FR2995178A1 - Fishing net, has mounting link attached with floating or ballasting line by series of connection points that is provided independent of another series of connection points, where former series of connection points is spaced along link - Google Patents
Fishing net, has mounting link attached with floating or ballasting line by series of connection points that is provided independent of another series of connection points, where former series of connection points is spaced along link Download PDFInfo
- Publication number
- FR2995178A1 FR2995178A1 FR1258391A FR1258391A FR2995178A1 FR 2995178 A1 FR2995178 A1 FR 2995178A1 FR 1258391 A FR1258391 A FR 1258391A FR 1258391 A FR1258391 A FR 1258391A FR 2995178 A1 FR2995178 A1 FR 2995178A1
- Authority
- FR
- France
- Prior art keywords
- link
- mounting
- points
- cord
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 claims abstract description 11
- 238000000034 method Methods 0.000 claims abstract description 10
- 238000005188 flotation Methods 0.000 claims description 22
- 239000011324 bead Substances 0.000 claims description 13
- 239000004698 Polyethylene Substances 0.000 claims description 3
- -1 polyethylene Polymers 0.000 claims description 3
- 229920000573 polyethylene Polymers 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims description 2
- 238000009958 sewing Methods 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- LUTSRLYCMSCGCS-BWOMAWGNSA-N [(3s,8r,9s,10r,13s)-10,13-dimethyl-17-oxo-1,2,3,4,7,8,9,11,12,16-decahydrocyclopenta[a]phenanthren-3-yl] acetate Chemical compound C([C@@H]12)C[C@]3(C)C(=O)CC=C3[C@@H]1CC=C1[C@]2(C)CC[C@H](OC(=O)C)C1 LUTSRLYCMSCGCS-BWOMAWGNSA-N 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01K—ANIMAL HUSBANDRY; AVICULTURE; APICULTURE; PISCICULTURE; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
- A01K75/00—Accessories for fishing nets; Details of fishing nets, e.g. structure
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Marine Sciences & Fisheries (AREA)
- Animal Husbandry (AREA)
- Biodiversity & Conservation Biology (AREA)
Abstract
Description
La présente invention concerne un filet de pêche, un ensemble préfabriqué apte à être assemblé à au moins une ligne de flottaison ou de lestage pour former ledit filet de pêche, un procédé de fabrication dudit ensemble préfabriqué et un procédé de fabrication d'un filet à partir dudit ensemble préfabriqué. Elle concerne en particulier un filet de pêche du type comprenant un ensemble préfabriqué et au moins une ligne de flottaison ou de lestage à laquelle ledit ensemble préfabriqué est assemblé, ledit ensemble préfabriqué comprenant au moins une nappe de filet à mailles comportant au moins un bord délimité par une rangée de mailles, dites de montage, au moins un cordon de montage, au moins certaines des mailles de montage dudit bord étant enfilées sur ledit cordon de montage pour former des groupes de mailles, et au moins un lien interposable entre cordon de montage et ligne de flottaison ou de lestage. Selon la tradition, la ou les nappes, de filet constitutives d'un filet de pêche sont assemblées au moins au niveau d'au moins l'un de leur bord par au moins un cordon de montage à une ligne de flottaison ou de lestage, encore appelée ralingue. Dans certaines fabrications, les bords, dits supérieur et inférieur du filet, sont respectivement l'un, solidarisé à la ligne de flottaison par un premier cordon de montage, l'autre, à la ligne de lestage, par un deuxième cordon de montage. Dans d'autres fabrications, seul l'un des bords de la nappe ou du pré-assemblage de nappes de filet est solidarisé à une ligne de flottaison ou de lestage selon le bord de nappe concerné. Ce montage est onéreux en raison du nombre d'heures de montage nécessaires et le produit obtenu est difficilement transportable en raison de son poids et de son encombrement, ce qui n'est pas le cas des nappes de filet seules.The present invention relates to a fishing net, a prefabricated assembly capable of being assembled to at least one waterline or ballast to form said fishing net, a method of manufacturing said prefabricated assembly and a method of manufacturing a net. from said prefabricated assembly. It relates in particular to a fishing net of the type comprising a prefabricated assembly and at least one waterline or ballast to which said prefabricated assembly is assembled, said prefabricated assembly comprising at least one mesh netting having at least one delimited edge by a row of meshes, said mounting, at least one mounting cord, at least some of the mounting mesh of said edge being threaded on said mounting cord to form groups of stitches, and at least one interposable link between mounting cord and waterline or ballast. According to the tradition, the net or nets, of net of a fishing net are assembled at least at least one of their edge by at least one mounting cord to a waterline or ballast, still called rope. In some embodiments, the edges, said upper and lower of the net, are respectively one secured to the waterline by a first mounting cord, the other at the ballast line by a second mounting cord. In other fabrications, only one of the edges of the web or pre-assembly of net plies is secured to a waterline or ballast along the edge of the sheet concerned. This assembly is expensive because of the number of hours of assembly required and the product obtained is difficult to transport because of its weight and its size, which is not the case of the nets only.
Pour résoudre ce problème, une solution dans laquelle le cordon de montage est pré-assemblé à un tire-câble destiné à être remplacé par une ligne de flottaison ou de lestage a été imaginée, comme l'illustre la demande internationale WO 2008/129140. Cette solution nécessite la présence d'un élément supplémentaire formé par le tire-câble. En outre, la conception impose un nombre de points de liaison entre cordon de montage et ligne de flottaison ou de lestage prédéterminé, fonction du nombre de groupes de mailles à former, de sorte que le montage du cordon de montage à la ligne de lestage ou de flottaison, de même qu'une séparation ultérieure de la nappe de filet et de la ligne de lestage ou de flottaison en vue de la récupération de la ligne de lestage ou de flottaison, peuvent être fastidieux.To solve this problem, a solution in which the mounting cord is pre-assembled to a cable puller to be replaced by a waterline or ballast was imagined, as illustrated in international application WO 2008/129140. This solution requires the presence of an additional element formed by the cable puller. In addition, the design imposes a number of connection points between the mounting cord and predetermined water line or ballast, depending on the number of mesh groups to be formed, so that the mounting of the mounting cord to the ballast line or flotation, as well as subsequent separation of the net web and the ballast or flotation line for recovery of the ballast or flotation line, may be tedious.
Il est également connu à travers le document WO 2006/070163 un filet de pêche comprenant un cordon de montage relié par l'intermédiaire de boucles reportées à un lien de répartition, lui-même solidarisé par entrelacement à la ligne de lestage ou de flottaison. A nouveau, pour assurer le maintien d'une distance minimale entre deux boucles de cordon de montage, afin d'assurer un déploiement dans des conditions acceptables de la ou des nappes de filet, il est nécessaire de coupler le lien de répartition et la ligne de lestage ou de flottaison en un grand nombre de points. Or, les contraintes économiques actuelles impliquent que de plus en plus de pêcheurs réutilisent leur ligne de flottaison ou de lestage. Ils doivent donc les séparer de la nappe de filet avant de les réinstaller sur une nouvelle nappe de filet. Le temps de montage et de démontage est donc un facteur primordial sans que ce dernier nuise à la qualité de déploiement de la ou des nappes de filet. Un but de la présente invention est donc de proposer un filet du type précité dont la conception permet de pré-fabriquer une partie du filet avant assemblage à la ligne de lestage ou de flottaison, de réduire le nombre de points de liaison nécessaires entre ligne de lestage ou de flottaison et le reste du filet, sans nuire à la qualité de déploiement de la nappe obtenue à l'aide du cordon de montage jouant le rôle de guide et de support de ladite nappe.It is also known through document WO 2006/070163 a fishing net comprising a mounting cord connected via loops carried to a distribution link, itself secured by interlacing with the weighting line or flotation. Again, in order to maintain a minimum distance between two mounting cord loops, in order to ensure deployment in acceptable conditions of the one or more layers of net, it is necessary to couple the distribution link and the line ballasting or flotation in a large number of points. However, the current economic constraints imply that more and more fishermen are reusing their waterline or ballast. They must separate them from the net before reinstalling them on a new net. The time of assembly and disassembly is therefore a major factor without the latter affecting the quality of deployment of the net or webs. An object of the present invention is therefore to provide a net of the aforementioned type whose design allows to pre-manufacture a portion of the net before assembly to the weighting or flotation line, to reduce the number of necessary connection points between line of weighting or flotation and the rest of the net, without affecting the quality of deployment of the web obtained using the mounting cord acting as a guide and support of said web.
A cet effet, l'invention a pour objet un filet de pêche du type comprenant un ensemble préfabriqué et au moins une ligne de flottaison ou de lestage à laquelle ledit ensemble préfabriqué est assemblé, ledit ensemble préfabriqué comprenant au moins une nappe de filet à mailles comportant au moins un bord délimité par une rangée de mailles, dites de montage, au moins un cordon de montage, au moins certaines des mailles de montage dudit bord étant enfilées sur ledit cordon de montage pour former des groupes de mailles, et au moins un lien interposable entre cordon de montage et ligne de flottaison ou de lestage, caractérisé en ce que, ledit lien formant l'intermédiaire de liaison entre cordon de montage et ligne de flottaison ou de lestage, ledit cordon de montage est solidarisé au lien par une série de points de liaison, dits premiers points de liaison disposés à intervalles le long dudit lien et formés par le cordon de montage qui, au niveau de chacun desdits premiers points de liaison, traverse ledit lien, la portion de cordon de montage s'étendant entre deux premiers points de liaison successifs étant appelée balancine, chaque groupe de mailles de montage pouvant coulisser librement sur la balancine correspondante sur laquelle il est enfilé, et en ce que le lien est solidarisé à la ligne de flottaison ou de lestage par une deuxième série de points de liaison, dits deuxièmes points de liaison indépendants des premiers points de liaison, lesdits deuxièmes points de liaison étant disposés à écartement le long du lien.For this purpose, the invention relates to a fishing net of the type comprising a prefabricated assembly and at least one waterline or ballast to which said prefabricated assembly is assembled, said prefabricated assembly comprising at least one mesh net having at least one edge delimited by a row of meshes, said mounting, at least one mounting cord, at least some of the mounting meshes of said edge being threaded on said mounting cord to form groups of stitches, and at least one interposable link between the mounting cord and waterline or ballast, characterized in that, said link forming the connecting intermediate between the mounting cord and waterline or ballast, said mounting cord is secured to the link by a series connecting points, said first connection points arranged at intervals along said link and formed by the mounting cord which, at each of said prems iers connection points, crosses said link, the portion of mounting cord extending between two first successive connection points being called balancine, each group of mounting links freely sliding on the corresponding balancine on which it is threaded, and that the link is secured to the waterline or ballast by a second series of connection points, said second connection points independent of the first connection points, said second connection points being spaced apart along the link.
Grâce au fait que le filet comporte un lien qui forme l'intermédiaire de liaison entre cordon de montage et ligne de flottaison ou de lestage, il est possible, dans un premier temps, de solidariser le cordon de montage au lien pour former un ensemble préfabriqué, qui est aisément transportable, puis dans un second temps, de solidariser le lien à la ligne de lestage ou de flottaison.Thanks to the fact that the net has a link which forms the intermediate link between the mounting cord and waterline or ballast, it is possible, initially, to secure the mounting cord to the link to form a prefabricated assembly , which is easily transportable, then in a second time, to secure the link to the weighting or flotation line.
Grâce au montage du cordon de montage sur le lien, à la manière d'une guirlande, et au fait que le cordon de montage traverse le lien pour former à chaque fois un point de liaison audit lien, l'intervalle correspondant à la distance entre deux points de liaison successifs du cordon de montage au lien est sensiblement fixe de sorte que la nappe ou le pré-assemblage de nappes de filet se déploient de manière aussi aisée et homogène que dans le cas d'un montage traditionnel où le cordon de montage est directement monté sur la ligne de lestage ou de flottaison. En outre, les points de liaison entre lien et ligne de lestage ou de flottaison sont distincts ou indépendants des points de liaison entre cordon de montage et lien, c'est-à-dire réalisés de manière indépendante, notamment en position et en nombre desdits points de liaison entre cordon de montage et lien pour permettre un nombre de deuxièmes points de liaison indépendant du nombre de premiers points de liaison, c'est-à-dire pour former une liaison entre ligne de flottaison ou de lestage et lien indépendante de la liaison entre lien et cordon de montage de sorte que la solidarisation ou le détachement de la ligne de flottaison ou de lestage du lien sont sans incidence sur la liaison entre lien et cordon de montage. Ainsi, il est possible de disposer d'un nombre de points de liaison entre lien et ligne de flottaison ou de lestage inférieur au nombre de points de liaison entre cordon de montage et lien, ce qui diminue les temps de montage et de démontage de la ligne de flottaison ou de lestage du reste du filet. Il est également possible, grâce à cette conception, de s'affranchir de toute liaison directe entre le cordon de montage et la ligne de flottaison ou de lestage. De préférence, le nombre de deuxièmes points de liaison est inférieur au nombre de premiers points de liaison.With the mounting of the mounting cord on the link, in the manner of a garland, and the fact that the mounting cord crosses the link to form each time a link point to said link, the interval corresponding to the distance between two successive connection points of the mounting cord to the link is substantially fixed so that the web or the pre-assembly of net plies unfold as easily and homogeneously as in the case of a traditional assembly where the mounting cord is directly mounted on the ballast or float line. In addition, the connection points between link and line weighting or flotation are separate or independent of the connection points between the mounting cord and link, that is to say, performed independently, including the position and number of said connecting points between mounting cord and link to allow a number of second connection points independent of the number of first connection points, that is to say to form a connection between waterline or ballast and link independent of the link between link and mounting cord so that the attachment or detachment of the waterline or ballast link do not affect the connection between link and mounting cord. Thus, it is possible to have a number of connection points between link and waterline or ballast lower than the number of connection points between the mounting cord and link, which reduces the time of assembly and disassembly of the waterline or ballast of the rest of the net. It is also possible, thanks to this design, to overcome any direct connection between the mounting cord and the waterline or ballast. Preferably, the number of second connection points is smaller than the number of first connection points.
Comme, en particulier, les deuxièmes points de liaison entre la ligne de flottaison ou de lestage et le lien ne participent pas au groupage des mailles de la ou des nappe(s) de filet, la position de ces deuxièmes points de liaison peut être variable le long de la ligne de flottaison ou de lestage et le nombre de ces deuxièmes points de liaison peut être réduit sans avoir à tenir compte du positionnement, du nombre, et de la longueur des balancines formées par le cordon de montage. De préférence, au niveau desdits premiers points de liaison au niveau desquels le cordon de montage traverse ledit lien, le cordon de montage est 30 assemblé au lien en formant au moins un noeud, de préférence d'arrêt, de préférence de type demi-clé.As, in particular, the second connection points between the waterline or ballast and the link do not participate in the grouping of the mesh or the net (s), the position of these second connection points may be variable along the waterline or ballast and the number of these second connection points can be reduced without having to take into account the positioning, the number, and the length of the balancines formed by the mounting cord. Preferably, at said first connection points at which the mounting cord passes through said link, the mounting cord is assembled to the link forming at least one node, preferably a stop, preferably of the half-key type. .
Ainsi, grâce à ce montage, outre le fait que, comme le cordon de montage traverse le lien à chacun de ses points de liaison au lien, les premiers points de liaison sont écartés l'un de l'autre d'une distance sensiblement fixe, le cordon de montage peut, au niveau de chacun de ses points de liaison au lien, être au moins limité en déplacement à coulissement au niveau du passage à travers le lien de sorte qu'une traction peut être exercée sur l'une ou l'autre des balancines jouxtant un premier point de liaison sans générer de coulissement du cordon de montage au niveau dudit point de liaison avec le lien.Thus, thanks to this assembly, in addition to the fact that, as the mounting cord crosses the link at each of its connection points to the link, the first connection points are spaced apart from each other by a substantially fixed distance , the mounting cord may, at each of its connection points to the link, be at least limited in sliding displacement at the passage through the link so that traction can be exerted on one or the other balancines adjoining a first connection point without generating sliding of the mounting cord at said link point with the link.
De préférence, au niveau desdits premiers points de liaison au niveau desquels le cordon de montage traverse ledit lien, la partie qui traverse le lien est formée par un méandre ou une ganse dudit cordon. Ce montage permet un gain en termes de temps au montage associé à une 15 facilité de montage. De préférence, le ou chaque lien est une tresse, de préférence inextensible, de préférence en polyéthylène. 20 De préférence, les deuxièmes points de liaison sont des points de liaison par couture ou par agrafage. De préférence, le filet de pêche comprend une ligne de flottaison, une ligne de lestage et un ensemble préfabriqué qui comprend au moins une nappe de filet 25 à mailles comportant au moins deux bords opposés délimités chacun par une rangée de mailles, dites de montage, deux cordons de montage associés chacun à un bord, au moins certaines des mailles dudit bord étant enfilées sur ledit cordon pour former des groupes de mailles et au moins deux liens interposés l'un, entre l'un des cordons de montage et la ligne de flottaison, 30 l'autre, entre l'autre cordon de montage et la ligne de lestage. L'invention a encore pour objet un ensemble préfabriqué destiné à être assemblé à au moins une ligne de flottaison ou de lestage pour former un filet de pêche du type précité, ledit ensemble préfabriqué comprenant au moins une nappe de filet à mailles comportant au moins un bord délimité par une rangée de mailles, dites de montage, au moins un cordon de montage, au moins certaines des mailles dudit bord étant enfilées sur ledit cordon, pour former des groupes de mailles et au moins un lien interposable entre cordon de montage et ligne de flottaison ou de lestage, caractérisé en ce que ledit lien étant apte à former l'intermédiaire de liaison entre cordon de montage et ligne de flottaison ou de lestage, ledit cordon de montage est solidarisé au lien par une série de points de liaison disposés à intervalle le long dudit lien et formés par le cordon de montage, qui, au niveau de chacun desdits premiers points de liaison, traverse ledit lien et est assemblé audit lien en formant au moins un noeud de préférence d'arrêt, de préférence de type demi-clé.Preferably, at said first connection points at which the mounting cord passes through said link, the portion that passes through the link is formed by a meander or a loop of said cord. This arrangement allows a gain in terms of time assembly associated with ease of assembly. Preferably, the or each link is a braid, preferably inextensible, preferably polyethylene. Preferably, the second connection points are stitching or stitching connection points. Preferably, the fishing net comprises a waterline, a ballast line and a prefabricated assembly which comprises at least one mesh web 25 having at least two opposite edges each delimited by a row of stitches, said assembly, two mounting cords each associated with an edge, at least some of the stitches of said edge being threaded over said bead to form groups of stitches and at least two links interposed one between one of the strings and the flotation, the other, between the other mounting cord and the ballast line. The invention also relates to a prefabricated assembly intended to be assembled to at least one waterline or ballast to form a fishing net of the aforementioned type, said prefabricated assembly comprising at least one mesh netting having at least one edge defined by a row of stitches, said mounting, at least one mounting cord, at least some of the stitches of said edge being threaded on said bead, to form groups of stitches and at least one interposable connection between the mounting cord and line floating or ballasting, characterized in that said link being able to form the connecting intermediate between the mounting cord and waterline or ballast, said mounting cord is secured to the link by a series of connection points arranged to interval along said link and formed by the mounting cord, which, at each of said first connection points, passes through said link and is assembled to the it links by forming at least one preferably stopping node, preferably half-key type.
De préférence, la partie du cordon de montage qui traverse le lien est formée par une ganse ou un méandre aménagé sur ledit cordon de montage. L'invention a encore pour objet un procédé de fabrication d'un ensemble préfabriqué destiné à être assemblé à au moins une ligne de flottaison ou de lestage pour former un filet de pêche du type précité, ledit ensemble préfabriqué comprenant au moins une nappe de filet à mailles comportant au moins un bord délimité par une rangée de mailles, dites de montage, au moins un cordon de montage, et au moins un lien interposable entre cordon de montage et ligne de flottaison ou de lestage, caractérisé en ce que ledit procédé comprend, après liaison entre eux du cordon de montage et du lien à ou au voisinage de l'une de leurs extrémités, a) une étape au cours de laquelle on enfile le cordon de montage à l'intérieur d'un nombre prédéterminé de mailles de montage pour former un groupe de mailles, b) une étape au cours de laquelle on crée, sur le cordon de montage, au niveau de la zone du cordon de montage destinée à être solidarisée au lien, une ganse ou méandre et on introduit, éventuellement après pré-perçage du lien, la ganse ou méandre à travers le lien, c) une étape au cours de laquelle on introduit le courant du cordon de montage, correspondant à la partie du cordon s'étendant entre la ganse et l'extrémité libre du cordon de montage, à l'intérieur de la ganse et on serre ledit noeud autour dudit lien, ce noeud correspondant à l'un des points de la série de points appelés premiers points de liaison entre cordon de montage et lien, d) la répétition des étapes a, b, c jusqu'à obtention du nombre souhaité de premiers points de liaison entre lien et cordon de montage.Preferably, the portion of the mounting cord passing through the link is formed by a loop or meander provided on said mounting cord. The invention also relates to a method of manufacturing a prefabricated assembly intended to be assembled to at least one waterline or ballast to form a fishing net of the aforementioned type, said prefabricated assembly comprising at least one net mesh having at least one edge delimited by a row of meshes, said mounting, at least one mounting cord, and at least one interposable link between mounting cord and waterline or ballast, characterized in that said method comprises after connecting the mounting cord and the link to or near one of their ends, a) a step in which the mounting cord is threaded into a predetermined number of meshes of assembly to form a group of stitches, b) a step in the course of which is created on the mounting cord, at the region of the mounting cord intended to be secured to the link, a loop or mate andre introduced, possibly after pre-drilling the link, the loop or meander through the link, c) a step during which we introduce the current of the mounting cord, corresponding to the part of the cord extending between the strap and the free end of the mounting cord, inside the loop and clamping said node around said link, this node corresponding to one of the points of the series of points called first connection points between mounting cord and link, d) repeating steps a, b, c to obtain the desired number of first link points between link and mounting cord.
L'invention a encore pour objet un procédé de fabrication d'un ensemble préfabriqué destiné à être assemblé à au moins une ligne de flottaison ou de lestage pour former un filet de pêche du type précité dans lequel ledit procédé comprend, après liaison entre eux du cordon de montage et du lien, à ou au voisinage de l'une de leurs extrémités : a) une étape au cours de laquelle on enfile le cordon de montage à l'intérieur d'un nombre prédéterminé de mailles de montage pour former un groupe de mailles, b) une étape au cours de laquelle on introduit l'extrémité libre du cordon de montage à travers le lien et on forme, avec le courant du lien correspondant à la portion du lien s'étendant au-delà de la zone de traversée du lien, au moins un noeud, de préférence de type demi-clé, ce noeud correspondant à l'un des points de la série de points appelés premiers points de liaison entre cordon de montage et lien et on répète les étapes a) et b) ci-dessus jusqu'à obtention du nombre souhaité de premiers points de liaison entre lien et cordon de montage.The invention also relates to a method of manufacturing a prefabricated assembly intended to be assembled to at least one waterline or ballast to form a fishing net of the aforementioned type wherein said method comprises, after connection between them. assembly cord and link, at or near one of their ends: a) a step in which the mounting cord is threaded into a predetermined number of mounting meshes to form a group mesh, b) a step during which the free end of the mounting cord is introduced through the link and, with the current of the link corresponding to the portion of the link extending beyond the traversing the link, at least one node, preferably half-key type, this node corresponding to one of the points of the series of points called first connection points between the mounting cord and link and the steps a) and b) above ju squ'à obtaining the desired number of first points of connection between link and cordon montage.
L'invention a encore pour objet un procédé de fabrication d'un filet à partir d'un ensemble préfabriqué obtenu par mise en oeuvre du procédé du type précité, caractérisé en ce que ledit procédé comprend au moins une étape d'assemblage par couture ou agrafage du ou de l'un des liens dudit ensemble préfabriqué avec une ligne de lestage ou de flottaison, les points de couture ou les agrafes formant les points de la série de points appelés deuxièmes points de liaison entre lien et ligne de flottaison ou de lestage, le nombre des deuxièmes points de liaison étant de préférence inférieur au nombre de premiers points de liaison. L'invention sera bien comprise à la lecture de la description suivante 5 d'exemples de réalisation, en référence aux dessins annexés dans lesquels : la figure 1 représente une vue schématique partielle à plat d'un filet conforme à l'invention ; 10 la figure 2 représente une vue schématique d'un mode de réalisation d'un premier point de liaison entre cordon de montage et lien ; la figure 3 représente une vue schématique d'une variante du mode de réalisation de la figure 2 ; 15 la figure 4 représente une vue schématique d'un autre mode de réalisation d'un premier point de liaison entre cordon de montage et lien. Comme mentionné ci-dessus, l'invention concerne un ensemble 2 préfabriqué 20 et un filet 1 de pêche comprenant un ensemble 2 préfabriqué et au moins une ligne 6 de flottaison ou de lestage à laquelle ledit ensemble 2 préfabriqué est assemblé. La figure 1 illustre une vue partielle d'un filet de pêche conforme à l'invention. 25 L'ensemble 2 préfabriqué dudit filet comprend une nappe 3 de filet partiellement représentée. Cette nappe 3 aurait pu être réalisée sous forme d'un assemblage de nappes généralement superposées sans sortir du cadre de l'invention. Cette nappe 3 de filet est de forme générale quadrangulaire et présente quatre bords, appelés respectivement bord supérieur, bord inférieur 30 et bords latéraux. Les bords supérieur et inférieur de la nappe 3 de filet forment deux bords opposés de la nappe. Le bord 31 supérieur de la nappe ou de l'ensemble de nappes est destiné à être assemblé à la ligne 6 de flottaison du filet tandis que le bord 31 inférieur est destiné à être assemblé à la ligne 6 de lestage. Un filet de l'invention peut comporter indifféremment uniquement une ligne de lestage ou uniquement une ligne 6 de flottaison ou à la fois une ligne de lestage et une ligne de flottaison, le montage de la ligne de flottaison au bord supérieur de la nappe ou de l'ensemble de nappes étant similaire au montage de la ligne de lestage au bord inférieur de la nappe ou de l'ensemble de nappes de sorte que le montage d'une seule ligne sera décrit ci-après.The subject of the invention is also a method for manufacturing a net from a prefabricated assembly obtained by implementing the method of the aforementioned type, characterized in that said method comprises at least one assembly step by sewing or stapling one or more of the links of said prefabricated assembly with a weighting or flotation line, the stitching points or the staples forming the points of the series of points called second connection points between the link and the waterline or ballast , the number of second connection points being preferably less than the number of first connection points. The invention will be better understood on reading the following description of exemplary embodiments, with reference to the appended drawings, in which: FIG. 1 represents a partial schematic plan view of a net according to the invention; Figure 2 shows a schematic view of an embodiment of a first connection point between the mounting cord and the link; FIG. 3 represents a schematic view of a variant of the embodiment of FIG. 2; Figure 4 shows a schematic view of another embodiment of a first connection point between the mounting cord and the link. As mentioned above, the invention relates to a prefabricated assembly 2 and a fishing net 1 comprising a prefabricated assembly 2 and at least one floatation or ballast line 6 to which said prefabricated assembly 2 is assembled. Figure 1 illustrates a partial view of a fishing net according to the invention. The prefabricated assembly 2 of said net comprises a threaded web 3 partially shown. This web 3 could have been made in the form of an assembly of generally superposed webs without departing from the scope of the invention. This net ply 3 is generally quadrangular in shape and has four edges, respectively called upper edge, lower edge 30 and side edges. The upper and lower edges of the ply 3 of thread form two opposite edges of the ply. The upper edge 31 of the ply or set of plies is intended to be assembled at the line 6 of flotation of the net while the lower edge 31 is intended to be assembled at the line 6 of ballast. A net of the invention may comprise either only a ballast line or only a float line or both a ballast line and a waterline, the mounting of the waterline at the upper edge of the sheet or the set of webs being similar to mounting the ballast line at the lower edge of the web or set of webs so that the single-line assembly will be described hereinafter.
Ledit ensemble 2 préfabriqué comporte un cordon 4 de montage lorsqu'il est équipé d'une seule ligne de flottaison ou de lestage ou deux cordons 4 de montage lorsqu'il comprend à la fois une ligne de flottaison et une ligne de lestage. Il doit être noté qu'une ligne de flottaison est une ligne, telle qu'une corde, un filin ou similaire muni de moyens de flottaison, réalisés d'une seule pièce ou rapportés sur ladite ligne, tandis qu'une ligne de lestage est une ligne, telle qu'une corde, un filet ou similaire, muni de moyens de lestage, réalisés d'une seule pièce ou rapportés sur ladite ligne.Said prefabricated assembly 2 comprises a mounting cord 4 when it is equipped with a single water line or ballast or two mounting cords 4 when it comprises both a water line and a ballast line. It should be noted that a water line is a line, such as a rope, rope or the like provided with buoyancy means, made in one piece or attached to said line, while a weight line is a line, such as a rope, a net or the like, provided with weighting means, made in one piece or attached to said line.
Ces deux types de lignes sont bien connus à ceux versés dans cet art. L'ensemble 2 préfabriqué comporte encore un lien 5 lorsque ledit filet est équipé d'une seule ligne de flottaison ou de lestage ou deux liens 5 lorsque ledit filet comprend à la fois une ligne de flottaison et une ligne de lestage où chaque lien est interposable entre cordon 4 de montage et ligne 6 de flottaison ou de lestage. Ainsi, en présence de deux liens, l'un des liens est interposable entre le cordon 4 de montage associé au bord supérieur de la ou des nappes de filet et la ligne 6 de flottaison tandis que l'autre lien est interposable entre le cordon de montage associé au bord inférieur de la ou des nappes du filet et la ligne 6 de lestage. Chaque lien 5 forme un intermédiaire de liaison entre un cordon de montage et une ligne de flottaison ou de lestage pour pouvoir s'affranchir d'une liaison directe entre cordon de montage et ligne comme dans l'état de la technique. De manière caractéristique à l'invention, le cordon 4 de montage est solidarisé au lien auquel il est associé par une série de points, dits premiers points P1 de liaison. Ces premiers points P1 de liaison sont disposés à écartement le long du lien et sont formés par le cordon de montage lui-même qui, au niveau de chaque premier point de liaison, traverse le lien. Entre deux premiers points de liaison, le cordon de montage forme généralement un arc ou un lobe par rapport au lien. Cette portion du cordon de montage est appelée balancine.These two types of lines are well known to those versed in this art. The prefabricated assembly 2 further comprises a link 5 when said net is equipped with a single waterline or ballast or two links 5 when said net comprises both a water line and a weight line where each link is interposable. between mounting cord 4 and line 6 float or ballast. Thus, in the presence of two links, one of the links is interposable between the mounting cord 4 associated with the upper edge of the one or more layers of net and the line 6 of flotation while the other link is interposable between the drawstring assembly associated with the lower edge of the net or plies of the net and the ballast line 6. Each link 5 forms a connecting intermediate between a mounting cord and a waterline or ballast to be able to overcome a direct connection between mounting cord and line as in the state of the art. Characteristically to the invention, the mounting cord 4 is secured to the link with which it is associated by a series of points, called first points P1 of connection. These first connection points P1 are spaced apart along the link and are formed by the mounting cord itself which, at each first connection point, passes through the link. Between two first connection points, the mounting cord generally forms an arc or lobe with respect to the link. This portion of the mounting cord is called balancine.
C'est à ce niveau du cordon de montage que les mailles 32, dites de montage de l'un des bords de la nappe ou de l'ensemble de nappes des filets sont enfilées sur ledit cordon et coulissent librement sur ce dernier pour former un groupe de mailles. Chaque groupe de mailles est donc formé par les mailles enfilées entre deux premiers points de liaison successifs sur la portion de cordon de montage s'étendant entre lesdits premiers points de liaison successifs. Le nombre de mailles enfilées sur le cordon de montage entre deux points de liaison et emprisonnées entre lesdits points de liaison est choisi au moment de la solidarisation du cordon au lien. Ce nombre de mailles varie généralement entre 3 et 20 et est choisi notamment suivant la grandeur de la maille, le type de filet et la volonté de l'utilisateur. Le cordon de montage est donc solidarisé au niveau du point P1 appelé premier point de liaison au lien puis est enfilé dans un nombre prédéterminé de mailles formant l'un des bords supérieur ou inférieur de la nappe ou de l'ensemble de nappes du filet, puis de nouveau solidarisé au lien par un nouveau premier point P1 de liaison avant d'être à nouveau enfilé dans un nombre prédéterminé de mailles. Les opérations se répètent jusqu'à obtention du nombre souhaité de premiers points de liaison entre cordon de montage et lien. Le cordon de montage se développe ainsi à la manière d'une guirlande le long du lien. Le fait que le cordon de montage traverse le lien pour former les points appelés premiers points de liaison au lien permet de disposer de premiers points de liaison entre cordon de montage et lien disposés en des emplacements déterminés sensiblement fixes le long dudit lien, ce qui permet un déploiement ultérieur homogène de la ou des nappes de filet. Au niveau de chaque premier point de liaison, le cordon de montage traverse 5 le lien puis est assemblé au lien, généralement par au moins un noeud. Plusieurs modes de réalisation d'un tel point de liaison peuvent être envisagés. Ainsi, la figure 2 illustre le cas où le cordon de montage est conformé pour former une ganse ou un méandre au niveau de la partie du cordon de montage 10 devant être introduite à travers le lien. Ce lien est de préférence pré-percé pour faciliter la traversée du lien par le cordon de montage. Le méandre formé au niveau du cordon de montage est introduit à travers l'ouverture dudit lien, comme l'illustre la figure 2. Le courant du cordon de montage, correspondant à la partie du cordon s'étendant entre la ganse 8 et l'extrémité libre du cordon 4 15 de montage, est ensuite introduit dans le méandre ou ganse 8. Une traction sur l'extrémité libre du cordon de montage assure le serrage de l'ensemble. Le noeud ainsi réalisé permet une limitation en déplacement à coulissement du cordon de montage au niveau de la zone de liaison au lien. Ce premier noeud, encore appelé demi-clé, peut être complété par un noeud de type demi-clé 20 supplémentaire comme l'illustre la figure 3 où le courant du cordon de montage forme un deuxième noeud de type demi-clé autour du lien, ce deuxième noeud jouxtant la zone où le cordon de montage traverse le lien. En variante, et comme l'illustre la figure 4, l'extrémité libre du cordon de 25 montage peut traverser le lien sans former au préalable une ganse ou un méandre au niveau du cordon de montage avant introduction à travers le lien. Le courant du cordon de montage entoure le lien pour former autour du lien un premier noeud, type demi-clé, ce premier noeud étant suivi d'un deuxième noeud type demi-clé pour parfaire l'immobilisation. Bien évidemment, d'autres 30 configurations d'assemblage du cordon de montage au lien à l'aide d'autres types de noeuds, après que le cordon de montage ait traversé le lien, peuvent être envisagées sans sortir de l'invention.It is at this level of the mounting cord that the meshes 32, said mounting one of the edges of the ply or the set of plies of the threads are strung on said cord and slide freely on the latter to form a mesh group. Each mesh group is thus formed by the stitches threaded between two first successive connection points on the portion of mounting cord extending between said first successive connection points. The number of meshes threaded on the mounting cord between two connection points and trapped between said connection points is chosen at the time of joining the cord to the link. This number of meshes generally varies between 3 and 20 and is chosen in particular according to the size of the mesh, the type of net and the will of the user. The mounting cord is thus secured at the point P1 called the first connection point to the link and then is threaded into a predetermined number of meshes forming one of the upper or lower edges of the web or set of webs of the net, then again secured to the link by a new first link point P1 before being again threaded into a predetermined number of meshes. The operations are repeated until the desired number of first connection points between the mounting cord and link. The mounting cord develops like a garland along the link. The fact that the mounting cord passes through the link to form the points called first link points to the link provides first connection points between the mounting cord and link arranged in fixed locations substantially fixed along said link, allowing a subsequent uniform deployment of the net or layers. At each first point of connection, the mounting cord passes through the link and is assembled to the link, usually by at least one node. Several embodiments of such a connection point can be envisaged. Thus, Figure 2 illustrates the case where the mounting cord is shaped to form a loop or meander at the portion of the mounting cord 10 to be introduced through the link. This link is preferably pre-drilled to facilitate the crossing of the link by the mounting cord. The meander formed at the mounting cord is introduced through the opening of said tie, as shown in Figure 2. The current of the mounting cord, corresponding to the portion of the cord extending between the loop 8 and the free end of the mounting cord 4 15, is then introduced into the meander or loop 8. A pull on the free end of the mounting cord ensures the tightening of all. The node thus produced allows a limitation in sliding displacement of the mounting cord at the link zone to the link. This first node, also called half-key, may be completed by an additional half-key type node 20 as illustrated in FIG. 3, where the current of the mounting cord forms a second half-key type node around the link, this second node adjacent to the area where the mounting cord passes through the link. Alternatively, and as shown in FIG. 4, the free end of the mounting cord may pass through the link without first forming a loop or meander at the mounting cord prior to introduction through the link. The current of the mounting cord surrounds the link to form around the link a first node, half-key type, this first node being followed by a second half-key type node to complete the immobilization. Of course, other mounting configurations of the link-up cord using other types of nodes, after the mounting cord has traversed the link, may be contemplated without departing from the invention.
Dans les exemples représentés, le lien 5 est une tresse en polyéthylène. Le cordon peut être introduit entre deux brins de la tresse à travers une ouverture ménagée à l'aide d'un outil qui écarte, en un emplacement prédéterminé de la longueur de la tresse, lesdits brins pour aménager ladite ouverture. Une fois lien et cordon assemblés entre eux par ces premiers points de liaison, cet ensemble préfabriqué peut être soit directement assemblé à une ligne de flottaison ou de lestage, soit stocké puis transporté avant d'être monté sur la ou les lignes de flottaison. En effet, les deuxièmes points P2 de liaison correspondant aux points de liaison entre lien et ligne de flottaison ou de lestage sont indépendants tant en nombre qu'en position des premiers points PI de liaison entre cordon de montage et lien car ils ne participent ni au maintien des premiers points de liaison en un emplacement ou en une zone d'emplacement prédéterminée sur le lien, ni à la réalisation desdits premiers points Pl. C'est dans ce sens qu'ils sont indépendants des premiers points PI de liaison. Il est ainsi possible de rompre tous les deuxièmes points P2 de liaison sans incidence sur les premiers points PI de liaison qui continuent, en l'absence des deuxièmes points de liaison, à assurer la liaison entre cordon de montage et lien, y compris sous l'effet d'une traction exercée sur le lien et le cordon de montage dans le sens d'un écartement de ces derniers l'un de l'autre et à se maintenir au niveau dudit lien en un emplacement sensiblement fixe. Ces deuxièmes points de liaison sont de préférence des points de couture ou des agrafes qui s'étendent entre lien et ligne de lestage ou de flottaison. Ainsi, un opérateur non formé, tel qu'un pêcheur, peut réaliser ce type de liaison sans avoir à se préoccuper des premiers points de liaison. En outre comme le nombre de deuxièmes points P2 de liaison peut être réduit en raison d'un rôle limité à la liaison du lien et de la ligne de flottaison ou de lestage entre eux, les temps de montage et par suite de démontage peuvent être réduits.30In the examples shown, the link 5 is a polyethylene braid. The cord may be introduced between two strands of the braid through an opening formed by means of a tool which spreads, at a predetermined location of the length of the braid, said strands to arrange said opening. Once link and cordon assembled together by these first connection points, this prefabricated assembly can be either directly assembled to a waterline or ballast, or stored and transported before being mounted on the waterline or lines. Indeed, the second connection points P2 corresponding to the connection points between the link and the waterline or ballast are independent both in number and in position of the first points PI connecting between the mounting cord and link because they do not participate in the maintaining the first connection points in a location or a predetermined location area on the link, or the realization of said first points Pl. It is in this sense that they are independent of the first points PI link. It is thus possible to break all the second connection points P2 without affecting the first connection points PI which continue, in the absence of the second connection points, to ensure the connection between the mounting cord and link, including under the the effect of a traction exerted on the link and the mounting cord in the direction of a spacing of the latter from one another and to maintain at said link in a substantially fixed location. These second connection points are preferably stitches or staples which extend between the link and the weighting or flotation line. Thus, an untrained operator, such as a fisherman, can achieve this type of connection without having to worry about the first points of connection. In addition, since the number of second points P2 of connection can be reduced because of a role limited to the connection of the link and the waterline or ballast between them, the assembly time and as a result of disassembly can be reduced .30
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1258391A FR2995178B1 (en) | 2012-09-07 | 2012-09-07 | FISHING FILET, PREFABRICATED ASSEMBLY AND MANUFACTURING METHOD THEREFOR, AND METHOD FOR MANUFACTURING A THREAD FROM THE PREFABRICATED ASSEMBLY |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1258391A FR2995178B1 (en) | 2012-09-07 | 2012-09-07 | FISHING FILET, PREFABRICATED ASSEMBLY AND MANUFACTURING METHOD THEREFOR, AND METHOD FOR MANUFACTURING A THREAD FROM THE PREFABRICATED ASSEMBLY |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2995178A1 true FR2995178A1 (en) | 2014-03-14 |
FR2995178B1 FR2995178B1 (en) | 2015-03-27 |
Family
ID=47137905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR1258391A Expired - Fee Related FR2995178B1 (en) | 2012-09-07 | 2012-09-07 | FISHING FILET, PREFABRICATED ASSEMBLY AND MANUFACTURING METHOD THEREFOR, AND METHOD FOR MANUFACTURING A THREAD FROM THE PREFABRICATED ASSEMBLY |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR2995178B1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2797148A1 (en) * | 1999-08-04 | 2001-02-09 | Rene Kersaudy | Procedure, for mounting net on to support rails, involves mounting wire with eyelets, passing through edge of mesh, with collector wire passing through eyelets and retaining net into sections by means of knots or folds. |
WO2006125929A1 (en) * | 2005-05-27 | 2006-11-30 | Etablissements Armand Mondiet | Knot for linking two parallel lines, method of producing and pre-assembling a net, such as a fishing net, and fishing net thus produced |
FR2886102A1 (en) * | 2005-05-27 | 2006-12-01 | Armand Mondiet Soc Par Actions | Fishing net e.g. trammel, preassembling or manufacturing method for fishing domain, involves connecting distribution thread to each end of flotation line through loops, which are passed across passage openings of thread |
-
2012
- 2012-09-07 FR FR1258391A patent/FR2995178B1/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2797148A1 (en) * | 1999-08-04 | 2001-02-09 | Rene Kersaudy | Procedure, for mounting net on to support rails, involves mounting wire with eyelets, passing through edge of mesh, with collector wire passing through eyelets and retaining net into sections by means of knots or folds. |
WO2006125929A1 (en) * | 2005-05-27 | 2006-11-30 | Etablissements Armand Mondiet | Knot for linking two parallel lines, method of producing and pre-assembling a net, such as a fishing net, and fishing net thus produced |
FR2886102A1 (en) * | 2005-05-27 | 2006-12-01 | Armand Mondiet Soc Par Actions | Fishing net e.g. trammel, preassembling or manufacturing method for fishing domain, involves connecting distribution thread to each end of flotation line through loops, which are passed across passage openings of thread |
Also Published As
Publication number | Publication date |
---|---|
FR2995178B1 (en) | 2015-03-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2190652C (en) | Device for breeding shellfish, especially oysters | |
EP2862469B1 (en) | Device with a loop for adjusting and tightening a strap | |
BR102013024495A2 (en) | LOOP BINDING SYSTEM IMPROVED FOR A BALKER | |
EP0844106B1 (en) | Reinforcing carcass for tyre, made out of a single wire | |
FR3009033A1 (en) | SEGMENTED AND WIND TURBINE BLADE EQUIPPED WITH SUCH A BLADE | |
EP1883724B1 (en) | Knot and method for linking two lines, fishing net comprising such a knot | |
WO2009037388A1 (en) | Agricultural shelter with simplified roof structure | |
FR2995178A1 (en) | Fishing net, has mounting link attached with floating or ballasting line by series of connection points that is provided independent of another series of connection points, where former series of connection points is spaced along link | |
EP3056628B1 (en) | Tablecloth structure canvas lined with several harpoons to improved connections | |
CA2790180A1 (en) | Method for operating a machine for plaiting reinforcing fibers | |
EP0343285B1 (en) | Cord unrolling device for tomato culture | |
EP3025054A1 (en) | Segmented wind turbine blade provided with an assembly device | |
EP1384401B1 (en) | Method and trawl-type net facilitating the installation of the trawl-type net on the mounting bar of a sewing machine | |
FR2797148A1 (en) | Procedure, for mounting net on to support rails, involves mounting wire with eyelets, passing through edge of mesh, with collector wire passing through eyelets and retaining net into sections by means of knots or folds. | |
FR2886102A1 (en) | Fishing net e.g. trammel, preassembling or manufacturing method for fishing domain, involves connecting distribution thread to each end of flotation line through loops, which are passed across passage openings of thread | |
FR2889552A1 (en) | LOST FORMWORK ELEMENT AND MODULE FOR CARRYING OUT SUCH ELEMENT. | |
EP3118357A1 (en) | Method and machine for producing a woven structure | |
FR2607836A1 (en) | METHOD FOR MANUFACTURING POLAR REINFORCEMENTS USING RADIAL WIRES AND CONTINUOUS CIRCONFERENTIAL WIRES, AND WEAVING MACHINE FOR CARRYING OUT THE METHOD | |
EP1155186A1 (en) | Junction with symmetrical weave for woven band with asymmetric weave | |
FR2748189A1 (en) | Method for mounting fishing net on to the bolt-rope, | |
FR2546788A1 (en) | METHOD FOR ALIGNING ALVEOL NODES IN HONEYCOMB | |
FR2581019A1 (en) | CLOSE FLOAT CATAMARAN | |
WO1996011135A1 (en) | Rigging for a sailing craft | |
WO2006070163A1 (en) | Method for production or pre-assembly of a net in particular a fishing net and fishing net obtained thus | |
WO2023047048A1 (en) | Assembly comprising a wingsail, a mast and multiple camber-adjusting devices for a wingsail, and a system for reducing the area of the wingsail catching the wind |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PLFP | Fee payment |
Year of fee payment: 5 |
|
PLFP | Fee payment |
Year of fee payment: 6 |
|
PLFP | Fee payment |
Year of fee payment: 7 |
|
PLFP | Fee payment |
Year of fee payment: 8 |
|
ST | Notification of lapse |
Effective date: 20210505 |