GB118058A - - Google Patents
Info
- Publication number
- GB118058A GB118058A GB118058DA GB118058A GB 118058 A GB118058 A GB 118058A GB 118058D A GB118058D A GB 118058DA GB 118058 A GB118058 A GB 118058A
- Authority
- GB
- United Kingdom
- Prior art keywords
- columns
- beams
- plates
- concrete
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
- E04B1/215—Connections specially adapted therefor comprising metallic plates or parts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
118,058. Rings, F. C. C. Feb. 12, 1918. Reinforced-concrete girders and beams; reinforced - concrete columns. -In the construction of buildings by means of precast columns, beams, and slabs, the core a of the column is first made and provided with steel plates b at the top and bottom and reinforcing rods c. The core is then erected and rods e are secured on the face by hoops f. The column above is then similarly erected, beams h with angle-plates i are laid on the columns, and bolts are passed through the plates b to connect the columns and beams. The outside of the columns is then covered with concrete which also encloses the plates b, and the floor slabs are laid from beam to beam. Alternatively, the columns may be made complete before erection and be provided with a sinking in the cap for the top plate b and bottom plate of the superposed column, and with bolt holes lined with iron tubes m, and recesses for the nuts.
Publications (1)
Publication Number | Publication Date |
---|---|
GB118058A true GB118058A (en) |
Family
ID=1712367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB118058D Active GB118058A (en) |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB118058A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2569669A (en) * | 1946-02-27 | 1951-10-02 | Peoples First Nat Bank & Trust | Beam connection for precast concrete members |
US3513610A (en) * | 1966-02-26 | 1970-05-26 | Trent Concrete Ltd | Concrete structural member,framework structure,and casting method |
EP1930513A1 (en) | 2006-11-30 | 2008-06-11 | Tecnostrutture SRL | Pillar for building constructions and structural node consisting of said pillar and one or more horizontal structural elements |
ES2315210A1 (en) * | 2008-08-28 | 2009-03-16 | Jose Cabrera Alcazar | Integral system of construction of housing and similar structure (Machine-translation by Google Translate, not legally binding) |
-
0
- GB GB118058D patent/GB118058A/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2569669A (en) * | 1946-02-27 | 1951-10-02 | Peoples First Nat Bank & Trust | Beam connection for precast concrete members |
US3513610A (en) * | 1966-02-26 | 1970-05-26 | Trent Concrete Ltd | Concrete structural member,framework structure,and casting method |
EP1930513A1 (en) | 2006-11-30 | 2008-06-11 | Tecnostrutture SRL | Pillar for building constructions and structural node consisting of said pillar and one or more horizontal structural elements |
ES2315210A1 (en) * | 2008-08-28 | 2009-03-16 | Jose Cabrera Alcazar | Integral system of construction of housing and similar structure (Machine-translation by Google Translate, not legally binding) |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107060067B (en) | Superimposed precast reinforced concrete structure system and construction method thereof | |
CN110259184A (en) | Column construction method is pulled out based on Removing Columns combined support jack-up system | |
CN108547311B (en) | Independent foundation under prefabricated assembled shaped steel concrete column | |
CN111851519A (en) | Space truss multilayer internal support system | |
CN211645934U (en) | Deep-buried karst cave treatment structure under tunnel bottom plate | |
CN103031926A (en) | Double T-shaped composite beam provided with prestressed steel tube concrete core rods and fabrication method of double T-shaped composite beam | |
CN113463653B (en) | Construction method for dismantling inner support in vertical sectional manner | |
GB118058A (en) | ||
CN212897482U (en) | Construction platform for high-rise building overhanging structural layer | |
JPH09209451A (en) | Joint construction of up and down columns with beam and joint method | |
CN214996417U (en) | Assembled factory shed made of concrete cast-in-place pile reinforcement cage | |
CN113738157B (en) | Temporary supports on two sides of post-cast strip of building and method for constructing constructional column by using temporary supports | |
CN114737608A (en) | Superposed underground structure anti-seismic system based on self-resetting breaking columns and construction method | |
CN213014306U (en) | Space truss multilayer internal support system | |
JP3098359B2 (en) | Column base structure and construction method thereof | |
Fasching et al. | Building box girder bridges using thin-walled pre-fabricated elements | |
CN201738249U (en) | Steel pillar-holding beam of pier | |
CN111058476A (en) | Beam lowering construction method of underground structure in reverse construction method | |
JPH0953277A (en) | Construction method for atomic power station | |
JPS6335931A (en) | Construction of building of atomic power plant | |
CN117386005B (en) | Prefabricated low-carbon structural system based on through beam column node and construction method | |
CN112575900A (en) | Double-layer synchronous hoisting construction method for large-span precast beam of assembled industrial factory building | |
CN221399099U (en) | Assembled integral underground structure | |
JPS64550B2 (en) | ||
CN115217121A (en) | Cooperative stress system and method for assembly type steel-concrete enclosure support and main body structure |