GB2377468A - Apparatus and method for ballast replacement - Google Patents
Apparatus and method for ballast replacement Download PDFInfo
- Publication number
- GB2377468A GB2377468A GB0116889A GB0116889A GB2377468A GB 2377468 A GB2377468 A GB 2377468A GB 0116889 A GB0116889 A GB 0116889A GB 0116889 A GB0116889 A GB 0116889A GB 2377468 A GB2377468 A GB 2377468A
- Authority
- GB
- United Kingdom
- Prior art keywords
- ballast
- ballast material
- operative association
- collector
- sleepers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/06—Renewing or cleaning the ballast in situ, with or without concurrent work on the track
- E01B27/10—Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The apparatus comprises (a) means e.g. a flat rotary cutter 13 to cut an elongate trench 12 adjacent one rail of the track and extending in a direction substantially parallel to said rail; (b) means to remove ballast material from beneath one or more of the sleepers 11b e.g. a chain saw and to convey said ballast material to a collector means located in said trench; (c) collector means a bucket wheel 14 to collect said removed ballast material and to deposit it on a conveying means; (d) means e.g. belt or screw conveyor 15 to convey the deposited collected ballast material to a disposal means; and (e) means e.g. bottom discharge hoppers to replace the removed ballast with fresh ballast; wherein at least said means (b) and (c) are in operative association with each other.
Description
r APPARATUS AND METHOD FOR BALLAST REPLACEMENT
This invention relates to an apparatus for the continuous replacement of ballast material beneath a railway track mounted on sleepers, to a ballast 5 replacement train incorporating such apparatus and to a method of ballast replacement by means of such apparatus.
The ballast material beneath the sleepers of a railway track degrades over a period of time owing to the forces exerted by trains using the track.
10 Moreover, if the ballast becomes wet (e.g. during inclement weather) it can effectively be formed into a slurry by the "pumping" action caused by movement of a train on the track. This leads to the formation of a so-
called "wet-spot", necessitating the removal of the damaged ballast and replacement with fresh ballast.
Hitherto, damaged ballast has been replaced either by physically "digging out" from the affected area or by taking up the track and sleepers before using mechanical excavators. In both such methods it is necessary to close the railway line to traffic.
It has been proposed to provide means for replacing ballast without having to take up the track. One such known means comprises a machine which grinds away the damaged ballast from beneath the sleepers and removes the grinding residue by suction to a conveyor. However, it has 25 been found that such a machine is substantially ineffective due to the compacted nature of the degraded ballast encountered in the United Kingdom.
It has also been proposed to cut a trench ahead of the excavation, the 30 intention being that the excavated ballast falls into the trench for subsequent collection. Cutting of the trench has been attempted by means
of a rotatable wheel having a plurality of scoops or buckets around its periphery. It has been found, however, that the scoops or buckets become clogged in use, with the result that the efficiency of the cutting machine is no greater than about 30% and a usable trench is not achieved.
It is an object of the present invention to provide apparatus for the continuous replacement of ballast, in which the above-mentioned disadvantages are minimised and efficient, cost-effective track maintenance is achieved.
Accordingly, in a first aspect, the present invention provides apparatus for the continuous replacement of ballast material beneath a railway track mounted on sleepers, the apparatus comprising: 15 (a) means to cut an elongate trench adjacent one rail of the track and extending in a direction substantially parallel to said rail; (b) means to remove ballast material from beneath one or more of the sleepers and to convey said ballast material to a collector means located 20 in said trench; (c) collector means to collect said removed ballast material and to deposit it on a conveying means; 25 (d) means to convey the deposited collected ballast material to a disposal means; (e) means to replace the removed ballast with fresh ballast; 30 in which at least said means (b) and (c) are in operative association with each other.
Suitably, at least said means (b), (c) and (d) are in operative association with one another.
Preferably, at least said means (b), (c), (d) and (e) are in operative 5 association with one another.
Most preferably, all said means (a) to (e) are in operative association with one another.
10 In accordance with the present invention, the collector means (c), for collecting removed ballast material and depositing it on a conveying means, may comprise a rotatable member of generally circular transverse section having a plurality of collector members located about its periphery. Thus, the collector means (c) may comprise a wheel having a plurality of scoops or buckets located about its periphery.
Alternatively, the collector means (c) may comprise a plurality of 20 radiating spokes, each spoke having a scoop or a bucket located at its outermost end.
Suitably, each scoop or bucket may be provided with a "sharpened" leading edge to facilitate collection of the removal ballast.
The means (a) may suitably comprise a flat rotary cutter, for example a trenching arm of the standard type available within the civil engineering industry. In use, the means (a) creates an elongate trench adjacent to and substantially parallel with one of the rails. Suitably, the trench will be of 30 a depth in the range 400 to 800 mm. When the means (a) is, in accordance with a particularly preferred embodiment of the present
invention, in operative association with the means (b), (c), (d) and (e), it is desirable that the trench should extend by at least 4.5m ahead of the ballast removal/conveying means (b).
5 The means (b) may suitably comprise a chain-saw in operative association with a conveyor wheel, for example a chain-saw/conveyor of the type available from Kershaw as 42-4 track undercutter. In use, the means (b) excavates ballast from beneath one or more adjacent sleepers and conveys it to the collector means (c).
The means (d), for conveying ballast material (received from the collector means (c)) to a disposal means, may suitably comprise a conveyor belt or the like.
15 Alternatively, the means (d) may comprise a helical screw-conveyor (e. g. Of a type known per se).
The means (e), for replacing the removed ballast with fresh ballast at the point of excavation, may suitably comprise one or more bottom discharge 20 hoppers of the "self-discharge" type, which in use deliver fresh ballast directly to the rear of the cutting face by means of under- wagon conveyors. Tamping and stabilisation means, (e.g. of a type known per se), may 25 additionally be provided in operative association with means (a) to (e) of the apparatus according to the present invention.
In a second aspect, the present invention provides a ballast replacement train for use in the continuous replacement of ballast material beneath a 30 railway track mounted on sleepers, the train comprising the apparatus
according to the first aspect of the present invention, mounted on one or more rail-borne vehicles.
In a preferred embodiment of the second aspect of the present invention, the train may comprise: (i) at least one locomotive; (ii) at least one apparatus according to the first aspect of the present invention; (iii) at least one wagon to receive excavated ballast; and 10 (iv) at least one wagon to contain replacement ballast; with, optionally, at least one tamping means.
In accordance with standard railway maintenance practice, the train may 15 further include at least one service/office wagon and at least one contingency wagon.
In a third aspect, the present invention provides a method for the continuous replacement of ballast material beneath a railway track 20 mounted on sleepers, by means of apparatus according to the first aspect of the present invention, in which the method comprises the steps of: (a) cutting an elongate trench ads acent one rail of the track and extending in a direction substantially parallel to said rail; (b) removing ballast material from beneath one or more of said sleepers and conveying said ballast material to a collector means located in said trench; 30 (c) collecting said removed ballast material and depositing it on a conveying means;
(d) conveying the deposited collected ballast material to a disposal means; and (e) replacing the removed ballast with fresh ballast, at least steps (b) 5 and (c) being in operative association with each other.
Suitably, at least steps (b), (c) and (d) are in operative association with one another.
10 Preferably, at least steps (b), (c), (d) and (e) are in operative association with one another.
Most preferably, all of steps (a) to (e) are in operative association with one another.
The method in accordance with the present invention may further comprise tamping and stabilization of the fresh ballast following step (e).
The present invention will be illustrated, merely by way of example, in 20 the following description and with reference to the accompanying
drawings. In the drawings (wherein like numerals denote like parts): 25 Figure 1 is a schematic sectional view of part of an apparatus according to the first aspect of the present invention; Figure 2 is a schematic view of a train according to the second aspect of the present invention, including the apparatus of 30 Figure 1.
Referring to Figure 1, a railway track comprises two sets of rails lOA and lOB, mounted on sleepers llA and llB respectively. An elongate trench 12, adjacent to one of the rails of set lOB, extends substantially parallel thereto.
Undercutting and conveying means 13 acts, in use, to remove ballast from beneath the sleepers llB and to convey it to the collector means 14.
The collector means 14 comprises a wheel provided with a plurality of 10 scoops or buckets and rotating about its axis in the direction shown by arrows A. The means 14 collects ballast from the undercutting and conveying means 13 and deposits the collected ballast on to conveyor means shown schematically at 15. The collected ballast is conveyed thereafter to one or more spoil wagons (not shown).
Replacement ballast material is delivered, in the direction shown schematically at 16, to the rear of the cutting face. This serves to maintain the track in a substantially level condition during ballast replacement and to minimise the loss of cant.
Referring to Figure 2, the train according to the second aspect of the present invention comprises a ballast excavation apparatus 20 of the type illustrated in Figure 1, in operative association with spoil wagons 21 and 22, ballast wagons 23 and 24 and a tamper/stabiliser 25.
The train is drawn by a locomotive 26 and may include a service/office wagon 27 and one or more contingency wagons 28.
Claims (1)
1. Apparatus for the continuous replacement of ballast material beneath a railway track mounted on sleepers, the apparatus comprising: (a) means to cut an elongate trench adjacent one rail of the track and extending in a direction substantially parallel to said rail; (b) means to remove ballast material from beneath one or more of the 10 sleepers and to convey said ballast material to a collector means located in said trench; (c) collector means to collect said removed ballast material and to deposit it on a conveying means; (d) means to convey the deposited collected ballast material to a disposal means; (e) means to replace the removed ballast with fresh ballast; in which at least said means (b) and (e) are in operative association with each other.
2. Apparatus according to Claim 1, in which at least said means (b),
25 (c) and (d) are in operative association with one another.
3. Apparatus according to Claim 1, in which at least said means (b), (c), (d) and (e) are in operative association with one another.
30 4. Apparatus according to Claim 1, in which all said means (a) to (e) are in operative association with one another.
5. Apparatus according to any one of Claims 1 to 4, in which the collector means (c) comprises a rotatable member of generally circular transverse section having a plurality of collector members located about its periphery.
6. Apparatus according to Claim 5, in which the collector means (c) comprises a wheel having a plurality of scoops or buckets located about its periphery.
10 7. Apparatus according to Claim 5, in which the collector means (c) comprises a plurality of radiating spokes, each spoke having a scoop or a bucket located at its outermost end.
8. Apparatus according to Claim 6 or 7, in which each scoop or 15 bucket is provided with a "sharpened" leading edge.
9. Apparatus according to any one of Claims 1 to 8, in which the means (a) comprises a flat rotary cutter.
20 10. Apparatus according to any one of Claims 1 to 9, in which the means (b) comprises a chain-saw in operative association with a conveyor wheel. 11. Apparatus according to any one of Claims 1 to 10, in which the 25 means (d) comprises a conveyor belt or the like.
12. Apparatus according to any one of Claims 1 to 10, in which the means (d) comprises a helical screw-conveyor.
13. Apparatus according to any one of Claims 1 to 12, in which the means (e) comprises one or more bottom discharge hoppers of the "self-
discharge" type.
5 14. Apparatus according to any one of Claims 1 to 13, further including tamping and stabilisation means.
15. Apparatus for the continuous replacement of ballast material beneath a railway track mounted on sleepers, substantially as hereinbefore 10 described with reference to and as illustrated in Figure 1 of the accompanying drawings.
16. A ballast replacement train comprising an apparatus according to any one of Claims 1 to 15, mounted on one or more rail-borne vehicles.
17. A train according to Claim 16, comprising: (i) at least one locomotive; (ii) at least one apparatus according to any one of Claims 1 to 15; 20 (iii) at least one wagon to receive excavated ballast; and (iv) at least one wagon to contain replacement ballast; with, optionally, at least one tamping means.
25 18. A train according to Claim 16 or 17, further including at least one service/office wagon and at least one contingency wagon.
19. A ballast replacement train, substantially as hereinbefore described with reference to and as illustrated in Figure 2 of the accompanying 30 drawings.
20. A method for the continuous replacement of ballast material beneath a railway track mounted on sleepers, by means of apparatus according to any one of Claims 1 to 15, in which the method comprises the steps of: (a) cutting an elongate trench adjacent one rail of the track and extending in a direction substantially parallel to said rail; (b) removing ballast material from beneath one or more of said 10 sleepers and conveying said ballast material to a collector means located in said trench; (c) collecting said removed ballast material and depositing it on a conveying means; (d) conveying the deposited collected ballast material to a disposal means; and (e) replacing the removed ballast with fresh ballast, at least steps (b) 20 and (c) being in operative association with each other.
21. A method according to Claim 20, in which at least said steps (b), (c) and (d) are in operative association with one another.
25 22. A method according to Claim 20, in which at least said steps (b), (c), (d) and (e) are in operative association with one another.
23. A method according to Claim 20, in which all of steps (a) to (e) are in operative association with one another.
24. A method according to any one of Claims 20 to 23, further comprising tamping and stabilisation of the fresh ballast following step (e).
5 25. A method for the continuous replacement of ballast material, substantially as described herein.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0116889A GB2377468B (en) | 2001-07-11 | 2001-07-11 | Apparatus and method for ballast replacement |
EP02254787A EP1275781A3 (en) | 2001-07-11 | 2002-07-09 | Apparatus and method for ballast replacement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0116889A GB2377468B (en) | 2001-07-11 | 2001-07-11 | Apparatus and method for ballast replacement |
Publications (3)
Publication Number | Publication Date |
---|---|
GB0116889D0 GB0116889D0 (en) | 2001-09-05 |
GB2377468A true GB2377468A (en) | 2003-01-15 |
GB2377468B GB2377468B (en) | 2005-01-19 |
Family
ID=9918277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB0116889A Expired - Fee Related GB2377468B (en) | 2001-07-11 | 2001-07-11 | Apparatus and method for ballast replacement |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP1275781A3 (en) |
GB (1) | GB2377468B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104928998A (en) * | 2014-03-17 | 2015-09-23 | 中国铁道科学研究院铁道建筑研究所 | Excavation device for railway ballast pillow bottoms |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7845098B1 (en) | 2009-05-22 | 2010-12-07 | Loram Maintenance Of Way, Inc. | Rotary undercutter for rail line maintenance |
CN111877060A (en) * | 2020-07-14 | 2020-11-03 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Ballastless track bed structure part replacement method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3967396A (en) * | 1974-09-23 | 1976-07-06 | Canron, Inc. | Undercutter with rotary trencher |
US4563826A (en) * | 1984-10-24 | 1986-01-14 | Kershaw Manufacturing Company, Inc. | Apparatus for removing ballast from beneath a railroad track |
US4674208A (en) * | 1986-03-31 | 1987-06-23 | Kershaw Manufacturing Company, Inc. | Ballast removing apparatus |
US4705115A (en) * | 1986-03-31 | 1987-11-10 | Kershaw Manufacturing Company, Inc. | Method and apparatus for reconditioning ballast along a railroad track |
GB2218139A (en) * | 1988-05-05 | 1989-11-08 | Tamper Corp | Railroad track ballast remover |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4119154A (en) * | 1977-02-18 | 1978-10-10 | Southern Railway Company | Method and apparatus for treating ballast |
IT1214197B (en) * | 1987-08-04 | 1990-01-10 | Danieli Off Mecc | SYSTEM FOR FOOD AND EVACUATION IN CONTINUOUS MATERIALS IN RENOVATION OPERATIONS RAILWAY AND SIMILAR PLATFORMS. |
-
2001
- 2001-07-11 GB GB0116889A patent/GB2377468B/en not_active Expired - Fee Related
-
2002
- 2002-07-09 EP EP02254787A patent/EP1275781A3/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3967396A (en) * | 1974-09-23 | 1976-07-06 | Canron, Inc. | Undercutter with rotary trencher |
US4563826A (en) * | 1984-10-24 | 1986-01-14 | Kershaw Manufacturing Company, Inc. | Apparatus for removing ballast from beneath a railroad track |
US4674208A (en) * | 1986-03-31 | 1987-06-23 | Kershaw Manufacturing Company, Inc. | Ballast removing apparatus |
US4705115A (en) * | 1986-03-31 | 1987-11-10 | Kershaw Manufacturing Company, Inc. | Method and apparatus for reconditioning ballast along a railroad track |
GB2218139A (en) * | 1988-05-05 | 1989-11-08 | Tamper Corp | Railroad track ballast remover |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104928998A (en) * | 2014-03-17 | 2015-09-23 | 中国铁道科学研究院铁道建筑研究所 | Excavation device for railway ballast pillow bottoms |
Also Published As
Publication number | Publication date |
---|---|
GB2377468B (en) | 2005-01-19 |
GB0116889D0 (en) | 2001-09-05 |
EP1275781A3 (en) | 2004-01-28 |
EP1275781A2 (en) | 2003-01-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5479725A (en) | Method of and arrangement for rehabilitating a ballast bed of a track | |
US5566619A (en) | Method and apparatus for rehabilitating the subgrade supporting a ballast bed | |
CA2137012C (en) | A machine installation for treating the ballast bed of a track | |
CA2383161C (en) | A cleaning machine and method of cleaning ballast | |
EP0512075B1 (en) | Method and apparatus for cleaning ballast | |
CN105401494A (en) | Railway ballast excavating device | |
EP1275781A2 (en) | Apparatus and method for ballast replacement | |
CN1086010C (en) | Pipeline construction machinery for digging track sub-grade material | |
JPH0132324B2 (en) | ||
USRE35788E (en) | Method of and arrangement for rehabilitating a ballast bed of a track | |
AU779760B2 (en) | A machine for renewing a track | |
US5937548A (en) | Machine for withdrawing bulk material from a track | |
EP1348057B1 (en) | Ballast removal method and apparatus | |
CA2329045C (en) | Method and pulverizer for pipeline trench padding | |
US5553674A (en) | Ballast cleaning machine | |
US4400897A (en) | Method and railway train for draining a railway track | |
US4119154A (en) | Method and apparatus for treating ballast | |
AU605490B2 (en) | Overburden excavator | |
US4858696A (en) | Mobile ballast cleaning machine | |
JPS626002A (en) | Apparatus for re-laying gravel for tunnel | |
RU2226580C2 (en) | Ballast cleaning machine | |
US20030090683A1 (en) | Method of grading railroad beds and a laser measuring device | |
CN117468284B (en) | Railway screening backfill equipment and method | |
CN217678366U (en) | Railway ballast excavating mechanism | |
CA2139541C (en) | Ballast cleaning machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
732E | Amendments to the register in respect of changes of name or changes affecting rights (sect. 32/1977) | ||
PCNP | Patent ceased through non-payment of renewal fee |
Effective date: 20060711 |