GB2273512A - Compensation for mud flow indicators - Google Patents
Compensation for mud flow indicators Download PDFInfo
- Publication number
- GB2273512A GB2273512A GB9225997A GB9225997A GB2273512A GB 2273512 A GB2273512 A GB 2273512A GB 9225997 A GB9225997 A GB 9225997A GB 9225997 A GB9225997 A GB 9225997A GB 2273512 A GB2273512 A GB 2273512A
- Authority
- GB
- United Kingdom
- Prior art keywords
- flow
- actual
- compensation
- well
- mud flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000005259 measurement Methods 0.000 claims 1
- 238000005553 drilling Methods 0.000 abstract description 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/001—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor specially adapted for underwater drilling
Abstract
When drilling from a floating vessel compensation for vessel "heave" is applied to Mud Flow Indicators, thus resulting in a smooth indication of actual well head flow. This is achieved by correcting the Indicator by an amount equal to the "heave". The corrected signal can then be used to detect kicks. <IMAGE>
Description
Compensation for Mud Flow Indicators
This refers to Drilling Mud flow, on Drill ships and Semi - submersibles, which are subject to vessel "heave" .
Vessel "heave", is the vertical movement of the vessel, due to external wave forces.
This "heave", influences the Mud flow in the flow line at
Rig level,and causes large fluctuations. These fluctuations are also monitored by the flow indicator.
By measuring the rate and amount of vessel "heave", and using this signal to correct the external influence on the flow indicator, then only the actual well head mud flow rate is indicated, and compensation for "heave" is achieved.
Claims (1)
- Claims1/ Compensation for Vessel "heave" is applied to the readout indication of Mud flow indicators, therefore resulting in actual flow measrement.2/ Flow indication on the readout is equivalent to the actual flow, and is therefore smooth and without the fluctuations inherent with uncompensated systems.3/ Well Control scenarios can be controlled more quickly and with greater accuracy, as the Mud flow rate indicated is equivalent to actual well bore flow.4/ Well "Kicks". and well bore pressure increases can detected more quickly.Amendments to the claims have been filed as follows 1/ Compensation for vessel motion, is applied to the readout indication of Mud Flow Indicators, therefore resulting in actual flow measurement.2/ Flow indication on the readout is equivalent to the actual flow, and is therefore smooth and without the fluctuations inherent with uncompensated systems.3/ Well control scenarios can be controlled more quickly, and with greater accuracy, as the Mud Flow rate indicated is equivalent to actual well bore flow.4 4/ Well "kicks" and well bore pressure increases can be detected more quickly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB9225997A GB2273512A (en) | 1992-12-12 | 1992-12-12 | Compensation for mud flow indicators |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB9225997A GB2273512A (en) | 1992-12-12 | 1992-12-12 | Compensation for mud flow indicators |
Publications (2)
Publication Number | Publication Date |
---|---|
GB9225997D0 GB9225997D0 (en) | 1993-02-10 |
GB2273512A true GB2273512A (en) | 1994-06-22 |
Family
ID=10726549
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB9225997A Withdrawn GB2273512A (en) | 1992-12-12 | 1992-12-12 | Compensation for mud flow indicators |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB2273512A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3976148A (en) * | 1975-09-12 | 1976-08-24 | The Offshore Company | Method and apparatus for determining onboard a heaving vessel the flow rate of drilling fluid flowing out of a wellhole and into a telescoping marine riser connecting between the wellhouse and the vessel |
GB1453203A (en) * | 1973-10-04 | 1976-10-20 | Offshore Co | Motion compensated blowout and lost circulation detection |
GB2106961A (en) * | 1981-09-28 | 1983-04-20 | Exxon Production Research Co | Controlling the flow of drilling fluid in a wellbore |
EP0498128A1 (en) * | 1991-02-07 | 1992-08-12 | Sedco Forex Technology Inc. | Method for determining fluid influx or loss in drilling from floating rigs |
-
1992
- 1992-12-12 GB GB9225997A patent/GB2273512A/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1453203A (en) * | 1973-10-04 | 1976-10-20 | Offshore Co | Motion compensated blowout and lost circulation detection |
US3976148A (en) * | 1975-09-12 | 1976-08-24 | The Offshore Company | Method and apparatus for determining onboard a heaving vessel the flow rate of drilling fluid flowing out of a wellhole and into a telescoping marine riser connecting between the wellhouse and the vessel |
GB2106961A (en) * | 1981-09-28 | 1983-04-20 | Exxon Production Research Co | Controlling the flow of drilling fluid in a wellbore |
EP0498128A1 (en) * | 1991-02-07 | 1992-08-12 | Sedco Forex Technology Inc. | Method for determining fluid influx or loss in drilling from floating rigs |
Also Published As
Publication number | Publication date |
---|---|
GB9225997D0 (en) | 1993-02-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3976148A (en) | Method and apparatus for determining onboard a heaving vessel the flow rate of drilling fluid flowing out of a wellhole and into a telescoping marine riser connecting between the wellhouse and the vessel | |
GB1453203A (en) | Motion compensated blowout and lost circulation detection | |
CA2060736A1 (en) | Method for determining fluid influx or loss in drilling from floating rigs | |
US4440239A (en) | Method and apparatus for controlling the flow of drilling fluid in a wellbore | |
CA1133624A (en) | Underwater mapping apparatus and method | |
JPH0220797B2 (en) | ||
JPH04507462A (en) | Semiconductor transducer dynamic fluid flow sensing system | |
GB1485657A (en) | Marine drilling arrangement | |
US4135394A (en) | Wave measuring buoy | |
GB2177218A (en) | Monitoring fluid circulation conditions in well drilling operations | |
US3552204A (en) | Means for detecting and recording water wave direction | |
GB2273512A (en) | Compensation for mud flow indicators | |
KR860002394A (en) | A device to automatically control the anchor movement of the anchored ship | |
US3910111A (en) | Wave height measuring device | |
GB1330472A (en) | Sonar systems | |
AU3174893A (en) | A flow gauging system | |
CN105115564B (en) | The measurement method and device of a kind of piezometric level apart from pressure-measuring pipe open height | |
KR102303695B1 (en) | Gos location calculation apparatus of unmanned underwater vehicle for stable gps signal reception | |
SU987528A1 (en) | Hydrodynamic log | |
FI84039C (en) | SYSTEM FOER AUTOMATISK OEVERVAKNING AV TRIMNINGEN OCH STABILITETEN HOS ETT FARTYG. | |
SU1134928A1 (en) | Drilling vessel position meter | |
CN207215105U (en) | A kind of measurement bar | |
SU1036912A1 (en) | Device for determining position of swivel joint in drilling rig | |
SU1760317A1 (en) | Method of determining angle position of object | |
Calder | Calibration of Echo Sounders for Offshore Sounding Using Temperature and Depth |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WAP | Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1) |