GB2197366A - Undersea tunnel and bridge - Google Patents
Undersea tunnel and bridge Download PDFInfo
- Publication number
- GB2197366A GB2197366A GB08603379A GB8603379A GB2197366A GB 2197366 A GB2197366 A GB 2197366A GB 08603379 A GB08603379 A GB 08603379A GB 8603379 A GB8603379 A GB 8603379A GB 2197366 A GB2197366 A GB 2197366A
- Authority
- GB
- United Kingdom
- Prior art keywords
- bridge
- view
- steel
- lanes
- engineering project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 238000009416 shuttering Methods 0.000 claims description 10
- 238000010276 construction Methods 0.000 claims description 7
- 241001609030 Brosme brosme Species 0.000 claims description 4
- 230000009977 dual effect Effects 0.000 claims description 4
- 239000007787 solid Substances 0.000 claims description 4
- 238000013459 approach Methods 0.000 claims description 2
- 230000004888 barrier function Effects 0.000 claims description 2
- 230000015556 catabolic process Effects 0.000 claims description 2
- 230000000694 effects Effects 0.000 claims description 2
- 238000010438 heat treatment Methods 0.000 claims description 2
- 239000003550 marker Substances 0.000 claims description 2
- 239000011120 plywood Substances 0.000 claims description 2
- 230000002265 prevention Effects 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 claims description 2
- 239000011347 resin Substances 0.000 claims description 2
- 229920005989 resin Polymers 0.000 claims description 2
- 230000002441 reversible effect Effects 0.000 claims description 2
- 239000000725 suspension Substances 0.000 claims description 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/063—Tunnels submerged into, or built in, open water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Structural Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Bridges Or Land Bridges (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
An undersea tunnel and bridge is described.
Description
SPECIFICATION
Undersea tunnel and bridge
Sealink expressway channel crossings. Twin train tunnels with platform on one side of each - escalators at mile intervals for supply of air, also maintance and escape routes for passengers. Thirty-one miles from Cheriton to
Sangatte
Six lanes motorway with verges both sides, centre crashbarriers. With also crashbarriers each side of bridge only for protection of lightweight concrete bridge windbreakers. Safety rails to bridge.
Bridge structure is only four lanes with two verges one each side of bridge load bearing piers. Double cable suspension each side of bridge. New reinforcement technics of use of neckties for pier construction 3.1. Aircraft warning lights to mount pier tops
Arc lights to one side of shipping lanes.
Incoming and seagoing lanes Marker buoys for control of shipping each side of shipping lanes and bridge openings placed five miles or over either side transmitting morse signals dot and dash - red and green lights starboard and port, protected by floating concrete crash barriers.
English and French roads and twin tunnels built as one with all necessary services provided service roads to internal crossing areas for maintance, exits of passengers in cases of emergence. Motorway road construction to join services roads with customs and charge services - French side converts both left and right hand driving styles. National breakdown to give crossing services.
Cable and wireless to supply all the telephone services required
Patent multi purpose lightweight shuttering with the use of dual staging for working platforms - internal lightweight tube shuttering in three types with seals. In removable sections secret act control
Details of drawings. Lightweight shuttering.
1. Shutter panel back view
2. Shutter panel side view
3. Shuttering both sides in position with side view of double scaffolding B.S.S. apply
4. Solid steel insert bar with centre stop 2 mts scaffold pipe size front and end views
5. Front view new scaffold clips
6. Back view double slotted tenons lock into two shutters - six per shutter in verticai positions
7. Side view with hinge and bolt H.T. Steel
8. Lock insert for lifting purposes. Threaded.
9. Safety housing
10. Hexegon nut to lock all solid.
11. Steel frame side and edge views.
12. Exploded view
13. Housing plate bored for threaded bolt.
14. Hexegon threaded nut
15. Steel pegs side view. End view
16. Tusk tenons side view. End view.
16. Tusk tenons top view square shoulder for steel peg locking
17. Three C.M.S marine resin bond plywood shutter facings multi bolted to steel frames.
18. Shutters side positions with two runs scaffold poles and scaffold clips all shutters have two bolt holes and top and bottom-corners internal and external steel
19. Shutter end view - all shutters are reversible.
Vehicles and passengers, private, business heavy goods, drivers with loads public service transport international. Railway dual tunnels steel lined for prevention of sabotage
Trains normal diesel passengers and freight full maintance on completion of all work electric overhead track train and freight speed in tunnels to suit British Rail and French time tables.
Motorway speed 70 miles per hour on both approaches to bridge. Bridge speed 50 miles per hour. Weather conditions to govern all speeds to police rules scale model constructed to guide all persons requiring knowldege of sea link expressway channel crossings.
Multi purpose lightweight shuttering. Manual to be provided for UK and international uses covering rules of construction.
Firms - finance project - British ferries.
Screg -credit du Nord.
First bank of Boston.
Crown Control.
Daylight to internal areas - surface heating.
CLAIMS
Amendments to the claims have been filed, and have the following effect:
Claims 1 above have been deleted or textually amended.
New or textually amended claims have been filed as follows:
CLAIMS
1. A Sealink multi purpose engineering project.
2. Engineering project as claimed in Claim 1. Consisting of two rail tracks passing coast to coast in separate tunnels. Trains to be powered by electric and diesel.
3. Engineering project as claimed in claim 2. With coast to coast major highway permitting all types of road transport with full emergency services.
4. Engineering project as claimed in claim 2-3 bridge structure for highway allowing use of two sea lanes to pass underneath separate areas with opposite flow of shipping.
5. Engineering project as claimed in claims 2-3-4 which carries all weather uses and safety precautions.
6. Engineering project as claimed in qlaims
**WARNING** end of DESC field may overlap start of CLMS **.
Claims (6)
1. Shutter panel back view
2. Shutter panel side view
3. Shuttering both sides in position with side view of double scaffolding B.S.S. apply
4. Solid steel insert bar with centre stop 2 mts scaffold pipe size front and end views
5. Front view new scaffold clips
6. Engineering project as claimed in qlaims 2-3-4-5. Requires new engineering technics and programmes with multi patented work all to British Standard Specifications and international engineering project as claimed in claims 2-3-4-5 basic drawings Figs. 1 to 6 scale model construction of project for information and publicity.
6. Back view double slotted tenons lock into two shutters - six per shutter in verticai positions
7. Side view with hinge and bolt H.T. Steel
8. Lock insert for lifting purposes. Threaded.
9. Safety housing
10. Hexegon nut to lock all solid.
11. Steel frame side and edge views.
12. Exploded view
13. Housing plate bored for threaded bolt.
14. Hexegon threaded nut
15. Steel pegs side view. End view
16. Tusk tenons side view. End view.
16. Tusk tenons top view square shoulder for steel peg locking
17. Three C.M.S marine resin bond plywood shutter facings multi bolted to steel frames.
18. Shutters side positions with two runs scaffold poles and scaffold clips all shutters have two bolt holes and top and bottom-corners internal and external steel
19. Shutter end view - all shutters are reversible.
Vehicles and passengers, private, business heavy goods, drivers with loads public service transport international. Railway dual tunnels steel lined for prevention of sabotage
Trains normal diesel passengers and freight full maintance on completion of all work electric overhead track train and freight speed in tunnels to suit British Rail and French time tables.
Motorway speed 70 miles per hour on both approaches to bridge. Bridge speed 50 miles per hour. Weather conditions to govern all speeds to police rules scale model constructed to guide all persons requiring knowldege of sea link expressway channel crossings.
Multi purpose lightweight shuttering. Manual to be provided for UK and international uses covering rules of construction.
Firms - finance project - British ferries.
Screg -credit du Nord.
First bank of Boston.
Crown Control.
Daylight to internal areas - surface heating.
CLAIMS
Amendments to the claims have been filed, and have the following effect:
Claims 1 above have been deleted or textually amended.
New or textually amended claims have been filed as follows:
CLAIMS
1. A Sealink multi purpose engineering project.
2. Engineering project as claimed in Claim 1. Consisting of two rail tracks passing coast to coast in separate tunnels. Trains to be powered by electric and diesel.
3. Engineering project as claimed in claim 2. With coast to coast major highway permitting all types of road transport with full emergency services.
4. Engineering project as claimed in claim 2-3 bridge structure for highway allowing use of two sea lanes to pass underneath separate areas with opposite flow of shipping.
5. Engineering project as claimed in claims 2-3-4 which carries all weather uses and safety precautions.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB08603379A GB2197366A (en) | 1986-02-11 | 1986-02-11 | Undersea tunnel and bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB08603379A GB2197366A (en) | 1986-02-11 | 1986-02-11 | Undersea tunnel and bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
GB8603379D0 GB8603379D0 (en) | 1986-03-19 |
GB2197366A true GB2197366A (en) | 1988-05-18 |
Family
ID=10592887
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB08603379A Withdrawn GB2197366A (en) | 1986-02-11 | 1986-02-11 | Undersea tunnel and bridge |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB2197366A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104021699A (en) * | 2014-05-16 | 2014-09-03 | 吴卓进 | Tunnel portal barrier prompting system |
CN110184987A (en) * | 2019-02-22 | 2019-08-30 | 江苏省淮安市航道管理处 | Grade separation on inland river " double flute on lower bridges and culverts " Combined water |
-
1986
- 1986-02-11 GB GB08603379A patent/GB2197366A/en not_active Withdrawn
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104021699A (en) * | 2014-05-16 | 2014-09-03 | 吴卓进 | Tunnel portal barrier prompting system |
CN110184987A (en) * | 2019-02-22 | 2019-08-30 | 江苏省淮安市航道管理处 | Grade separation on inland river " double flute on lower bridges and culverts " Combined water |
CN110184987B (en) * | 2019-02-22 | 2021-04-06 | 江苏省淮安市航道管理处 | Double-groove combined overwater overpass on lower bridge and culvert of inland river |
Also Published As
Publication number | Publication date |
---|---|
GB8603379D0 (en) | 1986-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3386351A (en) | System of grade separation and also underroad parking | |
Atubi | An evaluation of transport infrastructure in Lagos state, Nigeria | |
GB2197366A (en) | Undersea tunnel and bridge | |
CN1102229A (en) | Urban three-dimensional traffic system | |
CN207130557U (en) | Traffic cross-road people car separates accessible two layers of freely-moving bridge | |
Haque | Analysis of railway accidents at level crossings in Dhaka City | |
Clark | General guidelines for the design of light rail transit facilities in Edmonton | |
DE19747237A1 (en) | Suspension railway | |
Tyson | Sussex Transport Heritage | |
Alan Danaher et al. | General design and engineering principles of streetcar transit | |
Preston | Kent's Transport Heritage | |
Whitham | The bridges, roads and rails of Bridgewater | |
Lewis | Railway signal engineering (mechanical) | |
Muchmore et al. | GOLD-RUSH GHOST TOWN | |
Fee | European Experience in Pedestrian and Bicycle Facilities | |
Pajunen | Traffic Safety at Railroad Level Crossings | |
American Society of Civil Engineers | Regulations of the English Board of Trade, for the Construction and Working of Railways | |
Cunliffe | Rail/highway grade crossings: An overview of design, operation and accident investigation | |
Frick | Traffic Protection for Highway Work Areas | |
CN107142801A (en) | Traffic cross-road people car separates accessible two layers of freely-moving bridge | |
Wilson | The Plattsmouth Crossing | |
National Research Council (US). Highway Research Board. Committee on Highway Capacity | Highway capacity manual: Practical applications of research | |
MEDFORD | railroad accident investigation | |
CN108560343A (en) | A kind of miniature cross overpass | |
Wilkins et al. | Considerations for Effective Light Rail Street Operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WAP | Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1) |