FR2860609A1 - Complex equipment maintenance plan self-convergent method, involves controlling feasibility of determined maintenance plan at long, short and medium term levels for establishing enforceable maintenance plan - Google Patents
Complex equipment maintenance plan self-convergent method, involves controlling feasibility of determined maintenance plan at long, short and medium term levels for establishing enforceable maintenance plan Download PDFInfo
- Publication number
- FR2860609A1 FR2860609A1 FR0311655A FR0311655A FR2860609A1 FR 2860609 A1 FR2860609 A1 FR 2860609A1 FR 0311655 A FR0311655 A FR 0311655A FR 0311655 A FR0311655 A FR 0311655A FR 2860609 A1 FR2860609 A1 FR 2860609A1
- Authority
- FR
- France
- Prior art keywords
- maintenance
- equipment
- facility
- installation
- operations
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Domaine de l'inventionField of the invention
La présente invention concerne un système de maintenance d'un équipement complexe à forte volumétrie. The present invention relates to a maintenance system for a complex equipment with high volumetry.
L'invention concerne la maintenance des équipements corn- plexes et à volumétrie de maintenance élevée. Il s'agit, par exemple, d'équipements pour lesquels plus de 100 000 ordres de maintenance sont émis par an et qui ne permettent que difficilement la mise en oeuvre des meilleures pratiques de maintenance, telles que définies par la norme AFNOR X60-000 ou les logiciels de gestion de maintenance assistée par ordinateur que l'on trouve sur le marché. The invention relates to the maintenance of complex and high maintenance volumetric equipment. These are, for example, equipment for which more than 100,000 maintenance orders are issued per year and which make it difficult to implement the best maintenance practices, as defined by the AFNOR X60-000 standard. or the computer-assisted maintenance management software that is available on the market.
Etat de la technique Il existe des systèmes de gestion de la maintenance assistée par ordinateur GMAO mais qui sont insuffisants pour traiter efficacement le problème de la maintenance des équipements complexes qui, comme indiqué, nécessitent la gestion d'un nombre élevé d'ordres de maintenance par an, équipements qui, en général, fonctionnent en continu et dont le coût de l'arrêt de maintenance est très élevé. STATE OF THE ART There are management systems for computer-assisted maintenance CMMS but which are insufficient to effectively deal with the problem of the maintenance of complex equipment which, as indicated, require the management of a large number of maintenance orders. per year, equipment which, in general, operate continuously and the cost of the maintenance shutdown is very high.
Ainsi, les opérations administratives (préparation, ordonnancement, réapprovisionnement, clôture des ordres, analyse de per- formantes, ...) sont souvent réalisées pour la maintenance préventive qui a un caractère répétitif. Par contre, ces opérations sont très lourdes, même avec une bonne GMAO, pour la maintenance corrective (dépannages, réparations) par nature moins répétitives. Il en résulte: - qu'en général, ces opérations, administratives ne sont pas effectuées 25 ou sont réalisées que très partiellement, - plus rarement, que ces opérations administratives sont réalisées de façon assez satisfaisante, mais pour un coût administratif qui apparaît très vite prohibitif et conduit généralement à une réduction du niveau de préparation. Thus, administrative operations (preparation, scheduling, replenishment, closing of orders, performance analysis, etc.) are often performed for preventive maintenance that is repetitive. On the other hand, these operations are very heavy, even with a good CMMS, for the corrective maintenance (repairs, repairs) by nature less repetitive. As a result: - in general, these administrative operations are not carried out 25 or are carried out only very partially, - more rarely, that these administrative operations are performed fairly satisfactorily, but for an administrative cost that appears very quickly prohibitive and generally leads to a reduction in the level of preparation.
La charge administrative augmente avec l'âge et l'étendue du parc à maintenir, et les services administratifs , en effectif constant ou en réduction d 'effectif, sont de plus en plus incapables à faire une préparation et un ordonnancement efficace de la maintenance. The administrative burden increases with the age and the size of the park to be maintained, and the administrative services, in constant strength or reduction of staff, are more and more incapable of making an effective preparation and scheduling of the maintenance.
En outre, le donneur d'ordre n'a pas les moyens pour pilo- ter efficacement la co-traitance partielle ou totale de ses équipements. In addition, the client does not have the means to effectively manage the partial or total co-contracting of his equipment.
Il en résulte que chaque opération de maintenance corrective est gérée de façon individuelle en fonction de l'urgence, avec un contrôle de la disponibilité matière et une sortie magasin associée. Le mode du dépannage urgent tend ainsi à se généraliser avec ses conséquences l'absence de visibilité sur les ressources à mettre en oeuvre (pièces, hommes, outils, documentation, finances, ... ), - une gestion des réparations à très court terme strictement pilotée par l'urgence, - des problèmes de manquants et de sur-stocks, - l'allongement du temps de réparation (baisse de productivité), - l'allongement du délai de réparation par report permanent des opéra- 10 Lions correctives non urgentes, - le risque d'allongement du temps d'immobilisation de l'équipement en maintenance, notamment dans le cas d'opérations sécuritaires ou d'opérations redonnant le taux de rendement nominal, l'augmentation des risques au plan sécuritaire lié à l'augmentation du 15 nombre de réparations non encore effectuées, - le risque d'arrêt non programmé de l'équipement dû au manque de pertinence des opérations de maintenance prétendue et/ou au retard de traitement des ordres de maintenance, - en conséquence, l'augmentation des coûts de maintenance, 20 et plus généralement une dégradation de l'ensemble des indicateurs de maintenance (cf norme P X 60-020). As a result, each corrective maintenance operation is managed individually according to the urgency, with a material availability check and an associated warehouse output. The mode of urgent troubleshooting tends to become widespread with its consequences the lack of visibility on the resources to implement (parts, men, tools, documentation, finances, ...), - a management of repairs in the very short term strictly driven by the urgency, - problems of missing and over-stocks, - longer repair time (decrease of productivity), - longer repair time by permanent postponement. urgent, - the risk of prolonging the downtime of maintenance equipment, particularly in the case of security operations or operations giving back the nominal rate of return, the increased security risks associated with increase in the number of repairs not yet carried out, the risk of unscheduled shutdown of the equipment due to the lack of relevance of the alleged maintenance operations and / or the delay in the processing of orders maintenance, - consequently, the increase in maintenance costs, 20 and more generally a degradation of all the maintenance indicators (see standard P X 60-020).
But de l'invention La présente invention a pour but de développer un système de maintenance automatisée autoconvergent permettant de traiter la maintenance d'équipements complexes et de volumétrie importante de façon efficace, et notamment de programmer très en avance les opérations de maintenance en fonction de la disponibilité des équipements, d'éviter la gestion de réparation à court terme effectuée dans l'urgence, éviter les problèmes d'approvisionnement ou de stocks excessifs, de raccourcir le temps de réparation et d'améliorer la productivité, d'éviter le risque d'allongement du temps d'immobilisation et, plus généralement, de traiter les problèmes de risques sécuritaires liés à l'augmentation du nombre de réparations non effectuées au moment où elles devraient l'être et encore plus généralement, de réduire globalement le coût de la maintenance tout en améliorant son efficacité. OBJECT OF THE INVENTION The object of the present invention is to develop an autoconvergent automated maintenance system making it possible to process the maintenance of complex and large volumetric equipment in an efficient manner, and in particular to schedule the maintenance operations as a function of the availability of equipment, avoid short-term repair management performed in a hurry, avoid supply problems or excessive inventory, shorten repair time and improve productivity, avoid risk longer downtime and, more generally, to deal with security risk issues related to the increase in the number of repairs not made when they should be and, more generally, to reduce the overall cost of repairs. maintenance while improving its efficiency.
A cet effet, l'invention concerne un système de maintenance du type défini ci-dessus caractérisé en ce qu'à partir de l'état initial de l'équipement et des caractéristiques de maintenance de ses composants, le système exécute le traitement des opérations très urgentes, - détermine automatiquement un plan de maintenance définissant, pour 5 chaque composant, les opérations de maintenance définies chacune par. For this purpose, the invention relates to a maintenance system of the type defined above, characterized in that from the initial state of the equipment and the maintenance characteristics of its components, the system executes the processing of the operations. very urgent, - automatically determines a maintenance plan defining, for each component, the maintenance operations each defined by.
* la date, * les moyens de maintenance et les conditions de maintenance, * le temps standard de réalisation et la description des opérations à 10 effectuer, * le lot de matériel pour l'opération, - contrôle la faisabilité du plan de maintenance au niveau long, moyen et court terme pour établir un plan de maintenance exécutoire en contrôlant la disponibilité des ressources, des moyens lourds, des piè- ces de rechange, et des outillages, - compose les lots de matériel pour chaque opération. the date, the means of maintenance and the maintenance conditions, the standard time for completion and the description of the operations to be performed, the batch of equipment for the operation, the feasibility of the maintenance plan at the level of long, medium and short term to establish an enforceable maintenance plan by controlling the availability of resources, heavy resources, spare parts, and tools; - composes batches of equipment for each operation.
En particulier, le système selon l'invention comprend une installation d'aide au diagnostic. In particular, the system according to the invention comprises a diagnostic assistance facility.
Suivant une autre caractéristique intéressante, le système effectue l'opération à la date avec le lot puis il optimise de façon automatique et convergente le plan de maintenance et il prend en compte les opérations d'industrialisation de la maintenance. According to another interesting feature, the system performs the operation on the date with the batch then it optimizes automatically and convergent maintenance plan and it takes into account the operations of industrialization of maintenance.
Suivant une autre caractéristique intéressante, le système effectue l'opération à la date avec le lot puis il optimise de façon automati- que et convergente le plan de maintenance et il prend en compte les opérations de modification / modernisations de l'équipement. According to another interesting characteristic, the system performs the operation on the date with the batch and then optimizes the maintenance plan automatically and convergently and takes into account the modification / modernization operations of the equipment.
L'invention permet ainsi de déterminer automatiquement les opérations à effectuer à des instants donnés pour éviter toute surprise et malfaçon des opérations de maintenance et surtout pour éviter que cel- les-ci ne soient pas faites ou que leur exécution soit repoussée, entraînant d'éventuelles difficultés de fonctionnement liées à des pannes et, par suite, arrêt de l'équipement. The invention thus makes it possible to automatically determine the operations to be performed at given times to avoid any surprise and malfunction of the maintenance operations and especially to prevent them from being made or their execution being pushed back, resulting in possible operational difficulties related to breakdowns and, consequently, equipment shutdown.
Le système réduit progressivement le nombre d'opérations très urgentes pour arriver à un très faible nombre de telles interventions exceptionnelles ce qui évite d'avoir à repousser de plus en plus les inter-ventions normales. Or, la bonne exécution de ces dernières évite les inter-ventions d'urgence ou du moins en réduit considérablement le nombre. The system gradually reduces the number of very urgent operations to arrive at a very small number of such exceptional interventions which avoids having to push back more and more normal interventions. However, the proper execution of the latter avoids emergency interventions or at least greatly reduces the number.
Le système permet de déterminer de façon très anticipée et automatique les interventions à effectuer. Ainsi, tout signalement est pris en compte immédiatement pour caractérisé sa cause et le mode d'intervention à préparer ainsi que les moyens à mettre en oeuvre. The system makes it possible to determine in a very anticipated and automatic manner the interventions to be performed. Thus, any report is taken into account immediately to characterize its cause and the mode of intervention to be prepared as well as the means to implement.
De façon générale, l'équipement concerné peut être une flotte de véhicules tel qu'un ensemble de trains et de convois ferroviaires, une flotte de véhicules routiers ou autres installations industrielles de transport ou de fabrication telle qu'une chaîne de fabrication puisque toute fabrication industrielle combine des opérations de conceptions, d'usinage et de transport entre les postes d'usinage et que ces différents moyens, devant fonctionner en coopération, nécessitent un système de maintenance pratiquement intégré à l'installation. Le système selon l'invention permet l'exécution des opérations dans un délai minimum et de manière planifiée, c'est-à-dire pendant les temps morts, contrairement à des opérations rendues nécessaires par une défaillance d'une machine provoquant son arrêt et nécessitant l'intervention immédiate sans préparation, et entraînant l'arrêt d'installations en amont et surtout en aval. In general, the equipment concerned may be a fleet of vehicles such as a set of railway trains and convoys, a fleet of road vehicles or other industrial transport or manufacturing facilities such as a production line since any manufacturing industrial combines design, machining and transport operations between the machining stations and that these different means, which must operate in cooperation, require a maintenance system that is practically integrated into the installation. The system according to the invention allows the execution of operations in a minimum time and in a planned manner, that is during idle time, unlike operations made necessary by a failure of a machine causing it to stop and requiring immediate intervention without preparation, and leading to the shutdown of facilities upstream and especially downstream.
Le système de maintenance s'adapte automatiquement aux informations recueillies au fur et à mesure de l'évolution de l'équipement. The maintenance system automatically adapts to the information collected as the equipment evolves.
Ainsi, le système modifie le plan de maintenance du composant en fonction des informations en retour concernant ce composant, recueillies lors de l'opération. Thus, the system modifies the maintenance plan of the component according to the feedback information concerning this component, collected during the operation.
Suivant une autre caractéristique avantageuse, on modifie le plan de maintenance du composant en fonction d'informations extérieu-25 res relatives à ce composant, fournies indépendamment d'une opération effectuée sur ce composant. According to another advantageous characteristic, the maintenance plan of the component is modified as a function of external information relating to this component, provided independently of an operation performed on this component.
Le système de l'invention est particulièrement remarquable par sa dimension autoconvergente car, à partir du module de gestion des récurrences, il déclenche la génération et la mise à jour des phases normales d'industrialisation des opérations, les études de modification de l'équipement et les études de modernisation de l'équipement. The system of the invention is particularly remarkable for its self-locking dimension because, starting from the recurrence management module, it triggers the generation and updating of the normal phases of industrialization of the operations, the equipment modification studies. and equipment modernization studies.
De façon générale, le système comprend A- une installation de dépannage de capture et de traitement de l'état de l'équipement ayant - une installation de dépannage rapide destinée au traitement des opérations urgentes, - une installation d'aide au diagnostic, - un collecteur d'informations pour le recueil des données de l'état de l'équipement, une installation d'analyse de ces données pour en déduire les besoins de maintenance, - une centrale de détection et de gestion des redondances, une centrale de gestion des récurrences, B- une installation centrale de planification/ préparation ayant - une installation disposant d'un programme d'assistance, de moyens de calcul P et d'une banque de données pour établir la nature des opérations à effectuer sur le composant à une date calculée, en établissant notamment la gamme de maintenance nécessaire à l'exécution de l'opération, - une installation de planification recevant l'état initial de l'équipement pour établir le plan de maintenance, une installation de préparation de lots recevant des informations de l'installation de planification pour préparer des lots de matériel, à partir de la liste de matériel, C- une installation de stockage ayant des éléments de maintenance et recevant des instructions de l'installation de planification donnant la liste de 20 matériel pour la préparation des lots, D- une installation d'exécution des opérations ayant - au moins un périphérique de maintenance pour effectuer l'opération de maintenance sur l'équipement, ainsi qu'un contrôleur d'état générant les informations d'exécution de l'opération et les informations complémentaires d'état du composant, - un collecteur d'informations recevant les informations du contrôleur d'état pour les transmettre à l'installation de planification de l'installation centrale, E- une installation de mesure des performances de l'équipement et de sa 30 maintenance composée: - d'une unité de traitement de la vie de l'équipement (traçabilité, etc) - d'une installation de contrôle / commande du taux d'utilisation en mode opérationnel et dégradé de l'équipement ainsi que des temps d'arrêt de l'équipement, de la charge de maintenance et de sa réduction dans le temps, du volume de pièces de rechange consommées et de sa réduction dans le temps en liaison avec la centrale de gestion des récurrences, du coût global de la maintenance de l'équipement et de son optimisation dans le temps, selon une décomposition multicritère. In general, the system comprises A- a system for troubleshooting the capture and treatment of the state of the equipment having - a quick troubleshooting facility for the treatment of urgent operations, - a facility for diagnostic assistance, - an information collector for collecting equipment status data, an installation for analyzing this data in order to deduce maintenance requirements, - a redundancy detection and management center, a management center recurrences, B- a central planning / preparation facility having - an installation having an assistance program, calculation means P and a database for establishing the nature of the operations to be performed on the component at a calculated date, establishing in particular the range of maintenance necessary for the execution of the operation, - a planning installation receiving the initial state of the equipment for read the maintenance plan, a batch preparation facility receiving information from the planning facility to prepare batches of equipment, from the hardware list, C- a storage facility having maintenance elements and receiving planning facility instructions listing the batch preparation material, D- an operation execution facility having - at least one maintenance device for performing the maintenance operation on the equipment, and a state controller generating the operation execution information and the component status information; - an information collector receiving the state controller information for transmission to the plant planning facility; the central installation, E- a facility for measuring the performance of the equipment and its maintenance consisting of: - a processing unit of the equipment life (traceability, etc.) - of a control / command system of the utilization rate in operational and degraded mode of the equipment as well as downtime of the equipment, the load maintenance and reduction over time, the volume of spare parts consumed and its reduction over time in connection with the recurrence management unit, the overall cost of maintenance of the equipment and its optimization in the field. time, according to a multi-criteria decomposition.
Suivant une autre caractéristique, l'installation d'industrialisation comprend: - une installation de planification en relation avec l'installation de planification / préparation, - une installation d'exécution des dossiers d'industrialisation à partir des informations fournies par la centrale de gestion des récurrences, - une installation de contrôle / commande des opérations d'industrialisation en rétroaction pour optimiser son efficacité. According to another characteristic, the industrialization installation comprises: a planning installation in connection with the planning / preparation facility; an installation for executing industrialization files based on the information provided by the central management unit; recurrences, - a control / control facility for industrialization operations in feedback to optimize its efficiency.
Selon l'invention, le système comprend une installation de modification / modernisations de l'équipement comprenant: - une installation de planification coopérant avec la banque de don-nées des équipements, une installation d'exécution des dossiers de modification et de modernisation des équipements, - une installation de contrôle / commande des opérations de modifi- cation / modernisations en rétroaction pour optimiser l'efficience. According to the invention, the system comprises an equipment modification / modernization installation comprising: a planning facility cooperating with the equipment data bank, a facility for executing equipment modification and modernization files; - a control / control facility for feedback / modification operations in order to optimize efficiency.
Suivant une autre caractéristique, le lot de matériel corn-20 prend le matériel, la documentation et l'outillage spécial pour exécuter l'opération. According to another feature, the corn-20 hardware package takes the hardware, documentation and special tools to perform the operation.
Les lots de matériel préparés sont habituellement les pièces de rechange servant au remplacement du sous-ensemble existant de l'équipement ou à sa réparation partielle ainsi que l'outillage spécial pour exécuter l'opération et la procédure pour exécuter l'opération, c'est-à- dire la documentation. Mais, selon l'invention, on réalise des lots d'industrialisation pour un composant sur lequel on intervient ou encore des lots de modification / modernisation pour remplacer un composant ou groupe de composants par un autre composant ou autre groupe de cornposants. Batches of prepared material are usually replacement parts used to replace the existing subset of the equipment or its partial repair as well as special tools to perform the operation and procedure to perform the operation; that is the documentation. However, according to the invention, industrialization batches are produced for a component on which intervention is carried out or else modification / modernization batches for replacing a component or group of components with another component or another group of components.
Suivant une autre caractéristique, on réalise des dossiers d'industrialisation et des lots d'industrialisation pour un composant. According to another characteristic, industrialization files and industrialization batches for a component are produced.
Les lots d'industrialisation comprennent les outillages, banc de test, et tous les équipements nécessaires à l'industrialisation d'une opération de maintenance déclenchée par le système. Industrialization lots include tooling, test bench, and all equipment necessary for the industrialization of a maintenance operation triggered by the system.
Suivant une autre caractéristique, on réalise des dossiers de modernisation et des lots de modernisation pour un composant ainsi que des dossiers de modification et des lots de modification pour un composant. According to another characteristic, modernization files and upgrade packages for a component are produced as well as modification files and modification packages for a component.
Les lots de modification et de modernisation fournissent les pièces de rechange et les outillages permettant de réaliser les opérations 5 de modification / modernisations déclenchées par le système. The modification and modernization batches provide the spare parts and tools for performing the modification / modernization operations triggered by the system.
Enfin, le système comprend une centrale de détection et de gestion des redondances et une centrale de gestion des récurrences. Finally, the system includes a redundancy detection and management center and a recurrence management center.
La centrale de détection et de gestion des redondances identifie automatiquement les signalements multiples ayant trait à un équivalent donné et à un équipement donné et à une défaillance donnée puis élimine les signalements redondants. The redundancy detection and management center automatically identifies multiple reports related to a given equivalent and equipment and a given failure and eliminates redundant reports.
La centrale de gestion des récurrences identifie les opérations de maintenance répétitives sur un même équipement ou système puis commande la réalisation du dossier de modification ou de moderni- sation pour toute la flotte d'équipements. The recurrence management center identifies repetitive maintenance operations on the same equipment or system and then orders the modification or upgrading file for the entire fleet of equipment.
Dessins La présente invention sera décrite ci-après de manière plus détaillée à l'aide d'exemples de réalisation de systèmes de maintenance automatisés selon l'invention représentés dans les dessins annexés dans lesquels: - la figure 1 est un schéma général du système de l'invention, la figure 2 est un schéma plus détaillé du système de maintenance selon la figure 1, la figure 3 est un schéma du système de maintenance selon l'invention 25 décrivant précisément les opérations d'autoconvergence déclenchées par l'installation d'industrialisation, - la figure 4 montre le système de maintenance selon l'invention décrivant particulièrement les opérations d'autoconvergence déclenchées par l'installation de modification / modernisation. Drawings The present invention will be described hereinafter in more detail with the aid of embodiments of automated maintenance systems according to the invention shown in the accompanying drawings in which: - Figure 1 is a general diagram of the system of FIG. 2 is a more detailed diagram of the maintenance system according to FIG. 1, FIG. 3 is a diagram of the maintenance system according to the invention precisely describing the self-locking operations triggered by the installation of FIG. industrialization, - Figure 4 shows the maintenance system according to the invention particularly describing the autoconvergence operations triggered by the installation of modification / modernization.
Description de modes de réalisation Description of embodiments
Selon la figure 1, l'invention concerne un système auto- convergent de maintenance d'un équipement complexe à forte volumétrie. According to FIG. 1, the invention relates to a self-converging system for the maintenance of complex equipment with a large volume.
Ce système de maintenance s'applique à un équipement E formé de composants Ej ayant, à un instant donné, un état Eji. L'état initial de l'équipement EIE et les caractéristiques de maintenance de ses composants Ej sont définis selon les règles et méthodes industrielles habituelles. This maintenance system applies to an equipment E formed of components Ej having, at a given instant, a state Eji. The initial state of the EIE equipment and the maintenance characteristics of its components Ej are defined according to the usual industrial rules and methods.
A partir de ces informations INF-Ej, le système calcule un plan de maintenance PM en déterminant, pour chaque composant Ej, des opérations de maintenance OPji. Chacune de ces opérations est définie par la date Tji à laquelle elle doit être effectuée, la nature de l'opération à effectuer NOji et la liste de matériel Lji nécessaire pour cette opération. From this information INF-Ej, the system calculates a maintenance plan PM by determining, for each component Ej, OPji maintenance operations. Each of these operations is defined by the date Tji at which it must be performed, the nature of the operation to be performed NOji and the list of hardware Lji necessary for this operation.
Selon l'invention, la détection puis la préparation de l'opération est réalisée suffisamment à l'avance pour que l'opération ne doive pas être faite dans des conditions d'urgence comme dans la pratique actuelle. La nature des opérations à effectuer NOji est définie selon les caractéristiques de maintenance des composants, c'est-à-dire le cycle de remplacement partiel ou total de tel ou tel composant de l'équipement. According to the invention, the detection and the preparation of the operation is carried out sufficiently in advance so that the operation does not have to be made under emergency conditions as in the current practice. The nature of the operations to be performed NOji is defined according to the maintenance characteristics of the components, that is to say the cycle of partial or total replacement of this or that component of the equipment.
La liste Lji des matériels nécessaires pour l'opération OPji comprend, outre le matériel de maintenance Mji, les moyens nécessaires à l'exécution de l'opération tels que l'outillage spécial OSji ainsi qu'une documentation DOji, avec la procédure pour l'exécution de l'opération. The list Lji of the materials necessary for the operation OPji includes, in addition to the maintenance material Mji, the means necessary for the execution of the operation such as the special tooling OSji as well as a documentation DOji, with the procedure for the execution of the operation.
A partir de la liste Lji de l'opération OPji, une installa tion I-K compose des lots de matériel Kji pour chaque opération OPji à effectuer. Ces lots Kji sont préparés en fonction de la date à laquelle l'opération Tji doit être effectuée; ils comprennent également les outillages spéciaux OSji pour l'exécution de l'opération, à l'exclusion de l'outillage habituel, disponible et la documentation et la procédure d'exécution DOji. From the list Lji of the operation OPji, an installation I-K composes lots of Kji material for each OPji operation to perform. These Kji batches are prepared according to the date on which the operation Tji must be performed; they also include OSJ special tools for the execution of the operation, excluding the usual tools, available and the DOji documentation and execution procedure.
Les lots Kji sont fournis à l'installation I-EO exécutant l'opération OPji. Cette installation ou plus généralement les moyens effectuant l'intervention reçoivent éventuellement directement les informations concernant l'opération à effectuer et, en particulier, la définition globale de l'opération OPji avec la date d'exécution Tji, la liste des pièces Lji nécessaires à l'opération et la nature des opérations à effectuer de manière à permettre la vérification par avance de la réception des lots et leur préparation en vue de l'opération, par exemple l'intégration des lots dans l'installation effectuant les opérations IEO. Kji batches are provided at the I-EO facility running the OPji operation. This installation or, more generally, the means performing the intervention may receive directly the information concerning the operation to be performed and, in particular, the global definition of the operation OPji with the execution date Tji, the list of the pieces Lji necessary to the operation and the nature of the operations to be carried out so as to allow the advance verification of the receipt of the batches and their preparation for the operation, for example the integration of the batches in the installation performing the IEO operations.
Selon une caractéristique avantageuse du système, pour en augmenter l'efficacité et tenir compte de paramètres évoluant dans le temps et d'une manière difficilement prévisible, le système modifie le plan de maintenance PE d'un composant Ej en fonction des informations en retour IRji relatives à ce composant Ej via les installations d'industrialisation I-IND, de modification I-MOD et de modernisa tion I-MOL. According to an advantageous characteristic of the system, in order to increase the efficiency thereof and to take account of parameters that change over time and in a manner that is difficult to predict, the system modifies the maintenance plan PE of a component Ej as a function of the feedback information. relating to this component Ej via I-IND industrialization, I-MOD modification and I-MOL modernization plants.
Ces informations en retour I-Rji sont captées ou introduites au moment de l'exécution de l'opération de maintenance OPji sur l'équipement Eji (équipement Ej à un instant donné i). This feedback information I-Rji are captured or introduced at the time of performing the maintenance operation OPji on the equipment Eji (equipment Ej at a given time i).
Ces informations permettent, par exemple, de modifier et notamment de réduire la fréquence de remplacement d'un composant suivant l'évolution de l'usure de celui-ci, toujours en fonction de paramètres imprévisibles, ou difficiles à prévoir ou dont la prévision précise n'a pu être faite initialement. Dans ces conditions, le système est intelligent et auto-évolutif puisqu'il intègre les informations recueillies à chaque instant pour évoluer et être en permanence mis à jour. This information makes it possible, for example, to modify and in particular to reduce the frequency of replacement of a component according to the evolution of the wear thereof, always according to unpredictable parameters, or difficult to predict or whose precise prediction could not be done initially. Under these conditions, the system is intelligent and self-evolving since it integrates the information collected at each moment to evolve and be constantly updated.
Il est également possible de modifier le plan de maintenance PE du composant Ej en fonction d'informations extérieures INF-EXj concernant ce composant et fournies indépendamment d'une opération d'entretien OPji, par une source extérieure INF-EX. Ces informations et mises à jour peuvent résulter de nouveaux procédés de fabrication de pièces entrant dans le lot des pièces d'entretien pour le composant et qui, par suite, permettent un ré-échelonnement du programme de remplacement des pièces soit par un allongement de l'intervalle entre deux interventions soit par une simplification de l'opération, une modification de l'outillage ou l'utilisation d'un outillage non spécialisé et plus généralement une modification et simplification de la procédure d'exécution de l'opération de maintenance. It is also possible to modify the maintenance plan PE of the component Ej according to external information INF-EXj concerning this component and provided independently of a maintenance operation OPji, by an external source INF-EX. This information and updates may result from new processes for the manufacture of parts that are part of the maintenance part lot for the component and that, as a result, allow for a re-scaling of the part replacement program by either lengthening the part interval between two interventions either by a simplification of the operation, a modification of the tooling or the use of non-specialized tools and more generally a modification and simplification of the procedure of execution of the maintenance operation.
La figure 2 montre un schéma plus détaillé d'un système de maintenance selon l'invention. Figure 2 shows a more detailed diagram of a maintenance system according to the invention.
Ce système se compose d'une installation centrale I-C ayant une installation de planification I-P qui établit le plan de maintenance PE de l'équipement E/Ej. Cette installation comprend des moyens de cal- cul P, une base de données BD et des programmes de planifica tion PR-PL. This system consists of an I-C central facility with an I-P planning facility that establishes the PE maintenance plan of the E / Ej equipment. This installation comprises calculation means P, a database BD and planning programs PR-PL.
La base de données BD contient l'état de l'équipement Ej et les programmes de planification PR-PL se composent des programmes de planification des opérations de maintenance et de renouvellement des composants Ej de l'équipement E. Cette base de données BD reçoit les informations initia-les INF-Ej de la source d'informations EIE de l'état initial de l'équipement traite les redondances et détermine les fréquences d'apparition d'une défaillance. The database BD contains the state of the equipment Ej and the scheduling programs PR-PL consist of the scheduling programs of maintenance operations and renewal of the components Ej of the equipment E. This database BD receives the initial information INF-Ej of the EIE information source of the initial state of the equipment processes the redundancies and determines the frequencies of appearance of a failure.
Dans un système selon l'invention, les redondances correspondent à l'émission de plusieurs signalements pour une seule et même panne. Cette émission provient de capteurs distincts qui détectent tous un signe éventuellement différent mais ayant pour origine la même panne ou défaillance. In a system according to the invention, the redundancies correspond to the transmission of several reports for a single failure. This emission comes from separate sensors that all detect a possibly different sign but having originated the same failure or failure.
Une récurrence selon la présente invention est la répétition d'une même panne. A recurrence according to the present invention is the repetition of the same failure.
Selon l'invention, le système se compose d'une installation de démarrage, de capture et de traitement I-DCT de l'état de l'équipement. Cette installation recueille les données d'état de l'équipement par l'intermédiaire d'un collecteur d'informations CI-DCT. Elle réalise les de-mandes d'intervention grâce à l'aide du diagnostic I-AD et effectue les dé- pannages rapides pour le traitement des opérations urgentes. According to the invention, the system consists of a start-up, capture and I-DCT processing of the state of the equipment. This facility collects equipment status data through a CI-DCT information collector. It carries out the intervention requests thanks to the help of the I-AD diagnosis and performs the rapid disassembly for the treatment of urgent operations.
Cette installation a également pour caractéristique avantageuse le déduction des besoins de maintenance par un système d'analyse I-AS, la détection des redondances avec la centrale (CDGR) et l'identification et la gestion des récurrences avec la centrale (CGR). Another advantage of this installation is the deduction of maintenance requirements by an I-AS analysis system, the detection of redundancies with the plant (CDGR) and the identification and management of recurrences with the plant (CGR).
L'installation centrale I-C comprend également une installation de préparation de lots I-K, qui prépare les lots de maintenance Kji. The I-C central facility also includes an I-K batch preparation facility, which prepares Kji maintenance batches.
L'installation centrale IC est reliée à la source d'informations EIE de l'état initial de l'équipement, à l'installation de stockage I-ST et à l'installation de transport I-T pour le transfert des lots Kji. The central plant IC is connected to the EIE information source of the initial state of the equipment, to the I-ST storage facility and to the I-T transport facility for the transfer of Kji lots.
Lorsque la nature NOji de l'opération OPji est calculée, la liste Lji est transmise à l'installation de stockage I-ST pour que celle-ci prépare les objets de la liste et les transmette à l'installation I-K. Les informations relatives à l'opération OPji sont également transmises directement par l'installation I-P à l'installation d'exécution I-EO. When the nature NOji of the operation OPji is calculated, the list Lji is transmitted to the storage facility I-ST so that it prepares the objects of the list and transmits them to the installation I-K. Information about the OPji operation is also passed directly from the I-P facility to the I-EO runtime facility.
L'installation de stockage I-ST dispose de la documentation DO, de l'outillage spécial OS et du matériel M nécessaires à la réalisation de lots Kji. The I-ST storage facility has the DO documentation, the special OS tooling and the M hardware needed to make Kji batches.
L'installation centrale I-C reçoit les informations en retour I-Rji de l'installation I-EO qui exécute les opérations de maintenance. The central I-C facility receives the I-Rji feedback information from the I-EO facility that performs the maintenance operations.
L'installation I-EO reçoit les composants Eji qui doivent subir une opération OPji à la date Tji. Cette installation I-EO se compose de périphériques de maintenance PPH-M équipés d'un contrôleur d'état de maintenance C-EM ainsi que d'un collecteur d'informations C-I. Les périphériques de maintenance sont gérés par le collecteur d'informations qui planifie les opérations et leur déroulement ainsi que leur bonne exécution. Le collecteur d'informations C-I recueille également les informations sur l'état des composants Ej par exemple avant et après l'intervention. A partir de ces informations, le collecteur établit les informations en retour IRji permettant de mettre à jour la base de données BD et servir avec les pro-grammes de planification, à modifier la planification des opérations OPji en fonction de l'évolution des composants Ej et de la fréquence des opérations de maintenance que ceuxci nécessitent. The I-EO installation receives the components Eji which must undergo an operation OPji on the date Tji. This I-EO installation consists of PPH-M maintenance devices with a C-EM maintenance status monitor and a C-I information collector. The maintenance devices are managed by the information collector which schedules the operations and their progress as well as their good execution. The information collector C-I also collects information on the state of the components Ej for example before and after the intervention. From this information, the collector establishes the IRji feedback information to update the database BD and serve with the planning programs, to modify the OPji operations planning according to the evolution of the components Ej and the frequency of the maintenance operations that they require.
A partir des ordres d'exécution de l'installation de planification I-P, les installations d'industrialisation I-IND, de modification I-MOD et de modernisation I-MOL permettent de faire converger le système de maintenance. From the I-P planning plant's implementation orders, the I-IND industrialization, I-MOD modification and I-MOL modernization facilities make it possible to converge the maintenance system.
Ainsi et comme déjà indiqué, le système réduit progressivement le nombre d'opérations très urgentes, évitant d'avoir à repousser de manière cumulée les interventions normales dont l'inexécution entraîne à son tour la nécessité d'autres interventions d'urgences qui s'accumuleraient jusqu'au blocage total. Thus, and as already indicated, the system progressively reduces the number of very urgent operations, avoiding having to postpone cumulated normal interventions whose non-performance in turn causes the need for other emergency interventions that accumulate until total blockage.
Contrairement à cette situation, l'invention réduit progres-15 sivement le nombre d'interventions d'urgence jusqu'au minimum incompressible. In contrast to this situation, the invention progressively reduces the number of emergency interventions to the incompressible minimum.
La figure 3 montre un schéma du système de maintenance selon l'invention en détaillant l'installation d'industrialisation. Ce système de maintenance comporte outre les installations déjà décrites à l'aide de la figure 2, un pilote de disponibilité P-DISPO relié à l'installation de planification I-P. Il est aussi relié à des sources d'informations extérieures telles que l'état de l'équipement E-E et une source signalant les besoins d'équipement B-E. En fonction de ces différentes informations transmises à l'installation de planification I-P, cette dernière établit un programme de maintenance PM tenant compte en fonction de la disponibilité de l'équipement ou elle modifie ce programme de maintenance. Figure 3 shows a diagram of the maintenance system according to the invention detailing the industrialization installation. This maintenance system comprises, in addition to the installations already described with reference to FIG. 2, a P-DISPO availability driver connected to the I-P planning installation. It is also connected to external information sources such as the state of the E-E equipment and a source signaling the B-E equipment requirements. Based on these different information transmitted to the I-P planning facility, the latter establishes a PM maintenance program that takes into account the availability of the equipment or modifies this maintenance program.
L'installation de dépannage, de capture et de traitement (I-DCT) comporte, entre autre, une centrale de gestion de récurrence. The troubleshooting, capture and processing (I-DCT) installation includes, among other things, a recurrence management unit.
Cette centrale de gestion de récurrence CGR enregistre l'historique des évènements et des interventions pour exploiter leur fréquence et leur répétition et faciliter l'auto-apprentissage du système. This CGR recurrence management system records the history of events and interventions to exploit their frequency and repetition and to facilitate self-learning of the system.
A partir des ordres d'exécution de l'installation de planification I-P, l'installation d'industrialisation I-IND assure l'autoconvergence du système de maintenance de l'équipement. From the execution orders of the I-P planning installation, the I-IND industrialization installation ensures the self-maintenance of the equipment maintenance system.
L'installation d'industrialisation I-IND comprend: une installation de planification I-IND-P qui programme à moyen et court terme la réalisation des dossiers d'industrialisation en fonction des informations fournies par la centrale de gestion des récurrences CGR et sous pilotage de l'installation centrale I-C, - une installation d'exécution des dossiers d'industrialisation I-IND-D qui conçoit les kits d'industrialisation K-Iji dans le but de réduire le 5 temps de maintenance, - une installation de contrôle / commande I-IND-CC qui contrôle la réduction effective des temps de maintenance des opérations industrialisées et lance les corrections des dossiers d'industrialisation lorsque nécessaire. The I-IND industrialization installation includes: an I-IND-P planning facility which programs in the medium and short term the realization of the industrialization files according to the information provided by the CGR recurrence management center and under piloting of the IC central installation, - an I-IND-D industrialization folder execution facility which designs the K-Iji industrialization kits with the aim of reducing the maintenance time, - a control installation / I-IND-CC control which controls the effective reduction of the maintenance times of the industrialized operations and launches the corrections of the files of industrialization when necessary.
1a L'installation centrale I-C prépare des lots d'industrialisation K-Iji en plus des lots de maintenance K-Mji à destination de l'installation de maintenance I-EO. Les lots d'industrialisation K-Iji sont transmis à cette installation qui, outre, les périphériques de mainte- nance PPH-M comporte également des périphériques d'industrialisation PPH- I. Le collecteur d'informations C-I recueille les in-formations des périphériques de maintenance et celles du ou des périphériques d'industrialisation PPH-I. 1a The I-C central facility prepares K-Iji industrialization batches in addition to the K-Mji maintenance batches for the I-EO maintenance facility. The K-Iji industrialization batches are sent to this plant which, in addition, the PPH-M maintenance peripherals also includes PPH-I industrial peripherals. The CI information collector collects the peripheral information. maintenance and those of the peripheral devices PPH-I industrialization.
La figure 4 montre le système de maintenance selon l'invention, qui outre les moyens déjà décrits pour le système de mainte- nance de la figure 3, prépare, à partir d'informations et d'études de com- posants nouveaux INF-CN, des lots de modification et de modernisation K-MOji; l'installation d'exécution des opérations IEO comporte des péri- phériques de modernisation PPH-MO pour remplacer les composants de type ancien Eji par des composants de conception nouvelle ENji. Les com- posants nouveaux ENji, étudiés et fabriqués sont disponibles dans l'installation de stockage I-ST et sont formés pour composer des lots de modernisation utilisés dans les conditions fixées par l'installation de pla- nification I-P. Selon une caractéristique avantageuse du système, pour en augmenter l'efficacité en réduisant les défaillances de l'équipement, le système commande des dossiers de modification à partir des informations fournies par la centrale de gestion des récurrences CDR. FIG. 4 shows the maintenance system according to the invention, which, in addition to the means already described for the maintenance system of FIG. 3, prepares, based on information and new component studies INF-CN , K-MOji modification and modernization packages; the IEO runtime installation includes PPH-MO upgrade peripherals to replace old Eji components with new ENji design components. The new ENji components, designed and manufactured, are available in the I-ST storage facility and are designed to form upgrade packages used under the conditions set by the I-P planning facility. According to an advantageous characteristic of the system, in order to increase its efficiency by reducing equipment failures, the system orders modification files from the information provided by the CDR recurrence management unit.
L'installation de modification I-MOD comporte - une installation de planification I-MOD-P qui programme à long, moyen et court terme, la réalisation des dossiers de modifications en fonction des informationsfournies par la centrale de gestion des récurrences et sous pilotage de l'installation centrale I-C, - une installation d'exécution des dossiers de modifications 1-MOD-D qui conçoit les kits de modification K-MOji dont le but est de réduire les défaillances, - une installation de contrôle commande des opérations de modifications I- MOD-CC en rétroaction pour augmenter l'efficacité. The I-MOD modification facility includes - a planning facility I-MOD-P which programs in the long, medium and short term, the realization of the modification files according to the information provided by the recurrence management center and under control of the IC central facility, - a 1-MOD-D change folder execution facility that designs K-MOji change kits to reduce failures, - a control facility for change operations I - MOD-CC in feedback to increase efficiency.
Selon une autre caractéristique avantageuse du système, pour en augmenter l'efficacité en garantissant le fonctionnement à l'état nominal de l'équipement pendant toute sa durée de vie, le système commande des dossiers de modernisation à partir des informations recueillies par le système d'analyse I-AS. According to another advantageous characteristic of the system, in order to increase its efficiency by guaranteeing the operation at the nominal state of the equipment throughout its lifetime, the system controls modernization files on the basis of the information collected by the system. I-AS analysis.
L'installation de modernisation I-MOL comporte - une installation de planification I-MOL-P qui programme depuis le très long terme jusqu'au très court terme, la réalisation des dossiers de modernisations, - une installation d'exécution des dossiers de modernisation I-MOL-D qui conçoit les kits de modernisation K-MOji dans le but d'assurer le fonctionnement nominal sur toute la durée de vie de l'équipement, - une installation de contrôle commande des opérations de modernisation I- MOL-CC de rétroaction pour augmenter l'efficacité. The I-MOL modernization facility includes - an I-MOL-P planning facility which programs from the very long term to the very short term, the realization of the files of modernizations, - an installation of execution of the files of modernization I-MOL-D, which designs the K-MOji upgrade kits for the purpose of ensuring nominal operation over the entire service life of the equipment, - a control installation for I-MOL-CC modernization operations feedback to increase efficiency.
Selon l'invention, l'installation mesure les performances de l'équipement et de sa maintenance I-MP qui constituent un ensemble de compteurs nécessaires aux fonctions d'autoconvergence. According to the invention, the installation measures the performance of the I-MP equipment and its maintenance which constitute a set of counters necessary for the autoconvergence functions.
Cette installation I-MP se compose d'une unité de traite- ment de la vie de l'équipement UTE qui trace l'ensemble des interventions 25 de maintenance depuis la mise en service de l'équipement ou de son sousensemble jusqu'à leur fin de vie. This I-MP installation consists of a unit for processing the life of the UTE equipment which traces all the maintenance operations from the commissioning of the equipment or its subassembly to their equipment. end of life.
L'installation I-MP comporte également une installation de contrôle / commande I-CCPERF qui effectue les mesures pour commander l'installation centrale I-C. The I-MP installation also includes an I-CCPERF control / command facility that performs measurements to control the I-C central plant.
Ces mesures concernent le taux d'utilisation en mode opérationnel et dégradé de l'équipement, les temps d'arrêt de l'équipement, la charge de maintenance et sa réduction dans le temps, le volume de pièces de rechange consommé et sa réduction dans le temps, le coût global de maintenance de l'équipement et son optimisation dans le temps selon une décomposition multicritère. These measures concern the rate of use in operational and degraded mode of equipment, equipment downtime, the maintenance load and its reduction over time, the volume of spare parts consumed and its reduction in time, the overall cost of maintenance of the equipment and its optimization over time according to a multi-criteria decomposition.
Claims (6)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0311655A FR2860609A1 (en) | 2003-10-06 | 2003-10-06 | Complex equipment maintenance plan self-convergent method, involves controlling feasibility of determined maintenance plan at long, short and medium term levels for establishing enforceable maintenance plan |
FR0404882A FR2860610B1 (en) | 2003-10-06 | 2004-05-06 | AUTOCONVERGENT SYSTEM FOR MAINTENANCE OF COMPLEX EQUIPMENT WITH HIGH VOLUMETRY |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0311655A FR2860609A1 (en) | 2003-10-06 | 2003-10-06 | Complex equipment maintenance plan self-convergent method, involves controlling feasibility of determined maintenance plan at long, short and medium term levels for establishing enforceable maintenance plan |
Publications (1)
Publication Number | Publication Date |
---|---|
FR2860609A1 true FR2860609A1 (en) | 2005-04-08 |
Family
ID=34307436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR0311655A Withdrawn FR2860609A1 (en) | 2003-10-06 | 2003-10-06 | Complex equipment maintenance plan self-convergent method, involves controlling feasibility of determined maintenance plan at long, short and medium term levels for establishing enforceable maintenance plan |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR2860609A1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0467257A2 (en) * | 1990-07-16 | 1992-01-22 | R.J. Reynolds Tobacco Company | Intelligent computer integrated maintenance system and method |
EP1178417A2 (en) * | 2000-07-21 | 2002-02-06 | Hitachi, Ltd. | Maintenance information management system and method of providing a maintenance plan |
US20030187530A1 (en) * | 2002-04-02 | 2003-10-02 | Miyako Hotta | Rotation planning apparatus and rotation planning system |
-
2003
- 2003-10-06 FR FR0311655A patent/FR2860609A1/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0467257A2 (en) * | 1990-07-16 | 1992-01-22 | R.J. Reynolds Tobacco Company | Intelligent computer integrated maintenance system and method |
EP1178417A2 (en) * | 2000-07-21 | 2002-02-06 | Hitachi, Ltd. | Maintenance information management system and method of providing a maintenance plan |
US20030187530A1 (en) * | 2002-04-02 | 2003-10-02 | Miyako Hotta | Rotation planning apparatus and rotation planning system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11775416B2 (en) | System and method for continuous testing and delivery of software | |
US8694196B1 (en) | Methods and systems for centrally managed maintenance program for aircraft fleets | |
US11645191B2 (en) | Review process for evaluating changes to target code for a software-based product | |
CA2690459C (en) | Remote monitoring systems and methods | |
US10339007B2 (en) | Agile re-engineering of information systems | |
US7206646B2 (en) | Method and apparatus for performing a function in a plant using process performance monitoring with process equipment monitoring and control | |
US9665090B2 (en) | Systems and methods for rule-based control system reliability | |
EP2085843B1 (en) | Method and system for analyzing performance of a wind farm | |
CN102622247B (en) | The BIOS information configuration-system of server and method | |
CN106161138A (en) | A kind of intelligence automatic gauge method and device | |
GB2440632A (en) | Method and tool for performing maintenance of components | |
US20140032470A1 (en) | Systems and methods for control reliability operations | |
US20150078178A1 (en) | Software platform for implementation and control of satellite communication systems | |
Exner et al. | Proactive maintenance as success factor for use-oriented Product-Service Systems | |
US20060116778A1 (en) | On-line statistical process control information system and method | |
US20120053979A1 (en) | Method of monitoring equipment/s over an installed base for improving the equipment design and performance | |
EP1281132A1 (en) | Centralised stochastic simulation method | |
KR101938946B1 (en) | Interface Middleware System for Collecting Mass Data and Method for Collecting Data of Interface Middleware System | |
Wolski et al. | Software quality model for a research‐driven organization—An experience report | |
KR101692470B1 (en) | Integrated Apparatus And Method For Engineering Process Implementation In Nuclear Power Plants | |
EP1489499A1 (en) | Tool and associated method for use in managed support for electronic devices | |
JP2023550706A (en) | Wireless network performance optimization system and method | |
FR2860609A1 (en) | Complex equipment maintenance plan self-convergent method, involves controlling feasibility of determined maintenance plan at long, short and medium term levels for establishing enforceable maintenance plan | |
FR2860610A1 (en) | Complex equipment e.g. fleet of road vehicle, maintenance plan self-convergent method, involves controlling feasibility of determined maintenance plan at long, short and medium term levels, for establishing enforceable maintenance plan | |
CN114119319A (en) | Intelligent water affair management method and system based on distributed small sample algorithm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ST | Notification of lapse | ||
AU | Other action affecting the ownership or exploitation of an industrial property right |