GB0025227D0 - Near wellbore modelling method and apparatus - Google Patents

Near wellbore modelling method and apparatus

Info

Publication number
GB0025227D0
GB0025227D0 GBGB0025227.0A GB0025227A GB0025227D0 GB 0025227 D0 GB0025227 D0 GB 0025227D0 GB 0025227 A GB0025227 A GB 0025227A GB 0025227 D0 GB0025227 D0 GB 0025227D0
Authority
GB
United Kingdom
Prior art keywords
near wellbore
modelling method
modelling
wellbore
wellbore modelling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GBGB0025227.0A
Other versions
GB2352036B (en
GB2352036A (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger UK Holdings Ltd
Original Assignee
Schlumberger Evaluation and Production Services UK Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Evaluation and Production Services UK Ltd filed Critical Schlumberger Evaluation and Production Services UK Ltd
Publication of GB0025227D0 publication Critical patent/GB0025227D0/en
Publication of GB2352036A publication Critical patent/GB2352036A/en
Application granted granted Critical
Publication of GB2352036B publication Critical patent/GB2352036B/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
GB0025227A 1998-05-04 1999-04-01 Near wellbore modelling method and apparatus Expired - Lifetime GB2352036B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US8401898P 1998-05-04 1998-05-04
PCT/IB1999/000569 WO1999057418A1 (en) 1998-05-04 1999-04-01 Near wellbore modeling method and apparatus

Publications (3)

Publication Number Publication Date
GB0025227D0 true GB0025227D0 (en) 2000-11-29
GB2352036A GB2352036A (en) 2001-01-17
GB2352036B GB2352036B (en) 2002-11-27

Family

ID=22182336

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0025227A Expired - Lifetime GB2352036B (en) 1998-05-04 1999-04-01 Near wellbore modelling method and apparatus

Country Status (5)

Country Link
US (1) US7451066B2 (en)
AU (1) AU2950499A (en)
CA (1) CA2329719C (en)
GB (1) GB2352036B (en)
WO (1) WO1999057418A1 (en)

Families Citing this family (154)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000036438A2 (en) * 1998-12-16 2000-06-22 Kepler Research & Development Limited Hydrocarbon reservoir testing
FR2801710B1 (en) * 1999-11-29 2002-05-03 Inst Francais Du Petrole METHOD FOR GENERATING A HYBRID MESH FOR MODELING A HETEROGENEOUS FORMATION CROSSED BY ONE OR MORE WELLS
FR2802324B1 (en) 1999-12-10 2004-07-23 Inst Francais Du Petrole METHOD FOR GENERATING A MESH ON A HETEROGENEOUS FORMATION CROSSED BY ONE OR MORE GEOMETRIC DISCONTINUITIES FOR THE PURPOSE OF MAKING SIMULATIONS
US7369973B2 (en) 2000-06-29 2008-05-06 Object Reservoir, Inc. Method and system for representing reservoir systems
DE60114012D1 (en) 2000-06-29 2005-11-17 Object Reservoir Inc METHOD AND DEVICE FOR MODELING GEOLOGICAL STRUCTURES WITH A FOUR-DIMENSIONAL UNSTRUCTURED GRILLE
US20020049575A1 (en) * 2000-09-28 2002-04-25 Younes Jalali Well planning and design
US7277836B2 (en) 2000-12-29 2007-10-02 Exxonmobil Upstream Research Company Computer system and method having a facility network architecture
US7761270B2 (en) 2000-12-29 2010-07-20 Exxonmobil Upstream Research Co. Computer system and method having a facility management logic architecture
US7249009B2 (en) * 2002-03-19 2007-07-24 Baker Geomark Llc Method and apparatus for simulating PVT parameters
US7725301B2 (en) * 2002-11-04 2010-05-25 Welldynamics, B.V. System and method for estimating multi-phase fluid rates in a subterranean well
US7496488B2 (en) 2003-03-06 2009-02-24 Schlumberger Technology Company Multi-scale finite-volume method for use in subsurface flow simulation
US6823297B2 (en) 2003-03-06 2004-11-23 Chevron U.S.A. Inc. Multi-scale finite-volume method for use in subsurface flow simulation
US7835893B2 (en) * 2003-04-30 2010-11-16 Landmark Graphics Corporation Method and system for scenario and case decision management
FR2869116B1 (en) * 2004-04-14 2006-06-09 Inst Francais Du Petrole METHOD FOR CONSTRUCTING A GEOMECHANICAL MODEL OF A SUBTERRANEAN ZONE FOR TORQUE TO A RESERVOIR MODEL
WO2005121840A1 (en) 2004-06-07 2005-12-22 Exxonmobil Upstream Research Company Method for solving implicit reservoir simulation matrix equation
US7640149B2 (en) 2004-12-15 2009-12-29 Schlumberger Technology Corporation Method system and program storage device for optimization of valve settings in instrumented wells using adjoint gradient technology and reservoir simulation
US8209202B2 (en) * 2005-04-29 2012-06-26 Landmark Graphics Corporation Analysis of multiple assets in view of uncertainties
WO2007001604A2 (en) * 2005-06-28 2007-01-04 Exxonmobil Upstream Research Company High-level graphical programming language and tool for well management programming
US20090216508A1 (en) * 2005-07-27 2009-08-27 Bruce A Dale Well Modeling Associated With Extraction of Hydrocarbons From Subsurface Formations
US8301425B2 (en) 2005-07-27 2012-10-30 Exxonmobil Upstream Research Company Well modeling associated with extraction of hydrocarbons from subsurface formations
BRPI0613857B1 (en) * 2005-07-27 2018-05-22 Exxonmobil Upstream Research Company METHOD AND APPARATUS ASSOCIATED WITH THE PRODUCTION OF HYDROCARBONS
EP1955253A4 (en) * 2005-11-21 2016-03-30 Chevron Usa Inc Method for field scale production optimization
US20070213935A1 (en) * 2005-12-29 2007-09-13 Schlumberger Technology Corporation Method and System to Display Well Properties Information
EP1994488B1 (en) * 2006-03-02 2013-07-17 ExxonMobil Upstream Research Company Method for quantifying reservoir connectivity using fluid travel times
WO2007149766A2 (en) 2006-06-18 2007-12-27 Chevron U.S.A. Inc. Reservoir simulation using a multi-scale finite volume including black oil modeling
EP2100218B1 (en) 2006-10-31 2013-05-15 ExxonMobil Upstream Research Company Modeling and management of reservoir systems with material balance groups
US7933758B2 (en) * 2006-12-05 2011-04-26 Conocophillips Company Method and apparatus for geomodel uplayering
DE102007012633A1 (en) * 2007-03-16 2008-09-18 Bayerische Motoren Werke Aktiengesellschaft Automatically creating a mesh of a component model
US8150663B2 (en) * 2007-03-30 2012-04-03 Paradigm Geophysical (Luxembourg) S.A.R.L. Partitioning algorithm for building a stratigraphic grid
CA2592725C (en) * 2007-06-26 2009-04-14 Imperial Oil Resources Limited A method for cleaning fouled vessels in the paraffinic froth treatment process
CA2594205C (en) * 2007-07-20 2009-11-24 Imperial Oil Resources Limited Use of a fluorocarbon polymer as a surface of a vessel or conduit used in a paraffinic froth treatment process for reducing fouling
CA2595336C (en) * 2007-07-31 2009-09-15 Imperial Oil Resources Limited Reducing foulant carry-over or build-up in a paraffinic froth treatment process
WO2009029135A1 (en) * 2007-08-24 2009-03-05 Exxonmobil Upstream Research Company Method for predicting well reliability by computer simulation
US8423337B2 (en) * 2007-08-24 2013-04-16 Exxonmobil Upstream Research Company Method for multi-scale geomechanical model analysis by computer simulation
US8768672B2 (en) * 2007-08-24 2014-07-01 ExxonMobil. Upstream Research Company Method for predicting time-lapse seismic timeshifts by computer simulation
US8548782B2 (en) * 2007-08-24 2013-10-01 Exxonmobil Upstream Research Company Method for modeling deformation in subsurface strata
US20100191516A1 (en) * 2007-09-07 2010-07-29 Benish Timothy G Well Performance Modeling In A Collaborative Well Planning Environment
US8437996B2 (en) 2007-12-13 2013-05-07 Exxonmobil Upstream Research Company Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
US9026417B2 (en) 2007-12-13 2015-05-05 Exxonmobil Upstream Research Company Iterative reservoir surveillance
US20110087471A1 (en) * 2007-12-31 2011-04-14 Exxonmobil Upstream Research Company Methods and Systems For Determining Near-Wellbore Characteristics and Reservoir Properties
US8099267B2 (en) * 2008-01-11 2012-01-17 Schlumberger Technology Corporation Input deck migrator for simulators
US20090200210A1 (en) * 2008-02-11 2009-08-13 Hommema Scott E Method Of Removing Solids From Bitumen Froth
CA2716809C (en) * 2008-03-20 2014-04-08 Exxonmobil Upstream Research Company Enhancing emulsion stability
US7933750B2 (en) * 2008-04-02 2011-04-26 Schlumberger Technology Corp Method for defining regions in reservoir simulation
CA2717373A1 (en) * 2008-04-17 2009-12-03 Exxonmobil Upstream Research Company Robust optimization-based decision support tool for reservoir development planning
BRPI0909446A2 (en) * 2008-04-18 2015-12-22 Exxonmobil Upstream Res Co reservoir development planning methods, decision support for petroleum resource development, development planning optimization, and hydrocarbon production.
WO2009131761A2 (en) * 2008-04-21 2009-10-29 Exxonmobile Upstream Research Company Stochastic programming-based decision support tool for reservoir development planning
CA2717353C (en) 2008-04-22 2016-06-21 Exxonmobil Upstream Research Company Functional-based knowledge analysis in a 2d and 3d visual environment
EP2291790B1 (en) * 2008-05-05 2020-04-29 Exxonmobil Upstream Research Company Modeling dynamic geological systems by visualizing and narrowing a parameter space
EP2297658A2 (en) 2008-05-16 2011-03-23 Chevron U.S.A. Incorporated Multi-scale method for multi-phase flow in porous media
US8252170B2 (en) 2008-06-27 2012-08-28 Exxonmobil Upstream Research Company Optimizing feed mixer performance in a paraffinic froth treatment process
US8301428B2 (en) * 2008-07-01 2012-10-30 Schlumberger Technology Corporation Modeling the nonlinear hysteresis response of reservoir media
EP2310972A2 (en) 2008-07-03 2011-04-20 Chevron U.S.A. Inc. Multi-scale finite volume method for reservoir simulation
US8346523B2 (en) * 2008-09-02 2013-01-01 Chevron U.S.A. Inc. Indirect-error-based, dynamic upscaling of multi-phase flow in porous media
US20100076740A1 (en) * 2008-09-08 2010-03-25 Schlumberger Technology Corporation System and method for well test design and interpretation
US8892407B2 (en) * 2008-10-01 2014-11-18 Exxonmobil Upstream Research Company Robust well trajectory planning
US8280709B2 (en) * 2008-10-03 2012-10-02 Schlumberger Technology Corporation Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
US8301429B2 (en) 2008-10-09 2012-10-30 Chevron U.S.A. Inc. Iterative multi-scale method for flow in porous media
AU2009311619B2 (en) * 2008-11-06 2015-10-01 Exxonmobil Upstream Research Company System and method for planning a drilling operation
AU2009314461B2 (en) 2008-11-14 2015-11-05 Exxonmobil Upstream Research Company Forming a model of a subsurface region
WO2010059288A1 (en) 2008-11-20 2010-05-27 Exxonmobil Upstream Research Company Sand and fluid production and injection modeling methods
BRPI0922214A2 (en) * 2008-12-03 2015-12-29 Chevron Usa Inc computer-implemented method and system for generating a grid used to construct a simulation model of a fractured subsurface reservoir
CA2745325A1 (en) * 2008-12-03 2010-06-10 Chevron U.S.A. Inc. System and method for predicting fluid flow characteristics within fractured subsurface reservoirs
EA201170931A1 (en) * 2009-01-13 2012-01-30 Эксонмобил Апстрим Рисерч Компани OPTIMIZATION OF WELL OPERATION PLANS
US8350851B2 (en) * 2009-03-05 2013-01-08 Schlumberger Technology Corporation Right sizing reservoir models
US8339396B2 (en) * 2009-03-05 2012-12-25 Schlumberger Technology Corporation Coarsening and splitting techniques
US20100286917A1 (en) * 2009-05-07 2010-11-11 Randy Doyle Hazlett Method and system for representing wells in modeling a physical fluid reservoir
KR20120025521A (en) * 2009-05-20 2012-03-15 인피니트 파워 솔루션스, 인크. Method of integrating electrochemical devices into and onto fixtures
CA2672004C (en) 2009-07-14 2012-03-27 Imperial Oil Resources Limited Feed delivery system for a solid-liquid separation vessel
US8655632B2 (en) * 2009-09-03 2014-02-18 Schlumberger Technology Corporation Gridless geological modeling
US20110071799A1 (en) * 2009-09-21 2011-03-24 Per Arne Slotte Grid models
WO2011043862A1 (en) 2009-10-07 2011-04-14 Exxonmobil Upstream Research Company Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
EA201270601A1 (en) 2009-10-28 2012-11-30 Шеврон Ю.Эс.Эй. Инк. MULTI-SCALE METHOD OF FINAL VOLUMES FOR MODELING COLLECTORS
US20110107246A1 (en) * 2009-11-03 2011-05-05 Schlumberger Technology Corporation Undo/redo operations for multi-object data
US20110106776A1 (en) * 2009-11-03 2011-05-05 Schlumberger Technology Corporation Incremental implementation of undo/redo support in legacy applications
US10061060B2 (en) 2009-11-12 2018-08-28 Exxonmobil Upstream Research Company Method and apparatus for generating a three-dimensional simulation grid for a reservoir model
EP3450679A1 (en) 2009-11-30 2019-03-06 Exxonmobil Upstream Research Company Adaptive newton's method for reservoir simulation
US9222929B2 (en) 2009-12-07 2015-12-29 Exxonmobil Upstream Research Company Solvent surveillance in solvent-based heavy oil recovery processes
EP2534605B1 (en) * 2010-02-12 2020-06-17 Exxonmobil Upstream Research Company Method and system for partitioning parallel simulation models
CA2693640C (en) 2010-02-17 2013-10-01 Exxonmobil Upstream Research Company Solvent separation in a solvent-dominated recovery process
US8731872B2 (en) 2010-03-08 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
AU2010347724B2 (en) 2010-03-12 2016-06-23 Exxonmobil Upstream Research Company Dynamic grouping of domain objects via smart groups
CA2696638C (en) 2010-03-16 2012-08-07 Exxonmobil Upstream Research Company Use of a solvent-external emulsion for in situ oil recovery
US8731887B2 (en) * 2010-04-12 2014-05-20 Exxonmobile Upstream Research Company System and method for obtaining a model of data describing a physical structure
US8727017B2 (en) 2010-04-22 2014-05-20 Exxonmobil Upstream Research Company System and method for obtaining data on an unstructured grid
US8731873B2 (en) 2010-04-26 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
EP2564309A4 (en) 2010-04-30 2017-12-20 Exxonmobil Upstream Research Company Method and system for finite volume simulation of flow
US8775142B2 (en) 2010-05-14 2014-07-08 Conocophillips Company Stochastic downscaling algorithm and applications to geological model downscaling
CA2705643C (en) 2010-05-26 2016-11-01 Imperial Oil Resources Limited Optimization of solvent-dominated recovery
US10083254B2 (en) 2010-06-15 2018-09-25 Exxonmobil Upstream Research Company Method and system for stabilizing formulation methods
US10087721B2 (en) 2010-07-29 2018-10-02 Exxonmobil Upstream Research Company Methods and systems for machine—learning based simulation of flow
EP2599023B1 (en) 2010-07-29 2019-10-23 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
US10198535B2 (en) 2010-07-29 2019-02-05 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
EP2599032A4 (en) 2010-07-29 2018-01-17 Exxonmobil Upstream Research Company Method and system for reservoir modeling
US9123161B2 (en) 2010-08-04 2015-09-01 Exxonmobil Upstream Research Company System and method for summarizing data on an unstructured grid
US8731875B2 (en) 2010-08-13 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
WO2012027020A1 (en) 2010-08-24 2012-03-01 Exxonmobil Upstream Research Company System and method for planning a well path
WO2012039811A1 (en) 2010-09-20 2012-03-29 Exxonmobil Upstream Research Company Flexible and adaptive formulations for complex reservoir simulations
CA2714842C (en) 2010-09-22 2012-05-29 Imperial Oil Resources Limited Controlling bitumen quality in solvent-assisted bitumen extraction
WO2012071090A1 (en) 2010-11-23 2012-05-31 Exxonmobil Upstream Research Company Variable discretization method for flow simulation on complex geological models
US8660824B2 (en) 2010-12-23 2014-02-25 Schlumberger Technology Corporation Discretely gridding complex fracturing for simulation
CN103282915A (en) 2010-12-30 2013-09-04 埃克森美孚上游研究公司 Systems and methods for subsurface reservoir simulation
EP2668641B1 (en) 2011-01-26 2020-04-15 Exxonmobil Upstream Research Company Method of reservoir compartment analysis using topological structure in 3d earth model
US9164191B2 (en) 2011-02-09 2015-10-20 Saudi Arabian Oil Company Sequential fully implicit well model for reservoir simulation
US10113400B2 (en) 2011-02-09 2018-10-30 Saudi Arabian Oil Company Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
US10175386B2 (en) 2011-02-09 2019-01-08 Saudi Arabian Oil Company Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
AU2011360212B2 (en) 2011-02-21 2017-02-02 Exxonmobil Upstream Research Company Reservoir connectivity analysis in a 3D earth model
CA2734811C (en) 2011-03-29 2012-11-20 Imperial Oil Resources Limited Feedwell system for a separation vessel
US9719333B2 (en) * 2011-04-12 2017-08-01 Landmark Graphics Corporation Variable fidelity simulation of flow in porous media
WO2013006226A1 (en) 2011-07-01 2013-01-10 Exxonmobil Upstream Research Company Plug-in installer framework
US8731892B2 (en) 2011-08-02 2014-05-20 Saudi Arabian Oil Company Systems and program product for performing a fully automated workflow for well performance model creation and calibration
US8688426B2 (en) 2011-08-02 2014-04-01 Saudi Arabian Oil Company Methods for performing a fully automated workflow for well performance model creation and calibration
US9489176B2 (en) 2011-09-15 2016-11-08 Exxonmobil Upstream Research Company Optimized matrix and vector operations in instruction limited algorithms that perform EOS calculations
US9753180B2 (en) 2012-03-28 2017-09-05 Exxonmobil Upstream Research Company Method for multiphase flow upscaling
WO2013169429A1 (en) 2012-05-08 2013-11-14 Exxonmobile Upstream Research Company Canvas control for 3d data volume processing
US20140321240A1 (en) * 2013-04-26 2014-10-30 Siemens Medical Solutions Usa, Inc. Elastography for cement integrity inspection
WO2014018055A2 (en) * 2012-07-27 2014-01-30 Landmark Graphics Corporation Systems and methods for estimating opportunity in a reservoir system
US9260948B2 (en) * 2012-07-31 2016-02-16 Landmark Graphics Corporation Multi-level reservoir history matching
EP2901363A4 (en) 2012-09-28 2016-06-01 Exxonmobil Upstream Res Co Fault removal in geological models
WO2014078891A1 (en) * 2012-11-20 2014-05-30 Stochastic Simulation Limited Method and system for characterising subsurface reservoirs
US20140236559A1 (en) 2013-02-18 2014-08-21 Saudi Arabian Oil Company Systems, methods, and computer-readable media for modeling complex wellbores in field-scale reservoir simulation
US10584570B2 (en) 2013-06-10 2020-03-10 Exxonmobil Upstream Research Company Interactively planning a well site
US9690885B2 (en) 2013-08-16 2017-06-27 Schlumberger Technology Corporation Interactive visualization of reservoir simulation data sets
DE112013007368T5 (en) * 2013-08-30 2016-05-12 Landmark Graphics Corporation Geostatistical approach to the simulation of the 3D geometry of a natural fracture network, caused by observations in a borehole
US9864098B2 (en) 2013-09-30 2018-01-09 Exxonmobil Upstream Research Company Method and system of interactive drill center and well planning evaluation and optimization
RU2016112546A (en) 2013-10-23 2017-10-09 Лэндмарк Графикс Корпорейшн 3D VISUALIZATION OF A WELL BORE
US9696442B2 (en) 2013-10-29 2017-07-04 Exxonmobil Upstream Research Company Method for estimating subsurface properties from geophysical survey data using physics-based inversion
US10808501B2 (en) 2014-03-17 2020-10-20 Saudi Arabian Oil Company Modeling intersecting faults and complex wellbores in reservoir simulation
US10677960B2 (en) 2014-03-17 2020-06-09 Saudi Arabian Oil Company Generating unconstrained voronoi grids in a domain containing complex internal boundaries
WO2015200259A1 (en) * 2014-06-23 2015-12-30 Smith International, Inc. Methods for analyzing and optimizing drilling tool assemblies
CA2948667A1 (en) 2014-07-30 2016-02-04 Exxonmobil Upstream Research Company Method for volumetric grid generation in a domain with heterogeneous material properties
US10359523B2 (en) 2014-08-05 2019-07-23 Exxonmobil Upstream Research Company Exploration and extraction method and system for hydrocarbons
US10184320B2 (en) 2014-09-02 2019-01-22 Saudi Arabian Oil Company Systems, methods, and computer medium to enhance hydrocarbon reservoir simulation
WO2016070073A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Managing discontinuities in geologic models
EP3213125A1 (en) 2014-10-31 2017-09-06 Exxonmobil Upstream Research Company Corp-urc-e2. 4A.296 Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
US10803534B2 (en) 2014-10-31 2020-10-13 Exxonmobil Upstream Research Company Handling domain discontinuity with the help of grid optimization techniques
US10280722B2 (en) 2015-06-02 2019-05-07 Baker Hughes, A Ge Company, Llc System and method for real-time monitoring and estimation of intelligent well system production performance
US10337294B2 (en) * 2015-10-01 2019-07-02 Baker Hughes, A Ge Company, Llc Reservoir permeability upscaling
US10329904B2 (en) 2016-03-18 2019-06-25 Baker Hughes, A Ge Company, Llc Determining the robustness of discrete fracture network permeability estimates
US10482202B2 (en) 2016-06-30 2019-11-19 The Procter & Gamble Company Method for modeling a manufacturing process for a product
CA3043231C (en) 2016-12-23 2022-06-14 Exxonmobil Upstream Research Company Method and system for stable and efficient reservoir simulation using stability proxies
US10233749B2 (en) * 2017-05-03 2019-03-19 Saudi Arabian Oil Company Multi-layer reservoir well drainage region
US11041976B2 (en) 2017-05-30 2021-06-22 Exxonmobil Upstream Research Company Method and system for creating and using a subsurface model in hydrocarbon operations
US10913901B2 (en) 2017-09-12 2021-02-09 Saudi Arabian Oil Company Integrated process for mesophase pitch and petrochemical production
EP3877955A4 (en) 2019-02-05 2022-07-20 Motive Drilling Technologies, Inc. Downhole display
US11401786B2 (en) * 2019-03-06 2022-08-02 Saudi Arabian Oil Company Systems and methods for hydrocarbon reservoir well connectivity graph optimization, simulation and development
US11454105B2 (en) 2019-04-25 2022-09-27 Saudi Arabian Oil Company Reservoir simulation modeling with well trajectory at true positions in grid simulation models
CN110017129B (en) * 2019-05-21 2023-07-21 江苏省环境科学研究院 Karst geothermal water scaling trend prediction method considering acid gas degassing
US11353622B2 (en) 2020-01-06 2022-06-07 Saudi Arabian Oil Company Systems and methods for hydrocarbon reservoir three dimensional unstructured grid generation and development
US11713666B2 (en) * 2020-05-11 2023-08-01 Saudi Arabian Oil Company Systems and methods for determining fluid saturation associated with reservoir depths
CN111968234B (en) * 2020-08-26 2023-08-29 西安石油大学 FLAC3D complex modeling method based on Rhino6 software
CN113075731B (en) * 2021-03-24 2022-05-17 东北石油大学 Deep reservoir continuity wellbore digital modeling method and device
CN113420359B (en) * 2021-07-02 2022-08-05 国网福建省电力有限公司 Method for automatically transmitting parameters to well placement based on REVIT (remote visual inspection) electric power engineering general diagram
CN117168995B (en) * 2023-09-05 2024-04-09 滨州新锐测绘技术有限公司 Mapping bracket performance testing device and testing method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4821164A (en) 1986-07-25 1989-04-11 Stratamodel, Inc. Process for three-dimensional mathematical modeling of underground geologic volumes
FR2734069B1 (en) * 1995-05-12 1997-07-04 Inst Francais Du Petrole METHOD FOR PREDICTING, BY AN INVERSION TECHNIQUE, THE EVOLUTION OF THE PRODUCTION OF AN UNDERGROUND DEPOSIT
US6018497A (en) * 1997-02-27 2000-01-25 Geoquest Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore
US6106561A (en) 1997-06-23 2000-08-22 Schlumberger Technology Corporation Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator
US6101447A (en) 1998-02-12 2000-08-08 Schlumberger Technology Corporation Oil and gas reservoir production analysis apparatus and method
GB2336008B (en) 1998-04-03 2000-11-08 Schlumberger Holdings Simulation system including a simulator and a case manager adapted for organizing data files
US6230101B1 (en) 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
FR2801710B1 (en) 1999-11-29 2002-05-03 Inst Francais Du Petrole METHOD FOR GENERATING A HYBRID MESH FOR MODELING A HETEROGENEOUS FORMATION CROSSED BY ONE OR MORE WELLS

Also Published As

Publication number Publication date
US20050015231A1 (en) 2005-01-20
WO1999057418A1 (en) 1999-11-11
CA2329719A1 (en) 1999-11-11
GB2352036B (en) 2002-11-27
GB2352036A (en) 2001-01-17
AU2950499A (en) 1999-11-23
US7451066B2 (en) 2008-11-11
CA2329719C (en) 2005-12-27

Similar Documents

Publication Publication Date Title
GB2352036B (en) Near wellbore modelling method and apparatus
GB2345757B (en) Well logging apparatus and method
GB2344123B (en) Well logging method and apparatus
GB2340152B (en) Multiple string completion apparatus and method
GB2312909B (en) Wellbore methods and apparatus
GB2330159B (en) Apparatus and method for lateral wellbore completion
GB0312661D0 (en) Wellbore sensor apparatus and method
GB9511538D0 (en) Wellbore methods and apparatus
AP9701164A0 (en) Drilling method and apparatus
GB2320269B (en) Wellbore methods and apparatus
GB2311960B (en) Modelling apparatus and method
GB9803183D0 (en) Apparatus and method
GB2345501B (en) Downhole window milling apparatus and method for using the same
GB9826556D0 (en) Apparatus and method for downhole telemetry
GB2345502B (en) Method and apparatus for well logging and well control
GB9811425D0 (en) Apparatus and method
GB9919611D0 (en) Apparatus and method
GB9822769D0 (en) Method and apparatus
GB9804246D0 (en) Electropermeabilisation method and apparatus
GB9929737D0 (en) Method and apparatus
GB9722612D0 (en) Drilling method and apparatus
GB9800541D0 (en) Prototyping apparatus and method
GB9809579D0 (en) Apparatus and method
GB9827357D0 (en) Method and apparatus
GB9826023D0 (en) Apparatus and method

Legal Events

Date Code Title Description
AT Applications terminated before publication under section 16(1)
PE20 Patent expired after termination of 20 years

Expiry date: 20190331