FR3083262B1 - INSTALLATION AND ENERGY PRODUCTION PROCESS - Google Patents

INSTALLATION AND ENERGY PRODUCTION PROCESS Download PDF

Info

Publication number
FR3083262B1
FR3083262B1 FR1855850A FR1855850A FR3083262B1 FR 3083262 B1 FR3083262 B1 FR 3083262B1 FR 1855850 A FR1855850 A FR 1855850A FR 1855850 A FR1855850 A FR 1855850A FR 3083262 B1 FR3083262 B1 FR 3083262B1
Authority
FR
France
Prior art keywords
installation
superheater
boiler
production process
energy production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
FR1855850A
Other languages
French (fr)
Other versions
FR3083262A1 (en
Inventor
Frank Tabaries
Bernard Siret
Eddie Marcarian
Christophe Lehaut
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNIM Environnement et Energie Services SAS
Original Assignee
Constructions Industrielles de la Mediterrane CNIM SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Constructions Industrielles de la Mediterrane CNIM SA filed Critical Constructions Industrielles de la Mediterrane CNIM SA
Priority to FR1855850A priority Critical patent/FR3083262B1/en
Priority to PCT/EP2019/067077 priority patent/WO2020002471A1/en
Publication of FR3083262A1 publication Critical patent/FR3083262A1/en
Application granted granted Critical
Publication of FR3083262B1 publication Critical patent/FR3083262B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B33/00Steam-generation plants, e.g. comprising steam boilers of different types in mutual association
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/12Heat utilisation in combustion or incineration of waste

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Hydrogen, Water And Hydrids (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

Cette installation, qui vise à produire de l'énergie de manière optimale à partir de deux combustibles différents, comporte un premier système de production de vapeur d'eau (100), avec une première unité de combustion (101) pour biomasse et une première chaudière (102) incluant à la fois un vaporiseur (102.2) et un surchauffeur (102.3). L'installation comporte aussi une unité de turbinage (300) pour turbiner la vapeur d'eau surchauffée (4) produite par le surchauffeur, afin de produire de l'énergie, notamment de l'énergie électrique. L'installation comporte en outre au moins un second système de production de vapeur d'eau et/ou d'eau surchauffée (200), qui est couplé au premier système, le ou chaque second système comprenant une seconde unité de combustion (201) pour un combustible autre que de la biomasse, et une seconde chaudière (202) produisant de la vapeur d'eau et/ou de l'eau surchauffée (10) qui sont envoyées à la première chaudière de manière à, conjointement à la vapeur d'eau produite par le vaporiseur, alimenter le surchauffeur.This installation, which aims to produce energy optimally from two different fuels, comprises a first water vapor production system (100), with a first combustion unit (101) for biomass and a first boiler (102) including both a vaporizer (102.2) and a superheater (102.3). The installation also comprises a turbine unit (300) for turbining the superheated water vapor (4) produced by the superheater, in order to produce energy, in particular electrical energy. The installation further comprises at least a second system for producing steam and / or superheated water (200), which is coupled to the first system, the or each second system comprising a second combustion unit (201) for a fuel other than biomass, and a second boiler (202) producing steam and / or superheated water (10) which are sent to the first boiler so as, together with the steam of water produced by the vaporizer, feed the superheater.

FR1855850A 2018-06-28 2018-06-28 INSTALLATION AND ENERGY PRODUCTION PROCESS Active FR3083262B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR1855850A FR3083262B1 (en) 2018-06-28 2018-06-28 INSTALLATION AND ENERGY PRODUCTION PROCESS
PCT/EP2019/067077 WO2020002471A1 (en) 2018-06-28 2019-06-26 Installation and method for producing energy

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1855850 2018-06-28
FR1855850A FR3083262B1 (en) 2018-06-28 2018-06-28 INSTALLATION AND ENERGY PRODUCTION PROCESS

Publications (2)

Publication Number Publication Date
FR3083262A1 FR3083262A1 (en) 2020-01-03
FR3083262B1 true FR3083262B1 (en) 2021-12-10

Family

ID=63036213

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1855850A Active FR3083262B1 (en) 2018-06-28 2018-06-28 INSTALLATION AND ENERGY PRODUCTION PROCESS

Country Status (2)

Country Link
FR (1) FR3083262B1 (en)
WO (1) WO2020002471A1 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5623822A (en) 1995-05-23 1997-04-29 Montenay International Corp. Method of operating a waste-to-energy plant having a waste boiler and gas turbine cycle
CN101968041B (en) * 2010-09-29 2012-05-30 武汉凯迪工程技术研究总院有限公司 Solar power generation method and system taking biomass boiler as auxiliary heat source
FR3012578B1 (en) * 2013-10-24 2015-12-11 Suez Environnement METHOD AND INSTALLATION FOR ENERGY ENHANCING WASTE
CN103953402B (en) * 2014-04-11 2015-07-29 武汉凯迪工程技术研究总院有限公司 The optimization integrated system of a kind of solar energy and biomass energy cogeneration

Also Published As

Publication number Publication date
FR3083262A1 (en) 2020-01-03
WO2020002471A1 (en) 2020-01-02

Similar Documents

Publication Publication Date Title
US8495878B1 (en) Feedwater heating hybrid power generation
EP2499725B1 (en) Hybrid biomass process with reheat cycle
ES8300376A1 (en) Combined cycle system for optimizing cycle efficiency having varying sulfur content fuels
MY136973A (en) Combined cycle generation system
López et al. Parabolic trough or linear fresnel solar collectors? An exergy comparison of a solar-assisted sugarcane cogeneration power plant
Wu et al. Component and process based exergy evaluation of a 600MW coal-fired power plant
FR3083262B1 (en) INSTALLATION AND ENERGY PRODUCTION PROCESS
Overend Direct combustion of biomass
FR3083263B1 (en) ENERGY PRODUCTION PLANT AND METHOD
WO2018146509A3 (en) System and method for sustainable generation of energy
Razuvaev et al. Economic efficiency evaluation of applying the general-purpose heat and power plant based on the reciprocating steam engine
US8596034B2 (en) Hybrid power generation cycle systems and methods
RU2376481C2 (en) Electric power generating complex with combined fuel
DiPippo An analysis of an early hybrid fossil-geothermal power plant proposal
Koralewska Innovative concepts of high-efficiency EfW plants
EA017175B1 (en) Electricity generating system using a combined fuel
Shafiq et al. Theoretical Investigations on Entropy Generation and Work Lost Analysis of 4MW Rice Husk Fired Thermal Power Plant
Bianchi et al. Repowering Existing Under-utilized WTE Power Plant with Gas Turbine
Tavman et al. Energy and Efficiency Analysis of A Coal-Fired Power Plant
NO20014002D0 (en) Process and plant for the use of biomass as an additional fuel in gas power plants
RU147386U1 (en) GAS TURBINE INSTALLATION
Shafi et al. First and second law analysis of coal gasification fuelled combined cycle power plant
Fossum Small-scale power/heat production based on biomass; Smaaskala kraft/varmeproduksjon basert paa biomasse
Karellas et al. Energetic and exergetic evaluation of the hybridization of Solar Combined Cycle Power Plants
Ameri et al. A comparison between solar field and supplementary firing for generating additional power in solar hybrid power plant

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

EXTE Extension to a french territory

Extension state: PF

PLSC Publication of the preliminary search report

Effective date: 20200103

PLFP Fee payment

Year of fee payment: 3

PLFP Fee payment

Year of fee payment: 4

TP Transmission of property

Owner name: CNIM ENVIRONNEMENT & ENERGIE SERVICES, FR

Effective date: 20210823

PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6