FR2572743A1 - Base course (layer) or carriageway foundation course (layer) - Google Patents

Base course (layer) or carriageway foundation course (layer) Download PDF

Info

Publication number
FR2572743A1
FR2572743A1 FR8416890A FR8416890A FR2572743A1 FR 2572743 A1 FR2572743 A1 FR 2572743A1 FR 8416890 A FR8416890 A FR 8416890A FR 8416890 A FR8416890 A FR 8416890A FR 2572743 A1 FR2572743 A1 FR 2572743A1
Authority
FR
France
Prior art keywords
layer
foundation
course
base layer
roadway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR8416890A
Other languages
French (fr)
Other versions
FR2572743B1 (en
Inventor
Thierry Rene Bocahut
Patrick Jean Joseph Bocahut
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bocahut SA
Original Assignee
Bocahut SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bocahut SA filed Critical Bocahut SA
Priority to FR8416890A priority Critical patent/FR2572743B1/en
Publication of FR2572743A1 publication Critical patent/FR2572743A1/en
Application granted granted Critical
Publication of FR2572743B1 publication Critical patent/FR2572743B1/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/003Foundations for pavings characterised by material or composition used, e.g. waste or recycled material

Abstract

a. Base course (layer) or carriageway foundation course (layer). b. Characterised in that it comprises, in weight per cent, 88 to 92% of a crushed limestone rock, 4 to 6% of preground slag, 4 to 6% of flue dust and 0.5 to 1.5% of lime, the rest being made up of water, and these various components being mixed by means of a mixing operation known per se. c. The invention is applicable to the road industry.

Description

Couche de base ou couche de fondation de chaussée
La présente invention s'applique à l'industrie de la route, et concerne plus spécialement les couches de base ou couches de fondation de chaussées.
Basement or foundation layer
The present invention applies to the road industry, and more specifically relates to the base layers or foundation layers of roadways.

De manière classique, il est connu que les routes ou autoroutes se composent d'une couche de base qui est recouverte par le revêtement proprement dit sur lequel circulent les véhicules (goudron, dalles de béton...). Conventionally, it is known that roads or motorways consist of a base layer which is covered by the actual coating on which vehicles circulate (tar, concrete slabs ...).

-Les qualités recherchées pour la couche de base sont de présenter une bonne résistance aux contraintes de toute sorte, associée à une épaisseur qui soit la plus faible possible, afin de diminuer le coût de la fabrication de la route. -The qualities sought for the base layer are to have good resistance to stresses of all kinds, associated with a thickness which is as small as possible, in order to reduce the cost of manufacturing the road.

Pour répondre à ces exigences, à première vue contradictoires, les couches de base de chaussées classiques contiennent généralement environ 85 % de roche calcaire concassée recomposée de manière à avoir une granulométrie continue de O à 20 mm, environ 15 % de laitier granulé constitué par des scories de hauts fourneaux qui nagent sur le métal en fusion donc par des sous-produits d'opérations d'élaboration métallurgiques ayant une composition à base de silicate, et 1 % de chaux vive, le reste étant constitué par de l'eau. To meet these requirements, at first glance contradictory, the base layers of conventional pavements generally contain approximately 85% of crushed limestone rock recomposed so as to have a continuous particle size from 0 to 20 mm, approximately 15% of granulated slag consisting of blast furnace slag which swims on the molten metal therefore by by-products of metallurgical processing operations having a composition based on silicate, and 1% quicklime, the rest being water.

Le mélange mentionné ci-dessus est effectué de manière courante dans des centrales de malaxage, à partir de silos et de trémies correspondants aux différents composants.  The above-mentioned mixing is commonly carried out in mixing plants, using silos and hoppers corresponding to the various components.

Pour améliorer les caractéristiques de ces couches de fondation classiques, on a proposé de remplacer le laitier granulé par du laitier pré-broyé. On a, par exemple, obtenu des couches de fondation et de base donnant toute satisfaction du point de vue de la résistances aux contraintes en mélangeant 90 % de roche calcaire 0/20 concassée, 10 % de laitier pré-broyé et 1 % de chaux en excès. To improve the characteristics of these conventional foundation layers, it has been proposed to replace the granulated slag with pre-ground slag. We have, for example, obtained foundation and base layers giving every satisfaction from the point of view of resistance to stresses by mixing 90% of crushed 0/20 limestone, 10% of pre-ground slag and 1% of lime in excess.

Cette composition présente, si on la compare à la composition définie ci-dessus, l'avantage de nécessiter moins de laitier, nettement plus onéreux que les roches concassées calcaire. This composition has, if compared to the composition defined above, the advantage of requiring less slag, significantly more expensive than crushed limestone.

Cependant, cet avantage se trouve partiellement diminué par la nécessité de prévoir une opération supplémentaire de broyage du laitier. However, this advantage is partially diminished by the need to provide an additional operation for grinding the slag.

A partir de ces compositions connues, l'invention se propose de mettre au point une couche de base ou couche de fondation de chaussée présentant une résistance satisfaisante aux contraintes, pour une épaisseur minimale, et ce, à partir de produits de départ peu onéreux. From these known compositions, the invention proposes to develop a base layer or foundation layer of roadway having satisfactory resistance to stresses, for a minimum thickness, and this, from inexpensive starting materials.

A cet effet, la couche de base ou couche de fondation de chaussée conforme à l'invention est caractérisée en ce qu'elle comporte, en pourcentage pondéraux, 88 à 92 X d'une roche calcaire concassée, entre 4 et ó de laitier pré-broyé, entre 4 et 6 % de cendres volantes et entre 0,5 et 1,5 % de chaux, le reste étant constitué par de l'eau, ces différents composants étant mélangés par la mise en oeuvre d'une opération de malaxage connue en ellememe. For this purpose, the base layer or foundation layer of roadway according to the invention is characterized in that it comprises, in percentage by weight, 88 to 92 X of a crushed limestone rock, between 4 and ó of pre slag crushed, between 4 and 6% of fly ash and between 0.5 and 1.5% of lime, the rest being constituted by water, these various components being mixed by the implementation of a mixing operation known in itself.

Cette composition permet, de manière surprenante, en remplaçant une partie du laitier pré-broyé par des cendres volantes notamment par des cendres volantes silico-alumineuses, et donc par un matériau moins onéreux, d'obtenir des couches à hautes performances, permettant de réduire les épaisseurs de chaussées construites jusqu 'à présent, pour une qualité égale, et par suite de réduire notablement les coûts des réalisations de chantier lancées par les différents pouvoirs publics. This composition makes it possible, surprisingly, by replacing part of the pre-ground slag with fly ash, in particular with silico-aluminous fly ash, and therefore with a less expensive material, to obtain high performance layers, making it possible to reduce the thicknesses of pavements built so far, for an equal quality, and consequently to significantly reduce the costs of the construction works launched by the various public authorities.

En effet, les cendres volantes qui proviennent du dépoussièrage des fumées, sont des résidus quantitativement importants des centrales thermiques, nombreuses et dis séminées sur tout le territoire, et peuvent toujours être obtenues très facilement et pour un prix de revient modique. In fact, the fly ash which comes from the dust removal from the fumes, are quantitatively important residues from thermal power plants, numerous and scattered all over the territory, and can always be obtained very easily and for a low cost price.

Au contraire, les industriels n'ont pas toujours sous la main des laitiers satisfaisants, et il est souvent nécessaire de les importer, ce qui entraine un court non négligeable en transport et en devises, sans compter la nécessité de mettre en oeuvre une opération supplémentaire de broyage. On the contrary, industrialists do not always have satisfactory slag on hand, and it is often necessary to import it, which results in a significant shortage in transport and foreign currency, not to mention the need to carry out an additional operation. grinding.

Selon une autre caractéristique de l'invention, la roche calcaire concassée a une granulométrie continue de 0 à 20 mm. According to another characteristic of the invention, the crushed limestone rock has a continuous particle size of 0 to 20 mm.

Selon une autre caractéristique de l'invention, la roche calcaire a un poids spécifique compris entre environ 2,65 et 2,80. According to another characteristic of the invention, limestone rock has a specific weight between about 2.65 and 2.80.

Selon une autre caractéristique de l'invention, la couche de base contient entre 5 et 7 % dieau, ce pourcentage variant en fonction des conditions climatiques et dépendant de la teneur en eau de fabrication et de l'humidité naturelle des constituants. According to another characteristic of the invention, the base layer contains between 5 and 7% of water, this percentage varying as a function of climatic conditions and dependent on the content of manufacturing water and the natural humidity of the constituents.

Selon une autre caractéristique de l'invention, le laitier pré-broyé a une granulométrie comprise entre 0 et 2 mm. According to another characteristic of the invention, the pre-ground slag has a particle size between 0 and 2 mm.

On a obtenu des résultats particulièrement favorables en préparant un laitier de manière telle que 12 % en poids soient susceptibles de passer au travers d'un tamis à 80 microns. Particularly favorable results have been obtained by preparing a slag in such a way that 12% by weight is capable of passing through a sieve at 80 microns.

Selon une autre caractéristique de l'invention, la chaux renferme environ 90 % de chaux libre de granulométrie comprise entre 0 et 0,2 mm. According to another characteristic of the invention, the lime contains about 90% of free lime with a particle size between 0 and 0.2 mm.

Les caractéristiques de la composition objet de l'invention seront décrites plus en détail en se référant à l'exemple ci-dessous d'une telle composition.  The characteristics of the composition which is the subject of the invention will be described in more detail with reference to the example below of such a composition.

EXEMPLE
On a utilisé de manière particulièrement satisfaisante, une couche de base ayant la composition suivante
- 90 % d'un concassé calcaire dur provenant de l'Avesnois (Frasnien) répondant aux caractéristiques suivantes - Poids spécifique variant de 2,65 à 2,80 - Los Angeles 20 - Micro Deval en présence d'eau sur la fraction 10/14
égal à 9,8, - Equivalent sable sur la fraction 0/6 supérieur à 50.
EXAMPLE
Particularly satisfactory use has been made of a base layer having the following composition
- 90% of a hard limestone crushed from Avesnois (Frasnien) meeting the following characteristics - Specific weight varying from 2.65 to 2.80 - Los Angeles 20 - Micro Deval in the presence of water on the fraction 10 / 14
equal to 9.8, - Sand equivalent on fraction 0/6 greater than 50.

- 5 % d'un laitier granulé provenant des usines métallurgiques GUSTAVE BOEL à LA LOUVIERE (BELGIQUE), broyé à l'aide de broyeurs à barres "Babbitless",
- 5 % de cendres volantes provenant de l'usine thermique de PONT S/SAMBRE (NORD),
- 1 % de chaux vive provenant de fours à chaux verticaux au gaz du type Maertz,
- 6,5 % d'eau.
- 5% of a granulated slag from the GUSTAVE BOEL metallurgical factories in LA LOUVIERE (BELGIUM), ground using "Babbitless" bar mills,
- 5% fly ash from the PONT S / SAMBRE (NORD) thermal plant,
- 1% quicklime from vertical gas lime kilns of the Maertz type,
- 6.5% water.

Claims (6)

REVENDICATIONS 10) Couche de base ou couche de fondation de chaussée caractérisée en ce qu'elle comporte, en pourcentage pondéraux, 88 à 92 % d'une roche calcaire concassée 4 à 6 % de laitier pré-broyé, 4 à 6 % de cendre volante et 0,5 à 1,5 % de chaux, le reste étant constitué par de l'eau, et ces différents composants étant mélangés par la mise en oeuvre d'une opération de malaxage connue en elle-même. 10) Base layer or foundation layer of pavement characterized in that it comprises, in percentage by weight, 88 to 92% of a crushed limestone rock 4 to 6% of pre-ground slag, 4 to 6% of fly ash and 0.5 to 1.5% lime, the remainder being water, and these various components being mixed by the implementation of a kneading operation known in itself. 20) Couche de base ou couche de fondation de chaussée, selon la revendication 1, caractérisée en ce que la roche calcaire concassée a une granulométrie 0/20 (formule reconstituée) de O à 20 mm.  20) Base layer or foundation layer of roadway, according to claim 1, characterized in that the crushed limestone rock has a particle size 0/20 (reconstituted formula) from 0 to 20 mm. 30) Couche de base ou couche de fondation de chaussée, selon l'une quelconque des revendications 1 et 2, caractérisée en ce que la roche calcaire a un poids spécifique compris entre, environ, 2,65 et 2,80. 30) Base layer or foundation layer of roadway, according to any one of claims 1 and 2, characterized in that the limestone rock has a specific weight between, approximately, 2.65 and 2.80. 40) Couche de base ou couche de fondation de chaussée, selon l'une quelconque des revendications 1 à 3, caractérisée en ce qu'elle contient entre 5 et 7 % d'eau. 40) Base layer or foundation layer of roadway, according to any one of claims 1 to 3, characterized in that it contains between 5 and 7% of water. 50) Couche de base ou couche de fondation de chaussée, selon l'une quelconque des revendications 1 à 4, caractérisée en ce que le laitier pré-broyé a une granulo métrie comprise entre 0 et 2 mm avec 12 % d'inférieurs à 80 microns. 50) Base layer or foundation layer of roadway, according to any one of claims 1 to 4, characterized in that the pre-ground slag has a particle size between 0 and 2 mm with 12% less than 80 microns. 60) Couche de base ou couche de fondation de chaussée, selon l'une quelconque des revendications 1 à 5, caractérisée en ce que la chaux renferme, environ, 90 % de chaux libre et que sa granulométrie est comprise entre 0 et 0,2 mm.  60) Base layer or foundation layer of roadway, according to any one of claims 1 to 5, characterized in that the lime contains, approximately, 90% of free lime and that its particle size is between 0 and 0.2 mm.
FR8416890A 1984-11-06 1984-11-06 BASE LAYER OR FOUNDATION LAYER Expired FR2572743B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR8416890A FR2572743B1 (en) 1984-11-06 1984-11-06 BASE LAYER OR FOUNDATION LAYER

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR8416890A FR2572743B1 (en) 1984-11-06 1984-11-06 BASE LAYER OR FOUNDATION LAYER

Publications (2)

Publication Number Publication Date
FR2572743A1 true FR2572743A1 (en) 1986-05-09
FR2572743B1 FR2572743B1 (en) 1986-12-19

Family

ID=9309311

Family Applications (1)

Application Number Title Priority Date Filing Date
FR8416890A Expired FR2572743B1 (en) 1984-11-06 1984-11-06 BASE LAYER OR FOUNDATION LAYER

Country Status (1)

Country Link
FR (1) FR2572743B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2710633A1 (en) * 1993-09-27 1995-04-07 Bocahut Ets Composition intended for the production of constituent courses of roadways

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1433508A (en) * 1965-02-17 1966-04-01 Pavement body material
FR1585658A (en) * 1968-08-27 1970-01-30
FR2311766A1 (en) * 1975-05-23 1976-12-17 Rheinische Kalksteinwerke Supporting layer for roads - comprising mineral granules hydraulic binder and coarse degradation resistant granules
FR2453837A1 (en) * 1979-04-12 1980-11-07 Couturier Jean Hydraulic binder for road sub-grade construction - comprising slag, fly ash, and free lime

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1433508A (en) * 1965-02-17 1966-04-01 Pavement body material
FR1585658A (en) * 1968-08-27 1970-01-30
FR2311766A1 (en) * 1975-05-23 1976-12-17 Rheinische Kalksteinwerke Supporting layer for roads - comprising mineral granules hydraulic binder and coarse degradation resistant granules
FR2453837A1 (en) * 1979-04-12 1980-11-07 Couturier Jean Hydraulic binder for road sub-grade construction - comprising slag, fly ash, and free lime

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2710633A1 (en) * 1993-09-27 1995-04-07 Bocahut Ets Composition intended for the production of constituent courses of roadways

Also Published As

Publication number Publication date
FR2572743B1 (en) 1986-12-19

Similar Documents

Publication Publication Date Title
JP2631336B2 (en) Natural soil stabilization method
Rohde et al. Electric arc furnace steel slag: base material for low-volume roads
EP0545740B1 (en) Process for double cold mixing of granular material for road construction
FR2572743A1 (en) Base course (layer) or carriageway foundation course (layer)
FR2710665A1 (en) Process for the manufacture of a water-permeable concrete structure, and structure produced with this process
FR2778912A1 (en) BITUMINOUS COATING BASED ON FRESH RECYCLING OF PAVEMENT MATERIALS, METHOD FOR RECYCLING SUCH MATERIALS AND USE OF THE COATING
CA1148359A (en) Production of spheroidical granules or beads from fused mineral matter
EP0279250B1 (en) Asphalt with a strong surface roughness
EP0007872B1 (en) Hydraulic concrete
Răcănel et al. Ecological asphalt mixtures with blast furnace slag
Zarei et al. Application of iron slag at different pavement layers
BE903034A (en) Road repair compsn. contg. mixt. of comminuted sand - hydraulic binder and bitumen emulsion
FR2730485A1 (en) BINDER COMPOSITION FOR THE MANUFACTURE OF A CONSTRUCTION MATERIAL
FR2577583A1 (en) Layer in the form of a ground covering
RU2204539C2 (en) Asphaltic concrete mix
FR2834306A1 (en) Improved coating for a sports track, notably a racecourse, incorporates a mixture of pozzolana and bitumen emulsion in a base layer
US392614A (en) Geoege s
FR2745018A1 (en) Cold coating for road surfaces
US2026614A (en) Paving composition and process of producing same
FR2711684A1 (en) Cover surface for sports grounds
WO1999052981A1 (en) Expansion joints for road works incorporating fibrous materials
GB2086401A (en) Asphalt composition
FR2489299A2 (en) Slow setting hydraulic binder - contg. slag, fly ash and slaked lime
Smith XV. On a Mineral in a Fumerole, at Auchenharvie Castle
FR2755884A1 (en) PROCESS FOR TREATING MACHEFERS FOR SEVERE FOAM

Legal Events

Date Code Title Description
ST Notification of lapse
DA Annulment of decision of lapse
ST Notification of lapse