FR2797893B1 - METHOD OF CONSTRUCTING A BRIDGE BRIDGE - Google Patents

METHOD OF CONSTRUCTING A BRIDGE BRIDGE

Info

Publication number
FR2797893B1
FR2797893B1 FR9910736A FR9910736A FR2797893B1 FR 2797893 B1 FR2797893 B1 FR 2797893B1 FR 9910736 A FR9910736 A FR 9910736A FR 9910736 A FR9910736 A FR 9910736A FR 2797893 B1 FR2797893 B1 FR 2797893B1
Authority
FR
France
Prior art keywords
bridge
tower
floor slab
constructing
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
FR9910736A
Other languages
French (fr)
Other versions
FR2797893A1 (en
Inventor
Michael Robert Craw Mcclenahan
Jerome Stubler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Freyssinet International STUP SA
Original Assignee
Freyssinet International STUP SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to FR9910736A priority Critical patent/FR2797893B1/en
Application filed by Freyssinet International STUP SA filed Critical Freyssinet International STUP SA
Priority to AT00958715T priority patent/ATE267299T1/en
Priority to KR1020017005001A priority patent/KR100732243B1/en
Priority to AU70151/00A priority patent/AU7015100A/en
Priority to EP00958715A priority patent/EP1125027B1/en
Priority to JP2001518503A priority patent/JP4436585B2/en
Priority to PT00958715T priority patent/PT1125027E/en
Priority to ES00958715T priority patent/ES2220526T3/en
Priority to DE60010846T priority patent/DE60010846D1/en
Priority to PCT/FR2000/002350 priority patent/WO2001014645A1/en
Publication of FR2797893A1 publication Critical patent/FR2797893A1/en
Application granted granted Critical
Publication of FR2797893B1 publication Critical patent/FR2797893B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • E01D21/065Incremental launching

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Piezo-Electric Or Mechanical Vibrators, Or Delay Or Filter Circuits (AREA)
  • Two-Way Televisions, Distribution Of Moving Picture Or The Like (AREA)
  • Measuring Fluid Pressure (AREA)
  • Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)
  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)

Abstract

The invention concerns a method for constructing a cable-stayed bridge comprising a floor slab (6), at least a tower (4), and inclined stay cables (7) mounted between the tower and the floor slab. The invention is characterised in that after the tower (4) has been erected, the method consists in fixing at least a support cable (10, 14) to said tower, linking the support cable (10, 14) to a section (6a, 6b) of the floor slab, and thrusting said apron section from one end (2, 3) of the bridge, the support cable (10, 14) providing support for the floor slab section (6a, 6b) while it is being thrust.
FR9910736A 1999-08-24 1999-08-24 METHOD OF CONSTRUCTING A BRIDGE BRIDGE Expired - Fee Related FR2797893B1 (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
FR9910736A FR2797893B1 (en) 1999-08-24 1999-08-24 METHOD OF CONSTRUCTING A BRIDGE BRIDGE
DE60010846T DE60010846D1 (en) 1999-08-24 2000-08-21 METHOD FOR THE PRODUCTION OF A CHANNEL BRIDGE
AU70151/00A AU7015100A (en) 1999-08-24 2000-08-21 Method for constructing a cable-stayed bridge
EP00958715A EP1125027B1 (en) 1999-08-24 2000-08-21 Method for constructing a cable-stayed bridge
JP2001518503A JP4436585B2 (en) 1999-08-24 2000-08-21 Cable-stayed bridge construction method
PT00958715T PT1125027E (en) 1999-08-24 2000-08-21 PROCESS OF CONSTRUCTION OF A SUSPENSIVE BRIDGE
AT00958715T ATE267299T1 (en) 1999-08-24 2000-08-21 METHOD FOR PRODUCING A CABLE-STAYED BRIDGE
KR1020017005001A KR100732243B1 (en) 1999-08-24 2000-08-21 Method for constructing a cable-stayed bridge
PCT/FR2000/002350 WO2001014645A1 (en) 1999-08-24 2000-08-21 Method for constructing a cable-stayed bridge
ES00958715T ES2220526T3 (en) 1999-08-24 2000-08-21 CONSTRUCTION PROCEDURE OF A HANGING BRIDGE.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR9910736A FR2797893B1 (en) 1999-08-24 1999-08-24 METHOD OF CONSTRUCTING A BRIDGE BRIDGE

Publications (2)

Publication Number Publication Date
FR2797893A1 FR2797893A1 (en) 2001-03-02
FR2797893B1 true FR2797893B1 (en) 2002-03-22

Family

ID=9549304

Family Applications (1)

Application Number Title Priority Date Filing Date
FR9910736A Expired - Fee Related FR2797893B1 (en) 1999-08-24 1999-08-24 METHOD OF CONSTRUCTING A BRIDGE BRIDGE

Country Status (10)

Country Link
EP (1) EP1125027B1 (en)
JP (1) JP4436585B2 (en)
KR (1) KR100732243B1 (en)
AT (1) ATE267299T1 (en)
AU (1) AU7015100A (en)
DE (1) DE60010846D1 (en)
ES (1) ES2220526T3 (en)
FR (1) FR2797893B1 (en)
PT (1) PT1125027E (en)
WO (1) WO2001014645A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926448A (en) * 2016-05-03 2016-09-07 中交第三航务工程局有限公司 Construction method for cable-stayed bridge main tower with curve single tower double cable planes

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101171039B1 (en) * 2010-09-02 2012-08-06 오베아룹코리아(주) Partially and fully earth-anchored cable-stayed bridge using main span prestressing appratus and construction method for the same
CN104612032B (en) * 2014-12-16 2016-06-15 中铁第四勘察设计院集团有限公司 Big across tilting arch bridge pylon cable-stayed bridge
KR101595485B1 (en) 2015-04-07 2016-02-18 주식회사 동해종합기술공사 Cable Bridge Snow Removal Apparatus
CN106012797A (en) * 2016-07-25 2016-10-12 同济大学 All-ground-anchor type single-tower double-span cable-stayed bridge structure and construction method thereof
CN106284093B (en) * 2016-08-31 2018-01-12 中铁一局集团有限公司 A kind of continuous cross sliding type construction method of large span cable crane
CN110184890B (en) * 2019-06-28 2024-03-19 同济大学建筑设计研究院(集团)有限公司 Bridge span structure
CN112048986A (en) * 2020-08-13 2020-12-08 中铁大桥勘测设计院集团有限公司 Inclined arch tower cable-stayed bridge
CN115897399B (en) * 2022-11-21 2024-05-31 中交建筑集团有限公司 Construction method of lute-shaped cable-stayed bridge inclined main tower

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2938029A1 (en) * 1979-09-20 1981-04-02 Polensky & Zöllner, 6000 Frankfurt METHOD FOR PRODUCING A CABLE ROPE OR TOW BELT BRIDGE
FR2693492A1 (en) 1992-07-10 1994-01-14 Dumez Cable stayed bridge - comprises tower(s) with cables extending from top(s) to deck and longitudinal steel beams with deck slabs spanning between
FR2758835B1 (en) 1997-01-28 1999-04-02 Freyssinet Int Stup SYSTEM FOR SLIDING THE APRON FROM A BRIDGE TO THE TOP OF A PILE
KR100360201B1 (en) * 1999-11-12 2002-11-08 주식회사 제일엔지니어링 Consruction method for transformed cable stayed bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926448A (en) * 2016-05-03 2016-09-07 中交第三航务工程局有限公司 Construction method for cable-stayed bridge main tower with curve single tower double cable planes
CN105926448B (en) * 2016-05-03 2017-05-31 中交第三航务工程局有限公司 A kind of construction method of the Cable stayed Bridge Main Tower in the double rope faces of the only tower of curve

Also Published As

Publication number Publication date
JP2003507605A (en) 2003-02-25
EP1125027A1 (en) 2001-08-22
DE60010846D1 (en) 2004-06-24
ES2220526T3 (en) 2004-12-16
EP1125027B1 (en) 2004-05-19
JP4436585B2 (en) 2010-03-24
KR100732243B1 (en) 2007-06-27
WO2001014645A1 (en) 2001-03-01
AU7015100A (en) 2001-03-19
ATE267299T1 (en) 2004-06-15
KR20010080281A (en) 2001-08-22
PT1125027E (en) 2004-09-30
FR2797893A1 (en) 2001-03-02

Similar Documents

Publication Publication Date Title
ITMI962520A0 (en) PROCEDURE FOR INCREASING THE LOAD-BEARING LOAD OF FOUNDATION SOILS FOR BUILDING CONSTRUCTIONS
DK0842715T3 (en) Method and equipment for producing seamless steel pipes
FR2762894B1 (en) METHOD FOR REINFORCING STRUCTURAL ELEMENTS
FR2794477B1 (en) CONSTRUCTION OPENING STRUCTURE CABLE, SHEATH SECTION OF SUCH CABLE, AND LAYING METHOD
FR2756860B1 (en) CHASSIS STRUCTURE AND CONSTRUCTION METHOD USING SUCH A STRUCTURE
FR2797893B1 (en) METHOD OF CONSTRUCTING A BRIDGE BRIDGE
DE60020925D1 (en) Device for connecting prefabricated beams to columns or corresponding support elements
FR2777951B1 (en) CRYOGENIC PUMP, CONNECTING TE, COLUMN, AND METHOD OF INSTALLING COLUMN
FI925357A0 (en) Construction method
FR2754556B1 (en) METHOD FOR REINFORCING A CONSTRUCTION STRUCTURE, AND STRUCTURE THEREFORE
TR199801008A3 (en) Method and device for the construction of suspended concrete floors and roofs.
FR2798150B1 (en) BUILDING FOUNDATION AND METHOD OF CONSOLIDATION OF A FOUNDATION OF FOUNDATION TYPE
FR2806107B1 (en) DEVIATION SADDLE FOR CABLE AND CIVIL ENGINEERING STRUCTURE COMPRISING SUCH A DEVIATION SADDLE
FI2894U1 (en) pipe Foundation
FR2765606B1 (en) SUPPORT BEAM FOR AN UNDERGROUND POOL GRID
ES2051254T3 (en) STRUCTURES RESISTANT TO THE EXPLOSION OF REINFORCED EARTH AND ITS METHOD OF CONSTRUCTION.
FR2804981B1 (en) ROLLING BEAM AND METHOD OF USING SUCH A BEAM
FR2826991B1 (en) METHOD AND CLADDING ELEMENT FOR TUNNEL WATERPROOFING
ITBO970299A0 (en) PROCEDURE AND EQUIPMENT FOR THE FORMATION OF METAL CAGES FOR REINFORCED CONCRETE.
RU94018045A (en) METHOD OF CONSTRUCTING THE ADJUSTMENT OF THE TRANSFER TUNNEL OF THE CONSTRUCTING LINE OF THE METROPOLITEN TO THE TRANSFERABLE TUNNEL OF THE OPERATING LINE
FR2763612B1 (en) METHOD FOR CONSTRUCTING BALCONIES OR LOGGIAS FOR UNFITTED BUILDINGS
KR970018176U (en) Prefabricated steel member for building
FR2711706B1 (en) Formwork system for an exterior cladding concrete structure
FR2777930B1 (en) DEVICE FOR POSITIONING PRE-STRESS CABLES IN THE FORMWORK OF A CONCRETE STRUCTURE, PARTICULARLY IN THE FORMWORK OF A DECK APRON, AND METHOD FOR MANUFACTURING THE DEVICE
KR940026958U (en) Connection device for construction steel pipe scaffolding

Legal Events

Date Code Title Description
ST Notification of lapse

Effective date: 20060428