B2 (en) Apparatus and method for gravel packing a horizontal open hole production interval
US5082052A (en) Apparatus for gravel packing wells
CA1246438A (en) Hydraulic fracturing and gravel packing method employing special sand control technique
US3960366A (en) Reverse acting lock open crossover valve
US3952804A (en) Sand control for treating wells with ultra high-pressure zones
US5197543A (en) Horizontal well treatment method
US20090159279A1 (en) Methods and systems for completing multi-zone openhole formations
US20020148610A1 (en) Intelligent well sand control
GB2376486A (en) A gravel-inflatable element for sealing wells
US5411090A (en) Method for isolating multiple gravel packed zones in wells
US5850875A (en) Method of deploying a well screen and associated apparatus therefor
US5163512A (en) Multi-zone open hole completion
GB2380509A (en) Unconsolidated zonal isolation and control
GB2499596A (en) Downhole flow control
AU2003261478A1 (en) Unconsolidated zonal isolation and control
US11619109B2 (en) Methods of sealing polished bore receptacles by localized sealant injection
AU2004203176B2 (en) Open hole zonal isolation and control
GB2353312A (en) Zonally isolated propants pack

Legal Events

Date Code Title Description
PE20 Patent expired after termination of 20 years

Expiry date: 20191102