GB201314272D0 - Methods and devices for filling tanks with no backflow from the borehole exit - Google Patents
Methods and devices for filling tanks with no backflow from the borehole exitInfo
- Publication number
- GB201314272D0 GB201314272D0 GBGB1314272.4A GB201314272A GB201314272D0 GB 201314272 D0 GB201314272 D0 GB 201314272D0 GB 201314272 A GB201314272 A GB 201314272A GB 201314272 D0 GB201314272 D0 GB 201314272D0
- Authority
- GB
- United Kingdom
- Prior art keywords
- backflow
- methods
- devices
- valve
- filling tanks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/10—Obtaining fluid samples or testing fluids, in boreholes or wells using side-wall fluid samplers or testers
Abstract
A method for sampling fluid from a subsurface formation includes retrieving fluids from the formation using a plurality of pumps, controlling a flow of the retrieved fluids using at least a first valve and a second valve, estimating an operating parameter of at least one pump of the plurality of pumps, and controlling the first valve and the second valve using the estimated operating parameter to initiate a fluid sampling event.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201113414288A | 2011-03-07 | 2011-03-07 | |
US201161450906P | 2011-03-09 | 2011-03-09 | |
US201161452492P | 2011-03-14 | 2011-03-14 | |
PCT/US2012/028280 WO2012122377A2 (en) | 2011-03-09 | 2012-03-08 | Methods and devices for filling tanks with no backflow from the borehole exit |
Publications (3)
Publication Number | Publication Date |
---|---|
GB201314272D0 true GB201314272D0 (en) | 2013-09-25 |
GB2501844A GB2501844A (en) | 2013-11-06 |
GB2501844B GB2501844B (en) | 2018-11-28 |
Family
ID=49261936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB1314272.4A Active GB2501844B (en) | 2011-03-07 | 2012-03-08 | Methods and devices for filling tanks with no backflow from the borehole exit |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB2501844B (en) |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4830112A (en) * | 1987-12-14 | 1989-05-16 | Erickson Don J | Method and apparatus for treating wellbores |
US7178591B2 (en) * | 2004-08-31 | 2007-02-20 | Schlumberger Technology Corporation | Apparatus and method for formation evaluation |
BRPI0410776B1 (en) * | 2003-05-21 | 2016-01-19 | Baker Hughes Inc | apparatus and method for determining pumping rate for forming fluid sample |
US7594541B2 (en) * | 2006-12-27 | 2009-09-29 | Schlumberger Technology Corporation | Pump control for formation testing |
-
2012
- 2012-03-08 GB GB1314272.4A patent/GB2501844B/en active Active
Also Published As
Publication number | Publication date |
---|---|
GB2501844A (en) | 2013-11-06 |
GB2501844B (en) | 2018-11-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2021006659A (en) | Subsea pumping apparatuses and related methods. | |
EP2895687A4 (en) | Hydraulic oil well pumping system, and method for pumping hydrocarbon fluids from a wellbore | |
WO2013016097A3 (en) | System and method for production of reservoir fluids | |
EA201270450A1 (en) | REGULATORY METHOD AND DEVICE FOR WELL OPERATIONS | |
WO2013079926A3 (en) | Drill string check valve | |
BR112013023019A2 (en) | method for characterizing an underground formation using a fluid pressure response during well drilling operations, and method for calculating fluid flow flowing from a well, based on a fluid pressure response during well drilling operations | |
WO2013022574A3 (en) | Methods for monitoring fluids within or produced from a subterranean formation during fracturing operations using opticoanalytical devices | |
MX2014002924A (en) | Completing a multi-stage well. | |
MX2014001426A (en) | Methods for monitoring fluids within or produced from a subterranean formation using opticoanalytical devices. | |
WO2011127411A3 (en) | Fluid displacement methods and apparatus for hydrocarbons in subsea production tubing | |
WO2013040296A3 (en) | Apparatus and methods for providing fluid into a subsea pipeline | |
MX342839B (en) | Automated diversion valve control for pump down operations. | |
WO2011080586A3 (en) | Formation sampling | |
WO2011123438A8 (en) | Method for maintaining wellbore pressure | |
GB201303095D0 (en) | Method and system for running barrier valve on production string | |
WO2014044637A3 (en) | Method for initiating fluid circulation using dual drill pipe | |
GB2543237A (en) | Well construction real-time telemetry system | |
WO2011008522A3 (en) | System and method for intermittent gas lift | |
GB2529598A (en) | Fluid dispensing apparatus and method | |
WO2012122377A3 (en) | Methods and devices for filling tanks with no backflow from the borehole exit | |
GB2566403A (en) | Systems and methods for managing fluid pressure in a borehole during drilling operations | |
WO2012140445A3 (en) | Subsea wellbore construction method and apparatus | |
MX2015016972A (en) | A gas lift system and a gas lift method. | |
MX2015012588A (en) | Enhanced oil production using control of well casing gas pressure. | |
GB2501844A (en) | Methods and devices for filling tanks with no backflow from the borehole exit |