GB2331811A - Surveying a well borehole by means of rate gyro and gravity measurements - Google Patents

Surveying a well borehole by means of rate gyro and gravity measurements Download PDF

Info

Publication number
GB2331811A
GB2331811A GB9901620A GB9901620A GB2331811A GB 2331811 A GB2331811 A GB 2331811A GB 9901620 A GB9901620 A GB 9901620A GB 9901620 A GB9901620 A GB 9901620A GB 2331811 A GB2331811 A GB 2331811A
Authority
GB
United Kingdom
Prior art keywords
sonde
measurements
well
borehole
survey
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB9901620A
Other versions
GB2331811B (en
GB9901620D0 (en
Inventor
Gary W Uttech
James Brosnahan
Eric Wright
Greg Allen Neubauer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gyrodata Inc
Original Assignee
Gyrodata Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US08/358,867 external-priority patent/US5657547A/en
Application filed by Gyrodata Inc filed Critical Gyrodata Inc
Publication of GB9901620D0 publication Critical patent/GB9901620D0/en
Publication of GB2331811A publication Critical patent/GB2331811A/en
Application granted granted Critical
Publication of GB2331811B publication Critical patent/GB2331811B/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/02Determining slope or direction
    • E21B47/022Determining slope or direction of the borehole, e.g. using geomagnetism

Landscapes

  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Geophysics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

A positional survey of a well borehole (12, fig.1) which is subject to deviation from the vertical is made by means of a survey tool (10) having a housing in the form of a sonde 16 containing a rate gyro (24), having an axis of rotation coincident with the centre-line axis of the sonde, and means (30) for measuring, along two orthogonal axes, the direction of gravity relative to the sonde, i.e. the angle of inclination of the sonde. The method, as described, comprises incrementally moving the sonde in the borehole e.g. by means of a slickline (20), taking orthogonal measurements at spaced locations, and combining the measurements to determine the borehole azimuth and inclination at the spaced locations. The sonde determines a reference North direction at each location by means of a two orthogonal measurements made with the rate gyro. The gyro and gravity measurements are used to determine two dimensions of the sonde position, the third being provided by a depth measurement. In an embodiment of the invention these measurements are repeated with the housing at each of two opposite azimuthal positions relative to its axis of rotation, the housing being rotatable by means of a drive (26). Each set of measurements is averaged, and the standard deviation determined as an indication of the quality of the measurements. The two averages should sum to zero; any residual value is a measure of error, e.g. as a result of drift, and can be used to provide the necessary compensation.

Description

1 1 / 1 1 - 1 1 1'- P'kTENTS ',CT 1977 ?l 0317GB-NF/ j sd 2331811 RATE
GYRO WELLS SURVEY SYSTEM INCLUDING NULLING SYSTEM
BACKGROUND OF THE DISCLOSURE
The present disclosure is directed to a rate gyro based survey device and a method of conducting a survey of a well borehole. In many instances, a well borehole is drilled which is substantially vertical. Rudimentary survey devices are used for such wells. By contrast, many wells are highly d.eviated. The well will define a pathway through space which proceeds from a centralized well head, typically clustered with a hiumber of other wells, and extends in a serpentine pathway to a remote point of entry into a producing formation. This is especially the case with offshore platforms. Typically, an offshore platform will be located at a particular location. A first well is drilled to verify the quality of the seismic data. Once a producing formation is located, and is verified by the first well, a number of other wells are drilled from the same location. This is advantageous because it requires that the offshore drilling platform be anchored at a articular location. That is, the p offshore drilling platform is anchored at a given site and several CD C) wells are then drilled from that site. The wells drilled from a single site will enter the producing formation at a number of scattered I locations. As an example, consider a producing formation which is 0 15,000 feet in length and width and which is located at a depth of C, 10,000 feet. From a single location approximately near the center, it is not uncommon to drill as many as 30 wells or more to the 1 _ - formation. Consider as an example an offshore location in about 200 feet of water where drilling is conducted into the single formation from a single platform location. After the first well has been drilled, a template is lowered to the mudline and rested on the bottom. The template typically supports several conductor pipes, typically arranged in a grid patfern such as 4 X 8. This provides a template with 32 holes in the template. Conductor pipes are placed in the holes in the template. Below that, a deviated well is drilled for most of the wells. Some of the wells are deviated so that they are drilled at an angle of perhaps only 30' with respect to the horizon as the wells are extended out laterally in a selected direction. The wells enter the formation at predetermined points. This means that each well has a first vertical portion, a bent portion below the conductor pipe, and then a long deviated portion followed by another portion which is often vertical. So to speak, the well is made of serial segments in the borehole.
C) A survey is necessary to define the precise location of the well borehole. In most deviated wells, a free fall survey instrument typically is not used. Free fall survey instruments are used for fairly vertical wells. Where the vertical component is substantial and the lateral deviation is nil, survey instruments are readily available which can simply be dropped to obtain such data. Alternately, survey instruments are known which can be placed in the drill string at the time of retrieval of the drill string so that well borehole survey data is obtained as the drill string is pulled from the well borehole. This typically occurs when the drill bit is changed. The capture of accurate survey information is important, especially 1.
where the well is highly deviated. As an example, the well can be deviated where it extends at a 30 angle with respect to the horizon. It can have two or more large angular deflection areas. The well 0 C) might terminate at a lateral location as much as 5,000 to 10,000 feet to the side of the drilling platform. Without regard to the lateral Z) C., extent of the well borehole, and without regard to the azimuth or the depth of the well, it is important to obtain an accurate survey from such wells. In this instance, an accurate survey is required to enable drilling the well to the total depth desired and hitting the target ZD C. -D entry into the producing formation. Typically, two or three surveys are required while drilling the well borehole. The surveys that are necessary enable correction to be undertaken so that the well can be further deviated to the intended location for the well.
In one aspect, the present disclosure sets forth a system which is able to be run on a slickline. The slickline is simply a support line to enable the survey sonde to be lowered to the bottom of the well borehole. The borehole path in space is located by the present system. In doing so, the sonde which encloses the equipment of the disclosure is lowered in either of two different fashions. In one instance, it can simply be lowered on the slickline within the drill string, and is then left at the bottom of the drill string, and then is moved incrementally upwardly as the drill string
I C, is pulled. Pulling the drill string is necessary in order to change the Z:) C it drill bit which is periodically required. In that sequence, the device is lowered to the bottom of the drill string and is landed 'ust above I j the drill bit. At that juncture of proceedings, the sonde cannot C precede any further because it is captured within the drill string and 1 is too large to pass through the openings in the drill bit. The drill bit is normally replaced by pullinla, the drill string. The drill string is pulled by removing the topmost joints of pipe. Typically, the derrick is sufficiently tall so that three joints can be removed simultaneously. The three joints together comprise a "stand" which is placed in the derrick to the side of the rotary table. By this approach, the entire drill string is pulled incrementally moving the drill bit toward the surface for replacement. Each stand is approximately 90 feet in height. Therefore the drill bit is stationary for an interval sufficient to remove one stand, and these intervals are spaced at 90 feet in length. At each momentary stop in the process of removing a stand of the drill string, the drill bit is stopped 0 C, and hence the sonde is stopped and obtains well borehole survey data. As additional stands of pipe are removed, this enables the sonde to stop and to obtain additional well borehole survey data. The data is measured at these stops while the survey is conducted.
In another procedure, the drill string is left in the well borehole. The sonde is lowered inside of the drill string to the bottom of the well borehole on a slickline, and is then pulled from the well borehole. In pulling, measurements are made by periodically stopping the sonde by stopping the slickline movement.
If the slickline remains inside of the drill string, during, rotation in the drilling phase, it can be readily severed. A line cutting device is available which can be placed on the slickline and which is permitted to fall to the bottom of the slickline. The inertial upset which occurs when the cutting device strikes bottom is Z sufficient to cut the slickline and thereby to enable retrieval of the 1 1 slickline cutting apparatus and the slickline prior to resuming the drilling phase. This leaves the sonde in the drill pipe. It is left so that it can be retrieved along with the drill string. It is always found I t:.
in the last joint of the drill stem (normally the bottom most drill collar) which is removed at the time that the drill string is pulled. As mentioned, pulling normally occurs during a trip to replace the drill C' D bit.
The present disclosure sets forth an apparatus which particularly has an advantage in overcoming modest amounts of instrument drift. It utilizes a rate gyro as well as two
C, accelerometers. Both devices provide measurements in orthogonal C> directions. In the preferred construction of the device, measurements are made in the X and Y dimensions. By definition, the Z dimension is coincident with the center line axis of the cylindrical sonde. Therefore X and Y define a plane at right angles with respect to the Z axis. There is a scale problem which arises from the use of a rate gyro mixed with accelerometers. The sensitivity of a gyro is enhanced compared with accelerometers. Typically, the signals from the rate gyro are approximately two orders of 0 11; magnitude more sensitive. This means that instrument drift C resulting from aging drift, temperature drift, drift as a result of I 2"D 0 vibration and the like are substantially amplified in the output signals from the rate gyro. One advantage of using a rate gyro is that I 1 0 Z:) C> the signal is so sensitive. It is however a detriment if the rate gyro C):-3 signal is to be used in conjunction with signals from accelerometers.
I I The present disclosure sets forth a mechanism in which the enhanced sensitivity of the rate gyro compared with the accelerometers is used -:7 to an advantage. One aspect of this derives from a mechanism which rotates the rate gyro housing 180. The housing is coincident with 1 the axis through the tool so that the rate gyro is rotated about the Z 0 axis. If the rotation is precisely 180', then the X and Y outputs from the rate gyro will be reversed. They will be reversed precisely thereby yielding the same output data with a reversal in algebraic 0 t) sign. If a value is obtained denoted as +X, and a second value is obtained which is denoted as -X, then the algebraic sum of these two r> values should be zero in a perfect situation where no systematic error such as instrument drift occurs. Should there be a minor amount of error in the system such as drift or other error, the magnitude of the algebraic sum of these two values is dependent on the error, and more precisely is two times the error. This will be represented below as 2A. Knowing this, the error A can be isolated, and can then be eliminated from the data. Not only is this is true for the X dimension, it is also true for the Y dimension. Therefore both errors in X and Y can be overcome. This enables the presentation then of a rate gyro Sianal which is substantially free of that type of error.
The present disclosure takes advantage of onboard
Z-> computing through a CPU which is provided with suitable power for r> t> 1 operation by a power supply, and which works with data which is input to the CPU. The data from the rate gyro and the two 0 accelerometers is written temporarily in memory. After a set of data is obtained, the set is then processed to reduce the amount of memory storage required. Speaking more specifically, in one aspect cp 0 of the present disclosure, a set or ensemble of data is obtained. The r number of measurements from each sensor output is represented by N where N is a positive integer. The integer is typically a multiple of two so that data processing is simplified. In one aspect of the present disclosure, N is typically 64, 128, 256 As will be seen, these represent values of N, where N is a multiple of two.
In summary, the present disclosure sets fourth a method and apparatus for obtaining survey data from a slickline supported tool which is maintained on the slickline or which is left in the drill string just above the drill bit. In both aspects, data is taken as the sonde which encloses the apparatus is pulled toward the surface, either on the slickline or on removal of the drill string, from the well borehole. In both instances, data is captured by making multiple measurements at a given depth in the well borehole whereby N data from each sensor output are collected and processed. The data are obtained from X and Y accelerometers and X and Y output sensors on a rate gyro. This provides four sets of data. The data are stored temporarily in memory until the N data measurements are accumulated from each of the four sensor outputs. The sensors provide this data at one position, and then the rate gyro housing, is rotated so that the data is provided from an alternate position. The alternate position is intended to be precisely equal and opposite. The second set of N data therefore provides data which ideally should subtract from the first set of data for the rate gyro. The N data are then averaged to provide four average values for each rate gyro orientation, two of which derived from the rate gyro and two of which are obtained from the accelerometers. This enables nullina to
C> substantially reduce the highly amplified effects of drift and the 1 error in the rate gyro data. The several data for each of the four 0.
sensors are statistically analyzed to provide the standard deviation. This is an indication of data quality.
DESCRIPTION OF THE DRAWINGS
So that the manner in which the above recited features, advantages and objects of the present invention are attained and can be understood in detail, more particular description of the invention, briefly summarized above, may be had by reference to the embodiments thereof which are illustrated in the appended drawings.
It is to be noted, ho,,vever, that the appended drawings illustrate only typical embodiments of this invention and are therefore not to be considered limiting of its scope, for the invention may add to other equally effective embodiments.
Fig g. I is a schematic diagram of the sonde of the present disclosure supported in a well borehole on a slickline and further shows a relative reference system for the sonde and a surface located reference system; a 1 Fig. 2 is a perspective view of the sonde showing the X I Z' and Y orientation of the gyro and accelerometer sensors with respect 4 to the Z axis which is coincident with the sonde housing; I Fig. 3 is an X and Y plot of the output signals of the Z> accelerometers with respect to an X and Y coordinate system showing Z> how he gravity vector G impacts the sensors and thereby provides I useful data; -S- --c Fig. 4 is a view similar to Fig. 3 for the gyro showing how a vector is located with indicates true north; and Fig. 5 is a combined coordinate system derived from Figs. 3 and 4 jointly showing how true north cooperates with other 0 measurements to thereby provide a indication of whole azimuth.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
Attention is first directed to Ficy. I of the drawings where I.D the numeral 10 identifies the apparatus of the present disclosure. It is shown in a well borehole 12 which extends into the earth from a well head location 14. At the well head, there is a reference system which is illustrated. At the surface, the reference system utilizes directional measurements, namely those on a compass rose. Ideally it is oriented to true north. In other words, to the extent that magnetic north is different from true north at different locations on the earth, it is preferable to use true north. Often, magnetic north can be measured and a simple adjustment incorporated because the deviation between true north and magnetic north is well known. The compass defines the orthogonal measurements as mentioned, and that therefore defines the vertical dimension also. The three references of course describe an orthogonal coordinate system.
The tool 10 is constructed in a cylindrical shape and is enclosed within a shell or housina known as a sonde 16. The sonde is for the protection of the apparatus located on the interior. The sonde at the upper end incorporates a fishing neck 18 for easy retrieval. It is incorporated so that a grappling type device can engage the fishing neck for retrieval. It is lowered into the well 11 1 1 borehole on a slickline 20. The slickline does not electrical conductor. In that instance, it would normally as a wire line because it includes one or more electrical Rather, it is a small diameter wire of sufficient strength to support the survey tool 10 - The slickline extends to the surface. From the surface, the slickline is lowered into the well borehole. Typically, this must be done through a blow out preventor (not shown) to prevent pressure from blowing up through the well and out through ID the wellhead. The slickline, once the tool has been extended to the bottom of the well borehole, can be cut by placing a cutter device 2 2 on the slickline which travels to the bottom of the slickline. When it is stopped, the inertial upset associated with that sudden stop causes a cutter mechanism inside the cutter 22 to sever the slickline. The slickline can then be retrieved with the apparatus 22 clamped on the lower end of the slickline. In one other aspect, Fig. I has been simplified [simply] by omitting the drill string from the drawing representation in the immediate area of the depicted survey instrument 10. As a practical matter, the tool of the present disclosure is normally lowered within the interior of a drill string 23.
Z:' It is lowered to the bottom drill string which is closed at the lower end by a drill bit. As be understood, it is necessary to obtain a survey from a partly drilled %vell borehole. In the drilling of a well borehole, the drill string 23 supports the drill bit at the very bottom end of the drill string. The lowermost tubular member is typically a drill collar. At least one and sometimes as many as ten drill collars are incorporated.
include an be termed conductors.
1 1 1 1,^c, xi e re. C) The sonde 16 can be r-etr-ieve on the slickline 20 and measurements correlated to depth recorded by a measuring device 0 having a measuring wheel 21 contacted against the line 20. The measurement data is stored by a recorder as a function of time.
The drill string is normally extended in the well bore hole until the point in time that the drill bit has worn. The rate of penetration is normally measured and this is some indication that the drill string needs to be pulled to replace a worn drill bit. The life of a drill bit is typically reasonably well known. The life of the drill bit, of course, is somewhat dependent on the formation materials being drilled at the moment; in this aspect of the present disclosure, the drill bit is pulled with the drill string and is replaced with a new drill bit of a selected type for continued drilling in a particular type formation.
The present disclosure particularly features the sonde 16 which is a sealed housing for the apparatus. It is able to operate in a steel drill pipe because it is not dependent on magnetically induced measurements. In other words, it is not necessarily responsive to the magnetic field of the earth. In that instance, it would require that the bottom most drill collar be formed of some nonmagnetic material. Such drill collars are quite expensive and can be avoided through the use of the present apparatus.
ZD As further shown in Fig. I of the drawings, there is a tool C) 1:1 related reference system. The Z dimension is coincident with the central axis of the elongate sonde 16. X and Y are dimensions at C:
right angles as defined before. A rate gyro 24 is supported in the Z- I sonde 16 such that it is axially coincident with the central or 1 1.
1 elongate dimension of the sonde 16. The rate gyro is enclosed in a suitable housina. The housina, sensors, and rotating member of the rate gyro elements which can be discussed in schematic form because the rate gyro is a device well known in ID a number of applications including oil well survey equipment. In other words, C) the rate gyro need only be shown in schematic form. It incorporates a housing which encloses the moving components. The housing itself C, 0 is mounted for rotation about the Z axis, and a housing drive 26 is 0 included. This drive rotates the housing precisely through a 1801 C) r) rotation. This rotation is about the Z axis or the axis of the sonde 16. The Z axis of the sonde is defined by the coordinate system previously mentioned, and hence rotation of the rate gyro about that axis provides measurements which will be discussed below, taking into account the X and Y dimensions in the tool related coordinate system.
In Fig. 1 of the drawings, the accelerometers 30 are also indicated in schematic form. As further illustrated, the housing drive 26 is connected with rate gyro 24 to provide the above described rotation. The data from the four sensors, two accelerometers 30 and two sensors associated with the rate gyro 24, are all input to the CPU 32. The CPU is provided with a suitable power supply and a clock 34 for operation. A program in accordance with the teachings of the present disclosure is stored in memory 36, and the data that is created during test procedures is likewise written in memory. When
0 retrieved to the surface, the memory can be interrogated, and the 1 data removed from the survey instrument 10 for subsequent and separate processing bl 1 11 To better understand the present apparatus, attention is momentarily directed to Fig. 2 of the drawings. As shown there, the -7 1 C' sonde including the sonde shell 16 is illustrated. In it, there are the two sets of sensors shown in symbolic form with particular emphasis on the X and Y coordinates for the two sets of sensors. As marked in Fig. 2, the X and Y dimensions are coincident. They differ in that the two sensor devices are offset along the length of the sonde. This offset does not impact the output data.
Going further with the structure shown in Fla. 2 of the drawings, there is imposed on the drawing the centerline axis through the sonde shell 16 which forms the protective jacket of the [survey instrument 10. Moreover the rate gyro which rotates in a plane transverse to the axis is likewise illustrated and a significant aspect of it is indicated, namely, the ability to locate true north illustrated by the symbol TN. Likewise, the two accelerometers are able to locate the gravity vector, illustrated by the symbol 0, which is C> indicated in Fig. 2 of the drawings. Going more specifically however Z-:1 C-1) C) to the symbolic representations which are sent forth in Figs. 3, 4, and considered jointly, it,vill be seen that the accelerometers provide two outputs. They will be represented symbolically as Ax and Ay. These are the two signals which are provided by the two accelerometers. In space, they define two resolved components of the gravity vector which is represented by the symbol G. As further Z shown in the drawings, the gravity vector which points toward the center of the earth defines an equal and opposite vector. That vector is represented by the symbol HS which refers to the high side of the C ! 3 1 11 tool face. The significance of that is understood with the explanation r; below.
Fig. 4 of the drawings shows the two output signals from the gyro which, as resolved components, defines a vector which points in the direction of true north represented by the symbol TN in Fig. 4. These representations shown in Figs. 3 and 4 are combined in Ficy. 5 of the drawinas. True north is useful for orientina the 1:1 M, measuring instrument 10 in space. Once that is known in conjun-ction with vector HS, the hole azimuth can be determined. The hole azimuth is represented by the vector Az. The representations in Figs. 3, 4, and 5 are significant in describing operation of the device C) - C) of this disclosure.
One important feature of the present apparatus is brought out by the method of operation. Consider a first set of I readings which is obtained by use of the survey tool which is shown C in Fia. I of the drawings. Assume for purposes of discussion that the survey tool 10 is lowered on a slickline 20 to the bottom of a drill string 23 and is left resting on the bottom the drill string just above the drill bit. At that location, the sonde is then located so that data can be obtained from a first location in the well borehole. Through the use of the present apparatus, measurements are obtained which are represented as Ax, Ay, Gx, and Gy. Preferably, many measurements are made, the number being represented by N, and they are recorded in memory. Assume for purposes of discussion that N data points is 128 or 256. Through the use of conventional statistical programs readily available, all of the data from each sensor output at a civen tool depth in the well borehole is 0 ! 4- collectively analyzed and the standard deviation of the four variables is then obtained. The standard deviation is recorded along with the average value. While N data are obtained for all the four variables at a given depth, the data are reduced to single values so that each of the four variables are individually and uniquely represented.
As one example, assume that the sonde 16 is lowered to precisely 10,000 feet in the well borehole and a set of data is obtained. Assume also that N is 256. 256 entries are recorded in memory for each of the four variables. Then, the four variables are averaged and the standard deviation for each of the four is also obtained.
At this juncture, the data derived from the rate gyro 1 includes averaged values of GX and Gy. The next step is to rotate the gyro housing. N measurements from each sensor again are made. These measurements are made after rotation and ideally are measurements which are equal and opposite the first measurements. The second set of N data from each of the four sensor outputs is likewise averaged, and the standard deviation is again determined.
0 0 The first average value for GX is then compared with the second 0 avera.e value of -Gx. When the two are added, the algebraic sum 0 C> should be zero if no systematic instrument error (such as drift) is present. In other words, the magnitude of the average of second set 0 Z"> of data is subtracted from the magnitude of the average of the first set of data from the rate gyro measurements.
Any small error which is obtained upon subtraction of the two values is primarily a function of error in the equipment, 1 -.
k which is usually sensor drift. These error differences can be useful in evaluating the quality of the data.
C) The foregoing routine should be considered with respect to the position of the measuring instrument 10 in the well borehole. Data is preferably collected from the bottom to the top. To do this, at the time that a drill string is to be pulled on a trip to replace the drill bit, the measuring instrument 10 is pumped down the drill string 0 ID supported on the slickline. When it lands at the bottom, the line is severe7d and retrieved so that it will not connect the several stands of pipe together. A first data set cons isting of measures of Gx, Gy, Ax, I=> Cp i and Ay is collected. This is collected while the drill bit is at bottom.
This is accomplished when the drill string is not rotating. The D Z:, averages are obtained for values of Gx, Gy, Ax, and Ay. In addition, the standard deviation for all four measurements is likewise obtained, thereby representing eight data values, four being the average measurements and four bein,,.,, the standard deviation of those measurements. The housing is then rotated and the second set C.
of measurements are obtained. These are the measurements of -Gx and -Gy. They are recorded for later subtraction, or they can be automatically subtracted by the CPU.
The collection of data requires a finite interval.
N(=256) measurements process is done in a few seconds.Earth movement continues while collecting the data long the well. The N measurements are taken at M depths.
The term M represents the number of measurements made at a specified depth along the well borehole. An example will be given below which involves 100 measurements or M = 100.
1 The averaged measurements and deviation data are stored and are subsequently retrieved when the tool 10 is brought C> to the surface. Assume for purposes of description that the well is 9,000 feet in depth. The drill stem is made of typically 90 foot stands of pipe so that data from M = 100 depths are obtained. The first set of N data are, co Ilected while the drill bit is on bottom and the second set of N data is collected after rotation of the gyro housing before the drill bit is raised by removal of the first stand of pipe. This -can be continued indefinitely until the entire drill stem has been removed to enable bit replacement. This will create M survey points in the 9000 feet of borehole.
At each stopping place for the drill string where the drill string is suspended while another stand of pipe is removed from the drill string,the housing is rotated so that two sets of gyro data are r> ZD C, obtained. This is repeated until the drill bit is brought to the surface. The measuring instrument 10 of the present disclosure is carried up the borehole in the bottom most drill Collar resting on top of the drill bit. The sonde 16 is then removed and connected to a suitable output cable to enable transfer of the measured data out of the sonde into another memory device. This enables the data to be further analyzed and used in plotting a survey of the well borehole.
Z As noted from the foregoing, one important advantage of 0 r) the system is that a set of N data for each sensor output is obtained with the housing positioned in one direction or orientation and then 1.) another set of N data is obtained with the housing rotated by 180'.
1 This is done repetitively as the drill string is pulled.
1 1 The present system is not susceptible to distortions which arise from the incorporation of ferrous materials in the drill string. The present apparatus operates in ferrous pipe. This avoids the costly isolation step of installing an exotic alloy drill collar in the drill string. Such drill collar are relatively expensive. For example, a drill collar made of Inconel (an alloy trademark) is very expensive compared to a drill collar made of steel. The presently disclosed system avoids that costly requirement.
Consider now the steps necessary to construct a survey. For each depth, measurements from the four sensor outputs (highly refined averages) were made at a particular elevation in the well borehole with a specified orientation of the tool in the well borehole. A careful and detailed survey can be obtained by this procedure usina M sets of data where M is an integer representing the number Z) 1:1 Z> of measurement sets of N data for each sensor output recorded at M locations in the well. The typical operation records data where M equals one with the drill bit on bottom. The next (M=2) is measured when the first stand of pipe is pulled.
In the forecoin-, each of the M measurements stations [are) is located spaced from adjacent stations by one stand of pipe or approximately 90 feet. This dimension is well known. The data collected thus has M sets of data where M represents the number of stops made in retrieving the drill string. This provides M finite locations along the pathway of the borehole. The athway can then I p represented in a three dimension plot of the well as a survey. The typical representation utilizes three variables, with one variable beginning depth in the well borehole of each of the M stops. In 4) C, -1 's- addition, the inclination and azimuth of the well borehole determined at each of the M stops thereby providing the remaining two variables C required to define the position of each stop in three dimensional space. The three variables provide a useful representation of data which has the form of a survey as mentioned.
In another way of operation, the too] can be lowered in the well borehole to a desired depth, and the first of the M measurements is made with the drill bit at the bottom of the borehole and the sonde rested above the drill bit in the drill string, Then, the slickline is retrieved from the borehole by a specified measurement. If the well is 10,000 feet in depth, it is not uncommon to move the sonde 100 feet. In this instance, the M sets of measurements would be 100 or M = 100. This enables operator control of the spacing of the data points along the survey. In a highly deviated well, the survey points may be quite close together.
C C) In a well which only deviates slightly, the survey points can be 0 farther apart which permits a smaller value of M. In this particular instance, M and N can be selected by the operator. Loosely, they represent scale or spacing along the survey. As before, the survey I I typically is reported in the form of azimuth, inclination, and location alona the well borehole. As noted with recard to Fias. 3, 4 and 5, Z> 0 C azimuth and inclination can be obtained from the data. Data quality is likewise obtained b noting the standard deviation. While the y foregoing is directed to the preferred embodiment, the scope can e 0 Z determined from the claims which follow.
1! 51 - 9 h <.

Claims (6)

CLAIMS:
1. A method of obtaining a survey in a well borehole subject to deviation from the vertical which comprises the steps of:
a) positioning in a well borehole a rate gyro having an axis of rotation coincident with a sonde which supports said rate gyro, and moving said sonde along the well borehole and taking measurements at spaced locations to determine a reference north measurement by combing measurements made with said rate gyro at opposite azimuthal positions with respect to said axis of rotation; b) measuring the direction of gravity along the sonde as it moves in the well borehole; c) determining from said measurements at least two dimensions of the position of the sonde in the well borehole, and d) determining the quality of said at least two determinations of the position of the sonde int he well borehole.
2. The method of Claim 1 wherein true north is formed by two orthogonal signals.
3. The method of Claim 2 including the step of locating gravity direction by making two orthogonal measurements.
4. The method of Claim 3 including the step of determining sonde depth in the well borehole.
5. The method of Claim 4 including the step of making measurements recorded in memory in the sonde and retrieving the sonde to obtain data recorded in memory.
'7
5. The method of Claim 4 including the step of determining well azimuth for the survey.
1 <"
6. The method of Claim 5 including the step of determining well inclination for the survey.
7. The method of Claim 6 including the step of making measurements recorded in memory in the sonde and retrieving the sonde to obtain data recorded in memory.
8. A method of obtaining a survey in a well borehole subject to deviation from the vertical which comprises the steps of:
a) positioning in a well borehole a rate gyro having an axis of rotation coincident with a sonde which supports said rate gyro, moving said sonde along the well borehole and making two orthogonal signal measurements at spaced locations, and determining a reference orth measurement from said orthogonal signal measurements; b) measuring the direction of gravity along the sonde during movement in the well borehole by making an additional two orthogonal signal measurement, and c) determining from said measurements at least two dimensions of the position of the sonde in the well borehole.
9. The method of Claim 8 including the step of determining sonde depth in the well borehole.
10. The method of Claim 9 including the step of determining well azimuth for the survey.
11. The method of Claim 10 including the step of determining well inclination for the survey.
12. The method of Claim 11 including the step of making measurements recorded in memory in the sonde and retrieving the sonde to obtain data recorded in memory.
13. A method of performing a survey of a well borehole comprising the steps of:
a) positioning an elongate sonde in a well borehole having a rate gyro therein rotating about an axis and forming an output indicative of north, and wherein said rate gyro is supported by a housing rotatable between first and second positions separated by 1800 of housing rotation and said output indicative of north comprises N measurements are made at a first sonde position, then the housing is rotated by 1800 and another N measurements is made where N is an integer; b) positioning the sonde at spaced locations along a well borehole; c) measuring the direction of the sonde along the well borehole, and d) combining the measurements to form a well borehole survey.
14. The method of Claim 13 wherein N measurements are averaged to provide an average value prior to housing rotation, and the two averaged values are incorporated in the survey.
15. The method of Claim 14 wherein measurement standard deviation is determined, and is included in the computed borehole survey data.
16. The method of Claim 15 wherein rate gyro housing rotation occurs after N measurements are made thereby to enable said N measurements to be made in a selected time interval and a second set of measurements to be made in a second selected time interval.
17. The method of Claim 16 wherein N measurements are made at first location in the well borehole, then, N measurements are made along the borehole at evenly spaced locations so that the borehole survey has a desired set of data points.
18. The method of Claim 13 wherein the sonde is lowered to the bottom of a drill string in the well borehole on a slickline and the slickline is retrieved leaving the sonde in the well borehole.
19. The method of Claim 18 wherein the sonde measures north and gravity direction while tripping the drill string out of the borehole.
20. A method of obtaining a survey in a well borehole, which borehole is subject.to a deviation from the vertical, the method comprising the steps of providing a sonde which supports a rate gyro which has an axis of rotation substantially coincident with the sonde, the sonde being provided with means for reversing the position of the gyro with respect to the said axis of rotation, the sonde also being provided with means to measure the direction of gravity relative to the sonde, the method further comprising the step of causing the sonde to move along the well borehole, and, at spaced apart positions in the borehole, measuring the direction of gravity and determining a reference direction by combining measurements made with the rate gyro at opposite azimuthal positions with respect to the axis of rotation, and subsequently determining from the measurements details concerning the orientation of the borehole at the point that the measurements were made.
21. A method according to Claim reference direction is true north.
wherein the 1 e- 22. A method according to Claim 20 or 21 wherein the means to determine the direction of gravity comprise two accelerometers.
23. A method according to any one of the preceding Claims wherein the method includes the step of determining well azimuth for the survey and the step of determining well inclination for the survey.
24. A method according to any one of the preceding Claims wherein the sonde incorporates a memory which stores the measurements, the method including the step of retrieving the sonde to obtain data recorded in the memory.
25. A method according to Claim 24 wherein the memory records the measured signals with respect to time, further means being provided to record the position of the sonde within the well with respect to time.
26. A method according to Claim 25 wherein the sonde is lowered into the well on a line or the like, and the means to record the position of the sonde within the well comprise means which record, with respect to time, the amount of the line supporting the sonde that has been fed into the well borehole.
27. A method according to any one of the preceding Claims wherein the gyro is supported by a housing rotatable between first and second positions separated by 180 0 of housing rotation, means being provided to reverse the position of the said housing at each said location.
28. A method according to any one of the preceding Claims wherein at each location a plurality of measurements are taken, the measurements subsequently being averaged.
1 e' 1 29. A method of obtaining a survey in well borehole comprising the steps of lowering a sonde into the well, the sonde comprising means to determine a reference direction and means to determine the direction of gravity, relative to the sonde, taking measurements from said means at selected points and determining the orientation of the borehole at those points.
30. An apparatus for conducting a well borehole survey comprising a sonde containing a rate gyro and means to determine the direction of gravity relative to the sonde, the rate gyro being adapted to determine a reference direction, means being provided to combine measurements made with the rate gyro at opposite azimuthal positions with respect to the axis of rotation of the gyro.
31. An apparatus according to Claim 30 wherein the said gyro is supported by a housing, means being provided to rotate the housing between first and second positions separated by 1800.
32. An apparatus according to Claim 30 or 31 wherein the sonde incorporates a memory adapted to store information relating to determined values with respect to time.
33. An apparatus for conducting a well borehole survey comprising a sonde containing means to determine a reference direction and means to determine the direction of gravity, relative to the sonde.
An apparatus according to Claim 33 containing a memory adapted to store values determined by said determining means.
4 all 35. A method of obtaining a survey in a well borehole substantially as herein described with reference to the accompanying drawings.
36. An apparatus for obtaining a survey in a well borehole substantially as herein described with reference to and as shown in the accompanying drawings.
37. Any novel feature or disclosed herein.
combination of features 26- -C- Amendments to the claims have been filed as follows 1 1. A method of obtaining a survey in a well borehole subject to deviation from the vertical which comprises the steps of:
a) positioning in a well borehole a rate gyro having an axis of rotation coincident with a sonde which supports said rate gyro, moving said sonde along the well borehole and making two orthogonal signal measurements at spaced locations, and determining a reference north measurement from said orthogonal signal measurements; b) measuring the direction of gravity along the sonde during movement in the well borehole by making an additional two orthogonal signal measurement, and C) determining from said measurements at least two dimensions of the position of the sonde in the well borehole.
2. The method of Claim I including the step of determining sonde depth in the well borehole.
J. The method of Claim 2 including the step of determining well azimuth for the survey.
4. The method of Claim -33 including the step of determining well inclination for the survey.
GB9901620A 1994-12-19 1995-12-19 Rate gyro wells survey system including nulling system Expired - Lifetime GB2331811B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US08/358,867 US5657547A (en) 1994-12-19 1994-12-19 Rate gyro wells survey system including nulling system
GB9525934A GB2296772B (en) 1994-12-19 1995-12-19 Rate gyro wells survey system including nulling system

Publications (3)

Publication Number Publication Date
GB9901620D0 GB9901620D0 (en) 1999-03-17
GB2331811A true GB2331811A (en) 1999-06-02
GB2331811B GB2331811B (en) 1999-08-18

Family

ID=26308328

Family Applications (1)

Application Number Title Priority Date Filing Date
GB9901620A Expired - Lifetime GB2331811B (en) 1994-12-19 1995-12-19 Rate gyro wells survey system including nulling system

Country Status (1)

Country Link
GB (1) GB2331811B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2369685A (en) * 2000-07-20 2002-06-05 Schlumberger Holdings Method Of Determining Trajectory In Borehole Drilling
GB2394779A (en) * 2002-10-09 2004-05-05 Pathfinder Energy Services Inc Borehole azimuth measeasurement using two sets of gravity sensors and an additional reference sensor
WO2004048893A1 (en) * 2002-11-22 2004-06-10 Reduct Method for determining a track of a geographical trajectory
US6882937B2 (en) 2003-02-18 2005-04-19 Pathfinder Energy Services, Inc. Downhole referencing techniques in borehole surveying
US6937023B2 (en) 2003-02-18 2005-08-30 Pathfinder Energy Services, Inc. Passive ranging techniques in borehole surveying
US6985814B2 (en) 2003-06-09 2006-01-10 Pathfinder Energy Services, Inc. Well twinning techniques in borehole surveying
US7080460B2 (en) 2004-06-07 2006-07-25 Pathfinder Energy Sevices, Inc. Determining a borehole azimuth from tool face measurements
US7725263B2 (en) 2007-05-22 2010-05-25 Smith International, Inc. Gravity azimuth measurement at a non-rotating housing
WO2014043751A1 (en) * 2012-09-19 2014-03-27 Reservoir Nominees Pty Ltd Multifunction orientation system
AU2015261610B2 (en) * 2012-09-19 2017-06-22 Reservoir Nominees Pty Ltd Multifunction orientation system with failover measurement system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239997B (en) * 2015-10-09 2018-06-22 山东大学 A kind of drilling trepanning azimuth, inclination angle positioning device and its localization method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4454756A (en) * 1982-11-18 1984-06-19 Wilson Industries, Inc. Inertial borehole survey system
US4756088A (en) * 1981-08-20 1988-07-12 Nl Industries, Inc. Instruments for monitoring the direction of a borehole

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4756088A (en) * 1981-08-20 1988-07-12 Nl Industries, Inc. Instruments for monitoring the direction of a borehole
US4454756A (en) * 1982-11-18 1984-06-19 Wilson Industries, Inc. Inertial borehole survey system

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2369685B (en) * 2000-07-20 2002-10-23 Schlumberger Holdings Borehole survey method utilizing continuous measurements
US6633816B2 (en) 2000-07-20 2003-10-14 Schlumberger Technology Corporation Borehole survey method utilizing continuous measurements
GB2369685A (en) * 2000-07-20 2002-06-05 Schlumberger Holdings Method Of Determining Trajectory In Borehole Drilling
US7002484B2 (en) 2002-10-09 2006-02-21 Pathfinder Energy Services, Inc. Supplemental referencing techniques in borehole surveying
GB2394779A (en) * 2002-10-09 2004-05-05 Pathfinder Energy Services Inc Borehole azimuth measeasurement using two sets of gravity sensors and an additional reference sensor
GB2394779B (en) * 2002-10-09 2006-04-19 Pathfinder Energy Services Inc Supplemental referencing techniques in borehole surveying
US7623961B2 (en) 2002-11-22 2009-11-24 Reduct Method for determining a track of a geographical trajectory
WO2004048892A1 (en) * 2002-11-22 2004-06-10 Reduct Method for determining a track of a geographical trajectory
WO2004048893A1 (en) * 2002-11-22 2004-06-10 Reduct Method for determining a track of a geographical trajectory
EP2270429A2 (en) 2002-11-22 2011-01-05 Reduct Method for determining a track of a geographical trajectory
EP2270429A3 (en) * 2002-11-22 2011-11-09 Reduct Method for determining a track of a geographical trajectory
US6937023B2 (en) 2003-02-18 2005-08-30 Pathfinder Energy Services, Inc. Passive ranging techniques in borehole surveying
US6882937B2 (en) 2003-02-18 2005-04-19 Pathfinder Energy Services, Inc. Downhole referencing techniques in borehole surveying
US6985814B2 (en) 2003-06-09 2006-01-10 Pathfinder Energy Services, Inc. Well twinning techniques in borehole surveying
US7080460B2 (en) 2004-06-07 2006-07-25 Pathfinder Energy Sevices, Inc. Determining a borehole azimuth from tool face measurements
US7725263B2 (en) 2007-05-22 2010-05-25 Smith International, Inc. Gravity azimuth measurement at a non-rotating housing
WO2014043751A1 (en) * 2012-09-19 2014-03-27 Reservoir Nominees Pty Ltd Multifunction orientation system
AU2015261610B2 (en) * 2012-09-19 2017-06-22 Reservoir Nominees Pty Ltd Multifunction orientation system with failover measurement system

Also Published As

Publication number Publication date
GB2331811B (en) 1999-08-18
GB9901620D0 (en) 1999-03-17

Similar Documents

Publication Publication Date Title
US5657547A (en) Rate gyro wells survey system including nulling system
US7204308B2 (en) Borehole marking devices and methods
DK174567B1 (en) Installations for use in boreholes
US5105894A (en) Method and apparatus for orientating core sample and plug removed from sidewall of a borehole relative to a well and formations penetrated by the borehole
US4813274A (en) Method for measurement of azimuth of a borehole while drilling
US6736221B2 (en) Method for estimating a position of a wellbore
US11629588B2 (en) Method and device for depth positioning downhole tool and associated measurement log of a hydrocarbon well
EP0387991B1 (en) Surveying of boreholes
CA2666291A1 (en) Downhole depth computation methods and related system
Buchanan et al. Geomagnetic referencing-the real-time compass for directional drillers
US9297249B2 (en) Method for improving wellbore survey accuracy and placement
SA118390837B1 (en) Systems, Devices, and Methods for Generating Drilling Windows
US4297790A (en) Survey apparatus and method employing rate-of-turn and free gyroscopes
CN101476463B (en) Drill-following natural gamma geosteering method for horizontal well
GB2331811A (en) Surveying a well borehole by means of rate gyro and gravity measurements
US4192077A (en) Survey apparatus and method employing rate-of-turn and free gyroscopes
EP0348049B1 (en) Surveying of boreholes
US20160003028A1 (en) Automatic Wellbore Survey Evaluation
GB2352043A (en) Method of drilling under rivers and other obstacles
WO2007104103A1 (en) Method of orientating a core sample
NO319197B1 (en) Method for orienting a deviation tool in a borehole with magnetic field disturbances
WO2017199104A1 (en) Method for improving drilling direction accuracy and knowledge of drilling direction
MacLeod et al. Identification of tectonic rotations in boreholes by the integration of core information with Formation MicroScanner and Borehole Televiewer images
GB2252169A (en) Detecting roll angle of a borehole tool
US20030168218A1 (en) Conductor system

Legal Events

Date Code Title Description
PE20 Patent expired after termination of 20 years

Expiry date: 20151218