GB2216433A GB8904787A GB8904787A GB2216433A GB 2216433 A GB2216433 A GB 2216433A GB 8904787 A GB8904787 A GB 8904787A GB 8904787 A GB8904787 A GB 8904787A GB 2216433 A GB2216433 A GB 2216433A
Authority
GB
United Kingdom
Prior art keywords
separator
oil
chamber
gas
installation according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB8904787A
Other versions
GB2216433B (en
GB8904787D0 (en
Inventor
Jean-Jacques Houot
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Societe National Elf Aquitaine
Original Assignee
Societe National Elf Aquitaine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Societe National Elf Aquitaine filed Critical Societe National Elf Aquitaine
Publication of GB8904787D0 publication Critical patent/GB8904787D0/en
Publication of GB2216433A publication Critical patent/GB2216433A/en
Application granted granted Critical
Publication of GB2216433B publication Critical patent/GB2216433B/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well
    • E21B43/36Underwater separating arrangements

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Jet Pumps And Other Pumps (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Earth Drilling (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The oil-gas mixture from an underwater oil well head 1 is fed into a vertically elongated vessel 13, which is partly located in a lined pit 10 in the sea bed and wherein the oil and gas are separated. Gas and oil are then raised to a surface platform 3 through separate pipes 9 and 8. A pump 16 at the bottom of vessel 13 is activated by electrodes 17 to 20 to pump the oil through pipe 8 whenever the gas-oil interface in the vessel rises sufficiently. <IMAGE>

Description

AN APPARATUS FOR OIL/GAS SEPARATION 2216433 AT AN UNDERWATER %ELL-HEAD The
present invention relates to an underwater installation for the production of hydrocarbons on a site the size of which does not allow the building of hydrocarbon treatment and extraction installations and for which it is therefore necessary to arrange for the crude effluent to be drawn off through an underwater pipeline to a central installation which carries out such functions.
Even if they spread over quite a wide area, it is normal practice with underwater hydrocarbon deposits to drain off the major part of the reserves in situ by a central plant which generally consists of one or more platforms or an anchored lighter. The peripheral parts of these deposits, particularly the periclinal areas, are then regarded as being marginal operations; the same applies to small deposits which are often situated close to an operable field.
For these marginal or peripheral parts, as for the small adjacent fields, routing-of effluent to a central installation is therefore required. However, if the didtance is considerable, several kilometres,' if the percentage of gas associated with the oil (in English "Gas Oil Ratio" or GOR) is high, and if it is known that it can fluctuate during the course of production, two major difficulties will become manifest: - the loss of head under diphasic conditions throughout the ducting as a whole may become excessive having regard to the eruptive pressure, - if production under continuous conditions remains possible, when this latter is established, restarting of the well or wells after a shut-down may become impossible by reason of the segregation of the liquid phase which results in the formation of a column of degasified liquid which is of excessive hydrostatic weight.
Precautions may be taken against these difficulties by increasing the pressure available at the inlet to the discharge ducting by various means.
An electric pump may be provided at the bottom of the well, taking into account the actual technical limitations 2 inherent in bottom pumps, particularly the limited free gas content at intake, and the risk of frequent maintenance operations (in English "WORK OVER").
It is also possible to set up a gas lift inside the well, a measure which has already been adopted for submerged well operations but which, at a considerable distance from a platform., tends to cause an increase in the head losses in the receiving pipeline and requires a considerable amount of gas to be in circulation by reason of the high average pressure required.
It is also possible to install a diphasic delivery pump near the wellhead. This formula has the disadvantage of the low output of diphasic pumps when the COR increases, which has to be countered by large dimensions and power levels.
As increasing the pressure available at the well-head comes up against serious difficulties as soon as the GOR becomes significant, it has been suggested to avoid these problems by separating the delivery of the gaseous phase from that of the liquid phase by setting up close to the well-head an off-shore production separator. Well, such equipment has not been found to be very adaptable to underwater use. In fact, land-based separators are equipment of which the dimensions have been optimised. They require maintaining the level of the oil/gas interface within a narrow range of around 10 or so centimetres and maintaining a high level of separation efficiency calls for frequent adjustments. Finally, with such separators', the height of oil is only around a metre, which hardly facilitates-oil pick-up by a conventional type of bottom pump (well bottom pumps, for example).
Thus, many models of off-shore-converted land-based separators have been suggested but have not found practical acceptance, for example: - US 3, 875,998 (Charpentier) discloses a horizontal separator disposed in the bottom part of a column supported by an articulating arrangement where the difficulties of adjustment linked with the low height of the separator tank were aggravated by the reciprocating nature of the installation. - BF 2,026,277 (Ocean Systems) includes horizontal off- shoreconverted separators set up directly on the sea bottom, as in the following patent.
3 BF 1,591,798 (Orieux) where the separator is toric, which would be an advantage for connection to the various inlet and outlet pipes, but it does leave the same drawbacks linked with the narrowness of the range of adjustment.
The object of the present invention is to alleviate these difficulties and to do so it proposes installing close to the operating well a separator of considerable vertical elongation, so that the height of the liquid can vary by several decimetres, or even several metres, between the.high and low points of operation and so that, despite these fluctuations in level, adequate submersion is always applied to a pump intended to draw off the said liquid.
A separator of considerable vertical elongation may be placed on the sea bottom and, if it is isolated and is substantially larger than the rest of the equipment, it may constitute an embarrassment to handling operations around the site and may even be a danger to navigation. It is possible then to connect it to a tower supporting a platform or even integrate it into the tower; it is also possible to place it in the bottom part of a reciprocating column supported by an articulating arrangement if such an arrangement is available, such as is described in US 3,875,998 (Charpentier).
If the production well is isolated, such as an economically marginal well might be, a characteristic feature of the in-vention wiill then be to house the said separator in a pit sunk into the sea bottom close to the operating well.
Preferably, the pit which is sunk and lined must be capable of accommodating a sufficiently large part of the separator that the part remaining above the sea bottom is of a height which does not exceed the height of the adjacent well-head, so that the major part of the separator is housed in the pit.
According to one embodiment, the separator consists of a cylindrical chamber closed at its bottom end and of which the top end is fixed to the lining of the pit sunk into the sea bottom close to the working well and it also comprises an assembly adapted to close the top end of the chamber and, through this closure, introduce into the chamber a nozzle for extracting the 4 effluent from the operating well, a nozzle for drawing off the gas, a pipe connecting a pump situated in the bottom part of the chamber and provided with energy supply means and means for connection to a device for monitoring the level of oil/gas in the chamber, to an oil discharge pipe, the various means constituting this assembly being capable of being removed from the chamber and raised to the surface jointly or separately for maintenance purposes.
According to another embodiment, the separator consists of a cylindrical chamber closed at its top and bottom ends and removably fixed to the lining of a pit sunk into the sea bottom close to the working well, and an assembly capable of introducing into the top part of the chamber a nozzle for extracting the effluent from the working well, a nozzle for drawing off the gas, a pipe connecting a pump located in the bottom part of the chamber and provided with energy supply means and means of connection to a device for measuring the level of oil/gas in the chamber, to an oil discharge pipe, the cylindrical chamber and the said means which it contains constituting one assembly which can be raised to the surface as a complete unit.
If a diphasic pump is provided to draw off the oil from the separator, the control system can be simplified by replacing the means of monitoring the oil/gas level in the chamber by direct monitoring of the rate of flow of liquid arriving at the central installation.
Further characteristic features and advantages of the invention will become evident from reading the ensuing description of a preferred embodiment of the invention which is given by way of indication and which implies no limitation, reference being made to the accompanying drawings, in which: Fig. 1 is an overall diagram of the installation; Fig. 2 shows a separator which can be dismantl.ed at the bottom, and Fig. 3 shows a separator which is not intended to be dismantled at the bottom.
With reference to Fig. 1 showing in principle the diagram of an installation according to the invention, there is an A underwater well-head (1) close to which there is installed a separator (2) and, at a distance therefrom which might be quite considerable, a platform (3) carrying the installations for processing and carrying away the hydrocarbons, the said installations not being shown, and also means of monitoring and controlling the well-head (4) and the separator (5).
Between the well-head (1), the separator (2) and the monitoring and control means (4) and (5), electric transmission cables are provided and are shown diagrammatically by the line (6).
The well-head (1) is connected to the separator (2) by a pipe (7) for carrying effluent from the well.
The separator (2) is connected to the processing installations on the platform (3) by two pipes, viz. a pipe (8) for the liquid phase and a pipe (9) for the gaseous phase.
The vertical type separator (2) is accommodated in a pit (10) sunk at a short distance, perhaps a few metres, from the head of the working well, (1).
The pit (10), after the lining (11) has been placed in position, together'with a bottom plug (12) and the bore hole cementation, defines a vertical cylindrical space in which the separator (2) is installed.
The separator (2) broadly consists of a cylindrical chamber bounded by a vertical body (13) closed at its top and bottom ends. This chamber is provided at the top with two nozzles, one (14) for the arrival of effluent from the well-head 1) and the other (15) for discharging the gaseous phase through the pipe (9) to the platform (3). Furthermore, the separator (2) is fitted with a vertical pipe provided at the bottom with a pump (16) fitted with a bottom motor and connected at the top to the pipe (8) for discharging the liquid phase and a means of monitoring the position of the liquid/gas interface in the separator, the monitoring device consisting of electrodes such as (17), (18), (19), (20) distributed along a vertical rod (21) and connected by electrical conductors to the monitoring mechanism (5).
The height (H) of the separator (2) is such that the bottom pump (16) is submerged by a sufficient amount (S) for its efficiency to be optimum. As the height of the separator (2) above the sea bottom must not exceed that of the well-head (1), it follows that the height (h) below the bottom is determined and that the depth of the pit to be sunk to house the separator can thus be calculated.
Fig. 2 shows an embodiment of a separator in which the vertical body (13) bounding the chamber in which the separation is carried out is installed in a lining (11) of a pit sunk for the purpose, this lining carrying a baseplate (11a) so that the various mechanical elements which permit of fluid intake, discharge of the two (liquid and gaseous) constituents,. monitoring and safety facilities, are placed on the tube (13) to which they are fixed by superimposition of the constituents in a manner comparable to a well-head.
The installation comprises three parts: 1 - A separating chamber consisting of a body (13) closed at its bottom end and disposed within a lining (11) of a diameter which is as large as necessary (for example up to 80 or 100 cm) cemented into the ground. The lining is installed in a pit sunk to a depth of several tens of metes, 50 m generally being sufficient. The body (13) is rigid with the lining (11) by means of an annular position and orientating device (13a). 2 A module (22) similar to a well-head and comprising, from the bottom upwards: - a hydraulic crude oil connector (23) of a diameter which is appropriate in the light of the diameter of the body (13), for anchoring the module (22) on the body (13), and also a guide assembly (24) on guidelines (25); - a forged block (26) comprising two remotely controlled hydraulic valves (27 and 28) on the intake (14) for diphasic fluid (27) and the outlet (15) of the separated gas (28); - a device (29) which, in operation, ensures annular fluidtightness around the oil delivery pipe. This equipment is provided with hydraulic control means, not shown; - a bracing arrangement with a. remotely controlled hydraulic valve for discharging oil (30); - a chuck (31) for anchoring of a hydraulic connector.
7 3 A module, pumping tube (32) and a cover plate (33) embodying all the sensitive components of the separator, viz.:
- a submerged pump (16), - a cable (34) for supplying power to the pump (16); - separator regulating equipment, which may comprise a level detector such as shown diagrammatically at (21) in Fig. 1 or a pressure detector, or both at the same time; - a remote monitoring system (35); - a delivery pipe (36) from the submerged pump (16); - a guide assembly (37) on guidelines; - a protective cover (38) with a connector (13) 5/8" which is at the top of the module.
The liquid or gaseous effluent inlets and outlets (27, 28, 30) will be provided with manual or automatic connecting means, not shown, to fit the well-head and the discharge pipelines.
This separating assembly has an appearance similar to that of a submerged productio ' n well-head. Handling operations can be carried out by using conventional and prior art means such as the handling equipment., cables, linkages...
Like the work of raising the equipment for inspection and maintenance, positioning can be carried out in a single unit by means of guidelines (25) or in two parts by successively using guidelines (25) and the guide assembly (37).
Fig. 3 shows a separating assembly designed to be set in place in a single unit in a pit which has been sunk, lined and cemented for the purpose. This assembly can be lifted in a single unit after disconnection of the various fluid inlet and outlet nozzles and disconnection of the power supply cable and communication cables which provide the link with the monitoring means.
The body of the separator (2) consists of a cylindrical chamber bounded by a vertical tubular body (13) closed at its top and bottom ends.
The body of the separator (2) consists of a plurality of elements which are so designed as to cope with the stresses of factory installation of the internal equipment. The assembly of these elements by prior art means is shown diagrammatically in the drawing as an assembly using flanges and bolts.
The internal equipment may be those items shown diagrammatically in Fig. 1 and described with reference to Fig. 2, viz.: - a submerged pump (16) at the bottom end of the delivery pipe (36) which is extended outside the separator (2) via a pipe (8), not shown; - a cable (36) carrying power to the pump (16); - regulating equipment (21) for the separator, connected td a remote monitoring system (35) not shown by means of cables (6); - an inlet (14) for effluent from the well (1); - an outlet (15) for the gaseous phase; - a guide assembly (24) on guidelines (25) for positioning and withdrawing the separating assembly (2).
Disposed between the tube (13) and the lining (11) are various items (13a) for positioning and orientating the separating device (2) inside the lining (11).
The installation at the bottom may be inspected by divers and it may also be completely remotely controlled from the surface using means known in the art and conventionally used.
The separator is linked to the well-head and to the discharge pipelines by manual or automaticconnection means, not shown.
In thevarious embodiments, the height of liquid in the bottom part of the chamber provides the desired advantage of the most continuous possible operation of the pump. It also allows the gas bubbles to rise through the liquid column so that the liquid which is conveyed to the pump inlet is as far as possible free from free gas in the form of bubbles.
The thermodynamic and mechanical conditions under which this is carried out are not necessarily those which permit of optimum separation of the two liquid and gaseous phases. It follows that the separated gas will probably contain condensate. A more intensive separation could possibly be carried out at the central production station on the sea bottom or at the surface.
Without departing from the scope of the invention, it may be envisaged to improve the separation on the actual site of the working well by disposing in the top part of the separator various elements of impact plates or liners designed to separate flow or for purposes of centrifugation (39 in Fig. 3) such as the devices which are known in the art.
7 1 9 It is possible to envisage these elements being set in position not only in order to improve the overall separation but also in order more easily to absorb pressure surges due to the frequently observed random passage of'gas-locks.
k 4 j

Claims (10)

PATENT CLAIMS
1. Underwater installation for the production of hydrocarbons, i combining an oil/gas separator with at least one working wellhead, characterised in that the separator is of considerable vertical elongation.
2. An installation according to Claim 1 in which the separator has such a vertical elongation that the height of liquid may vary 0 from a few centimetres to several metres between the high and low control points and so that, despite these fluctuations in level, sufficient immersion is applied to the pump which is intended to draw off the.said liquid.
-
3. An installation according to Claim 2 in which the separator which is of considerable vertical elongation is partially housed in a pit sunk into the bottom of the sea close to the working well and provided with a lining.
4. An installation according to Claim 2 in which the separator which is of considerable vertical elongation is partially housed in a pit sunk into the bottom of the sea close to the working well, so that the part of the separator which remains above the bottom has a height which does not exceed the height of the well-head.
5. An installation according to Claim 3 in which the separator consists of a cylindrical chamber closed at its bottom end and of which the top end is fixed to the lining of the pit sunk into the sea bottom, close to the working well, and an assembly adapted to close the top end of the chamber and to introduce through this closure and into the said chamber a nozzle for extracting effluent from the working well, a nozzle for drawing off gas, a pipe connecting a pump located in the bottom of the chamber, provided with energy supply means and means of connection to a device for monitoring the oil/gas level in the chamber, to an oil draw- off nozzle, the various means constituting this assembly being capable of being separated from the chamber and raised to the surface jointly or separately.
6. An installation according to Claim 3, in which the separator consists of a cylindrical chamber closed at its top and bottom ends, removably fixed to the lining of a pit suk into the sea bottom close to the working well, and an assembly adaptedto introduce into the top part of the chamber a nozzle for the extraction of effluent from the working well, a nozzle for drawing off gas, a pipe connecting a pump disposed in the bottom part of the chamber and provided with energy supply means and means for connection to a device for monitoring the oil/gas level in the chamber, to an oil draw-off nozzle, the cylindrical chamber and the said means which it contains constituting an assembly which can be raised to the surface as a single unit.
7. An installation according to Claim 1, in which the oil/gas separator is installed in the bottom part of a fixed metallic structure.
8. An installation according toClaim 1 in which the oil/gas separator is installed in the bottom part of a structure supported by an articulating arrangement.
I
9. An installation according to Claim 2 in which the pump intended for drawing off the liquid is a diphasic'pump.
10. An underwater installation for the production of hydrocarbons substantially as described herein with reference to the accompanying drawings.
1 Published 1989 stThe Patent Ofnee. State House, 68!71 High Holborn, London WCIR 4TP. Furthercoples maybe obtainedfromThe PatentO:Mce. Sales Branch, St Mary Cray, Orpington, Kent BR5 3RD. Printed by Multiplex techniques ltd. St Mary Cray, Kent, Cori. 1/87
GB8904787A 1988-03-02 1989-03-02 An apparatus for oil/gas separation at an underwater well-head Expired - Lifetime GB2216433B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR8802631A FR2628142B1 (en) 1988-03-02 1988-03-02 DEVICE FOR SEPARATING OIL GAS AT THE HEAD OF AN UNDERWATER WELL

Publications (3)

Publication Number Publication Date
GB8904787D0 GB8904787D0 (en) 1989-04-12
GB2216433A true GB2216433A (en) 1989-10-11
GB2216433B GB2216433B (en) 1991-11-27

Family

ID=9363828

Family Applications (1)

Application Number Title Priority Date Filing Date
GB8904787A Expired - Lifetime GB2216433B (en) 1988-03-02 1989-03-02 An apparatus for oil/gas separation at an underwater well-head

Country Status (6)

Country Link
US (1) US4982794A (en)
FR (1) FR2628142B1 (en)
GB (1) GB2216433B (en)
NO (1) NO890876L (en)
OA (1) OA09068A (en)
TN (1) TNSN89021A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2242373A (en) * 1990-03-26 1991-10-02 British Offshore Eng Tech Crude oil separator

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5294214A (en) * 1992-05-29 1994-03-15 Union Oil Company Of California Gas eliminator for offshore oil transfer pipelines
BR9301439A (en) * 1993-04-05 1994-11-15 Petroleo Brasileiro Sa Integrated system and method of infra-marine repressurization
US5474601A (en) * 1994-08-02 1995-12-12 Conoco Inc. Integrated floating platform vertical annular separation and pumping system for production of hydrocarbons
DE69511821T2 (en) 1994-11-10 2000-01-13 Babcock & Wilcox Co Separation of oil and gas phase at the wellhead
US5570744A (en) * 1994-11-28 1996-11-05 Atlantic Richfield Company Separator systems for well production fluids
US5477924A (en) * 1994-12-20 1995-12-26 Imodco, Inc. Offshore well gas disposal
US5762149A (en) * 1995-03-27 1998-06-09 Baker Hughes Incorporated Method and apparatus for well bore construction
BR9602747A (en) * 1996-06-12 1998-09-08 Petroleo Brasileiro Sa Method and apparatus for subsea oil production through intermittent gas injection
US6216799B1 (en) 1997-09-25 2001-04-17 Shell Offshore Inc. Subsea pumping system and method for deepwater drilling
US6276455B1 (en) 1997-09-25 2001-08-21 Shell Offshore Inc. Subsea gas separation system and method for offshore drilling
US5972061A (en) * 1998-04-08 1999-10-26 Nykyforuk; Craig Wellhead separation system
US6004385A (en) * 1998-05-04 1999-12-21 Hudson Products Corporation Compact gas liquid separation system with real-time performance monitoring
US6251168B1 (en) * 1999-07-23 2001-06-26 Hudson Products Corporation High efficiency gas scrubber using combined coalescing media and centrifugal cyclone
GB9921373D0 (en) * 1999-09-10 1999-11-10 Alpha Thames Limited Modular sea-bed system
NO996196D0 (en) * 1999-12-14 1999-12-14 Aker Eng As
CA2461639C (en) 2001-09-10 2013-08-06 Ocean Riser Systems As Arrangement and method for regulating bottom hole pressures when drilling deepwater offshore wells
US6651745B1 (en) * 2002-05-02 2003-11-25 Union Oil Company Of California Subsea riser separator system
US6688392B2 (en) * 2002-05-23 2004-02-10 Baker Hughes Incorporated System and method for flow/pressure boosting in a subsea environment
US7914266B2 (en) * 2004-03-31 2011-03-29 Schlumberger Technology Corporation Submersible pumping system and method for boosting subsea production flow
US20070235223A1 (en) * 2005-04-29 2007-10-11 Tarr Brian A Systems and methods for managing downhole pressure
WO2007021335A2 (en) * 2005-08-09 2007-02-22 Exxonmobil Upstream Research Company Vertical annular separation and pumping system with integrated pump shroud and baffle
WO2007021337A1 (en) * 2005-08-09 2007-02-22 Exxonmobil Upstream Research Company Vertical annular separation and pumping system with outer annulus liquid discharge arrangement
WO2009148943A1 (en) * 2008-06-03 2009-12-10 Shell Oil Company Offshore drilling and production systems and methods
US8857519B2 (en) * 2010-04-27 2014-10-14 Shell Oil Company Method of retrofitting subsea equipment with separation and boosting
US20130177356A1 (en) * 2010-06-21 2013-07-11 Jerry M. Edmondson Subsea deepwater petroleum fluid spill containment
IT1401274B1 (en) * 2010-07-30 2013-07-18 Nuova Pignone S R L SUBMARINE MACHINE AND METHODS FOR SEPARATING COMPONENTS OF A MATERIAL FLOW
CN105756612A (en) * 2014-12-19 2016-07-13 中石化胜利石油工程有限公司钻井工艺研究院 Precise adding device for gas drilling
US11566507B2 (en) 2020-08-26 2023-01-31 Saudi Arabian Oil Company Through-tubing simultaneous gas and liquid production method and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1309826A (en) * 1969-09-08 1973-03-14 Mobil Oil Corp Subsea satellite for gas production
WO1981001310A1 (en) * 1979-11-02 1981-05-14 Ostlund As Method and column for collection and separation of oil,gas and water from blowing wells at the sea bed
GB2063777A (en) * 1979-11-16 1981-06-10 Inst Francais Du Petrole Antipollution devices for collecting lighterthan-water fluids escaping from an underwater source
GB2063776A (en) * 1979-11-08 1981-06-10 Duke J A Apparatus and method for collecting subsea oil leakage and the like
GB2066095A (en) * 1979-10-11 1981-07-08 Eppmann K A device for recovery of fluids from a subaqueous leak
WO1983001471A1 (en) * 1981-10-16 1983-04-28 Milgram, Jerome, H. Separating collector for subsea blowouts

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1591780A (en) * 1968-11-14 1970-05-04
US3608630A (en) * 1968-12-16 1971-09-28 Ocean Systems Offshore oil production method and apparatus
FR2146931A1 (en) * 1971-07-26 1973-03-09 Combustion Eng Underwater well product separator - with gas and liquid delivery valves control system
BE790646A (en) * 1971-10-29 1973-02-15 Erap PLANT FOR THE BOTTOM SEPARATION OF EFFLUENT FROM PRODUCT WELLS OF A MARINE OIL FIELD
US3893918A (en) * 1971-11-22 1975-07-08 Engineering Specialties Inc Method for separating material leaving a well
GB1420011A (en) * 1973-01-09 1976-01-07 Favret U Method and apparatus for separating material leaving a well
FR2528105B1 (en) * 1982-06-08 1985-08-09 Chaudot Gerard OPERATING SYSTEM FOR INCREASING THE RECOVERY OF FLUIDS FROM A SOURCE, SIMPLIFYING PRODUCTION AND PROCESSING FACILITIES, FACILITATING OPERATIONS WHILE IMPROVING SECURITY
FR2528106A1 (en) * 1982-06-08 1983-12-09 Chaudot Gerard SYSTEM FOR THE PRODUCTION OF UNDERWATER DEPOSITS OF FLUIDS, TO ALLOW THE PRODUCTION AND TO INCREASE THE RECOVERY OF FLUIDS IN PLACE, WITH FLOW REGULATION
US4558744A (en) * 1982-09-14 1985-12-17 Canocean Resources Ltd. Subsea caisson and method of installing same
US4685833A (en) * 1984-03-28 1987-08-11 Iwamoto William T Offshore structure for deepsea production
US4793418A (en) * 1987-08-03 1988-12-27 Texaco Limited Hydrocarbon fluid separation at an offshore site and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1309826A (en) * 1969-09-08 1973-03-14 Mobil Oil Corp Subsea satellite for gas production
GB2066095A (en) * 1979-10-11 1981-07-08 Eppmann K A device for recovery of fluids from a subaqueous leak
WO1981001310A1 (en) * 1979-11-02 1981-05-14 Ostlund As Method and column for collection and separation of oil,gas and water from blowing wells at the sea bed
GB2063776A (en) * 1979-11-08 1981-06-10 Duke J A Apparatus and method for collecting subsea oil leakage and the like
GB2063777A (en) * 1979-11-16 1981-06-10 Inst Francais Du Petrole Antipollution devices for collecting lighterthan-water fluids escaping from an underwater source
WO1983001471A1 (en) * 1981-10-16 1983-04-28 Milgram, Jerome, H. Separating collector for subsea blowouts

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2242373A (en) * 1990-03-26 1991-10-02 British Offshore Eng Tech Crude oil separator
GB2242373B (en) * 1990-03-26 1995-01-11 British Offshore Eng Tech Subsea separator,storage & pumping unit and its associated control system

Also Published As

Publication number Publication date
OA09068A (en) 1991-10-31
GB2216433B (en) 1991-11-27
US4982794A (en) 1991-01-08
FR2628142A1 (en) 1989-09-08
TNSN89021A1 (en) 1991-02-04
GB8904787D0 (en) 1989-04-12
FR2628142B1 (en) 1990-07-13
NO890876D0 (en) 1989-03-01
NO890876L (en) 1989-09-04

Similar Documents

Publication Publication Date Title
US4982794A (en) Apparatus for oil/gas separation at an underwater well-head
FI78341C (en) Procedure and tower for the collection and separation of oil, gas and water from outbreaks in the seabed
US4265313A (en) Mooring station and transfer terminal for offshore hydrocarbon production
US4182584A (en) Marine production riser system and method of installing same
US4589434A (en) Method and apparatus to prevent hydrate formation in full wellstream pipelines
US4478586A (en) Buoyed moonpool plug for disconnecting a flexible flowline from a process vessel
CA1258620A (en) Offshore hydrocarbon production system
US3292695A (en) Method and apparatus for producing underwater oil fields
CA3008372A1 (en) Submerged hydrocarbon recovery apparatus
US3911688A (en) Pipe apparatus for the collection of petroleum from deep water wells
US4967843A (en) Device for producing an effluent contained in a submarine geological formation and production method employed using such a device
US7314084B2 (en) Subsea pumping module system and installation method
US4270611A (en) Mooring station and transfer terminal for offshore hydrocarbon production
US4195653A (en) Method and apparatus for recovering products of low pumpability
US20100065508A1 (en) Method and apparatus of submersible intake equipment
NO139323B (en) UNDERWATER PRODUCTION EQUIPMENT.
NO832033L (en) PLANT FOR HYDROCARBON RECOVERY
US3612177A (en) Deep water production system
WO2011154733A1 (en) Apparatus and method for containment of underwater hydrocarbon and other emissions
US3536135A (en) Underwater production facility including base unit and production fluid handling unit
JPH0135998B2 (en)
NO146191B (en) DIVING CLOCK AND PROCEDURE FOR MANUORING A DIVE CLOCK IN THE SEA
JPS5922879B2 (en) Liquid/gas separation equipment
NO861798L (en) PROCEDURE FOR OIL EXTRACTION.
NO811948L (en) UNDERWATER FOR OIL.

Legal Events

Date Code Title Description
PE20 Patent expired after termination of 20 years

Expiry date: 20090301