GB2276353A - Floating methanol production complex - Google Patents

Floating methanol production complex Download PDF

Info

Publication number
GB2276353A
GB2276353A GB9405942A GB9405942A GB2276353A GB 2276353 A GB2276353 A GB 2276353A GB 9405942 A GB9405942 A GB 9405942A GB 9405942 A GB9405942 A GB 9405942A GB 2276353 A GB2276353 A GB 2276353A
Authority
GB
United Kingdom
Prior art keywords
floating
production
methanol
storage unit
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
GB9405942A
Other versions
GB9405942D0 (en
Inventor
Brian L Noble
Alexander Christopher Barnard
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OFFSHORE PRODUCTION SYSTEMS LI
Original Assignee
OFFSHORE PRODUCTION SYSTEMS LI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OFFSHORE PRODUCTION SYSTEMS LI filed Critical OFFSHORE PRODUCTION SYSTEMS LI
Publication of GB9405942D0 publication Critical patent/GB9405942D0/en
Publication of GB2276353A publication Critical patent/GB2276353A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

A system for the production of methanol from an offshore natural gas field comprises a floating production unit (10) in the form of a floating platform. The production unit (10) includes a methane-to-methanol production plant (18). A floating storage unit (12) is spaced apart from the production unit (10) but is coupled to the production unit (10) by a pipeline (26) which conveys producted methanol from the production unit (10) to the storage unit (12). The storage unit may include personnel accommodation and plant controls linked to the production unit by a telecommunications link. The platform may be moored to the sea bed by a four point mooring arrangement, each attachment point being a permanently set anchor drilled and cemented in place (Fig. 3b) the mooring line caternaries being adjusted via tension winches. <IMAGE>

Description

"Floating Methanol Production Complex" This invention relates to the offshore production of methanol from natural gas extracted from a subsea well.
The invention makes possible engineering developments to enable substantial quantities of chemical grade AA methanol and other refined products to be produced on a floating production facility moored over a reservoir of feed stock.
Offshore natural gas is currently exploited in two ways. When the gas field is reasonably close to centres of use, the gas is transported ashore via a pipeline, and transmitted to the users via a distribution network after minimal treatment. If there is no centre of use in the vicinity of the field, the gas is piped ashore and liquefied to form liquefied natural gas (LNG) which is held in cryogenic storage tanks until it is exported by LNG tanker to the area of consumption. LNG storage and gasification facilities are also required at the point of reception.
It will be appreciated that exploiting natural gas by the LNG route requires extremely high capital expenditure, including the use of specialised tankers which are not suitable for any other uses. These constraints have inhibited the development of offshore gas fields which are below a rather large size, or which are in particularly remote locations.
The conversion of methane to methanol is a well known process in widespread commercial use. Offshore natural gas may be exploited by conversion to methanol, which is very much easier to store and transport than LNG.
Currently, this is done by piping the gas to an onshore conversion plant, but this has disadvantages in the cost of transmission and the fixed location of the plant.
It has been proposed to convert natural gas to methanol in a floating plant located at the gas field. However, no such installation has been made hitherto. It is believed that the reasons why floating conversion has not hitherto been practicable are both economic and technical. The various proposals which have been made have been centred on the use of a single-hull vessel, such as a tanker or barge, to accommodate the entire installation including conversion, storage and crew accommodation. It would be difficult to build or convert a vessel of this nature at a cost which would make the overall system economic. It would also be difficult to achieve an acceptable degree of safety for the operating personnel or the environment, given that the vessel would combine storage of a flammable product with a chemical conversion plant and accommodation for personnel.Further, the usual processes for converting methane to methanol are gravity-dependent and their functioning is severely affected by changes in inclination, to an extent that it is believed that these processes could not be made to work on a vessel undergoing pitch or roll.
According to the present invention, a system for the production of methanol from an offshore natural gas field comprises a floating production unit in the form of a floating platform carrying a methane-to-methanol production plant, a floating storage unit spaced apart from the floating production unit, and pipeline means interconnecting the production and storage units.
Preferably the floating platform is semisubmersible and may be moored to the seabed.
Preferably the floating storage unit is a tanker vessel which may be secured to a single point mooring.
Preferably personnel accommodation and plant control are located on the floating storage unit.
The plant control suitably comprises a master control unit on the floating storage unit, a slave control unit on the floating production unit, and double or triple telecommunications links between the storage and production units. The telecommunications links are suitably microwave, radio or troposcatter.
The floating platform is preferably moored at each corner to a seabed anchor. Preferably each anchor is drilled and permanently set in place; suitably each anchor is formed by drill collar and a rock bit, most preferably also with an under reamer, to form an annulus which is cemented.
Preferably also, each anchor includes a pulley fairlead set at seabed level, a mooring line being looped around the fairlead and led to a pair of deck winches.
The floating production unit preferably includes a vent boom mounted on the floating platform. Typically, the vent boom is mounted at a corner of the floating platform and is preferably rotatable through ninety degrees. Preferably, a vent boom control arrangement is provided which acts to position the boom rotationally in accordance with the prevailing wind.
An embodiment of the present invention will now be described, by way of example only, with reference to the drawings, in which: Fig. 1 is a schematic perspective view of an offshore installation embodying the invention; Fig. 2 is a block diagram illustrating the control system of the installation of Fig. 1; Fig. 3a is a schematic side view of part of a mooring system used in the installation; Fig. 3b is a cross-section of a mooring anchor used in the mooring system, as installed; Fig. 3c is a side view of a tool used in the mooring anchor; Fig. 4 is a plan view of the production platform in the system of Fig. 1, illustrating the mounting and use of a vent boom; Fig. 5 is a control schematic of the drive and control arrangement for the vent boom; and Fig. 6 is a process flow schematic for the floating storage unit in the system of Fig. 1.
Referring to Fig. 1, the system of the present invention includes a floating production unit 10 and a floating storage unit 12.
The floating production unit 10 is in the form of a conventional semisubmersible platform vessel 10, having a deck 14 mounted on six columns 16 which are in turn carried on two submersible hulls 58 (see Fig. 3A). A suitable form of vessel 10 is a modified "Sedco 600" semisubmersible.
The vessel 10 is positioned geographically above or adjacent to a gas field and is connected to receive gas from the field. Preferably, a number of wells are connected to a christmas tree assembly located on the seabed under the vessel 10, which is connected thereto by a flexible riser. These arrangements are well known and do not in themselves form part of the present invention, and are therefore not shown or described in detail.
The floating production unit 10 includes a methanol conversion plant generally indicated at 18 carried on the deck 14, and a vent boom 20 which will be described in detail below.
The methanol conversion plant 18 may be any suitable known system. Preferably, the plant 18 uses the "Katalco" methanol synthesis system by Imperial Chemical Industries in conjunction with partial oxygenation (gasifier) equipment by Texaco.
The floating storage unit 12 is in the form of a converted tanker 22 pivotally secured at the stern to a single point mooring 24 of known type. Methanol is transferred from the floating production unit 10 to the floating storage unit 12 by a pipeline 26. The two units are preferably spaced apart by about 1.5km for safety reasons.
Methanol is pumped to the storage unit 12 as it is produced and is stored there as will be described in more detail below. It is then exported in conventional product or parcel tankers periodically, transhipment being accomplished with the tanker moored bow-to-bow with the storage unit 12.
A typical system would suitably produce 2,500-3,000 tonnes of methanol per day, with the floating storage unit being of approximately 110,000 tonnes useful deadweight. Export would typically require two shuttle tankers of 35,000 deadweight tonnes each.
The control arrangements are shown in Fig. 2. These are based on the use of a main control centre 30 on the floating storage unit 12, connected to a slave or backup control centre 32 on the floating production unit 10. These may be interconnected as shown via duplicated or triplicated microwave, radio or troposcatter data links 34, or in any other suitable manner such as cable or fibre optic links on the seabed.
This arrangement allows all control functions normally to be carried out from the main control centre located on the floating storage unit 12, thus allowing only a minimum number of personnel to be required aboard the floating production unit 10 at any time.
The integrity of the data links is constantly monitored by heartbeat. In the event of failure, both the main and slave control centres act to safely shut down the process plant and utilities.
The fabrication of the main and slave control centres can be carried out on land, thus allowing the system pre-commissioning to be carried out and the data links proved prior to fitting out on the marine facilities.
The preferred mooring arrangement is illustrated in Fig. 3. The vessel 10 is moored by a four point permanent mooring system, each corner column being connected to a permanently set anchor arrangement.
Each anchor arrangement is drilled with a drill string consisting of a 12-1/4" rock bit 40, a 12-1/4" x 171/2" under reamer 42, a 20' x 7-3/4" spiral ground drill collar 44, a 6'6" x 12-1/4" stabiliser 46, and a 30' x 7-3/4" spiral ground drill collar 48. This string is run to give a 12-1/4" hole with an enlarged 17-1/2" intermediate section created by operating the under reamer 42, the entire annulus then being filled with oil well cement 50.
A pad eye 51 is welded to the top of the collar 48, to which a pulley fairlead 52 is connected. A mooring line 54 is looped around the fairlead 52 and is connected to double deck winches (not shown) via a double fairlead 56 secured to the hull 58 and a double fairlead (not shown) at deck level.
The catenary of the four mooring lines is adjusted by their respective winches in accordance with weatherinduced heave of the vessel 10 to achieve optimum motion characteristics. The use of mooring lines looped around fairleads at anchor level reduces mooring line tension to approximately half of that in conventional single line systems.
Referring to Figs. 4 and 5, the vent boom system is directed to ensuring that carbon emissions can be vented away from the vessel 10 without coming into contact with the oxygen plant, and this can be achieved for any wind direction without repositioning the vessel 10.
As shown in Fig. 4, the vent boom 20 is mounted on a gimbal mechanism with drive ring, generally indicated at 60, which incorporates a slipring seal through which waste gases can be passed while allowing the boom to be rotated through 90 degrees. The main drive is by an electric motor 62, with backup drive by a hydraulic motor 64 (or a hydraulic ram) actuated by solenoid operated valves 66, 68 (see Fig. 5).
The control system, Fig. 5, is fully duplicated with wind direction inputs from a main position transducer 70 driven by a weathervane 72 on the vessel aerial mast, and a standby position transducer 70a driven by a weathervane 72a at an alternative elevated position.
Integrity of the system is monitored by a comparator 74 which compares weathervane position with boom position.
When out of limits, the comparator 74 disables the main system and enables the backup system. The backup system remains enabled until the comparator 74 is reset via reset input 76; the comparator reset will latch only if the main system is functioning normally. Once reset has been achieved, the main system will be enabled and the secondary system disabled.
An important aspect of the overall system is the downloading of product from the floating production unit 10 to the floating storage unit 12, since this allows the loads acting on the vessel 10 to be controlled within suitable parameters. As seen in Fig. 6, product arriving on the floating storage unit 12 is metered by a flow meter 80 and passed to one of two day tanks 82a, 82b which suitably are sized to accept the entire methanol production from one 12 hour shift period, that is 1,250-1,500 tonnes. The product is held in the day tank until it has undergone laboratory analysis before being downloaded into the main cargo tanks 84. Any product found to be out of specification is pumped to a holding tank 86. As seen in Fig. 1, the tanks 82, 86 may suitably be deck mounted. A fourth deck mounted tank may be provided to allow for redundancy.
Product is off loaded to the shuttle tankers by the floating storage unit's normal cargo handling pumps 88 and cargo shipping pumps 90 via a fiscal metering system 92 of known type.
Out of specification product is returned periodically from the holding tank 86 to the floating production unit 10 by a transfer pump 94 via a flow meter 96, for re-processing or for use as fuel. The data generated from the various metering stations can be used to monitor the integrity of the pipeline It will thus be seen that the present invention provides a system which enables relatively small and remote offshore gas fields to be exploited in an efficient and safe manner. The separation of storage from the high temperature production process provides safety, and allows weight control at the production unit such that a semisubmersible may be used, which in turn provides a stable platform for the production process.
As an alternative or addition to shipping methanol, the whole or part of the methanol synthesis gas could be used as a feedstock for the production of high grade diesel fuel. There are well known methods of converting synthesis gas to hydrocarbons, such as the Fischer Tropsch process and more recent processes using cobalt or precious metal catalysts.
In one modification, a proportion of the methanol syngas is mixed with nitrogen before being passed through a cooled slurry reactor. The product, a mixture of light material, diesel and wax, needs to be hydrocracked slightly and isomerised to produce more diesel; this would be performed ashore. The end product is free of aromatics and sulphur and can therefore be sold at a premium. The additional plant required is the slurry-type reactor and a nitrogen/CG2 circulator and cooler. The light ends column of the methanol plant is used to stabilise the hydrocarbon product prior to transfer to the floating storage unit and shipping to the onshore facility.
Alternatively, the system could be dedicated to diesel production, and in this case the hydrocracker could be accommodated on the floating production unit, with diesel product being loaded for export directly from the floating storage unit.
Other modifications may be made within the scope of the invention.

Claims (12)

1. A system for the production of methanol from an offshore natural gas field comprises a floating production unit in the form of a floating platform carrying a methane-to-methanol production plant, a floating storage unit spaced apart from the floating production unit, and pipeline means interconnecting the production and storage units.
2. A system according to claim 1, wherein personnel accommodation is located on the floating storage unit.
3. A system according to claim 1 or claim 2, wherein plant control for the methane-to-methanol production plant is located on the floating storage unit.
4. A system according to claim 3, wherein the plant control comprises a master control unit on the floating storage unit, a slave control unit on the floating production unit and a communications link between the master and slave control units.
5. A system according to claim 4, wherein the communications link is a double or a triple communications link.
6. A system according to any of the preceding claims, the system further comprising anchoring means to moor the platform to the seabed.
7. A system according to claim 6, wherein the anchoring system comprises an anchor which is drilled into the seabed.
8. A system according to claim 7, wherein the anchor is cemented to the seabed after being drilled into the seabed.
9. A system according to any of claims 6 to 8, wherein the anchoring system comprises a fairlead which co-operates with a mooring line to moor the platform to the seabed.
10. A system according to claim 9 when dependent on claim 7 or claim 8, wherein a fairlead is mounted on the anchor and another fairlead is mounted on the floating platform.
11. A system according to any of claims 6 to 10, wherein a number of anchors are provided to moor the floating platform to the seabed.
12. A system for the production of methanol from an offshore natual gas field as hereinbefore described, with reference to any of the accompanying drawings.
GB9405942A 1993-03-25 1994-03-25 Floating methanol production complex Withdrawn GB2276353A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB939306157A GB9306157D0 (en) 1993-03-25 1993-03-25 Floating methanol production complex

Publications (2)

Publication Number Publication Date
GB9405942D0 GB9405942D0 (en) 1994-05-11
GB2276353A true GB2276353A (en) 1994-09-28

Family

ID=10732696

Family Applications (2)

Application Number Title Priority Date Filing Date
GB939306157A Pending GB9306157D0 (en) 1993-03-25 1993-03-25 Floating methanol production complex
GB9405942A Withdrawn GB2276353A (en) 1993-03-25 1994-03-25 Floating methanol production complex

Family Applications Before (1)

Application Number Title Priority Date Filing Date
GB939306157A Pending GB9306157D0 (en) 1993-03-25 1993-03-25 Floating methanol production complex

Country Status (3)

Country Link
AU (1) AU6379994A (en)
GB (2) GB9306157D0 (en)
WO (1) WO1994021512A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001002242A1 (en) * 1999-07-02 2001-01-11 Single Buoy Moorings, Inc. Simplified storage barge
WO2004065748A2 (en) * 2003-01-22 2004-08-05 Single Buoy Moorings, Inc. Marginal gas transport in offshore production
WO2006057664A1 (en) * 2004-11-22 2006-06-01 Syntroleum Corporation Movable gas-to-liquid system and process
WO2008057052A1 (en) * 2006-11-07 2008-05-15 How Kiap Gueh Method of producing methane and heavy hydrocarbons from marine vessels equipped with nuclear powerplant
US7655135B2 (en) 2006-03-14 2010-02-02 Syntroleum Corporation Process for removing solid particles from a hydroprocessing feed
WO2019147810A1 (en) * 2018-01-24 2019-08-01 Nw Innovation Works Near-shore floating methanol conversion ship and export terminal

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9911021D0 (en) * 1999-05-13 1999-07-14 Kvaerner Oil & Gas As Process for treating and liquefying gaseous mixtures as natural gases
EP1156026A1 (en) 2000-05-19 2001-11-21 Shell Internationale Researchmaatschappij B.V. Process for the production of liquid hydrocarbons
MY137714A (en) 2001-05-29 2009-02-27 Shell Int Research Method to start a process for hydrocarbons
MY139324A (en) 2001-06-25 2009-09-30 Shell Int Research Integrated process for hydrocarbon synthesis
MY128179A (en) 2001-10-05 2007-01-31 Shell Int Research System for power generation in a process producing hydrocarbons
EP1306632A1 (en) 2001-10-25 2003-05-02 Shell Internationale Researchmaatschappij B.V. Process for liquefying natural gas and producing liquid hydrocarbons
KR101157205B1 (en) 2010-05-06 2012-06-20 한국과학기술연구원 FPSO-DME system for conversion of associated gas in oil fields and stranded gas in stranded gas fields, and process for production of dimethyl ether using the same
NO20111770A1 (en) 2011-12-21 2011-12-21 Modi Vivendi As System and method for offshore industrial activities with CO2 reinjection
RU2742652C1 (en) * 2020-08-14 2021-02-09 Общество с ограниченной ответственностью "Флотметанол" Method for producing methanol on a floating platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1084965A (en) * 1965-05-05 1967-09-27 Motherwell Bridge & Engineerin Method and apparatus for storing fluids under water
US3507238A (en) * 1968-03-26 1970-04-21 Santa Fe Int Corp Semisubmersible oil storage vessel
US4134732A (en) * 1977-06-08 1979-01-16 Continental Oil Company Floating methanol plant
US4984935A (en) * 1986-12-22 1991-01-15 Petroleo Brasileiro S.A. -Petrobras Floating enclosed offshore support structure
GB2237287A (en) * 1989-10-13 1991-05-01 Enserch Int Investment Production of synthesis gas

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1495174A (en) * 1976-04-13 1977-12-14 Laird Group Ltd Fairleads
FR2408511A1 (en) * 1977-11-10 1979-06-08 Dziewolski Richard Anchorage system for floating platform - has anchor cable running in pulley system between two cable winders on platform and sea bed anchor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1084965A (en) * 1965-05-05 1967-09-27 Motherwell Bridge & Engineerin Method and apparatus for storing fluids under water
US3507238A (en) * 1968-03-26 1970-04-21 Santa Fe Int Corp Semisubmersible oil storage vessel
US4134732A (en) * 1977-06-08 1979-01-16 Continental Oil Company Floating methanol plant
US4984935A (en) * 1986-12-22 1991-01-15 Petroleo Brasileiro S.A. -Petrobras Floating enclosed offshore support structure
GB2237287A (en) * 1989-10-13 1991-05-01 Enserch Int Investment Production of synthesis gas

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"Will floating plants get into the swim?" Chemical week, November 24 1976, pages *
70-71 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001002242A1 (en) * 1999-07-02 2001-01-11 Single Buoy Moorings, Inc. Simplified storage barge
US6390733B1 (en) 1999-07-02 2002-05-21 Imodco, Inc. Simplified storage barge and method of operation
WO2004065748A2 (en) * 2003-01-22 2004-08-05 Single Buoy Moorings, Inc. Marginal gas transport in offshore production
WO2004065748A3 (en) * 2003-01-22 2004-10-07 Single Buoy Moorings Marginal gas transport in offshore production
WO2006057664A1 (en) * 2004-11-22 2006-06-01 Syntroleum Corporation Movable gas-to-liquid system and process
US7655135B2 (en) 2006-03-14 2010-02-02 Syntroleum Corporation Process for removing solid particles from a hydroprocessing feed
WO2008057052A1 (en) * 2006-11-07 2008-05-15 How Kiap Gueh Method of producing methane and heavy hydrocarbons from marine vessels equipped with nuclear powerplant
WO2019147810A1 (en) * 2018-01-24 2019-08-01 Nw Innovation Works Near-shore floating methanol conversion ship and export terminal

Also Published As

Publication number Publication date
WO1994021512A1 (en) 1994-09-29
GB9405942D0 (en) 1994-05-11
GB9306157D0 (en) 1993-05-19
AU6379994A (en) 1994-10-11

Similar Documents

Publication Publication Date Title
US6021848A (en) Method of loading and treatment of hydrocarbons
GB2276353A (en) Floating methanol production complex
US7299760B2 (en) Floating LNG import terminal and method for docking
Shimamura FPSO/FSO: State of the art
US20020174662A1 (en) Method and apparatus for offshore LNG regasification
Wichers Guide to single point moorings
US20050222278A1 (en) Transportable gas to liquid plant
GB2359054A (en) Mooring and flowline system
AU2007233572B2 (en) LNG production facility
Glanville et al. Neptune project: spar history and design considerations
Aggarwal et al. Deepwater Arctic-technical challenges and solutions
GB2191229A (en) Offshore hydrocarbon production system
Ronalds et al. FPSO trends
D'Souza et al. The semisubmersible floating production system: from Argyll to Appomattox
dos Santos et al. Improvements Achieved in the Project of FPSO P-50
Mastrangelo et al. Field Experience and Concept to be Taken into Account in a FPSO Design
Drawe III et al. Technical and economic considerations in developing offshore oil and gas prospects using floating production systems
Mercier et al. The Hutton TLP: a preliminary design
Denise et al. COMPASS 2-A Cost Effective Floating Production System
Takata et al. Combining Floating and Grounded LNG Plant, LNG Storage and Power Units Offshore for Gas Field Developments
CA2220092C (en) A method of loading and treatment of hydrocarbons
Carneiro Barracuda Field: New Records for Turret Moored FPSO's
Chimisso et al. Deepwater FPSO for Aquila Field Development in the Adriatic
Henriques et al. From P-34 to P-50: FPSO Evolution
McCall et al. Examine and Evaluate a Process to Use Salt Caverns to Receive Ship Borne Liquefied Natural Gas

Legal Events

Date Code Title Description
WAP Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1)