FR3073810A1 - METHOD AND STATION FOR AUTOMATED LOADING OF ROOF TRAVERS ON A BOX FRAME OF A MOTOR VEHICLE - Google Patents

METHOD AND STATION FOR AUTOMATED LOADING OF ROOF TRAVERS ON A BOX FRAME OF A MOTOR VEHICLE Download PDF

Info

Publication number
FR3073810A1
FR3073810A1 FR1760897A FR1760897A FR3073810A1 FR 3073810 A1 FR3073810 A1 FR 3073810A1 FR 1760897 A FR1760897 A FR 1760897A FR 1760897 A FR1760897 A FR 1760897A FR 3073810 A1 FR3073810 A1 FR 3073810A1
Authority
FR
France
Prior art keywords
sleepers
manipulator
crosspiece
crosspieces
body frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR1760897A
Other languages
French (fr)
Other versions
FR3073810B1 (en
Inventor
Philippe Joliveau
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PSA Automobiles SA
Original Assignee
PSA Automobiles SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PSA Automobiles SA filed Critical PSA Automobiles SA
Priority to FR1760897A priority Critical patent/FR3073810B1/en
Publication of FR3073810A1 publication Critical patent/FR3073810A1/en
Application granted granted Critical
Publication of FR3073810B1 publication Critical patent/FR3073810B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D65/00Designing, manufacturing, e.g. assembling, facilitating disassembly, or structurally modifying motor vehicles or trailers, not otherwise provided for
    • B62D65/02Joining sub-units or components to, or positioning sub-units or components with respect to, body shell or other sub-units or components
    • B62D65/022Transferring or handling sub-units or components, e.g. in work stations or between workstations and transportation systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D65/00Designing, manufacturing, e.g. assembling, facilitating disassembly, or structurally modifying motor vehicles or trailers, not otherwise provided for
    • B62D65/02Joining sub-units or components to, or positioning sub-units or components with respect to, body shell or other sub-units or components
    • B62D65/024Positioning of sub-units or components with respect to body shell or other sub-units or components

Abstract

L'invention a pour objet un procédé de dépose automatisée de traverses de toit (4a-4c) sur une armature de caisse (1a-1c) à une station de chargement (3) comprenant un unique poste de dépose (7) des traverses (4a-4c). Le poste de dépose (7) comprend un unique magasin (8) de stockage des traverses (4a-4c) et un unique manipulateur (11) de préhension des traverses (4a-4c) dont la mise en œuvre est placée sous la dépendance d'un moyen de commande (5). Une première étape est une étape de saisie collective par le manipulateur (11) d'un jeu de traverses (4a-4c) stocké dans le magasin (8) de stockage et comprenant une traverse avant (4a), une traverse médiane (4b) et une traverse arrière (4c). Une deuxième étape est une étape de dépôts successifs par le manipulateur (11) de chacune des traverses (4a-4c) préalablement saisies, comprenant des opérations de dépose d'au moins deux des trois traverses (4a-4c) sur l'armature de caisse (1a-1c ), dont au moins la traverse arrière (4c) et la traverse avant (4a), sous contrôle du moyen de commande (5) en fonction de la configuration de l'armature de caisse (1a-1c) à produire préalablement identifiée.The invention relates to a method of automatically depositing roof sleepers (4a-4c) on a body frame (1a-1c) at a loading station (3) comprising a single station (7) for laying the sleepers ( 4a-4c). The removal station (7) comprises a single store (8) for storing the sleepers (4a-4c) and a single manipulator (11) for gripping the sleepers (4a-4c), the implementation of which is placed under the control of control means (5). A first step is a step of collective gripping by the manipulator (11) of a set of crosspieces (4a-4c) stored in the storage magazine (8) and comprising a front cross member (4a), a crossbeam (4b) and a rear crossmember (4c). A second step is a step of successive deposition by the manipulator (11) of each of the crosspieces (4a-4c) previously entered, comprising operations of depositing at least two of the three crosspieces (4a-4c) on the reinforcement of body (1a-1c), including at least the rear crossmember (4c) and the front crossmember (4a), under control of the control means (5) according to the configuration of the body frame (1a-1c) to produce previously identified.

Description

PROCEDE ET STATION DE CHARGEMENT AUTOMATISE DE TRAVERSES DE TOIT SUR UNE ARMATURE DE CAISSE D'UN VEHICULE AUTOMOBILE.METHOD AND STATION FOR AUTOMATICALLY LOADING ROAD CROSSINGS ON A BODY REINFORCEMENT OF A MOTOR VEHICLE.

La présente invention relève du domaine des véhicules automobiles et plus particulièrement de l'automatisation des opérations de ferrage sur une chaîne d'assemblage des composants d'une armature de caisse d'un véhicule automobile. L'invention relève plus particulièrement de l'automatisation des opérations de dépose de traverses de toit sur une telle armature de caisse.The present invention relates to the field of motor vehicles and more particularly to the automation of shoeing operations on an assembly line of the components of a body frame of a motor vehicle. The invention relates more particularly to the automation of operations for removing roof sleepers on such a body frame.

Les véhicules automobiles comprennent une armature de caisse habillée d'éléments de carrosserie et agencée pour former une structure roulante. L'armature de caisse ménage une structure robuste pour le véhicule, sur laquelle sont ensuite installés divers équipements, notamment pour fournir la propulsion du véhicule et/ou pour procurer un confort aux passagers.Motor vehicles include a body frame covered with bodywork elements and arranged to form a rolling structure. The body frame provides a robust structure for the vehicle, on which various equipment is then installed, in particular to provide propulsion of the vehicle and / or to provide comfort to the passengers.

L'armature de caisse comprend divers composants qui sont assemblés entre eux en différents postes de travail successifs d'une chaîne d'assemblage. Parmi ses composants, l'armature de caisse comprend une ossature de toit qui est essentiellement composée de longerons et de traverses et qui est configurée pour recevoir au moins un panneau ménageant un pavillon de toit du véhicule. Les longerons s'étendent d'avant en arrière et les traverses s'étendent entre les côtés latéraux de l'armature de caisse. Les longerons et les traverses sont couramment agencés en arceaux, les longerons formant alors des arcs de pavillon longitudinaux et les traverses formant alors des arcs de pavillon transversaux.The body frame comprises various components which are assembled together in different successive work stations of an assembly line. Among its components, the body frame comprises a roof frame which is essentially composed of side members and cross members and which is configured to receive at least one panel providing a roof pavilion for the vehicle. The side members extend from front to rear and the cross members extend between the lateral sides of the body frame. The side members and the cross members are commonly arranged in arches, the side members then forming longitudinal roof arcs and the cross members then forming transverse roof arcs.

Le pavillon est susceptible d'être formé d'un panneau plein installé de manière fixe sur l'armature de caisse via l'ossature de toit. L'ossature de toit comprend alors typiquement un jeu de trois traverses dont une traverse avant, une traverse médiane et une traverse arrière, tel qu'il ressort par exemple du document 2 921 038 (PEUGEOT CITROËN AUTOMOBILES SA).The roof may be formed by a solid panel installed fixedly on the body frame via the roof frame. The roof framework then typically comprises a set of three crosspieces including a front crosspiece, a central crosspiece and a rear crosspiece, as shown for example in document 2,921,038 (PEUGEOT CITROËN AUTOMOBILES SA).

Le pavillon est aussi susceptible de comprendre au moins un panneau qui est muni d'un vitrage et/ou qui est monté mobile sur l'ossature de toit entre une position d'ouverture et une position de fermeture. Dans ce cas, l'ossature de toit comprend typiquement un jeu de deux traverses avant et arrière entre lesquelles est installé un cadre porteur du panneau, tel qu'il ressort par exemple du document 3 047 221 (PEUGEOT CITROËN AUTOMOBILES SA).The pavilion is also likely to include at least one panel which is provided with glazing and / or which is movably mounted on the roof framework between an open position and a closed position. In this case, the roof frame typically comprises a set of two front and rear crosspieces between which is installed a support frame for the panel, as shown, for example, from document 3,047,221 (PEUGEOT CITROËN AUTOMOBILES SA).

Les longerons et les traverses de l'ossature de toit sont montés sur l'armature de caisse en étant fixés au sommet de montants répartis longitudinalement aux côtés latéraux de l'armature de caisse. Une phase de dépose des composants de l'ossature de toit sur les montants est alors réalisée sur la chaîne d'assemblage de l'armature de caisse, préalablement à leur fixation les uns aux autres et/ou avec des éléments de renfort ou d'habillage.The longitudinal members and cross members of the roof frame are mounted on the body frame by being fixed to the top of uprights distributed longitudinally to the lateral sides of the body frame. A phase of removing the components of the roof frame on the uprights is then carried out on the assembly line of the body frame, prior to their attachment to each other and / or with reinforcing elements or dressing.

Dans ce contexte, la chaîne d'assemblage de l'armature de caisse comprend plusieurs stations de travail disposées le long d'une ligne d'acheminement pas à pas d'armatures de caisse à produire successivement. Essentiellement, la chaîne d'assemblage de l'armature de caisse comprend successivement une station de chargement des côtés de caisse et/ou d'un panneau arrière, une station de chargement des traverses, puis une station de mise en conformation de la caisse, notamment par apport d'un habillage.In this context, the assembly line of the body armature comprises several work stations arranged along a step-by-step routing line of body armatures to be produced successively. Essentially, the assembly line of the body frame successively comprises a station for loading the sides of the body and / or a rear panel, a station for loading the sleepers, then a station for shaping the body, in particular by providing a covering.

La station de chargement des traverses comprend classiquement des postes de dépose des traverses sur l'ossature de caisse. Les différents postes de dépose comprennent un manipulateur et un magasin de stockage de traverses d'un type donné, c’est-à-dire de traverses de type traverse avant, de type traverse médiane ou de type traverse arrière. Une telle segmentation des différents postes de dépose facilite la gestion de l'ordre de dépôt des traverses sur l'armature de caisse. Le dépôt des traverses sur l'armature de caisse est contrôlé par un moyen de commande régulant la mise en œuvre des manipulateurs selon un ordre de dépôt préalablement établi.The sleeper loading station conventionally comprises crossover removal stations on the body frame. The various depositing stations include a manipulator and a storage warehouse for sleepers of a given type, that is to say sleepers of the front sleeper type, of the middle sleeper type or of the rear sleeper type. Such a segmentation of the various depositing stations facilitates the management of the order of depositing the crosspieces on the body frame. The deposition of the crosspieces on the body frame is controlled by a control means regulating the implementation of the manipulators according to a previously established deposit order.

Ainsi, l'armature de caisse est déplacée par la ligne d'acheminement successivement vers les postes de dépose. Un manipulateur saisit une traverse au magasin de stockage qui lui est affecté, puis la déplace pour la déposer à son emplacement prévu sur l'armature de caisse. L'opération est répétée à chacun des postes de dépose selon l'ordre de dépôt des traverses préalablement établi.Thus, the body frame is moved by the routing line successively to the depositing stations. A manipulator grabs a cross member at the storage warehouse assigned to it, then moves it to place it in its intended location on the box frame. The operation is repeated at each of the drop-off stations according to the order of deposit of the sleepers previously established.

Dans ce contexte et sur la base du constat qui vient d'être fait, la présente invention s'inscrit plus spécifiquement dans une recherche d'une procédure d'automatisation des opérations de dépose des traverses sur l'armature de caisse à la station de chargement des traverses.In this context and on the basis of the observation which has just been made, the present invention is more specifically part of a search for a procedure for automating the operations of removing the sleepers on the body frame at the station. loading of sleepers.

Ainsi l'invention a pour objet un procédé de dépose automatisée sur une armature de caisse d'un véhicule automobile, de traverses que comprend une ossature de toit participante de l'armature de caisse. L'invention a aussi pour objet une station de chargement des traverses sur l'armature de caisse que comprend une chaîne d'assemblage des composants de l'armature de caisse.Thus, the subject of the invention is an automated method of depositing on a body frame of a motor vehicle, sleepers that comprises a participating roof frame of the body frame. The invention also relates to a station for loading sleepers on the body frame that includes an assembly line for the components of the body frame.

Un but de l'invention est de limiter l'encombrement au sol de la station de chargement des traverses sur l'armature de caisse. Il est finalement recherché de réduire l'encombrement global au sol de la chaîne d'assemblage comprenant ladite station de chargement.An object of the invention is to limit the space occupied on the ground by the loading station for the sleepers on the body frame. It is finally sought to reduce the overall size on the ground of the assembly line comprising said loading station.

Un autre but de l'invention est d'aménager la station de chargement des traverses, de manière à obtenir des cadences soutenues de production des armatures de caisse successivement déplacées le long de la chaîne d'assemblage.Another object of the invention is to arrange the loading station for the sleepers, so as to obtain sustained production rates for the body frames successively moved along the assembly line.

Un autre but de l'invention est de simplifier l'organisation de la station de chargement des traverses, notamment pour en limiter ses coûts de structure, ses coûts d'aménagement à l'intérieur d'un bâtiment abritant la chaîne d'assemblage, et/ou ses coûts de mise en œuvre.Another object of the invention is to simplify the organization of the sleeper loading station, in particular to limit its structural costs, its development costs inside a building housing the assembly line, and / or its implementation costs.

Un autre but de l'invention est de permettre une dépose sélective des traverses sur les armatures de caisse, en tenant compte d'une potentielle diversification des architectures des ossatures de toit entre les armatures de caisse successivement déplacées le long de la chaîne d'assemblage.Another object of the invention is to allow a selective removal of the crosspieces on the body frames, taking into account a potential diversification of the architectures of the roof frames between the body frames successively moved along the assembly line .

Une telle diversité d'architectures des ossatures de toit relève notamment des ossatures de toit comprenant trois traverses pour la réception d'un panneau fixe de pavillon, ou des ossatures de toit comprenant deux traverses pour la réception d'un cadre support d'au moins un panneau de pavillon vitré et/ou d'au moins un panneau de pavillon mobile entre une position d'ouverture et de fermeture.Such a diversity of architectures of the roof frames in particular relates to roof frames comprising three crosspieces for the reception of a fixed roof panel, or roof frameworks comprising two crosspieces for the reception of a support frame of at least a glazed roof panel and / or at least one roof panel movable between an open and closed position.

Il est notamment visé par l'invention une réduction des coûts de production du véhicule dans le contexte d'une concurrence économique notoirement sévère dans le domaine automobile. Une telle réduction des coûts est notamment recherchée :It is in particular targeted by the invention a reduction in the production costs of the vehicle in the context of notoriously severe economic competition in the automotive field. Such cost reduction is particularly sought:

-) en augmentant les cadences de production des armatures de caisse,-) by increasing the production rates of body fittings,

-) en réduisant l'encombrement de la station de chargement ou autrement dit en optimisant l'exploitation d'une surface qui est recherchée la plus modeste possible et qui est réservée à l'installation de la station de chargement à l'intérieur d'un bâtiment abritant la chaîne d'assemblage,-) by reducing the size of the loading station or in other words by optimizing the use of a surface which is sought as small as possible and which is reserved for the installation of the loading station inside a building housing the assembly line,

-) en simplifiant l'agencement et/ou l'organisation de la station de chargement, ainsi que les modalités de son installation le long de la ligne d'acheminement des armatures de caisse, et/ou-) by simplifying the layout and / or organization of the loading station, as well as the methods of its installation along the line of routing of the body fittings, and / or

-) en optimisant la rentabilité de la station de chargement en la rendant polyvalente, notamment à partir d'une faculté de la station de chargement à déposer sélectivement des traverses sur les armatures de caisse selon des architectures des ossatures de toit qui peuvent être diversifiées.-) by optimizing the profitability of the loading station by making it versatile, in particular from a faculty of the loading station to selectively deposit sleepers on the body frames according to architectures of the roof frames which can be diversified.

Les buts visés par la présente invention sont atteints isolément ou en combinaison par application des dispositions qui suivent.The aims of the present invention are achieved individually or in combination by applying the following provisions.

Le procédé de l'invention est un procédé de dépose automatisée de traverses de toit sur une armature de caisse à une station de chargement participante d'une chaîne d'assemblage. La station de chargement est disposée le long d'une ligne d'acheminement pas à pas d'armatures de caisse à produire successivement.The method of the invention is an automated method of depositing roof rails on a body frame at a participating loading station of an assembly line. The loading station is arranged along a step-by-step routing line of box frames to be produced successively.

La station de chargement comprend au moins un poste de dépose d'au moins une traverse sur l'armature de caisse. Ledit au moins un poste de dépose comprend au moins un magasin de stockage d'au moins une traverse et au moins un manipulateur de préhension de ladite au moins une traverse. La mise en œuvre du manipulateur est placée sous la dépendance d'un moyen de commande provoquant dans une première étape une saisie de ladite au moins une traverse par le manipulateur et dans une deuxième étape une dépose de ladite au moins une traverse sur l'armature de caisse.The loading station comprises at least one station for depositing at least one cross member on the body frame. Said at least one depositing station comprises at least one storage store for at least one cross member and at least one manipulator for gripping said at least one cross member. The implementation of the manipulator is placed under the dependence of a control means causing in a first step an entry of said at least one cross member by the manipulator and in a second step a removal of said at least one cross member on the frame checkout.

Selon l'invention, ladite première étape est une étape de saisie collective par un unique manipulateur de trois traverses d'un jeu de traverses stocké dans un unique magasin de stockage par paquets de dits jeu de trois traverses. Chaque jeu de traverses comprend une traverse avant, une traverse médiane et une traverse arrière.According to the invention, said first step is a step of collective entry by a single manipulator of three sleepers of a set of sleepers stored in a single storage store in packets of said set of three sleepers. Each set of cross members includes a front cross member, a middle cross member and a rear cross member.

Ladite deuxième étape est une étape de dépôts successifs par le manipulateur de chacune des traverses préalablement saisies. La deuxième étape comprend des opérations de dépose d'au moins deux des trois traverses sur l'armature de caisse, dont au moins la traverse arrière et la traverse avant, sous contrôle du moyen de commande en fonction de la configuration de l'armature de caisse à produire préalablement identifiée.Said second step is a step of successive deposits by the manipulator of each of the previously entered sleepers. The second step includes operations for removing at least two of the three cross members on the body frame, including at least the rear cross member and the front cross member, under control of the control means depending on the configuration of the body frame. case to be produced previously identified.

Pour si besoin préciser, la notion traverse ainsi que les notions arrière, médiane et avant qualifiant les traverses, sont des notions relatives typiquement identifiées au regard de l'extension longitudinale du véhicule d'avant vers l'arrière.If necessary, the notion of cross member as well as the rear, middle and front notions qualifying the sleepers, are relative concepts typically identified with regard to the longitudinal extension of the vehicle from front to rear.

L'identification de la configuration individuelle des armatures de caisse successivement déplacées le long de la chaîne d'assemblage est par exemple classiquement réalisée à partir d'un échange d'informations entre le moyen de commande et un moyen d'identification individuelle des armatures de caisse à produire successivement. Une telle identification peut être réalisée en début d'acheminement de l'armature de caisse par la chaîne d'assemblage et/ou en entrée d'une station de travail qu'elle comprend.The identification of the individual configuration of the body armatures successively displaced along the assembly line is for example conventionally carried out on the basis of an exchange of information between the control means and a means of individual identification of the body armatures. case to be produced successively. Such an identification can be carried out at the start of routing of the body frame by the assembly line and / or at the input of a work station which it comprises.

Selon une forme de réalisation, la deuxième étape comprend plus spécifiquement :According to one embodiment, the second step more specifically comprises:

-) des opérations de dépose successives par le manipulateur au moins de la traverse avant et de la traverse arrière sur l'armature de caisse, et-) successive removal operations by the manipulator at least of the front cross member and the rear cross member on the body frame, and

-) une opération de dépôt de la traverse médiane par le manipulateur sélectivement en fonction de la configuration de l'armature de caisse à produire préalablement identifiée.-) an operation for depositing the middle cross member by the manipulator selectively as a function of the configuration of the body frame to be produced previously identified.

L'opération de dépôt de la traverse médiane est alors :The operation of depositing the middle cross member is then:

-) soit une opération de dépose de la traverse médiane sur l'armature de caisse, qui est de préférence effectuée entre les opérations de dépose de la traverse avant et de la traverse arrière,-) or a removal operation of the middle cross member on the body frame, which is preferably carried out between the removal operations of the front cross member and the rear cross member,

-) soit une opération de dépôt de la traverse médiane dans un bac de récupération, qui est de préférence effectuée avant, ou voire après, les opérations de dépose de la traverse arrière et de la traverse avant sur l'armature de caisse.-) Or an operation of depositing the middle cross member in a recovery tank, which is preferably carried out before, or even after, the operations of removing the rear cross member and the front cross member on the body frame.

Selon une forme de réalisation, le procédé comprend une opération de chargement du magasin par paquets de dits jeux de traverses. Les traverses de chacun des paquets sont rangées adjacentes sur le magasin de stockage suivant leur direction d'extension principale, selon un ordre de rangement successivement de la traverse médiane, de la traverse arrière et de la traverse avant. En outre, la première étape est une étape de saisie collective des traverses par le manipulateur suivant ledit ordre de rangement.According to one embodiment, the method comprises an operation of loading the magazine in packs of said sets of sleepers. The crosspieces of each of the packages are stored adjacent to the storage magazine in their main direction of extension, in a sequential order of storage of the middle crosspiece, the rear cross member and the front cross member. In addition, the first step is a step of collective entry of the sleepers by the manipulator according to said order of storage.

Selon une forme de réalisation, à l'issue de la première étape et suivant le sens de saisie collective des traverses d'un dit jeu de traverses par le manipulateur au magasin de stockage, les traverses sont portées par le manipulateur suivant un ordre de superposition. Selon cet ordre de superposition, la traverse arrière est disposée à un plan supérieur de surplomb de la traverse médiane et de la traverse avant, et la traverse médiane est disposée à un plan médian de surplomb de la traverse avant qui est disposée à un plan inférieur.According to one embodiment, at the end of the first step and in the direction of collective entry of the crosspieces of a said set of crosspieces by the manipulator at the storage store, the crosspieces are carried by the manipulator according to an order of superposition . According to this order of superposition, the rear cross member is disposed at an upper plane of overhang of the central cross member and the front cross member, and the central cross member is arranged on a median plane of overhang of the front cross member which is arranged on a lower plane .

L'invention a aussi pour objet une station de chargement de traverses de toit sur une armature de caisse apte à la mise en œuvre d'un procédé conforme à l'invention. Selon l'invention, la station de chargement comprend un dit poste de dépose qui est unique et qui comprend :The invention also relates to a loading station for roof rails on a body frame suitable for implementing a method according to the invention. According to the invention, the loading station comprises a said deposit station which is unique and which comprises:

-) un unique dit magasin de stockage par paquets de jeux de traverses, comprenant chacun trois traverses dont une traverse arrière, une traverse médiane et une traverse avant, et-) a single so-called storage store for sets of sleeper sets, each comprising three sleepers including a rear crossmember, a middle crossmember and a front crossmember, and

-) un unique manipulateur de saisie collective des traverses d'un dit jeu de traverses et de dépôts individuels successifs des traverses audit poste de dépose unique.-) a single manipulator for collective entry of the sleepers of a said set of sleepers and of successive individual deposits of the sleepers at said single drop-off station.

Selon une forme de réalisation et pour chacun des paquets de dits jeux de traverses, le magasin de stockage comprend des supports individuels des traverses en des positions respectives prédéfinies les unes par rapport aux autres. Lesdits supports sont chacun munis au moins d'organes de positionnement des traverses qui leurs sont affectées.According to one embodiment and for each of the packages of said sets of sleepers, the storage magazine comprises individual supports for the sleepers in respective predefined positions relative to each other. Said supports are each provided with at least positioning members of the sleepers which are assigned to them.

Selon une forme de réalisation, le manipulateur est équipé d'une tête de préhension collective des traverses d'un dit jeu de traverses. La tête de préhension comprend des têtes de saisie individuelle des traverses en des positions respectives prédéfinies les unes par rapport aux autres, en corrélation avec les positions respectives au moins en adjacence des traverses dans le magasin de stockage.According to one embodiment, the manipulator is equipped with a collective gripping head of the sleepers of a said set of sleepers. The gripping head comprises individual gripping heads for the sleepers in respective predefined positions relative to each other, in correlation with the respective positions at least adjacent to the sleepers in the storage magazine.

Selon une forme de réalisation, la tête de préhension est munie d'un organe de jonction au manipulateur suivant une direction d'assemblage entre eux, notamment une direction en élévation. La tête de préhension est aussi munie d'une poutre de soutien en adjacence des têtes de saisie, la poutre étant orientée perpendiculairement à ladite direction d'assemblage et perpendiculairement à une direction principale d'extension des têtes de saisie orientée suivant la direction d'extension principale des traverses qui leurs sont affectées. Autrement dit, la direction d'assemblage entre la tête de préhension et le manipulateur, l'orientation de la poutre et la direction d'extension des têtes de saisie parallèlement les unes aux autres, sont perpendiculaires entre elles dans un repère orthonormé.According to one embodiment, the gripping head is provided with a member for joining the manipulator in a direction of assembly between them, in particular a direction in elevation. The gripping head is also provided with a support beam adjacent to the gripping heads, the beam being oriented perpendicular to said direction of assembly and perpendicular to a main direction of extension of the gripping heads oriented in the direction of main extension of the sleepers assigned to them. In other words, the direction of assembly between the gripping head and the manipulator, the orientation of the beam and the direction of extension of the gripping heads parallel to each other, are perpendicular to each other in an orthonormal reference frame.

La tête de préhension est de préférence agencée en structure étagée comprenant successivement l'organe de jonction, la poutre portée par l'organe de jonction, et l'ensemble des têtes de saisie individuellement montées sur la poutre parallèlement les unes aux autres. Selon une variante, la tête de préhension est agencée en structure étagée comprenant successivement l'organe de jonction, la poutre portée par l'organe de jonction, et l'ensemble des têtes de saisie portées par la poutre parallèlement les unes aux autres, l'une au moins des têtes de saisie étant portée par l'une quelconque au moins des autres têtes de saisie. Autrement dit selon cette variante, l'une au moins des têtes de saisie est porteuse d'une autre tête de saisie interposée en adjacence entre les deux autres têtes de saisie, via au moins un bras les reliant entre elles.The gripping head is preferably arranged in a stepped structure successively comprising the joining member, the beam carried by the joining member, and all of the gripping heads individually mounted on the beam parallel to each other. According to a variant, the gripping head is arranged in a stepped structure successively comprising the joining member, the beam carried by the joining member, and all of the gripping heads carried by the beam parallel to each other, l at least one of the gripping heads being carried by any at least of the other gripping heads. In other words, according to this variant, at least one of the gripping heads carries another gripping head interposed adjacent between the two other gripping heads, via at least one arm connecting them together.

Selon une forme de réalisation, ladite poutre forme un support d'un organe de contrôle-commande de la mise en œuvre individuelle de chacune des têtes de saisie. La mise en œuvre de l'organe de contrôle-commande est placée sous la dépendance du moyen de commande. La poutre est de préférence évidée en logeant des moyens de transmission d'énergie, électrique, pneumatique et/ou hydraulique, reliant entre eux l'organe de contrôle-commande et des organes équipant les têtes de saisie, tels que par exemple au moins un organe de serrage et/ou au moins un détecteur de présence des traverses sur la tête de saisie.According to one embodiment, said beam forms a support for a control-command member for the individual implementation of each of the gripping heads. The implementation of the control command is placed under the dependence of the control means. The beam is preferably hollowed out by housing means for transmitting energy, electrical, pneumatic and / or hydraulic, connecting the control-command member and members equipping the gripping heads, such as for example at least one clamping member and / or at least one detector for the presence of crosspieces on the gripping head.

De préférence, chacune des têtes de saisie est équipée :Preferably, each of the gripping heads is equipped with:

-) d'au moins un organe de positionnement sur la tête de saisie de la traverse qui lui est affectée,-) at least one positioning member on the gripping head of the crosspiece which is assigned to it,

-) d'au moins un organe de serrage de ladite traverse qui lui est affectée,-) at least one clamping member of said crosspiece which is assigned to it,

-) d'au moins un organe d'appui de ladite traverse qui lui est affectée contre la tête de saisie, et-) at least one support member of said crosspiece which is assigned to it against the gripping head, and

-) d'au moins un détecteur de présence sur la tête de saisie de ladite traverse qui lui est affectée.-) At least one presence detector on the gripping head of said crosspiece which is assigned to it.

Des exemples de réalisation d'une station de chargement et/ou de ses composants conformes à la présente invention vont être décrits en relation avec les figures des planches annexées, dans lesquelles :Examples of embodiments of a loading station and / or of its components in accordance with the present invention will be described in relation to the figures of the appended plates, in which:

-) la figure 1 est une illustration schématique d'une station de chargement de traverses sur une armature de caisse de véhicule automobile selon un exemple de réalisation de l'invention, qui est disposée le long d'une ligne d'acheminement pas à pas d'une série d'armatures de caisse à produire.-) Figure 1 is a schematic illustration of a sleeper loading station on a frame of a motor vehicle body according to an exemplary embodiment of the invention, which is arranged along a step-by-step routing line of a series of box frames to be produced.

-) la figure 2 est une illustration schématique partielle en vue latérale d'un exemple de réalisation d'un magasin de stockage de traverses configuré pour équiper la station de chargement représentée sur la figure 1,-) FIG. 2 is a partial diagrammatic illustration in side view of an exemplary embodiment of a sleeper storage store configured to equip the loading station shown in FIG. 1,

-) la figure 3 et la figure 4 sont des illustrations schématiques respectivement en vue latérale et en vue de dessous, d'un exemple de réalisation d'une tête de préhension des traverses configurée pour équiper un manipulateur unique que comprend la station de chargement représentée sur la figure 1,-) Figure 3 and Figure 4 are schematic illustrations respectively in side view and in bottom view, of an embodiment of a gripping head of the sleepers configured to equip a single manipulator that includes the loading station shown in Figure 1,

-) la figure 5 et la figure 6 sont des illustrations partielles en perspective d'un exemple de réalisation d'un magasin de stockage de traverses configuré pour équiper la station de chargement représentée sur la figure 1, respectivement représenté à vide et représenté chargée d'un jeu de traverses.-) Figure 5 and Figure 6 are partial perspective illustrations of an embodiment of a sleeper storage store configured to equip the loading station shown in Figure 1, respectively shown empty and shown loaded d 'a set of sleepers.

-) la figure 7 et la figure 8 sont des illustrations partielles en perspective suivant des points de vue respectifs, d'un exemple de réalisation d'une tête de préhension des traverses configurée pour équiper un manipulateur unique que comprend la station de chargement représentée sur la figure 1,-) Figure 7 and Figure 8 are partial illustrations in perspective from respective points of view, of an exemplary embodiment of a gripping head of the sleepers configured to equip a single manipulator that includes the loading station shown on Figure 1,

-) la figure 9 et la figure 10 sont des illustrations partielles en perspective de la tête de préhension représentée sur les figures 7 et 8, en situation de préhension des traverses préalablement saisie au magasin de stockage représenté sur les figures 5 et 6.-) FIG. 9 and FIG. 10 are partial illustrations in perspective of the gripping head shown in FIGS. 7 and 8, in a situation of gripping the sleepers previously picked up from the storage magazine shown in FIGS. 5 and 6.

-) les figures 11 à 16 sont des vues en perspective illustrant un exemple de mise en œuvre d'un procédé conforme à l'invention.-) Figures 11 to 16 are perspective views illustrating an example of implementation of a method according to the invention.

Les figures et leurs descriptions détaillées exposent l'invention selon des modalités particulières qui ne sont pas restrictives quant à la portée de l'invention telle que définie par les revendications. Les figures et leurs descriptions détaillées peuvent servir à mieux définir l'invention, si besoin en relation avec la description générale qui vient d’en être faite.The figures and their detailed descriptions show the invention according to particular methods which are not restrictive as to the scope of the invention as defined by the claims. The figures and their detailed descriptions can be used to better define the invention, if necessary in relation to the general description which has just been made.

Sur la figure 1, une chaîne d'assemblage est organisée pour produire des armatures de caisse 1a, 1b, 1c pour des véhicules automobiles. La chaîne d'assemblage comprend une ligne d'acheminement 2 pas à pas des armatures de caisse 1a-1c vers diverses des stations de travail installées successivement le long de la ligne d'acheminement 2. Les armatures de caisse 1a-1c sont ainsi déplacées pas à pas suivant un sens S1 d'avancement vers les stations de travail, pour assembler progressivement les composants des armatures de caisses 1a-1c à chaque pas d'avancement.In Figure 1, an assembly line is organized to produce body frames 1a, 1b, 1c for motor vehicles. The assembly line comprises a routing line 2 step by step of the box frames 1a-1c to various work stations installed successively along the route line 2. The box frames 1a-1c are thus moved step by step along a direction S1 of advancement towards the workstations, for gradually assembling the components of the box frames 1a-1c at each advancement step.

Parmi lesdites stations de travail, la chaîne d'assemblage comprend une station de chargement 3 de traverses 4a, 4b, 4c sur les armatures de caisse 1a-1c. Les traverses 4a-4c sont assemblées sélectivement sur les armatures de caisses 4a-4c via des montants et/ou des longerons latéraux préalablement montés sur les armatures de caisse 1a-1c, tels que par exemple les montants 22a ou les longerons 22b qui sont visibles sur les figures 11, 13, 14 et 15. Les traverses 4a-4b sont constitutives d'une ossature de toit des armatures de caisse 1a-1c qui est prévue pour recevoir ultérieurement au moins un panneau formant un pavillon de toit.Among said work stations, the assembly line comprises a loading station 3 of sleepers 4a, 4b, 4c on the body frames 1a-1c. The crosspieces 4a-4c are selectively assembled on the box frames 4a-4c via uprights and / or side rails previously mounted on the box frames 1a-1c, such as for example the uprights 22a or the side rails 22b which are visible in FIGS. 11, 13, 14 and 15. The crosspieces 4a-4b constitute a roof frame of the body frames 1a-1c which is designed to subsequently receive at least one panel forming a roof pavilion.

La chaîne d'assemblage comprend au moins un moyen de commande 5 pour réguler les divers automates à mettre en œuvre pour former les armatures de caisse1a-1c en fonction de leur agencement propre. Le moyen de commande 5 est équipé d'une mémoire 6a d'identification individuelle des armatures de caisse laïc selon leur architecture. Une telle identification est notamment réalisée par échanges d'informations entre un organe d'identification 6b des armatures de caisse 1a-1c et le moyen de commande 5.The assembly line comprises at least one control means 5 for regulating the various automata to be used to form the box frames 1a-1c according to their own arrangement. The control means 5 is equipped with a memory 6a for the individual identification of the lay body frames according to their architecture. Such an identification is notably carried out by exchanges of information between an identification member 6b of the body fittings 1a-1c and the control means 5.

Dans le contexte de l'invention, la différentiation entre les architectures des armatures de caisse 1a-1c concerne le nombre et le type de traverses 4a-4c devant être respectivement installées sur les armatures de caisse 1a-1c, selon la configuration des ossatures de toit qu'elles comprennent respectivement.In the context of the invention, the differentiation between the architectures of the body frames 1a-1c relates to the number and type of crosspieces 4a-4c to be respectively installed on the body frames 1a-1c, depending on the configuration of the frameworks of roof they understand respectively.

Notamment selon une première architecture d'armatures de caisse 1b à produire, leur ossature de toit comprend un jeu de trois traverses 4a-4c pour recevoir un panneau de pavillon de toit fixe, dont une traverse avant 4a, une traverse médiane 4b et une traverse arrière 4c. Selon une deuxième architecture d'armatures de caisse 1c à produire, leur ossature de toit comprend un jeu de deux traverses pour recevoir un cadre d'installation d'un pavillon de toit vitrée et/ou mobile entre une position d'ouverture et de fermeture, dont une traverse avant 4a et une traverse arrière 4c.In particular according to a first architecture of body frames 1b to be produced, their roof framework comprises a set of three crosspieces 4a-4c for receiving a fixed roof roof panel, including a front crosspiece 4a, a middle crosspiece 4b and a crosspiece rear 4c. According to a second architecture of body frames 1c to be produced, their roof framework comprises a set of two crosspieces to receive a frame for installing a glazed and / or movable roof pavilion between an open and closed position. , including a front cross member 4a and a rear cross member 4c.

La station de chargement comprend un poste de dépose 7 unique des traverses 4a-4c sur les armatures de caisse 1a-1c à produire qui sont successivement présentées par la ligne d'acheminement 2 à la station de chargement 3. Le poste de dépose 7 comprend un unique magasin 8 de stockage des traverses 4a-4c, sur lequel sont successivement installés par paquets 10 des jeux de trois traverses respectivement avant 4a, médiane 4b et arrière 4c. Les traverses 4a-4c sont chargées adjacentes sur le magasin 8 de stockage par un opérateur, qui dispose de bacs de stockage 9a-9c respectifs des traverses avant 4a, médiane 4b et arrière 4c.The loading station comprises a single depositing station 7 for the crosspieces 4a-4c on the body frames 1a-1c to be produced which are successively presented by the routing line 2 to the loading station 3. The depositing station 7 comprises a single magazine 8 for storing the sleepers 4a-4c, on which are successively installed in packs 10 sets of three sleepers respectively before 4a, median 4b and rear 4c. The crosspieces 4a-4c are loaded adjacent to the storage magazine 8 by an operator, who has respective storage bins 9a-9c of the front crosspieces 4a, median 4b and rear 4c.

Le magasin 8 de stockage est ainsi chargé en paquets 10 successifs de dits jeux de traverses avant 4a, médiane 4b et arrière 4c par l'opérateur, humain ou automate. Le magasin 8 de stockage achemine alors successivement les paquets de jeux de traverses 4a-4c vers un manipulateur 11 unique équipant le poste de dépose 7.The storage magazine 8 is thus loaded in successive packets 10 of said sets of front crosspieces 4a, median 4b and rear 4c by the operator, human or automatic. The storage magazine 8 then successively routes the sets of sleeper sets 4a-4c to a single manipulator 11 fitted to the depositing station 7.

Le manipulateur 11 saisie collectivement les traverses 4a-4c d'un paquet au magasin 8 de stockage. A cet effet, Le manipulateur 11 est équipé d'une tête de préhension 12 qui est agencée pour saisir collectivement les trois traverses 4a4c d'un même jeu de traverses avant 4a, médiane 4b et arrière 4c. Le manipulateur dépose alors sur l'armature de caisse 1a présente à la station de chargement 3 au moins les traverses avant 4a et arrière 4c, voire aussi la traverse médiane 4b selon l'architecture de l'armature de caisse 1a à produire.The manipulator 11 collects collectively the crosspieces 4a-4c from a package to the storage magazine 8. To this end, the manipulator 11 is equipped with a gripping head 12 which is arranged to collectively grasp the three crosspieces 4a4c of the same set of front crosspieces 4a, median 4b and rear 4c. The manipulator then deposits on the body frame 1a present at the loading station 3 at least the front crosspieces 4a and rear 4c, or even also the middle crosspiece 4b according to the architecture of the body frame 1a to be produced.

Plus particulièrement, la dépose des traverses 4a-4c par le manipulateur 11 est effectuée sélectivement selon l'architecture de l'armature de caisse 1b-1c à produire, sous contrôle du moyen de commande 5. Dans le cas où l'architecture de l'armature de caisse 1c à produire est du type munie d'une ossature de toit comprenant seulement une traverse avant 4a et une traverse arrière 4c, le manipulateur 11 dépose la traverse médiane 4b dans un bac de récupération 13. Le dépôt par le manipulateur 11 de la traverse médiane 4b dans le bac de récupération 13 est de préférence effectué préalablement à l'installation de la traverse avant 4a et de la traverse arrière 4c sur l'armature de caisse 1a.More particularly, the removal of the crosspieces 4a-4c by the manipulator 11 is carried out selectively according to the architecture of the body frame 1b-1c to be produced, under control of the control means 5. In the case where the architecture of the the body frame 1c to be produced is of the type provided with a roof frame comprising only a front crossmember 4a and a rear crossmember 4c, the manipulator 11 deposits the middle crossmember 4b in a recovery tank 13. Deposit by the manipulator 11 of the middle cross member 4b in the recovery tank 13 is preferably carried out prior to the installation of the front cross member 4a and the rear cross member 4c on the body frame 1a.

Plus particulièrement sur les figures 2, 5 et 6, les traverses d'un même jeu de traverses 4a-4c sont installées sur des supports 14a-14c individuels qui équipent le magasin 8 de stockage. Les supports 14a-14c sont chacun munis d'organes de positionnement 15 des traverses 4a-4c qui leurs sont affectées et qui sont par exemple agencés en taquets et/ou en pilotes de positionnement des traverses 4a-4c reposant sur les supports 14a-14c.More particularly in FIGS. 2, 5 and 6, the sleepers of the same set of sleepers 4a-4c are installed on individual supports 14a-14c which equip the storage magazine 8. The supports 14a-14c are each provided with positioning members 15 for the crosspieces 4a-4c which are assigned to them and which are for example arranged in cleats and / or in pilots for positioning the crosspieces 4a-4c resting on the supports 14a-14c .

Les traverses 4a-4c de chacun des paquets 10 sont installées en repos sur les supports 14a-14c qui leurs sont affectés, en étant positionnés sur les supports 14a-14c via les organes de positionnement 15 suivant leur direction D1 principale d'extension et suivant leur direction D2 transverse qui est orientée perpendiculairement à leur direction D1 principale d'extension.The crosspieces 4a-4c of each of the packages 10 are installed at rest on the supports 14a-14c which are assigned to them, by being positioned on the supports 14a-14c via the positioning members 15 along their main direction D1 of extension and following their transverse direction D2 which is oriented perpendicular to their main extension direction D1.

Les traverses 4a-4c d'un même paquet 10 sont installées sur le magasin 8 de stockage sur les supports 14a-14c qui leurs sont affectés, suivant un ordre de rangement prédéfini. Chaque paquet 10 de traverses d'un même jeu de traverses 4a-4b est acheminé par le magasin 8 de stockage vers le manipulateur 11 conformément à cet ordre de rangement, qui est défini successivement par la traverse médiane 4b, la traverse arrière 4c et la traverse avant 4a.The crosspieces 4a-4c of the same package 10 are installed on the storage magazine 8 on the supports 14a-14c which are assigned to them, according to a predefined storage order. Each packet 10 of sleepers of the same set of sleepers 4a-4b is conveyed by the storage magazine 8 to the manipulator 11 in accordance with this order of storage, which is defined successively by the middle sleeper 4b, the rear sleeper 4c and the front cross member 4a.

Plus particulièrement encore sur les figures 3 et 4, et sur les figures 7 et 8, la tête de préhension 12 du manipulateur 11 saisie collectivement les traverses d'un jeu de traverses 4a-4c présentées au magasin 8 de stockage suivant leur ordre de rangement. Par suite, les traverses d'un même jeu de traverses 4a-4c sont portées par la tête de préhension 12 suivant leur ordre de rangement sur le magasin 8 de stockage.More particularly still in FIGS. 3 and 4, and in FIGS. 7 and 8, the gripping head 12 of the manipulator 11 collectively collects the crosspieces of a set of crosspieces 4a-4c presented to the storage magazine 8 according to their storage order . Consequently, the sleepers of the same set of sleepers 4a-4c are carried by the gripping head 12 according to their order of storage on the storage magazine 8.

En outre, les traverses d'un même jeu de traverses 4a-4c sont portées par la tête de préhension 12 suivant un ordre de superposition prédéfini. Suivant le sens S2 de préhension des traverses 4a-4c par la tête de préhension 12, ledit ordre de superposition est défini par des plans P1, P2, P3 individuels de soutien des traverses 4a-4c par la tête de préhension 12.In addition, the crosspieces of the same set of crosspieces 4a-4c are carried by the gripping head 12 according to a predefined superposition order. According to the direction S2 for gripping the crosspieces 4a-4c by the gripping head 12, said order of superposition is defined by individual planes P1, P2, P3 for supporting the crosspieces 4a-4c by the gripping head 12.

Selon ledit ordre de superposition, la traverse arrière 4c est disposée à un plan P1 supérieur de surplomb de la traverse médiane 4b et de la traverse avant 4a. La traverse médiane 4b est disposée à un plan P2 médian de surplomb de la traverse avant 4a qui est quant à elle disposée à un plan P3 inférieur.According to said order of superposition, the rear cross member 4c is disposed at an upper plane P1 of overhang of the middle cross member 4b and of the front cross member 4a. The median cross-member 4b is arranged at a median plane P2 of overhang of the front cross-member 4a which is itself disposed at a lower plane P3.

Ledit ordre de rangement et/ou ledit ordre de superposition sont définis de sorte qu'une quelconque traverse 4a-4c ne fasse pas obstacle à l'installation des autres traverses 4a-4c sur l'armature de caisse 1 a-1 c par le manipulateur 11, et cela quelle que soit l'architecture de l'armature de caisse 1a-1c à produire.Said storage order and / or said superposition order are defined so that any cross member 4a-4c does not prevent the installation of the other cross members 4a-4c on the body frame 1 a-1 c by the manipulator 11, regardless of the architecture of the body frame 1a-1c to be produced.

La tête de préhension 12 comprend un organe de jonction 16 au manipulateur 11 qui est porteuse d'une poutre 17, elle-même porteuse de trois têtes de saisie 18a, 18b, 18c qui sont adjacentes suivant leur direction D3 principale d'extension. Chacune des têtes de saisie 18a-18c est affectée à la préhension d'une seule traverse d'un jeu de traverses 4a-4c, en s'étendant principalement suivant un direction D3 perpendiculaire à la poutre 17 et parallèle à la direction D1 principale d'extension des traverses 4a-4c.The gripping head 12 comprises a junction member 16 to the manipulator 11 which carries a beam 17, itself carrying three gripping heads 18a, 18b, 18c which are adjacent in their main direction D3 of extension. Each of the gripping heads 18a-18c is assigned to gripping a single cross member of a set of cross members 4a-4c, extending mainly in a direction D3 perpendicular to the beam 17 and parallel to the main direction D1 d 'extension of sleepers 4a-4c.

La poutre 17 forme aussi un support pour un organe de contrôlecommande 19 dont la mise en œuvre est placée sous la dépendance du moyen de commande 5. L'organe de contrôle-commande 19 régule la mise en œuvre individuelle de chacune des têtes de saisie 18a-18c, notamment lors de la saisie et/ou de la dépose des traverses 4a-4c par le manipulateur 11 sur l'armature de caisse 1 b ou dans le bac 13 de récupération en ce qui concerne la traverse médiane 4b pour une architecture d'armature de caisse 1c exempte de traverse médiane 4b.The beam 17 also forms a support for a control-command member 19 whose implementation is placed under the dependence of the control means 5. The control-command member 19 regulates the individual implementation of each of the gripping heads 18a -18c, in particular during the entry and / or the removal of the crosspieces 4a-4c by the manipulator 11 on the body frame 1b or in the recovery tank 13 as regards the middle crosspiece 4b for an architecture d 'body frame 1c free of central cross 4b.

Sur les figures 3 et 4 ainsi que sur les figures 7 et 8, chacune des têtes de saisie 18a-18c est équipée d'organes de maintien 20a-20c de la traverse 4a-4c qui lui est affectée. De tels organes de maintien comprennent notamment des organes de positionnement 20a agencés par exemple en taquets, d'organes d'appui 20b configurés en doigts d'appui et/ou en taquets par exemple, et d'au moins un organe de serrage 20c, par exemple configuré en pince. Les organes de maintien 20a-20c sont montés sur les têtes de saisie 18a-18c via des branches 21 qui équipent des poutrelles 21 a, 21 b, 21 c de montage des têtes de saisie 18a-18c sur la poutre 17, et/ou qui sont directement montées sur la poutre 17.In FIGS. 3 and 4 as well as in FIGS. 7 and 8, each of the gripping heads 18a-18c is equipped with holding members 20a-20c for the crosspiece 4a-4c which is assigned to it. Such retaining members include in particular positioning members 20a arranged for example in cleats, support members 20b configured in support fingers and / or in cleats for example, and at least one clamping member 20c, for example configured as a clamp. The holding members 20a-20c are mounted on the gripping heads 18a-18c via branches 21 which equip beams 21 a, 21 b, 21 c for mounting the gripping heads 18a-18c on the beam 17, and / or which are directly mounted on the beam 17.

La mise en œuvre de l'organe de serrage 20c est placée sous la dépendance de l'organe de contrôle-commande 19. Au moins un capteur de présence 20d, équipant par exemple l'organe de serrage 20c, permet de transmettre à l'organe de contrôle-commande 19 une information relative à la présence ou non d'une traverse 4a-4c sur la tête de saisie 18a-18c qui lui est affectée.The implementation of the clamping member 20c is placed under the dependence of the control-command member 19. At least one presence sensor 20d, equipping for example the clamping member 20c, makes it possible to transmit to the control unit 19 information relating to the presence or absence of a cross 4a-4c on the gripping head 18a-18c which is assigned to it.

Sur les figures 11 à 16, la tête de préhension 12 est approchée de l'armature de caisse 1a présente à la station de chargement 3. Selon l'exemple illustré, l'armature de caisse 1a est destinée à recevoir les trois traverses 4a-4c conformément à son identification préalable par le moyen de commande 5.In FIGS. 11 to 16, the gripping head 12 is approached to the body frame 1a present at the loading station 3. According to the example illustrated, the body frame 1a is intended to receive the three crosspieces 4a- 4c in accordance with its prior identification by the control means 5.

Selon l'exemple d'exécution du procédé de l'invention illustré, une première opération de dépose de la traverse avant 4a sur l'armature de caisse 1a est effectuée par le manipulateur 11 comme illustré sur la figure 11 et plus en détail sur la figure 12. Le manipulateur 11 dépose ensuite la traverse médiane 4b sur l'armature de caisse 1a lors d'une deuxième opération de dépose, comme illustré sur la figure 13 et plus en détail sur la figure 14. Puis lors d'une troisième opération de dépose, le manipulateur 11 dépose in fine la traverse arrière 4c sur l'armature de caisse 1a lors d'une troisième opération de dépose, comme illustré sur la figure 15 et plus en détail sur la figure 16. Le sens S3 de dépose des traverses 4a-4c sur l'armature de caisse 1a par le manipulateur 11, est orienté suivant le sens S2 de saisie des traverses 4a-4c par le manipulateur 11 au magasin 8 de stockage.According to the embodiment of the method of the invention illustrated, a first operation of removing the front cross member 4a on the body frame 1a is carried out by the manipulator 11 as illustrated in FIG. 11 and in more detail on the Figure 12. The manipulator 11 then deposits the middle cross member 4b on the body frame 1a during a second removal operation, as illustrated in Figure 13 and in more detail in Figure 14. Then during a third operation removal, the manipulator 11 ultimately deposits the rear crossmember 4c on the body frame 1a during a third removal operation, as illustrated in FIG. 15 and in more detail in FIG. 16. The direction S3 of removal of the sleepers 4a-4c on the body frame 1a by the manipulator 11, is oriented in the direction S2 for entering the sleepers 4a-4c by the manipulator 11 at the storage store 8.

Il est compris que dans le cas où l'armature de caisse 1c est destinée à recevoir seulement une traverse avant 4a et une traverse arrière 4c pour la formation d'un pavillon vitré et/ou mobile, la deuxième opération de dépose est substituée par une opération de dépôt de la traverse médiane 4b dans le bac de récupération 13 préalablement à la dépose des traverses avant 4a et arrière 4c sur l'armature de caisse 1c.It is understood that in the case where the body frame 1c is intended to receive only a front crossmember 4a and a rear crossmember 4c for the formation of a glazed and / or movable pavilion, the second removal operation is replaced by a depositing operation of the central cross member 4b in the recovery tank 13 prior to the removal of the front cross members 4a and rear 4c on the body frame 1c.

On relèvera aussi plus particulièrement sur les vues de détails des figures 12, 14 et 16, que les opérations de dépose individuelle des traverses 4a-4c sur l'armature de caisse 1a sont réalisées en évitant une gêne susceptible d'être induite par la présence initiale de l'ensemble des traverses 4a-4c du jeu sur la tête de préhension 12. Une telle gêne est notamment évitée en raison de l'ordre de rangement et/ou de l'ordre de superposition des traverses 4a-4c initialement prévus lors de leur saisie collective par la tête de préhension 12 sur le magasin 8 de stockage.It will also be noted more particularly in the detailed views of Figures 12, 14 and 16, that the individual removal operations of the crosspieces 4a-4c on the body frame 1a are carried out avoiding discomfort likely to be induced by the presence initial of all of the crosspieces 4a-4c of the game on the gripping head 12. Such discomfort is notably avoided due to the order of storage and / or the order of superposition of the crosspieces 4a-4c initially provided during of their collective seizure by the gripping head 12 on the storage magazine 8.

Claims (10)

REVENDICATIONS 1Procédé de dépose automatisée de traverses de toit (4a-4c) sur une armature de caisse (1a-1c) à une station de chargement (3) participante d'une chaîne d'assemblage et disposée le long d'une ligne d'acheminement (2) pas à pas d'armatures de caisse (1a-1c) à produire successivement, la station de chargement (3) comprenant au moins un poste de dépose (7) d'au moins une traverse (4a-4c) sur l'armature de caisse (1a-1c), ledit au moins un poste de dépose (7) comprenant au moins un magasin (8) de stockage d'au moins une traverse (4a-4c) et au moins un manipulateur (11 ) de préhension de ladite au moins une traverse (4a-4c) dont la mise en œuvre est placée sous la dépendance d'un moyen de commande (5) provoquant dans une première étape une saisie de ladite au moins une traverse (4a-4c) par le manipulateur (11 ) et dans une deuxième étape une dépose de ladite au moins une traverse (4a-4c) sur l'armature de caisse (1a-1c), caractérisé :1Automated process for depositing roof rails (4a-4c) on a body frame (1a-1c) at a loading station (3) participating in an assembly line and arranged along a routing line (2) step by step of box frames (1a-1c) to be produced successively, the loading station (3) comprising at least one depositing station (7) of at least one crosspiece (4a-4c) on the 'box frame (1a-1c), said at least one depositing station (7) comprising at least one store (8) for storing at least one crosspiece (4a-4c) and at least one manipulator (11) of gripping said at least one crosspiece (4a-4c) whose implementation is placed under the dependence of a control means (5) causing in a first step an entry of said at least one crosspiece (4a-4c) by the manipulator (11) and in a second step, depositing said at least one cross member (4a-4c) on the body frame (1a-1c), characterized: -) en ce que ladite première étape est une étape de saisie collective par un unique manipulateur (11) de trois traverses d'un jeu de traverses (4a-4c) stocké dans un unique magasin (8) de stockage par paquets (10) de dits jeu de trois traverses (4a4c), chaque jeu de traverses (4a-4c) comprenant une traverse avant (4a), une traverse médiane (4b) et une traverse arrière (4c), et-) in that said first step is a step of collective entry by a single manipulator (11) of three sleepers from a set of sleepers (4a-4c) stored in a single store (8) for storage in packages (10) said set of three sleepers (4a4c), each set of sleepers (4a-4c) comprising a front cross member (4a), a middle cross member (4b) and a rear cross member (4c), and -) en ce que ladite deuxième étape est une étape de dépôts successifs par le manipulateur (11) de chacune des traverses (4a-4c) préalablement saisies, comprenant des opérations de dépose d'au moins deux des trois traverses (4a-4c) sur l'armature de caisse (1a-1c), dont au moins la traverse arrière (4c) et la traverse avant (4a), sous contrôle du moyen de commande (5) en fonction de la configuration de l'armature de caisse (1a-1c) à produire préalablement identifiée.-) in that said second step is a step of successive deposition by the manipulator (11) of each of the crosspieces (4a-4c) previously entered, comprising removal operations of at least two of the three crosspieces (4a-4c) on the body frame (1a-1c), including at least the rear crossmember (4c) and the front crossmember (4a), under control of the control means (5) depending on the configuration of the body armature ( 1a-1c) to be produced previously identified. 2,- Procédé selon la revendication 1, caractérisé en ce que la deuxième étape comprend :2, - Method according to claim 1, characterized in that the second step comprises: -) des opérations de dépose successives par le manipulateur (11) au moins de la traverse avant (4a) et de la traverse arrière (4c) sur l'armature de caisse (1a-1c), et -) une opération de dépôt de la traverse médiane (4b) par le manipulateur (11) sélectivement en fonction de la configuration de l'armature de caisse (1a-1c) à produire préalablement identifiée, soit sur l'armature de caisse (1a, 1b) en étant effectuée entre les opérations de dépose de la traverse avant (4a) et de la traverse arrière (4c), soit dans un bac (13) de récupération en étant effectuée avant les opérations de dépose de la traverse arrière (4c) et de la traverse avant (4a) sur l'armature de caisse (1a, 1b).-) successive removal operations by the manipulator (11) at least of the front crossmember (4a) and the rear crossmember (4c) on the body frame (1a-1c), and -) a depositing operation of the central crosspiece (4b) by the manipulator (11) selectively as a function of the configuration of the body frame (1a-1c) to be produced previously identified, either on the body frame (1a, 1b) being carried out between the operations for removing the front crossmember (4a) and the rear crossmember (4c), or in a recovery tank (13) being carried out before the removal operations for the rear crossmember (4c) and the front crossmember ( 4a) on the body frame (1a, 1b). 3, - Procédé selon l'une quelconque des revendications 1 et 2, caractérisé :3, - Method according to any one of claims 1 and 2, characterized: -) en ce qu'il comprend une opération de chargement du magasin (8) par paquets (10) de dits jeux de traverses (4a-4c), les traverses (4a-4c) de chacun des paquets (10) étant rangées adjacentes sur le magasin (8) de stockage suivant leur direction (D1) d'extension principale selon un ordre de rangement successivement de la traverse médiane (4b), de la traverse arrière (4c) et de la traverse avant (4a), et -) en ce que la première étape est une étape de saisie collective des traverses (4a4c) par le manipulateur (11 ) suivant ledit ordre de rangement.-) in that it comprises an operation of loading the magazine (8) in packs (10) of said sets of sleepers (4a-4c), the sleepers (4a-4c) of each of the packs (10) being adjacent rows on the storage magazine (8) in their direction (D1) of main extension according to a sequential order of storage of the central crosspiece (4b), the rear crosspiece (4c) and the front crosspiece (4a), and - ) in that the first step is a step of collective entry of the sleepers (4a4c) by the manipulator (11) according to said order of storage. 4, - Procédé selon l'une quelconque des revendications 1 à 3, caractérisé en ce qu'à l'issue de la première étape et suivant le sens (S2) de saisie collective des traverses d'un dit jeu de traverses (4a-4c) par le manipulateur (11) au magasin (8) de stockage, les traverses (4a-4c) sont portées par le manipulateur (11 ) suivant un ordre de superposition selon lequel la traverse arrière (4c) est disposée à un plan (P1 ) supérieur de surplomb de la traverse médiane (4b) et de la traverse avant (4a), et selon lequel la traverse médiane (4b) est disposée à un plan (P2) médian de surplomb de la traverse avant (4a) qui est disposée à un plan (P3) inférieur.4, - Method according to any one of claims 1 to 3, characterized in that at the end of the first step and in the direction (S2) of collective entry of the sleepers of a said set of sleepers (4a- 4c) by the manipulator (11) at the storage store (8), the crosspieces (4a-4c) are carried by the manipulator (11) according to an order of superposition according to which the rear crosspiece (4c) is arranged on a plane ( P1) upper overhang of the median cross member (4b) and of the front cross member (4a), and according to which the median cross member (4b) is arranged at a median plane (P2) of overhang of the front cross member (4a) which is arranged at a lower plane (P3). 5, - Station de chargement de traverses de toit (4a-4c) sur une armature de caisse (1a-1c) apte à la mise en œuvre d'un procédé selon l'une quelconque des revendications 1 à 4, caractérisée en ce qu'elle comprend un dit poste de dépose (7) qui est unique et qui comprend :5, - Loading station for roof rails (4a-4c) on a body frame (1a-1c) suitable for implementing a method according to any one of claims 1 to 4, characterized in that '' it includes a so-called deposit station (7) which is unique and which includes: -) un unique dit magasin (8) de stockage par paquets (10) de jeux de traverses (4a4c) comprenant chacun trois traverses dont une traverse arrière (4c), une traverse médiane (4b) et une traverse avant (4a), et-) a single said store (8) for storing packets (10) of sets of crosspieces (4a4c) each comprising three crosspieces including a rear crosspiece (4c), a middle crosspiece (4b) and a front crosspiece (4a), and -) un unique manipulateur (11) de saisie collective des traverses d'un dit jeu de traverses (4a-4c) et de dépôts individuels successifs des traverses (4a-4c) audit poste de dépose (7) unique.-) a single manipulator (11) for collective entry of the crosspieces of a said set of crosspieces (4a-4c) and of successive individual deposits of the crosspieces (4a-4c) at said single deposition station (7). 6, - Station de chargement selon la revendication 5, caractérisée en ce que pour chacun des paquets (10) de dits jeux de traverses (4a-4c), le magasin (8) de stockage comprend des supports (14a-14c) individuels des traverses (4a-4c) en des positions respectives prédéfinies les unes par rapport aux autres, lesdits supports (14a-14c) étant chacun munis au moins d'organes de positionnement (15) des traverses (4a-4c) qui leurs sont affectées.6, - Loading station according to claim 5, characterized in that for each of the packages (10) of said sets of sleepers (4a-4c), the storage magazine (8) comprises supports (14a-14c) individual sleepers (4a-4c) in respective predefined positions relative to each other, said supports (14a-14c) being each provided with at least positioning members (15) of the sleepers (4a-4c) assigned to them. 7, - Station de chargement selon l'une quelconque des revendications 5 et 6, caractérisée en ce que le manipulateur (11) est équipé d'une tête de préhension (12) collective des traverses d'un dit jeu de traverses (4a-4c), la tête de préhension (12) comprenant des têtes de saisie (18a-18c) individuelle des traverses (4a-4c) en des positions respectives prédéfinies les unes par rapport aux autres en corrélation avec les positions respectives au moins en adjacence des traverses (4a4c) dans le magasin (8) de stockage.7, - Loading station according to any one of claims 5 and 6, characterized in that the manipulator (11) is equipped with a gripping head (12) collective of the sleepers of a said set of sleepers (4a- 4c), the gripping head (12) comprising individual gripping heads (18a-18c) of the crosspieces (4a-4c) in respective predefined positions relative to each other in correlation with the respective positions at least adjacent to the sleepers (4a4c) in the storage magazine (8). 8, - Station de chargement selon la revendication 7, caractérisée en ce que la tête de préhension (12) est munie d'un organe de jonction (16) au manipulateur (11) suivant une direction d'assemblage entre eux et d'une poutre (17) de soutien en adjacence des têtes de saisie (18a-18c) qui est orientée perpendiculairement à ladite direction d'assemblage et perpendiculairement à une direction (D2) principale d'extension des têtes de saisie (18a-18c) orientée suivant la direction (D1) d'extension principale des traverses (4a-4c) qui leurs sont affectées.8, - Loading station according to claim 7, characterized in that the gripping head (12) is provided with a junction member (16) to the manipulator (11) in an assembly direction between them and a support beam (17) adjacent to the gripping heads (18a-18c) which is oriented perpendicular to said assembly direction and perpendicular to a main direction (D2) of extension of the gripping heads (18a-18c) oriented along the main extension direction (D1) of the crosspieces (4a-4c) assigned to them. 9, - Station de chargement selon la revendication 8, caractérisée en ce que ladite poutre (17) forme un support d'un organe de contrôle-commande (19) de la mise en œuvre individuelle de chacune des têtes de saisie (18a-18c), dont la mise en œuvre est placée sous la dépendance du moyen de commande (5).9, - Loading station according to claim 8, characterized in that said beam (17) forms a support for a control-command member (19) for the individual implementation of each of the gripping heads (18a-18c ), the implementation of which is placed under the dependence of the control means (5). 10,- Station de chargement selon l'une quelconque des revendications 7 à 9, caractérisée en ce que chacune des têtes de saisie (18a-18c) est équipée d'au moins un organe de positionnement (20a) sur la tête de saisie (18a-18c) de la 5 traverse (4a-4c) qui lui est affectée, d'au moins un organe de serrage (20c) de ladite traverse (4a-4c) qui lui est affectée, d'au moins un organe d'appui (20b) de ladite traverse (4a-4c) qui lui est affectée contre la tête de saisie (18a-18c), et d'au moins un capteur de présence (20d) sur la tête de saisie (18a-18c) de ladite traverse (4a4c) qui lui est affectée.10, - Loading station according to any one of Claims 7 to 9, characterized in that each of the gripping heads (18a-18c) is equipped with at least one positioning member (20a) on the gripping head ( 18a-18c) of the crosspiece (4a-4c) which is assigned to it, of at least one clamping member (20c) of said crosspiece (4a-4c) which is assigned to it, of at least one member of support (20b) of said crosspiece (4a-4c) which is assigned to it against the gripping head (18a-18c), and of at least one presence sensor (20d) on the gripping head (18a-18c) of said crosspiece (4a4c) which is assigned to it.
FR1760897A 2017-11-17 2017-11-17 METHOD AND STATION FOR AUTOMATED LOADING OF ROOF TRAVERS ON A BOX FRAME OF A MOTOR VEHICLE Active FR3073810B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR1760897A FR3073810B1 (en) 2017-11-17 2017-11-17 METHOD AND STATION FOR AUTOMATED LOADING OF ROOF TRAVERS ON A BOX FRAME OF A MOTOR VEHICLE

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1760897A FR3073810B1 (en) 2017-11-17 2017-11-17 METHOD AND STATION FOR AUTOMATED LOADING OF ROOF TRAVERS ON A BOX FRAME OF A MOTOR VEHICLE
FR1760897 2017-11-17

Publications (2)

Publication Number Publication Date
FR3073810A1 true FR3073810A1 (en) 2019-05-24
FR3073810B1 FR3073810B1 (en) 2019-10-11

Family

ID=60765942

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1760897A Active FR3073810B1 (en) 2017-11-17 2017-11-17 METHOD AND STATION FOR AUTOMATED LOADING OF ROOF TRAVERS ON A BOX FRAME OF A MOTOR VEHICLE

Country Status (1)

Country Link
FR (1) FR3073810B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130145616A1 (en) * 2011-12-07 2013-06-13 Hyundai Motor Company Vehicle body assemble system
US20150034703A1 (en) * 2013-07-30 2015-02-05 Fuji Jukogyo Kabushiki Kaisha Method of manufacturing vehicle body
EP2857296A1 (en) * 2012-06-04 2015-04-08 Honda Motor Co., Ltd. Vehicle body assembling method and vehicle body assembling device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130145616A1 (en) * 2011-12-07 2013-06-13 Hyundai Motor Company Vehicle body assemble system
EP2857296A1 (en) * 2012-06-04 2015-04-08 Honda Motor Co., Ltd. Vehicle body assembling method and vehicle body assembling device
US20150034703A1 (en) * 2013-07-30 2015-02-05 Fuji Jukogyo Kabushiki Kaisha Method of manufacturing vehicle body

Also Published As

Publication number Publication date
FR3073810B1 (en) 2019-10-11

Similar Documents

Publication Publication Date Title
EP2882568B1 (en) Method and unit for welding motor vehicle body elements, including rapid tool change by means of a hoisting turret
FR3073810A1 (en) METHOD AND STATION FOR AUTOMATED LOADING OF ROOF TRAVERS ON A BOX FRAME OF A MOTOR VEHICLE
EP3498564A1 (en) Method for assembling a railway vehicle body
EP2129570B1 (en) Geometrical conformation unit
EP2142418B1 (en) Floor for automobile including a holder and automobile including such floor
EP3283360A1 (en) Assembly station for assembling the body of a motor vehicle
EP2307263B1 (en) Device for the production of at least two different types of motor vehicle body
EP3305631B1 (en) Assembly method of a floor of a body shell structure of a motor vehicle
EP2097210B1 (en) Method of and system for positioning a part on an assembly and manufacture line
WO2010133781A1 (en) Plant and method for assembling sides of a vehicle passenger compartment
EP4056490B1 (en) Method of manufacturing a container for packaging a plurality of parts and robotised installation
EP3254903B1 (en) Part for attaching trim elements to a side structure element of a motor vehicle
EP3077152B1 (en) Assembly station of a roof panel on a vehicle body, method using such assembly station.
EP3672862B1 (en) Set of body components for a motor vehicle secured together by an electric welding point by means of sockets
EP3476700B1 (en) Arrangement of a vehicle body and associated production method
EP3735364B1 (en) Support structure for an element to be fixed to a front pillar of a vehicle
FR2839491A1 (en) Lower connection node for automobile base frame comprises central plane edged by diagonal edge connecting rear and front lateral edges each constituted from vertical rib connected by curved central rib fitting sheet metal wheel passage
FR2987768A1 (en) Mobile grouping base plate for setting crimping tools under press for crimping nuts for door of car, has supply slots for receiving reservoirs of nuts, and distributors for automatically conveying nuts from reservoirs to crimping tools
FR3034716A1 (en) METHOD FOR FASTENING A BLOCK TANK ON A FUND
FR3129915A1 (en) MOUNTING ASSEMBLY OF A MOTOR VEHICLE EQUIPMENT WITH A MANIPULATOR
FR3122151A1 (en) AUTOMATIC PARTS FEEDING IN A MOTOR VEHICLE HOOD ASSEMBLY ISLAND
JP2013104224A (en) Construction machine
EP1807246A1 (en) Workstation assembly and modular workstation therefor
FR2511275A1 (en) DEVICE FOR AUTOMATIC DRILLING OF PLANAR PANELS, IN PARTICULAR OF VEHICLE LENGTHS
FR2757819A1 (en) METHOD AND DEVICE FOR MOUNTING BODY ELEMENTS OF MOTOR VEHICLES

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20190524

PLFP Fee payment

Year of fee payment: 3

PLFP Fee payment

Year of fee payment: 4

PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6

PLFP Fee payment

Year of fee payment: 7