FR2905204B1 - Procede de commande pour installation domotique - Google Patents
Procede de commande pour installation domotiqueInfo
- Publication number
- FR2905204B1 FR2905204B1 FR0607437A FR0607437A FR2905204B1 FR 2905204 B1 FR2905204 B1 FR 2905204B1 FR 0607437 A FR0607437 A FR 0607437A FR 0607437 A FR0607437 A FR 0607437A FR 2905204 B1 FR2905204 B1 FR 2905204B1
- Authority
- FR
- France
- Prior art keywords
- control method
- domotic installation
- domotic
- installation
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title 1
- 238000000034 method Methods 0.000 title 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00007—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/58—The condition being electrical
- H02J2310/60—Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/62—The condition being non-electrical, e.g. temperature
- H02J2310/64—The condition being economic, e.g. tariff based load management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Selective Calling Equipment (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0607437A FR2905204B1 (fr) | 2006-08-22 | 2006-08-22 | Procede de commande pour installation domotique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0607437A FR2905204B1 (fr) | 2006-08-22 | 2006-08-22 | Procede de commande pour installation domotique |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2905204A1 FR2905204A1 (fr) | 2008-02-29 |
FR2905204B1 true FR2905204B1 (fr) | 2008-11-21 |
Family
ID=37898468
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR0607437A Active FR2905204B1 (fr) | 2006-08-22 | 2006-08-22 | Procede de commande pour installation domotique |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR2905204B1 (fr) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2933820B1 (fr) * | 2008-07-10 | 2010-09-03 | Energisme | Procede et dispositif de commande de consommateurs electriques. |
FR2986359B1 (fr) * | 2012-01-27 | 2015-09-25 | Electricite De France | Procede et dispositif de pilotage d'installations electriques |
FR3133112B1 (fr) * | 2022-02-28 | 2024-03-29 | Totalenergies Electricite Et Gaz France | Système et procédé de communication de trame(s) de données d’un compteur électrique, installation électrique et programme d’ordinateur associés |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2541052A1 (fr) * | 1983-02-15 | 1984-08-17 | Electricite De France | Procede de telecommande centralisee perfectionne |
US6624532B1 (en) * | 2001-05-18 | 2003-09-23 | Power Wan, Inc. | System and method for utility network load control |
-
2006
- 2006-08-22 FR FR0607437A patent/FR2905204B1/fr active Active
Also Published As
Publication number | Publication date |
---|---|
FR2905204A1 (fr) | 2008-02-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FR2944727B3 (fr) | Procede de commande pour cisailles motorisees | |
FR2903074B1 (fr) | Procede de degivrage pour aeronef | |
FR2947223B1 (fr) | Procede de commande de faisceau d'eclairage pour vehicules | |
EP2074723A4 (fr) | Procédé d'émission de signal de commande | |
FR2918332B1 (fr) | Systeme de commande pour systeme de freinage hydraulique | |
FR2927309B1 (fr) | Systeme de commande pour nacelle de turboreacteur | |
HK1144509A1 (en) | Method and system for aggregate bandwidth control | |
FR2887301B1 (fr) | Systeme de commande electronique pour nacelle | |
FR2939554B1 (fr) | Procede de fonctionnement d'un systeme domotique | |
FR2916421B1 (fr) | Systeme de commande d'un giravion. | |
FR2904391B1 (fr) | Appareil et procede de commande pour transmission automatique. | |
FR2927310B1 (fr) | Systeme de commande pour nacelle de turboreacteur | |
FR2904079B1 (fr) | Appareil de commande et procede pour une transmission automatique | |
FR2904080B1 (fr) | Appareil de commande et procede pour une transmission automatique | |
FR2924395B1 (fr) | Systeme de commande de direction | |
EP2041462A4 (fr) | Appareil pour manoeuvrer un moyen d'installation controlable | |
FR2936041B1 (fr) | Procede de commande d'une table de cuisson | |
FR2966626B1 (fr) | Procede de fonctionnement d'une unite mobile de commande d'une installation domotique. | |
FR2899923B1 (fr) | Procede de commande et installation de store commandee par ce procede | |
EP2151116A4 (fr) | Procédé pour la commande de tampon d'un dispositif réseau | |
FR2930597B1 (fr) | Procede de commande d'un moteur | |
FR2925128B1 (fr) | Procede de commande d'un alterno-demarreur autopilote comportant une etape abregee de preflux | |
DK2070385T3 (da) | Metode til styring af et transmissionssystem / method for controlling a transmission system | |
FR2927408B1 (fr) | Procede de commande d'une installation de deshydratation au moyen de zeolites | |
FR2949514B1 (fr) | Procede de commande d'un systeme micro-hybride |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PLFP | Fee payment |
Year of fee payment: 11 |
|
GC | Lien (pledge) constituted |
Effective date: 20161227 |
|
PLFP | Fee payment |
Year of fee payment: 12 |
|
RG | Lien (pledge) cancelled |
Effective date: 20171215 |