FR506189A - Method of establishing reinforced cement floors with hollow bricks forming slabs - Google Patents

Method of establishing reinforced cement floors with hollow bricks forming slabs

Info

Publication number
FR506189A
FR506189A FR506189A FR506189DA FR506189A FR 506189 A FR506189 A FR 506189A FR 506189 A FR506189 A FR 506189A FR 506189D A FR506189D A FR 506189DA FR 506189 A FR506189 A FR 506189A
Authority
FR
France
Prior art keywords
reinforced cement
hollow bricks
bricks forming
cement floors
forming slabs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
FR506189A
Other languages
French (fr)
Inventor
Leopold Warme
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of FR506189A publication Critical patent/FR506189A/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/18Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly cast between filling members
    • E04B5/19Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly cast between filling members the filling members acting as self-supporting permanent forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
FR506189A 1919-11-17 1919-11-17 Method of establishing reinforced cement floors with hollow bricks forming slabs Expired FR506189A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR506189T 1919-11-17

Publications (1)

Publication Number Publication Date
FR506189A true FR506189A (en) 1920-08-16

Family

ID=8908962

Family Applications (1)

Application Number Title Priority Date Filing Date
FR506189A Expired FR506189A (en) 1919-11-17 1919-11-17 Method of establishing reinforced cement floors with hollow bricks forming slabs

Country Status (1)

Country Link
FR (1) FR506189A (en)

Similar Documents

Publication Publication Date Title
FR506189A (en) Method of establishing reinforced cement floors with hollow bricks forming slabs
FR495418A (en) Construction process for reinforced cement structures
FR510001A (en) Reinforced cement floor slab
FR575735A (en) Hollow brick for reinforced cement ceilings
FR501257A (en) Hollow body for the construction of reinforced concrete floors
FR538215A (en) Method of building walls with pillars forming reinforced or unreinforced cement frames
FR567971A (en) Hollow reinforced cement slabs for floors
FR526503A (en) Construction process for reinforced cement floors without formwork
FR504885A (en) Process for the construction of cement or concrete walls with one or more air spaces - case b
FR531593A (en) Hollow brick for construction of reinforced concrete floor
FR516062A (en) Improvements made to the construction of reinforced cement buildings
FR496152A (en) Construction of reinforced cement floor slabs and joists forming an immediate ceiling and floor
FR557829A (en) Cement concrete huts for the construction of funeral structures
FR595137A (en) Method of establishing hollow reinforced cement floors
FR512195A (en) Industrial process for the rapid construction of monolithic and permanent buildings, in reinforced cement concrete
FR488235A (en) Method of establishing and constructing reinforced cement ships
FR497817A (en) Process for the establishment of reinforced concrete constructions
FR523717A (en) Formwork for the manufacture of reinforced cement beams
FR21382E (en) Reinforced cement construction
FR497863A (en) Wall made of cement blocks
FR510802A (en) Improvements made to the establishment of reinforced cement floors and roofs
FR500356A (en) Economic dismantling reinforced cement construction
FR598583A (en) Process for establishing hollow slab and reinforced cement floors
FR30872E (en) Process for establishing hollow slab and reinforced cement floors
FR494599A (en) Construction process for hollow brick and reinforced cement ship hulls