FR2844401A1 - Method for providing zone with two secure independent supply points, comprises continuous testing of three independent incoming supplies and switching on fault detection to secure supply points - Google Patents

Method for providing zone with two secure independent supply points, comprises continuous testing of three independent incoming supplies and switching on fault detection to secure supply points Download PDF

Info

Publication number
FR2844401A1
FR2844401A1 FR0210978A FR0210978A FR2844401A1 FR 2844401 A1 FR2844401 A1 FR 2844401A1 FR 0210978 A FR0210978 A FR 0210978A FR 0210978 A FR0210978 A FR 0210978A FR 2844401 A1 FR2844401 A1 FR 2844401A1
Authority
FR
France
Prior art keywords
permutation
flip
arrivals
flop
outputs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR0210978A
Other languages
French (fr)
Other versions
FR2844401B1 (en
Inventor
Pascal Lete
Stephane Gruffat
Philippe Saignes
Pascal Lombard
Jean Cerutti
Alain Lamoine
Jean Pierre Goming
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electricite de France SA
Original Assignee
Electricite de France SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electricite de France SA filed Critical Electricite de France SA
Priority to FR0210978A priority Critical patent/FR2844401B1/en
Publication of FR2844401A1 publication Critical patent/FR2844401A1/en
Application granted granted Critical
Publication of FR2844401B1 publication Critical patent/FR2844401B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • H02J3/0073Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources for providing alternative feeding paths between load and source when the main path fails, e.g. transformers, busbars

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The method may use three independent sources of incoming supply (A,B,C) which are connected to two changeover switches (B1,B2). The outputs from these two switches are in turn connected to two further changeover switches (B3,B4) to give final outputs (P1,P2). The incoming supplies are continuously monitored and on detection of a failure the changeover switches are operated to maintain the final outputs secure Independent claims are also included for the following : 1) Installation which has at least three independent incoming supplies connected to two secure outputs through changeover switches which on any incoming supply failure are automatically operated to secure the outgoing supply points 2) A work station which as part of the installation includes a processor programmed to operate the changeover switches such as to secure the outgoing supply points after a failure of one of the incoming supplies

Description

Procédé et installation pour l'alimentation électrique d'une zoneMethod and installation for the electrical supply of a zone

d'activité avec deux sources indépendantes et issues d'un réseau de distribution La présente invention concerne un procédé et une installation pour assurer sensiblement en permanence l'alimentation électrique de zones d'activité, telles que  The present invention relates to a method and an installation for substantially permanently supplying power to activity zones, such as

des aéroports.airports.

Dans des zones d'activité telle que des aéroports 10 ou des usines de traitement de produits sensibles, le  In areas of activity such as airports 10 or factories processing sensitive products, the

risque d'une coupure longue d'alimentation électrique est intolérable. Les normes de sécurité généralement appliquées imposent que deux sources d'alimentation, distinctes et opérationnelles chacune, soient prévues en 15 permanence pour de telles zones.  risk of a long power cut is intolerable. The generally applied security standards require that two separate and operational power sources are provided at all times for such areas.

Une solution habituelle consiste à prévoir alors, outre une source issue d'un réseau de distribution, une source secondaire autonome, du type groupe électrogène ou autre. Néanmoins, de telles sources secondaires ont une 20 autonomie limitée dans le temps. De plus, elles sont de conception coteuse, compte tenu de l'importance de l'alimentation électrique à fournir pour des zones d'activité du type précité. Elles nécessitent en outre un  A usual solution consists in providing then, in addition to a source coming from a distribution network, an autonomous secondary source, of the generator or other type. However, such secondary sources have a limited autonomy over time. In addition, they are costly in design, given the importance of the electrical supply to be provided for activity areas of the aforementioned type. They also require a

entretien à titre préventif qui est constant.  preventative maintenance which is constant.

Une solution pour remédier à ce problème consiste à prévoir deux sources indépendantes, issues toutes deux du réseau de distribution, et basculer de l'une des sources (habituelle) à l'autre (secondaire) en cas de défaillance de la source habituelle. Cependant, le service de 30 distribution lui-même doit garantir à sa clientèle deux sources indépendantes, toujours opérationnelles même en cas de détérioration éventuelle d'une ligne du réseau d'alimentation. Le service de distribution doit garantir en outre l'alimentation de la zone d'activité malgré le dysfonctionnement d'un moyen de bascule d'une source à l'autre. De plus, certaines zones d'activité ne peuvent pas supporter des coupures électriques trop longues. En l'espèce, des zones d'activité telles que des aéroports sont équipées de moyens d'éclairage, notamment des pistes, 10 comprenant des lampes à sodium ou d'autres lampes  One solution to remedy this problem consists in providing two independent sources, both from the distribution network, and switching from one of the sources (usual) to the other (secondary) in the event of failure of the usual source. However, the distribution service itself must guarantee its customers two independent sources, always operational even in the event of possible deterioration of a line of the supply network. The distribution service must also guarantee the supply of the activity area despite the malfunction of a means of switching from one source to another. In addition, certain activity zones cannot withstand long power outages. In this case, activity zones such as airports are equipped with lighting means, in particular runways, comprising sodium lamps or other lamps.

présentant une inertie dans leur régime de fonctionnement normal. Ainsi, une coupure de courant trop longue (par exemple supérieure à environ une seconde) peut entraîner une défaillance encore plus longue des moyens d'éclairage 15 et est, à ce titre, intolérable.  with inertia in their normal operating regime. Thus, a too long power cut (for example greater than about one second) can lead to an even longer failure of the lighting means 15 and is, as such, intolerable.

La présente invention vient améliorer la situation. Elle propose à cet effet un procédé d'alimentation électrique d'une zone d'activité à partir d'un réseau de 20 distribution, dans lequel: a) on prévoit au moins trois arrivées indépendantes A, B et C, issues du réseau de distribution, ainsi que des moyens de permutation comprenant au moins trois entrées reliées respectivement aux trois arrivées, et deux sorties 25 reliées respectivement à deux départs qui sont capables d'alimenter une zone d'activité, b) on teste répétitivement l'alimentation électrique susceptible d'être fournie par chaque arrivée A, B et C, et c) on pilote lesdits moyens de permutation, en cas de défaillance d'une arrivée, détectée à l'étape b), de manière à assurer, aux deux sorties des moyens de permutation, deux alimentations électriques respectives, indépendantes, délivrées selon l'une des combinaisons des arrivées A et (B ou C), ou B et C. Selon un avantage que procure la présente invention, l'indépendance des arrivées permet, en cas de défaillance de l'une des arrivées, de continuer à assurer l'alimentation possible de la zone d'activité à partir de deux sources indépendantes et, dans la pire situation 10 correspondant à une défaillance de deux des arrivées, l'alimentation de la zone d'activité grâce à la seule  The present invention improves the situation. To this end, it proposes a method of supplying electricity to an activity zone from a distribution network, in which: a) at least three independent arrivals A, B and C are provided, originating from the distribution network distribution, as well as permutation means comprising at least three inputs connected respectively to the three inlets, and two outputs 25 connected respectively to two outlets which are capable of supplying an activity area, b) repeatedly testing the power supply capable to be supplied by each arrival A, B and C, and c) said permutation means are piloted, in the event of an arrival failure, detected in step b), so as to ensure, at the two outputs of the means permutation, two respective, independent power supplies, delivered according to one of the combinations of arrivals A and (B or C), or B and C. According to an advantage which the present invention provides, the independence of perm and, in the event of a failure of one of the arrivals, to continue to ensure the possible supply of the activity area from two independent sources and, in the worst situation 10 corresponding to a failure of two of the arrivals, the feeding of the activity area thanks to the only

arrivée valide restante.valid arrival remaining.

Par rapport à la solution préconisant l'utilisation d'un ou plusieurs groupes électrogènes, la 15 présente invention offre une solution évolutive selon les besoins d'alimentation de la zone d'activité, la seule  Compared to the solution advocating the use of one or more generator sets, the present invention offers a scalable solution according to the supply needs of the activity area, the only

limite étant la puissance tolérée par les câbles.  limit being the power tolerated by the cables.

Dans une réalisation avantageuse, on prévoit à l'étape a) une arrivée supplémentaire indépendante D pour 20 assurer, à l'étape c), une alimentation électrique, délivrée aux deux sorties des moyens de permutation, selon au moins l'une des combinaisons des arrivées (A ou B) et  In an advantageous embodiment, provision is made in step a) for an independent additional supply D to ensure, in step c), an electrical supply, delivered to the two outputs of the permutation means, according to at least one of the combinations arrivals (A or B) and

(C ou D).(C or D).

Préférentiellement, on détecte à l'étape b) une 25 chute de l'alimentation électrique fournie par l'une des  Preferably, in step b) a drop in the electrical supply supplied by one of the

arrivées, en dessous d'un seuil prédéterminé et pendant une durée de temporisation choisie. En variante ou en complément, on peut estimer une pente de la chute d'alimentation pendant ladite durée de temporisation, en 30 fonction de laquelle on applique ou non l'étape c).  arrivals, below a predetermined threshold and for a selected delay time. As a variant or in addition, it is possible to estimate a slope of the supply drop during said delay time, depending on which step c) is applied or not.

Avantageusement, on prend en compte, en outre, un temps de latence pour la mise en oeuvre de l'étape c), tandis que ladite durée de temporisation, additionnée au temps de latence, est inférieure ou voisine de 0,5 seconde. Ce temps de latence comprend préférentiellement - un temps requis pour choisir une configuration appropriée des moyens de permutation en vue de relier les deux sorties des moyens de permutation à deux arrivées non 10 défaillantes, et - un temps requis pour l'actionnement physique de moyens  Advantageously, a latency time is also taken into account for the implementation of step c), while said delay time, added to the latency time, is less than or close to 0.5 seconds. This latency time preferably comprises - a time required to choose an appropriate configuration of the permutation means with a view to connecting the two outputs of the permutation means to two non-faulty arrivals, and - a time required for the physical actuation of means

de bascule que comprennent les moyens de permutation.  that include the permutation means.

Dans une réalisation préférée, les moyens de permutation comportent des moyens de bascule d'un premier 15 niveau, comprenant des entrées reliées aux arrivées, et des moyens de bascule d'un second niveau, comprenant des sorties reliées aux départs. A l'étape c), on détecte alors une défaillance éventuelle d'un composant des moyens de bascule de premier niveau pour mettre en oeuvre les 20 moyens de bascule de second niveau en assurant, aux deux sorties des moyens de permutation, des alimentations respectives valides selon l'une desdites combinaisons des arrivées A et (B ou C), ou B et C. La présente invention vise aussi une installation 25 pour la mise en oeuvre du procédé ci-avant, cette installation comportant des moyens de permutation comprenant: - au moins trois entrées reliées respectivement à trois arrivées indépendantes A, B et C, issues d'un réseau de 30 distribution, - deux sorties reliées respectivement à deux départs destinés à alimenter une zone d'activité, et - des moyens de bascule agencés pour assurer, aux deux sorties des moyens de permutation, deux alimentations 5 électriques respectives, indépendantes, délivrées selon l'une des combinaisons des arrivées A et (B ou C), ou C et B. Avantageusement, l'installation comporte au moins  In a preferred embodiment, the permutation means comprise rocking means of a first level, comprising inputs connected to the arrivals, and rocking means of a second level, comprising outputs connected to the departures. In step c), a possible failure of a component of the first level flip-flop means is then detected to implement the second-level flip-flop means by ensuring, at the two outputs of the permutation means, respective power supplies valid according to one of said combinations of arrivals A and (B or C), or B and C. The present invention also relates to an installation 25 for implementing the above method, this installation comprising permutation means comprising: - at least three inputs connected respectively to three independent arrivals A, B and C, coming from a distribution network, - two outputs connected respectively to two departures intended to supply an activity area, and - tilting means arranged to ensure, at the two outputs of the permutation means, two respective independent electrical supplies 5, delivered according to one of the combinations of arrivals A and (B or C), or C and B. Advantage wear, the installation includes at least

une station de travail capable de piloter les moyens de 10 permutation en cas de défaillance d'une arrivée.  a work station capable of controlling the means of permutation in the event of failure of an arrival.

A ce titre, la présente invention vise aussi une telle station de travail, comportant un automate programmé pour estimer, en service, une configuration des moyens de permutation en cas de défaillance d'une arrivée et/ou en 15 cas de dysfonctionnement d'un composant des moyens de permutation. Avantageusement, l'installation précitée comporte des capteurs de l'alimentation électrique fournie par chaque arrivée, reliés chacun à ladite station de travail, 20 et la station de travail est alors agencée pour - détecter une chute de l'alimentation électrique fournie par une arrivée, - estimer une configuration des moyens de permutation appropriée permettant de délivrer, aux deux sorties des 25 moyens de permutation, des alimentations électriques respectives non défaillantes, selon l'une des combinaisons des arrivées A et (B ou C), ou B et C, - et commander les moyens de bascule des moyens de permutation pour délivrer lesdites deux alimentations 30 respectives non défaillantes aux deux sorties des moyens  As such, the present invention also relates to such a workstation, comprising an automaton programmed to estimate, in service, a configuration of the switching means in the event of failure of an arrival and / or in the event of malfunction of a component of the permutation means. Advantageously, the aforementioned installation comprises sensors of the electric power supplied by each arrival, each connected to said work station, and the work station is then arranged to - detect a drop in the electric power supplied by an arrival. , - estimate an appropriate configuration of the permutation means making it possible to deliver, to the two outputs of the permutation means, respective non-faulty electrical supplies, according to one of the combinations of arrivals A and (B or C), or B and C , - and control the switching means of the permutation means for delivering said two respective non-faulty power supplies 30 to the two outputs of the means

de permutation.permutation.

Préférentiellement, ladite station de travail est agencée en outre pour: commander l'actionnement physique, par exemple par assistance motorisée, de chaque moyen de bascule des moyens de permutation; - détecter une défaillance de fonctionnement éventuelle de chaque moyen de bascule, et  Preferably, said work station is further arranged to: control the physical actuation, for example by motorized assistance, of each switching means of the permutation means; - detect a possible operational failure of each tilting means, and

- réestimer une nouvelle configuration des moyens de permutation, avantageusement en cas de défaillance d'une 10 arrivée et/ou d'un moyen de bascule.  re-estimate a new configuration of the permutation means, advantageously in the event of a failure of an arrival and / or of a flip-flop means.

D'autres caractéristiques et avantages de  Other features and benefits of

l'invention apparaîtront à l'examen de la description  the invention will appear on examination of the description

détaillée ci-après, et des dessins annexés sur lesquels: - la figure 1 représente une installation au sens de la 15 présente invention, permettant d'alimenter, à partir de deux départs Pl et P2, une zone d'activité; - la figure 2 représente schématiquement les moyens de permutation de l'installation, à partir de quatre bascules, avec quatre arrivées A, B, C et D, et deux 20 départs Pl et P2 capables d'alimenter chacun la zone d'activité; - la figure 3 représente schématiquement les moyens de permutation de l'installation, à partir de quatre bascules, ici avec trois arrivées A, B et C, et deux 25 départs Pl et P2 capables d'alimenter chacun la zone d'activité; - la figure 4 représente schématiquement les moyens de permutation de l'installation correspondant à ceux représentés sur la figure 2, mais dans lesquels chaque 30 bascule comprend deux interrupteurs dont les sorties sont reliées entre elles; la figure 5 représente schématiquement les moyens de permutation de l'installation correspondant à ceux représentés sur la figure 3, mais dans lesquels chaque bascule comprend deux interrupteurs dont les sorties sont reliées entre elles; - la figure 6 représente schématiquement une installation complète comprenant des moyens de permutation du type représenté sur la figure 4, selon un mode de réalisation préféré; et - la figure 7 représente la variation temporelle de la tension d'alimentation récupérée à l'un des départs en cas de défaillance de l'une des arrivées initialement  detailed below, and attached drawings in which: - Figure 1 shows an installation within the meaning of the present invention, for supplying, from two feeds P1 and P2, an activity area; FIG. 2 schematically represents the means of permutation of the installation, from four flip-flops, with four arrivals A, B, C and D, and two departures P1 and P2 capable of supplying each the activity zone; FIG. 3 schematically represents the means of permutation of the installation, from four flip-flops, here with three arrivals A, B and C, and two departures Pl and P2 capable of supplying each the activity zone; FIG. 4 schematically represents the means of permutation of the installation corresponding to those shown in FIG. 2, but in which each rocker comprises two switches whose outputs are connected together; FIG. 5 diagrammatically represents the means of permutation of the installation corresponding to those represented in FIG. 3, but in which each rocker comprises two switches whose outputs are connected together; - Figure 6 shows schematically a complete installation comprising permutation means of the type shown in Figure 4, according to a preferred embodiment; and FIG. 7 represents the temporal variation of the supply voltage recovered at one of the departures in the event of failure of one of the initial arrivals

connectée à ce départ.connected to this departure.

On se réfère tout d'abord à la figure 1 dans 15 laquelle une zone d'activité (telle qu'un aéroport), est alimentée à partir de la seule énergie du réseau de distribution, sans utiliser de source autonome (telle qu'un groupe électrogène), et ce, en marche normale ou en  Firstly, reference is made to FIG. 1 in which an activity zone (such as an airport) is supplied from the sole energy of the distribution network, without using an autonomous source (such as a generator), in normal operation or in

marche de secours.emergency march.

A cet effet, on prévoit, dans une réalisation  To this end, provision is made in an embodiment

préférée, quatre arrivées indépendantes A, B, C et D, issues du réseau de distribution public et connectées à une installation INS au sens de la présente invention.  preferred, four independent arrivals A, B, C and D, coming from the public distribution network and connected to an INS installation within the meaning of the present invention.

L'installation INS comprend des moyens de permutation (non 25 représentés sur la figure 1) de manière à délivrer, à partir des quatre arrivées A, B, C et D, deux départs d'alimentation Pl et P2, indépendants et susceptibles  The INS installation includes permutation means (not shown in FIG. 1) so as to deliver, from the four arrivals A, B, C and D, two feed feeds Pl and P2, independent and susceptible

d'alimenter chacun la zone d'activité.  to supply the activity zone each.

Dans un mode de réalisation préféré, l'installation INS est capable de gérer quatre arrivées indépendantes pour fournir des alimentations aux départs Pi et P2 correspondant à (A ou B) et (C ou D). Dans une variante selon laquelle trois arrivées indépendantes A, B et C seulement sont disponibles, l'installation assure une alimentation des départs Pl et P2 correspondant à A et (B ou C), ou B et C, comme on le verra plus loin. L'installation INS correspond à un poste de distribution publique qui constitue ainsi une centrale de permutation rapide, entre quatre sources d'alimentation amont A, B, C et D, de façon à garantir la continuité 10 d'alimentation sur un réseau aval. Avantageusement, la  In a preferred embodiment, the installation INS is capable of managing four independent arrivals to supply power to the departures Pi and P2 corresponding to (A or B) and (C or D). In a variant according to which only three independent arrivals A, B and C are available, the installation supplies feeds to the departures Pl and P2 corresponding to A and (B or C), or B and C, as will be seen below. The INS installation corresponds to a public distribution station which thus constitutes a rapid switching center, between four upstream supply sources A, B, C and D, so as to guarantee continuity of supply on a downstream network. Advantageously, the

zone d'activité, dans le réseau aval, peut être alimentée en permanence par deux sources amont distinctes Pi et P2.  activity zone, in the downstream network, can be permanently supplied by two separate upstream sources Pi and P2.

Lorsque l'une des quatre sources amont A, B, C ou D est défaillante, l'installation INS détecte cette défaillance 15 et procède à l'alimentation du réseau aval à partir d'une  When one of the four upstream sources A, B, C or D is faulty, the installation INS detects this fault 15 and proceeds to supply the downstream network from a

autre source, par permutation.other source, by permutation.

Dans l'exemple décrit, les sources d'alimentation A, B, C et D fournissent une tension d'alimentation de 20 kV. Bien entendu, il peut être prévu des sources 20 d'alimentation en tensions différentes, selon les normes  In the example described, the power sources A, B, C and D provide a supply voltage of 20 kV. Of course, it is possible to provide power sources 20 with different voltages, according to the standards.

de distribution électrique en France.  of electrical distribution in France.

On se réfère maintenant à la figure 2 sur laquelle les moyens de permutation de l'installation de la figure 1 comprennent quatre entrées connectées aux arrivées A, B, C 25 et D, et deux sorties connectées aux deux départs Pl et P2, respectivement. Ces moyens de permutation assurent l'aiguillage de l'énergie électrique des arrivées vers les départs, notamment en cas de défaillance de l'une des arrivées. A cet effet, ces moyens de permutation comportent: - une première bascule Bl entre l'arrivée A et l'arrivée B; - une seconde bascule B2 entre l'arrivée C et l'arrivée D; - une troisième bascule B3 entre la sortie de la première bascule BE et la sortie de la seconde bascule B2, la sortie de cette troisième bascule B3 étant reliée au premier départ Pi; et - une quatrième bascule B4 entre la sortie de la première 10 bascule Bi et la sortie de la seconde bascule B2, la sortie de cette quatrième bascule B4 étant reliée au  Referring now to Figure 2 in which the permutation means of the installation of Figure 1 comprises four inputs connected to the arrivals A, B, C 25 and D, and two outputs connected to the two departures Pl and P2, respectively. These permutation means ensure the routing of electrical energy from arrivals to departures, in particular in the event of failure of one of the arrivals. To this end, these permutation means comprise: - a first flip-flop B between the arrival A and the arrival B; - a second flip-flop B2 between arrival C and arrival D; - A third flip-flop B3 between the output of the first flip-flop BE and the output of the second flip-flop B2, the output of this third flip-flop B3 being connected to the first start Pi; and a fourth flip-flop B4 between the output of the first flip-flop Bi and the output of the second flip-flop B2, the output of this fourth flip-flop B4 being connected to the

second départ P2.second start P2.

Chacune des quatre bascules BE, B2, B3 et B4 peut comprendre un commutateur entre deux positions pour 15 aiguiller l'énergie électrique entre deux arrivées, vers un départ. Dans une variante correspondant à un mode de réalisation préféré, telle que représentée sur la figure 4, chaque bascule comprend deux interrupteurs dont les sorties sont reliées entre elles. Ces interrupteurs se 20 présentent avantageusement sous la forme de disjoncteurs  Each of the four flip-flops BE, B2, B3 and B4 may include a switch between two positions to direct the electrical energy between two arrivals, towards a departure. In a variant corresponding to a preferred embodiment, as shown in Figure 4, each flip-flop comprises two switches whose outputs are connected together. These switches are advantageously in the form of circuit breakers

ou d'interrupteurs sécurisés.or secure switches.

Dans un mode de fonctionnement normal, les deux bascules Bi et B2 sont configurées pour connecter les arrivées B et D, respectivement, à leur sortie. Par 25 ailleurs, les troisième et quatrième bascules B3 et B4 sont configurées de manière à ne connecter qu'une arrivée (respectivement B et D) à un départ (respectivement Pi et P2). Ainsi, l'arrivée B est connectée au départ Pl et  In a normal operating mode, the two flip-flops Bi and B2 are configured to connect the arrivals B and D, respectively, to their outputs. Furthermore, the third and fourth flip-flops B3 and B4 are configured so as to connect only one arrival (respectively B and D) to a departure (respectively Pi and P2). Thus, the arrival B is connected to the departure Pl and

l'arrivée D est connectée au départ P2.  the arrival D is connected to the departure P2.

En cas de défaillance de l'arrivée B, la première bascule BE change d'état pour aiguiller l'énergie fournie par l'arrivée A, vers le départ Pl, par l'intermédiaire de la bascule B3 qui ne change pas d'état. En cas de défaillance de l'arrivée D, la bascule B2 change d'état pour aiguiller l'énergie fournie par l'arrivée C vers le 5 départ P2, par l'intermédiaire de la bascule B4 qui ne change pas d'état. Par ailleurs, si la première bascule Bl présente un dysfonctionnement, ou encore si les deux arrivées A et B sont défaillantes à la fois, l'une des sources non défaillantes C et D alimente les deux départs 10 Pl et P2. De même, si la seconde bascule B2 présente un dysfonctionnement, ou encore si les deux arrivées C et D sont défaillantes à la fois, l'une des deux sources non  In the event of failure of the arrival B, the first flip-flop BE changes state to direct the energy supplied by the arrival A, towards the departure Pl, via the flip-flop B3 which does not change state . In the event of failure of the arrival D, the flip-flop B2 changes state to direct the energy supplied by the arrival C to the departure P2, via the flip-flop B4 which does not change state. Furthermore, if the first flip-flop B1 has a malfunction, or even if the two arrivals A and B are faulty at the same time, one of the non-faulty sources C and D feeds the two feeders 10 Pl and P2. Similarly, if the second flip-flop B2 has a malfunction, or if the two arrivals C and D are faulty at the same time, one of the two sources does not

défaillantes A et B alimente les deux départs Pl et P2.  faulty A and B feeds the two feeders Pl and P2.

En particulier, partant de la configuration en 15 mode normal de la figure 2, si la source B devient défaillante et que, de plus, la première bascule Bl présente un dysfonctionnement, la troisième bascule B3 change d'état de sorte que les deux départs Pl et P2 sont alimentés par la même source D. De même, si l'arrivée D 20 est défaillante et que la seconde bascule B2 présente un dysfonctionnement, la quatrième bascule B4 change d'état et les deux départs Pl et P2 sont alimentés par la même arrivée B. Ainsi, dans un premier temps, on détectera une défaillance de l'une des quatre arrivées et, dans un 25 second temps, on détectera une défaillance éventuelle d'un moyen de bascule de premier niveau tel que l'une des première et seconde bascules B1 et B2, comme on le verra plus loin. En particulier, en cas de dysfonctionnement des moyens de bascule de premier niveau Bl ou B2, on prévoira 30 une permutation dans les moyens de bascule de second  In particular, starting from the configuration in normal mode of FIG. 2, if the source B becomes faulty and that, moreover, the first flip-flop B1 malfunctions, the third flip-flop B3 changes state so that the two starts Pl and P2 are supplied by the same source D. Likewise, if the arrival D 20 is faulty and the second flip-flop B2 has a malfunction, the fourth flip-flop B4 changes state and the two feeds Pl and P2 are supplied by the same arrival B. Thus, firstly, a failure of one of the four arrivals will be detected and, secondly, a possible failure of a first level rocker means such as one will be detected first and second flip-flops B1 and B2, as we will see below. In particular, in the event of a malfunction of the first level rocking means Bl or B2, provision will be made for a permutation in the second level rocking means

niveau B3 ou B4.level B3 or B4.

il Dans le mode de réalisation représenté sur la figure 2, on obtient alors une combinaison d'alimentation, au niveau des départs Pi et P2, correspondant à A et (C ou D), ou B et (C ou D), ou A ou B ou C ou D seulement. Bien 5 entendu, dans une variante plus sophistiquée, il peut être  In the embodiment shown in FIG. 2, a supply combination is then obtained, at the level of the departures Pi and P2, corresponding to A and (C or D), or B and (C or D), or A or B or C or D only. Of course, in a more sophisticated variant, it can be

prévu un étage supplémentaire de bascule permettant de rendre indépendantes, d'une part, les arrivées A et B, et, d'autre part, les arrivées C et D, ce qui permet d'obtenir un ensemble de combinaisons correspondant à A et (B ou C 10 ou D), ou C et (D ou B), ou A, B, C ou D seulement.  provided an additional weighing stage making it possible to make arrivals A and B independent on the one hand, and arrivals C and D on the other hand, which makes it possible to obtain a set of combinations corresponding to A and ( B or C 10 or D), or C and (D or B), or A, B, C or D only.

Dans le mode de réalisation représenté sur la figure 3, seules trois arrivées A, B et C indépendantes, sont prévues. Néanmoins, les moyens de permutation de la figure 2 sont conservés, avec toutefois des arrivées 15 respectives des première et seconde bascules Bl et B2 connectées à la même arrivée B. Ainsi, en cas de défaillance de la source A, la première bascule Bi change d'état pour aiguiller l'énergie délivrée par la source B, vers le départ Pl. En cas de défaillance de la première 20 bascule Bi, les deux départs Pl et P2 sont alimentés par une même arrivée B ou C. Dans ce cas, la troisième bascule B3 change d'état et relie le premier départ Pl à la seconde bascule B2. De façon symétrique, si la source C est défaillante, la seconde bascule B2 change d'état pour 25 connecter l'arrivée B au départ P2. De même, si la seconde bascule B2 présente un dysfonctionnement, la bascule B4 change d'état pour connecter l'arrivée A au second départ P2. Ce mode de réalisation permet ainsi de délivrer aux départs Pl et P2 une alimentation selon l'une des 30 combinaisons A et (B ou C), ou B et C, ou A, B ou C seulement. Dans les modes de réalisation respectifs des  In the embodiment shown in FIG. 3, only three independent arrivals A, B and C are provided. Nevertheless, the permutation means of FIG. 2 are preserved, with however arrivals 15 of the first and second flip-flops Bl and B2 connected to the same arrival B. Thus, in the event of failure of the source A, the first flip-flop Bi changes state to direct the energy delivered by the source B, towards the departure Pl. In the event of failure of the first flip-flop Bi, the two departures Pl and P2 are supplied by the same arrival B or C. In this case, the third flip-flop B3 changes state and connects the first start P1 to the second flip-flop B2. Symmetrically, if the source C fails, the second flip-flop B2 changes state to connect the arrival B to the departure P2. Similarly, if the second flip-flop B2 has a malfunction, the flip-flop B4 changes state to connect the arrival A to the second departure P2. This embodiment thus makes it possible to deliver to the feeders P1 and P2 a supply according to one of the combinations A and (B or C), or B and C, or A, B or C only. In the respective embodiments of the

figures 4 et 5, les bascules Bl, B2, B3 et B4 ont été remplacées respectivement par des couples d'interrupteurs IA et IB, IC et ID, Il et I2, I3 et I4. Les sorties des 5 interrupteurs de chaque couple sont reliées entre elles.  Figures 4 and 5, the flip-flops B1, B2, B3 and B4 have been replaced respectively by pairs of switches IA and IB, IC and ID, Il and I2, I3 and I4. The outputs of the 5 switches of each pair are linked together.

Comme indiqué ci-avant, dans cette réalisation préférée, les interrupteurs sont préférentiellement des disjoncteurs utilisés habituellement en distribution publique, de sorte que les risques de dysfonctionnement des moyens de 10 permutation sont limités.  As indicated above, in this preferred embodiment, the switches are preferably circuit breakers usually used in public distribution, so that the risks of malfunction of the switching means are limited.

On se réfère maintenant à la figure 6 pour décrire un mode de réalisation préféré d'une installation au sens de la présente invention. Dans ce mode de réalisation, on prévoit huit interrupteurs pour relier deux départs Pl, P2 15 à quatre arrivées possibles A, B, C et D, comme décrit ciavant en référence à la figure 4. Préférentiellement, le basculement de chaque interrupteur est piloté par une commande électrique commandée par une station de travail STE. En effet, on doit éviter de mettre en parallèle deux 20 arrivées. C'est ainsi que les interrupteurs de chaque couple IA et IB, IC et ID, Il et I2, I3 et I4 ne sont jamais dans le même état, fermés. Par ailleurs, il est prévu des capteurs de tension en amont de chaque interrupteur relié à une arrivée (interrupteurs de premier 25 niveau). Ces capteurs de tension sont connectés à la station de travail STE, ce qui permet de détecter la défaillance de l'une des arrivées A, B, C ou D, en particulier si cette arrivée défaillante était initialement connectée à l'un des départs Pl et P2. Ainsi, 30 la station de travail STE est agencée pour détecter la défaillance de l'une des arrivées, ou encore un dysfonctionnement de l'un des interrupteurs de l'installation. De façon avantageuse, il est prévu des compartiments indépendants Si, S2, d'une part, et S3, 5 d'autre part, pour les moyens de bascule de premier niveau et pour les moyens de bascule de second niveau, respectivement. Par ailleurs, il est prévu en outre des compartiments indépendants pour les interrupteurs connectés aux arrivées A et B, d'une part, et pour les 10 interrupteurs connectés aux deux autres arrivées C et D, d'autre part. Ces compartiments sont avantageusement séparés géographiquement, dans des enceintes isolées et formées dans des structures en béton de surface voisines d'une dizaine de m2. Ainsi, en cas d'incendie dans le compartiment S1 (comprenant les interrupteurs reliés aux arrivées A et B) entraînant la dégradation de l'un des interrupteurs IA ou IB, le compartiment S2 (comprenant les interrupteurs reliés aux arrivées C et D) est préservé. De même, le compartiment S3 (comprenant les interrupteurs 20 reliés aux départs Pi et P2) est préservé. Ainsi, les interrupteurs Il et I2 reliés au départ Pi peuvent changer d'état et seule l'une des sources C ou D alimente les deux  Reference is now made to FIG. 6 to describe a preferred embodiment of an installation within the meaning of the present invention. In this embodiment, eight switches are provided for connecting two feeders Pl, P2 15 to four possible arrivals A, B, C and D, as described above with reference to FIG. 4. Preferably, the switching of each switch is controlled by an electrical control controlled by a STE workstation. In fact, two arrivals must be avoided in parallel. This is how the switches of each pair IA and IB, IC and ID, Il and I2, I3 and I4 are never in the same state, closed. Furthermore, voltage sensors are provided upstream of each switch connected to an inlet (first level switches). These voltage sensors are connected to the STE workstation, which makes it possible to detect the failure of one of the arrivals A, B, C or D, in particular if this faulty arrival was initially connected to one of the departures Pl and P2. Thus, the work station STE is arranged to detect the failure of one of the arrivals, or even a malfunction of one of the switches of the installation. Advantageously, independent compartments S1, S2, on the one hand, and S3, 5, on the other hand, are provided for the first level rocking means and for the second level rocking means, respectively. In addition, independent compartments are provided for the switches connected to arrivals A and B, on the one hand, and for the 10 switches connected to the other two arrivals C and D, on the other hand. These compartments are advantageously separated geographically, in isolated enclosures and formed in concrete structures with a surface area of around ten m2. Thus, in the event of a fire in compartment S1 (comprising the switches connected to arrivals A and B) causing degradation of one of the switches IA or IB, compartment S2 (comprising the switches connected to arrivals C and D) is preserved. Likewise, the compartment S3 (comprising the switches 20 connected to the feeders Pi and P2) is preserved. Thus, the switches Il and I2 connected to the start Pi can change state and only one of the sources C or D supplies the two

départs Pl et P2.Pl and P2 departures.

Dans une réalisation moins sophistiquée, les 25 compartiments Sl et S2 peuvent être prévus dans une même enceinte, toutefois séparée géographiquement du  In a less sophisticated embodiment, the 25 compartments S1 and S2 can be provided in the same enclosure, however geographically separated from the

compartiment S3.compartment S3.

La station de travail STE comprend préférentiellement une unité centrale connectée à un 30 organe de saisie tel qu'un clavier et à un moniteur de contrôle. Dans la mémoire de l'unité centrale est stocké un logiciel pour estimer les configurations respectives des interrupteurs, en cas de défaillance d'une arrivée, ou encore en cas de dysfonctionnement de l'un des interrupteurs. Ainsi, la station de travail STE reliée aux 5 moteurs M et aux capteurs de tension précités met en oeuvreun automate programmé au préalable pour estimer le plus rapidement possible la configuration des moyens de permutation, en cas d'une défaillance quelconque (d'une  The STE workstation preferably comprises a central unit connected to an input device such as a keyboard and to a control monitor. In the memory of the central unit is stored software for estimating the respective configurations of the switches, in the event of a failure of an arrival, or in the event of a malfunction of one of the switches. Thus, the workstation STE connected to the 5 motors M and to the aforementioned voltage sensors implements a PLC programmed beforehand to estimate as quickly as possible the configuration of the permutation means, in the event of any failure (of a

source ou d'un interrupteur).source or switch).

Avantageusement, la station de travail STE est contrôlée régulièrement par une station de travail maître STM, capable de remplacer la station de travail esclave  Advantageously, the workstation STE is regularly controlled by a master workstation STM, capable of replacing the slave workstation

STE, en cas de défaillance de cette dernière.  STE, in case of failure of the latter.

On se réfère maintenant à la figure 7 pour décrire 15 les étapes de permutation que la station de travail effectue en cas de défaillance de l'une des sources ou  Reference is now made to FIG. 7 to describe the permutation steps that the workstation performs in the event of a failure of one of the sources or

d'un dysfonctionnement d'un interrupteur.  a switch malfunction.

En principe, pour des zones d'activité telles que des aéroports, chacun des deux départs Pl et P2 ne doit 20 pas subir de creux de tension, ni de coupure d'alimentation supérieurs ou de l'ordre d'une seconde. Un creux de tension est défini par exemple par une chute de 15% en tension triphasée. Le temps de coupure est compté à partir du franchissement du seuil de 15% (début de la durée tl de la figure 7). Dans une réalisation préférée, le premier étage de bascules (les interrupteurs IA, IB, IC et ID) est prioritaire sur le second jeu de bascules (les interrupteurs Il, I2, I3 et I4) et ce deuxième étage de bascules n'est déclenché que si des permutations dans le 30 premier étage n'ont pas fonctionné ou ne peuvent pas fonctionner à cause d'une défaillance de l'un des  In principle, for activity zones such as airports, each of the two departures P1 and P2 should not be subjected to a voltage dip, or to a power cut of greater than or on the order of one second. A voltage dip is defined for example by a 15% drop in three-phase voltage. The cut-off time is counted from the crossing of the 15% threshold (start of the duration tl in FIG. 7). In a preferred embodiment, the first flip-flop (the switches IA, IB, IC and ID) has priority over the second set of flip-flops (the switches Il, I2, I3 and I4) and this second flip-flop is not triggered that if permutations in the first stage have not worked or cannot work due to a failure of one of the

interrupteurs du premier étage.first floor switches.

Pour chaque permutation possible, la mise en parallèle de deux arrivées A, B, C ou D est proscrite en 5 mode automatique. Un basculement se déroule donc selon une séquence comprenant les étapes suivantes - détection d'un creux de tension; - estimation d'une configuration de permutation; commande de l'ouverture de l'interrupteur relié à 10 l'arrivée défaillante; - confirmation de l'ouverture de cet interrupteur par transmission de sa position vers la station de travail STE; et - commande d'un moteur pour la fermeture d'un second 15 interrupteur (par exemple l'interrupteur IA en cas de défaillance de l'arrivée B, tels que représentés sur la  For each possible changeover, the parallel connection of two arrivals A, B, C or D is prohibited in 5 automatic mode. A changeover therefore takes place in a sequence comprising the following steps - detection of a voltage dip; - estimation of a permutation configuration; command to open the switch connected to the faulty inlet; - confirmation of the opening of this switch by transmitting its position to the STE workstation; and - control of a motor for closing a second switch (for example the switch IA in the event of failure of the inlet B, as shown on the

figure 4).figure 4).

Préférentiellement, chaque capteur en amont des interrupteurs IA, IB, IC et ID est un relais de tension 20 numérique capable d'envoyer, pour chaque phase de l'alimentation, une information "creux de tension", si la tension d'alimentation est inférieure de 15% à une tension nominale habituelle. Dans une variante plus sophistiquée, il peut être estimé une pente de chute de tension et une 25 information "creux de tension" est envoyée à la station de travail STE si la pente de cette chute de tension est  Preferably, each sensor upstream of the switches IA, IB, IC and ID is a digital voltage relay capable of sending, for each phase of the supply, "voltage dip" information, if the supply voltage is 15% lower than usual nominal voltage. In a more sophisticated variant, a voltage drop slope can be estimated and "voltage dip" information is sent to the workstation STE if the slope of this voltage drop is

supérieure à une valeur de pente prédéterminée.  greater than a predetermined slope value.

En se référant à nouveau à la figure 7, la durée tl correspond à un temps d'acquisition de la mesure par le 30 relais de tension numérique précité (capteur de tension en amont des interrupteurs d'arrivée), auquel s'ajoute un temps de cycle de calcul dans l'estimation de la configuration de permutation à adopter. Ce dernier temps de cycle dépend essentiellement de la rapidité du processeur prévu dans l'unité centrale de la station de 5 travail STE. En pratique, la durée globale tl est voisine de 70 millisecondes, avec les moyens de détection des creux de tension et de calcul de la configuration de la  Referring again to FIG. 7, the duration tl corresponds to a time for acquisition of the measurement by the aforementioned digital voltage relay (voltage sensor upstream of the incoming switches), to which is added a time of calculation cycle in the estimation of the permutation configuration to be adopted. This last cycle time depends essentially on the speed of the processor provided in the central unit of the STE workstation. In practice, the overall duration tl is close to 70 milliseconds, with the means for detecting voltage dips and calculating the configuration of the

permutation actuelle.current permutation.

Par ailleurs, la durée t3 correspond au temps 10 nécessaire pour actionner physiquement les interrupteurs de l'installation (ouverture de l'interrupteur IB, fermeture de l'interrupteur IA, en cas de défaillance de l'arrivée B), y compris la confirmation d'ouverture de l'interrupteur IB, transmise à la station de travail STE. 15 En principe, la durée t3 d'actionnement mécanique des  Furthermore, the duration t3 corresponds to the time 10 necessary to physically actuate the switches of the installation (opening of the switch IB, closing of the switch IA, in the event of failure of the arrival B), including the confirmation of the IB switch, transmitted to the STE workstation. 15 In principle, the duration t3 of mechanical actuation of the

interrupteurs est voisine de 200 millisecondes, en particulier comprise entre 160 et 220 millisecondes, selon les caractéristiques des moyens de permutation utilisés.  switches is close to 200 milliseconds, in particular between 160 and 220 milliseconds, depending on the characteristics of the permutation means used.

On remarquera en particulier que la tension d'alimentation 20 U de l'un des départs Pl et P2 est nulle pendant la durée t3 puisqu'il faut d'abord ouvrir l'interrupteur de l'arrivée défaillante, puis fermer l'interrupteur de  It will be noted in particular that the supply voltage 20 U of one of the feeders Pl and P2 is zero for the duration t3 since it is first necessary to open the switch of the faulty feeder, then close the switch of

l'arrivée non défaillante.non-faulty arrival.

Ainsi, la durée totale nécessaire à la détection 25 d'une défaillance et à la permutation consécutive (correspondant à la durée tl+t3) est au maximum voisine de 300 millisecondes. Comme la zone d'activité, dans ce mode de réalisation, exige que les coupures d'alimentation ne dépassent pas une seconde, il reste donc une durée t2 30 permettant une temporisation, avant de déclencher mécaniquement la permutation. Cette durée de temporisation t2 choisie, voisine de 200 millisecondes dans l'exemple décrit, permet alors de s'assurer qu'une tension momentanément défaillante ne remonte pas finalement à la valeur nominale Un, de fonctionnement normal. Cette durée 5 de temporisation t2 permet en particulier d'éviter de procéder à des permutations qui, finalement, ne sont pas nécessaires, et d'éviter surtout une coupure  Thus, the total duration necessary for the detection of a failure and for the subsequent permutation (corresponding to the duration tl + t3) is at most close to 300 milliseconds. As the activity zone, in this embodiment, requires that the power cuts do not exceed one second, there therefore remains a duration t2 30 allowing a time delay, before mechanically triggering the permutation. This delay time t2 chosen, close to 200 milliseconds in the example described, then makes it possible to ensure that a momentarily faulty voltage does not ultimately rise to the nominal value Un, of normal operation. This time delay 5 t2 makes it possible in particular to avoid carrying out permutations which, ultimately, are not necessary, and above all to avoid a break

d'alimentation de la zone d'activité pendant une durée t3.  supplying the activity zone for a period t3.

Si, en cas de défaillance de l'une des arrivées, 10 confirmée pendant la durée t2, la station de travail STE détecte un dysfonctionnement de l'un des interrupteurs pendant la durée t3, il est estimé une nouvelle configuration de la permutation, pendant une durée voisine de tl, et deux des interrupteurs du second niveau Il et I2 15 ou I3 et I4 changent d'état, pendant une durée voisine de t3. Ainsi, la tension d'alimentation de l'un des postes Pi et P2 est nulle pendant une durée voisine de t3+tl+ t3,  If, in the event of failure of one of the arrivals, 10 confirmed during the time t2, the work station STE detects a malfunction of one of the switches during the time t3, a new configuration of the permutation is estimated, during a duration close to tl, and two of the second level switches Il and I2 15 or I3 and I4 change state, for a duration close to t3. Thus, the supply voltage of one of the stations Pi and P2 is zero for a period close to t3 + tl + t3,

soit environ 500 millisecondes au maximum.  or about 500 milliseconds maximum.

En cas de basculement nécessaire dans le second 20 niveau, l'opération de permutation (détection de défaillance, temporisation, première permutation échouée, nouvelle estimation, seconde permutation réussie) est  In the event of a switchover required in the second level, the permutation operation (detection of failure, timeout, first permutation failed, new estimation, second permutation successful) is

finalement de durée inférieure à une seconde.  ultimately lasting less than a second.

Ainsi, selon l'un des avantages que procure la 25 présente invention, une structure de permutation à un premier niveau et à un second niveau permet de pallier, à la fois, une défaillance d'une source d'alimentation et un  Thus, according to one of the advantages afforded by the present invention, a first-level and second-level permutation structure makes it possible to compensate for both a failure of a power source and a

dysfonctionnement d'un moyen de bascule.  malfunction of a tilting means.

Bien entendu, la présente invention ne se limite 30 pas à la forme de réalisation décrite ci-avant à titre  Of course, the present invention is not limited to the embodiment described above by way of

d'exemple; elle s'étend à d'autres variantes.  For example; it extends to other variants.

Ainsi, on comprendra que le nombre d'arrivées indépendantes prévu peut être supérieur à trois ou quatre arrivées. Par ailleurs, les tensions d'alimentation de 20 kV sont données ici à titre d'exemple. Elles peuvent varier, d'une part, en fonction de la distribution du réseau et, d'autre part, en fonction des besoins de la  Thus, it will be understood that the number of independent arrivals planned may be greater than three or four arrivals. Furthermore, the supply voltages of 20 kV are given here by way of example. They can vary, on the one hand, according to the distribution of the network and, on the other hand, according to the needs of the

zone d'activité.activity area.

De même, pour assurer une indépendance totale entre les permutations relatives à chaque source A, B, C 10 et/ou D, il peut être prévu un nombre d'interrupteurs ou de bascules adéquat, ce qui grève cependant le cot derevient de l'installation.  Likewise, to ensure complete independence between the permutations relating to each source A, B, C 10 and / or D, an adequate number of switches or flip-flops may be provided, which however strikes the cost becomes installation.

Claims (22)

Revendicationsclaims 1. Procédé d'alimentation électrique d'une zone d'activité à partir d'un réseau de distribution, dans lequel: a) on prévoit au moins trois arrivées indépendantes A, B et C, issues du réseau de distribution, ainsi que des moyens de permutation comprenant au moins trois entrées reliées respectivement aux trois arrivées, et deux sorties reliées respectivement à deux départs (Pl,P2), capables 10 d'alimenter une zone d'activité, b) on teste répétitivement l'alimentation électrique susceptible d'être fournie par chaque arrivée A, B et C, et c) on pilote lesdits moyens de permutation, en cas de 15 défaillance d'une arrivée, détectée à l'étape b) , de manière à assurer, aux deux sorties des moyens de permutation, deux alimentations électriques respectives, indépendantes, délivrées selon l'une des combinaisons des arrivées A et (B ou C), ou B et C. 20  1. A method of supplying electricity to an activity area from a distribution network, in which: a) at least three independent arrivals A, B and C are provided, originating from the distribution network, as well as permutation means comprising at least three inputs connected respectively to the three inlets, and two outputs connected respectively to two outlets (Pl, P2), capable of supplying an activity zone, b) the electrical supply capable of d 'be supplied by each arrival A, B and C, and c) piloting said permutation means, in the event of failure of an arrival, detected in step b), so as to ensure, at the two outputs of the means permutation, two respective independent power supplies, delivered according to one of the combinations of arrivals A and (B or C), or B and C. 20 2. Procédé selon la revendication 1, dans lequel on détecte à l'étape b) une chute de l'alimentation électrique fournie par l'une des arrivées, en dessous d'un seuil prédéterminé et pendant une durée de temporisation 25 choisie (t2).  2. Method according to claim 1, in which a drop in the electrical supply supplied by one of the inlets is detected in step b), below a predetermined threshold and for a chosen delay time (t2 ). 3. Procédé selon l'une des revendications 1 et 2, dans lequel, à l'étape c), on déconnecte d'abord toute arrivée défaillante d'une sortie des moyens de permutation, avant 30 de connecter au moins une arrivée non défaillante à l'une  3. Method according to one of claims 1 and 2, in which, in step c), any faulty supply is firstly disconnected from an output of the permutation means, before connecting at least one non-faulty supply. to one desdites sorties des moyens de permutation.  of said outputs of the permutation means. 4. Procédé selon l'une des revendications 2 et 3, dans lequel on prend en compte, en outre, un temps de latence (tl+t3) pour la mise en oeuvre de l'étape c), tandis que ladite durée de temporisation, additionnée au temps de  4. Method according to one of claims 2 and 3, in which one takes into account, in addition, a latency time (tl + t3) for the implementation of step c), while said delay time , added to the time of latence, est inférieure ou voisine de 0,5 seconde.  latency, is less than or close to 0.5 seconds. 5. Procédé selon la revendication 4, dans lequel ledit temps de latence comprend: - un temps (tl) requis pour choisir une configuration 10 appropriée des moyens de permutation en vue de relier les deux sorties des moyens de permutation à deux arrivées non défaillantes, et5. The method as claimed in claim 4, in which said latency time comprises: a time (tl) required to choose an appropriate configuration of the permutation means in order to connect the two outputs of the permutation means to two non-faulty arrivals, and - un temps (t3) requis pour l'actionnement physique de moyens de bascule que comprennent les moyens de 15 permutation.  - A time (t3) required for the physical actuation of flip-flop means which include the permutation means. 6. Procédé selon l'une des revendications précédentes, dans lequel les moyens de permutation comportent des moyens de bascule d'un premier niveau (Bl,B2), comprenant 20 des entrées reliées aux arrivées, et des moyens de bascule  6. Method according to one of the preceding claims, in which the permutation means comprise rocking means of a first level (B1, B2), comprising inputs connected to the arrivals, and rocking means d'un second niveau (B3,B4), comprenant des sorties reliées aux départs, et dans lequel, à l'étape c), on détecte une défaillance éventuelle d'un composant des moyens de bascule de premier niveau pour mettre en oeuvre les moyens 25 de bascule de second niveau en assurant, aux deux sorties des moyens de permutation, des alimentations respectives valides selon l'une desdites combinaisons des arrivées A et (B ou C), ou B et C.  of a second level (B3, B4), comprising outputs connected to the feeders, and in which, in step c), a possible failure of a component of the first level rocker means for implementing the second level flip-flop means 25 ensuring, at the two outputs of the permutation means, respective valid supplies according to one of said combinations of arrivals A and (B or C), or B and C. 7. Procédé selon la revendication 6, prise en combinaison7. The method of claim 6, taken in combination avec l'une des revendications 2 et 3, dans lequel on prend  with one of claims 2 and 3, in which we take en compte, en cas de défaillance d'un composant des moyens de bascule de premier niveau, un temps de latence supplémentaire comprenant: - un temps (tl) requis pour choisir une nouvelle 5 configuration des moyens de permutation, notamment desdits moyens de bascule de second niveau, et - un temps (t3) requis pour un actionnement physique supplémentaire des moyens de bascule que comprennent les moyens de permutation, et dans lequel la mise en oeuvre de l'étape c), en cas de défaillance d'un composant des moyens de bascule de premier niveau, est de durée inférieure ou voisine d'une seconde.  taking into account, in the event of a failure of a component of the first level flip-flop means, an additional latency time comprising: - a time (tl) required to choose a new configuration of the permutation means, in particular of said flip-flop means second level, and - a time (t3) required for additional physical actuation of the flip-flop means that comprise the permutation means, and in which the implementation of step c), in the event of a component failure first level toggle means, is of duration less than or close to one second. 8. Procédé selon l'une des revendications précédentes,  8. Method according to one of the preceding claims, dans lequel on prévoit à l'étape a) quatre arrivées indépendantes A, B, C et D pour assurer, à l'étape c), une alimentation électrique, délivrée aux deux sorties des moyens de permutation, selon l'une au moins des 20 combinaisons des arrivées (A ou B) et (C ou D).  in which there are provided in step a) four independent arrivals A, B, C and D to ensure, in step c), an electrical supply, delivered to the two outputs of the permutation means, according to at least one of the 20 combinations of arrivals (A or B) and (C or D). 9. Installation pour la mise en oeuvre du procédé selon l'une des revendications 1 à 8, caractérisée en ce qu'elle  9. Installation for implementing the method according to one of claims 1 to 8, characterized in that it comporte des moyens de permutation comprenant: - au moins trois entrées reliées respectivement à trois arrivées indépendantes A, B et C, issues d'un réseau de distribution, - deux sorties reliées respectivement à deux départs (Pl,P2) destinés à alimenter une zone d'activité, et - des moyens de bascule agencés pour assurer, aux deux sorties des moyens de permutation, deux alimentations électriques respectives, indépendantes, délivrées selon l'une des combinaisons des arrivées A et (B ou C), ou C et B.  includes permutation means comprising: - at least three inputs connected respectively to three independent arrivals A, B and C, coming from a distribution network, - two outputs connected respectively to two departures (Pl, P2) intended to supply a zone activity, and - rocking means arranged to provide, at the two outputs of the permutation means, two respective, independent electrical supplies, delivered according to one of the combinations of arrivals A and (B or C), or C and B . 10. Installation selon la revendication 9, caractérisée en ce que les moyens de permutation comprennent quatre entrées reliées respectivement à quatre arrivées indépendantes A, B, C et D, issues d'un réseau de distribution, et en ce que les moyens de bascule sont 10 agencés pour assurer, aux deux sorties des moyens de permutation (Pl,P2), deux alimentations électriques respectives, indépendantes, délivrées selon l'une au moins10. Installation according to claim 9, characterized in that the permutation means comprise four inputs connected respectively to four independent arrivals A, B, C and D, coming from a distribution network, and in that the switching means are 10 arranged to ensure, at the two outputs of the permutation means (Pl, P2), two respective, independent electrical supplies, delivered according to at least one des combinaisons des arrivées (A ou B) et (C ou D).  combinations of arrivals (A or B) and (C or D). 11. Installation selon la revendication 10, caractérisée en ce que les moyens de permutation comportent: - une première bascule (Bl) entre une première entrée reliée à l'arrivée A et une seconde entrée reliée à l'arrivée B, - une seconde bascule (B2) entre une troisième entrée reliée à l'arrivée C et une quatrième entrée reliée à l'arrivée D, - une troisième bascule (B3) entre la sortie de la première bascule et la sortie de la seconde bascule, dont 25 la sortie est reliée à un premier départ (Pl), et - une quatrième bascule (B4) entre la sortie de la première bascule et la sortie de la seconde bascule, dont  11. Installation according to claim 10, characterized in that the permutation means comprise: - a first flip-flop (Bl) between a first input connected to the arrival A and a second input connected to the arrival B, - a second flip-flop (B2) between a third input connected to the inlet C and a fourth input connected to the inlet D, - a third flip-flop (B3) between the output of the first flip-flop and the output of the second flip-flop, including the output is connected to a first start (Pl), and - a fourth flip-flop (B4) between the output of the first flip-flop and the output of the second flip-flop, of which la sortie est reliée à un second départ (P2).  the output is connected to a second start (P2). 12. Installation selon la revendication 11, caractérisée  12. Installation according to claim 11, characterized en ce que chaque bascule comprend un commutateur.  in that each scale includes a switch. 13. Installation selon la revendication 11, caractérisée en ce que chaque bascule (Bl; B2; B3; B4) comprend deux interrupteurs (IA,IB; IC,ID; I1,I2; I3,I4) dont les  13. Installation according to claim 11, characterized in that each rocker (Bl; B2; B3; B4) comprises two switches (IA, IB; IC, ID; I1, I2; I3, I4) whose sorties sont reliées entre elles.outputs are interconnected. 14. Installation selon l'une des revendications 9 à 13, caractérisée en ce qu'elle comporte au moins une station de travail (STE) capable de piloter les moyens de  14. Installation according to one of claims 9 to 13, characterized in that it comprises at least one work station (STE) capable of controlling the means of permutation en cas de défaillance d'une arrivée.  permutation in case of failure of an arrival. 15. Installation selon la revendication 14, caractérisée en ce qu'elle comporte une seconde station de travail (STM), de secours, propre à remplacer une première station de travail (STE), en cas de défaillance de ladite première 15 station.  15. Installation according to claim 14, characterized in that it comprises a second work station (STM), standby, capable of replacing a first work station (STE), in the event of failure of said first station. 16. Installation selon l'une des revendications 14 et 15, caractérisée en ce qu'elle comporte des capteurs de l'alimentation électrique fournie par chaque arrivée, 20 reliés chacun à ladite station de travail, et en ce que la  16. Installation according to one of claims 14 and 15, characterized in that it comprises sensors of the electrical supply supplied by each inlet, each 20 connected to said work station, and in that the station de travail est agencée pour: - détecter une chute de l'alimentation électrique fournie par une arrivée, - estimer une configuration des moyens de permutation 25 appropriée permettant de délivrer, aux deux sorties des moyens de permutation, deux alimentations électriques respectives, indépendantes, non défaillantes, selon l'une des combinaisons des arrivées A et (B ou C), ou B et C, - et commander les moyens de bascule des moyens de 30 permutation pour délivrer lesdites deux alimentations respectives non défaillantes aux deux sorties des moyens  work station is arranged to: - detect a drop in the electrical supply supplied by an inlet, - estimate an appropriate configuration of the permutation means 25 enabling two respective independent electrical supplies to be supplied to the two outputs of the permutation means, non-faulty, according to one of the combinations of arrivals A and (B or C), or B and C, - and order the switching means of the permutation means to deliver said two respective non-faulty supplies to the two outputs of the means de permutation.permutation. 17. Installation selon la revendication 16, caractérisée 5 en ce que ladite station de travail est agencée pour commander l'actionnement physique de chaque moyen de  17. Installation according to claim 16, characterized in that said work station is arranged to control the physical actuation of each means of bascule des moyens de permutation.toggles permutation means. 18. Installation selon la revendication 17, caractérisée 10 en ce que ladite station de travail est agencée pour  18. Installation according to claim 17, characterized in that said work station is arranged for détecter une défaillance de fonctionnement de chaque moyen de bascule, et en ce qu'elle est agencée pour réestimer une nouvelle configuration des moyens de permutation, en cas de défaillance d'une arrivée et/ou d'un moyen de 15 bascule.  detecting an operational failure of each flip-flop means, and in that it is arranged to re-estimate a new configuration of the permutation means, in the event of failure of an arrival and / or a flip-flop means. 19. Installation selon la revendication 18, prise en combinaison avec la revendication 11, caractérisée en ce que ladite station est agencée pour commander 20 l'actionnement de la troisième (B3) et/ou de la quatrième (B4) bascule, en cas de défaillance de l'une des première  19. Installation according to claim 18, taken in combination with claim 11, characterized in that said station is arranged to control the actuation of the third (B3) and / or the fourth (B4) rocker, in the event of failure of one of the first (B1) et seconde (B2) bascules.(B1) and second (B2) flip-flops. 20. Installation selon la revendication 19, caractérisée 25 en ce qu'elle comporte au moins un premier poste (S1,S2)  20. Installation according to claim 19, characterized in that it comprises at least one first station (S1, S2) comprenant les première et seconde bascules et un second poste (S3) comprenant les troisième et quatrième bascules, et en ce que lesdits premier et second postes sont reliés électriquement et disposés dans des enceintes séparées 30 géographiquement.  comprising the first and second scales and a second station (S3) comprising the third and fourth scales, and in that said first and second stations are electrically connected and arranged in geographically separate enclosures. 21. Installation selon l'une des revendications 9 à 20, prises en combinaison avec la revendication 10, caractérisée en ce qu'elle comporte un premier poste (Si) comprenant des moyens de bascule (IA,IB) entre deux 5 arrivées (A,B) parmi les quatre arrivées (A,B,C,D) et un  21. Installation according to one of claims 9 to 20, taken in combination with claim 10, characterized in that it comprises a first station (Si) comprising tilting means (IA, IB) between two arrivals (A , B) among the four arrivals (A, B, C, D) and one second poste (S2) comprenant des moyens de bascule (IC,ID) entre deux autres arrivées (C,D), et en ce que lesdits premier et second postes sont disposés dans des enceintes  second station (S2) comprising means for switching (IC, ID) between two other arrivals (C, D), and in that said first and second stations are arranged in enclosures séparées géographiquement.separated geographically. 22. Station de travail destinée à équiper une installation selon l'une des revendication 14 et 15, caractérisée en ce qu'elle comporte un automate (STE) programmé pour estimer, en service, une configuration des moyens de permutation en 15 cas de défaillance d'une arrivée et/ou en cas de dysfonctionnement d'un composant des moyens de permutation.  22. Work station intended to equip an installation according to one of claims 14 and 15, characterized in that it comprises an automaton (STE) programmed to estimate, in service, a configuration of the permutation means in the event of failure. of an arrival and / or in the event of a malfunction of a component of the permutation means.
FR0210978A 2002-09-05 2002-09-05 METHOD AND INSTALLATION FOR THE POWER SUPPLY OF AN ACTIVITY AREA WITH TWO INDEPENDENT SOURCES AND FROM A DISTRIBUTION NETWORK. Expired - Lifetime FR2844401B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR0210978A FR2844401B1 (en) 2002-09-05 2002-09-05 METHOD AND INSTALLATION FOR THE POWER SUPPLY OF AN ACTIVITY AREA WITH TWO INDEPENDENT SOURCES AND FROM A DISTRIBUTION NETWORK.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR0210978A FR2844401B1 (en) 2002-09-05 2002-09-05 METHOD AND INSTALLATION FOR THE POWER SUPPLY OF AN ACTIVITY AREA WITH TWO INDEPENDENT SOURCES AND FROM A DISTRIBUTION NETWORK.

Publications (2)

Publication Number Publication Date
FR2844401A1 true FR2844401A1 (en) 2004-03-12
FR2844401B1 FR2844401B1 (en) 2005-09-30

Family

ID=31725849

Family Applications (1)

Application Number Title Priority Date Filing Date
FR0210978A Expired - Lifetime FR2844401B1 (en) 2002-09-05 2002-09-05 METHOD AND INSTALLATION FOR THE POWER SUPPLY OF AN ACTIVITY AREA WITH TWO INDEPENDENT SOURCES AND FROM A DISTRIBUTION NETWORK.

Country Status (1)

Country Link
FR (1) FR2844401B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2936380A1 (en) * 2008-09-24 2010-03-26 Messier Bugatti ELECTRIC ACTUATOR WHICH INCLUDES TWO CURRENT VOLTAGE INVERTERS SUPPLYING AN ELECTRICAL MACHINE AND WHICH IS RECONFIGURABLE IN THE PRESENCE OF A FAULT
FR2936663A1 (en) * 2008-10-01 2010-04-02 Jean Jacques Carrillo DISTRIBUTOR OF SECURED AUTO POWER SOURCES AND INSTALLATION COMPRISING SAME
FR3009453A1 (en) * 2013-08-05 2015-02-06 Hispano Suiza Sa ELECTRICITY DISTRIBUTION CIRCUIT WITH SWITCHES FEEDING AT LEAST TWO LOADS BY TWO SOURCES.

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
RADWAN A: "KONZEPTE RDUNDANTER USV-TECHNIK", NTZ (NACHRICHTENTECHNISCHE ZEITSCHRIFT), VDE VERLAG GMBH. BERLIN, DE, vol. 51, no. 3, 1998, pages 20 - 23, XP000740459, ISSN: 0027-707X *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2936380A1 (en) * 2008-09-24 2010-03-26 Messier Bugatti ELECTRIC ACTUATOR WHICH INCLUDES TWO CURRENT VOLTAGE INVERTERS SUPPLYING AN ELECTRICAL MACHINE AND WHICH IS RECONFIGURABLE IN THE PRESENCE OF A FAULT
WO2010034906A2 (en) * 2008-09-24 2010-04-01 Messier-Bugatti Electric actuator including two current-controlled voltage inverters powering an electric machine, and reconfigurable in the presence of a defect
WO2010034906A3 (en) * 2008-09-24 2010-05-20 Messier-Bugatti Electric actuator including two current-controlled voltage inverters powering an electric machine, and reconfigurable in the presence of a defect
CN102165666A (en) * 2008-09-24 2011-08-24 梅西耶-布加蒂公司 Electric actuator including two current-controlled voltage inverters powering an electric machine, and reconfigurable in the presence of a defect
US8604733B2 (en) 2008-09-24 2013-12-10 Messier-Bugatti-Dowty Electric actuator including two current-controlled voltage inverters powering an electrical machine, and reconfigurable in the presence of a defect
CN102165666B (en) * 2008-09-24 2014-12-31 梅西耶-布加蒂-道提公司 Electric actuator including two current-controlled voltage inverters powering an electric machine, and reconfigurable in the presence of a defect
FR2936663A1 (en) * 2008-10-01 2010-04-02 Jean Jacques Carrillo DISTRIBUTOR OF SECURED AUTO POWER SOURCES AND INSTALLATION COMPRISING SAME
FR3009453A1 (en) * 2013-08-05 2015-02-06 Hispano Suiza Sa ELECTRICITY DISTRIBUTION CIRCUIT WITH SWITCHES FEEDING AT LEAST TWO LOADS BY TWO SOURCES.

Also Published As

Publication number Publication date
FR2844401B1 (en) 2005-09-30

Similar Documents

Publication Publication Date Title
EP2320535B1 (en) Current-limiting circuit breaker, electrical distribution device equipped with such a limiting circuit breaker and current-limiting method
EP0550348B1 (en) High quality electrical power distribution system
EP2718975B1 (en) Device for generating photovoltaic energy with individual cell management
EP1449287B1 (en) Control and protection module of a switch apparatus
FR2721450A1 (en) Power supply systems for aircraft
FR2610120A1 (en) CONTROL AND PROTECTION ASSEMBLY CONNECTING A LOCAL COMMUNICATION NETWORK TO AN INDUSTRIAL PROCESS
EP0074910A1 (en) Methods and devices for the AC electric supply of a load without interruption of the AC signal
FR2721451A1 (en) Electrical supply system
EP3276769A1 (en) Device for monitoring/controlling a source changeover switch
EP2342794B1 (en) Method for organising an electric network including a plurality of generators, distribution block and equipment
FR2844401A1 (en) Method for providing zone with two secure independent supply points, comprises continuous testing of three independent incoming supplies and switching on fault detection to secure supply points
CA2364846C (en) Electrical energy distribution system and contactor for such a system
EP2980942B1 (en) Safety system for the electrical connection of electrical equipment to a power supply apparatus, and electrical installation comprising such a system
FR2688951A1 (en) Terminal electrical distribution device and installation
FR2682540A1 (en) DEVICE FOR COUPLING AN EXTERNAL SOURCE OF ELECTRICAL POWER SUPPLY TO AN AIRCRAFT ON THE GROUND.
EP2999084B1 (en) Electrical interconnection device for source inverter, and source inverter comprising such a device
EP2693585B1 (en) System for protecting a plurality of electrical outlets against short circuits, and electrical facility comprising such a protective system
EP3273258B1 (en) Method for controlling an electrical installation from a remote location
FR2685830A1 (en) Power supply installation including at least two loads and their respective no-break power supplies, and method of replacing one power supply by the other
FR3076670A1 (en) POWER SUPPLY NETWORK AND METHOD OF CONTROLLING THE SAME
FR3018006A1 (en) CONTROLLED SWITCHING SYSTEM FOR SELECTIVE CONNECTION OF A THREE-PHASE ELECTRICAL SYSTEM
EP3621171A1 (en) Electrical facility with quick redeployment
EP3964901A1 (en) Interface for controlling medium-voltage circuit breakers and switches
BE1026003A1 (en) Set of a plurality (N) of electricity generators
WO2020089533A1 (en) Auxiliary shunt module for a differential protection device

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 14

PLFP Fee payment

Year of fee payment: 15

PLFP Fee payment

Year of fee payment: 16

PLFP Fee payment

Year of fee payment: 17

PLFP Fee payment

Year of fee payment: 18

PLFP Fee payment

Year of fee payment: 19

PLFP Fee payment

Year of fee payment: 20