FR2490740A1 - Hydroelectric power generating system - has series of local power stations along course of river for maximum efficiency, associated with locks - Google Patents

Hydroelectric power generating system - has series of local power stations along course of river for maximum efficiency, associated with locks Download PDF

Info

Publication number
FR2490740A1
FR2490740A1 FR8020555A FR8020555A FR2490740A1 FR 2490740 A1 FR2490740 A1 FR 2490740A1 FR 8020555 A FR8020555 A FR 8020555A FR 8020555 A FR8020555 A FR 8020555A FR 2490740 A1 FR2490740 A1 FR 2490740A1
Authority
FR
France
Prior art keywords
water
river
tube
rivers
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
FR8020555A
Other languages
French (fr)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to FR8020555A priority Critical patent/FR2490740A1/en
Priority to FR8024006A priority patent/FR2493923A2/en
Publication of FR2490740A1 publication Critical patent/FR2490740A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B17/00Other machines or engines
    • F03B17/06Other machines or engines using liquid flow with predominantly kinetic energy conversion, e.g. of swinging-flap type, "run-of-river", "ultra-low head"
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B13/00Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

A metal tube is placed along the centre of the bed of a river. It has an open end at a point at a high level in the river course. Some way downstream the tube is taken into a power house in which it rises to a height just less than its entry point. Water falls the height of the power house and drives a water turbine. The discharge of the turbine enters another similar metal tube which enters a further power house further downstream. The arrangement is repeated along the course of the river in a series of local power stations.

Description

Centrales Electriques reliées entre-elles et alimentes tout au long d'un cours d'eau par un tube sous-fluvial.  Power stations connected to each other and supplied along a watercourse by a sub-fluvial tube.

La présente invention concerne la fabrication de l'Ener- gieb Electrique à partir de l'Energie de l'eau courante des Fleuves,
Affluents et Rivières,captée par un tube, et traitée par des Centrales
Hydro-Electriques norinales,formant de la première å la derniere,une suite ininterrompue,du point le plus apte choisi en amont,jusqu'au point le plus adéquat,fixé en aval,d'où la dénominationi
CENTRALES FLUVIALES PROCESSIONNAIRES.
The present invention relates to the manufacture of the Electric Energyb from the energy of running water from rivers,
Tributaries and Rivers, captured by a tube, and treated by Power Plants
Normal hydroelectric, forming from the first to the last, an uninterrupted sequence, from the most suitable point chosen upstream, to the most suitable point, fixed downstream, hence the denominationi
PROCESSIONARY RIVER PLANTS.

La différence d'altitude (niveau de la mer)des points choisis en Amont et Aval,assure,suivant le prinoipe des vases communi- quants,l'arrivée au point B(ainsi qu'aux points suivants,C,D,E,etc) l'exact volume d'eau capté en A.(Pl.I/5,Fig.I). The difference in altitude (sea level) of the points chosen upstream and downstream, ensures, according to the principle of the communicating vessels, arrival at point B (as well as at the following points, C, D, E, etc) the exact volume of water captured in A. (Pl.I / 5, Fig.I).

Suivant l'importance du cours d'eau, un chevauchement est possible ,doublant ainsi l'énergie captée du courant.(Pl.I/5,Fig.2.)
Dans l'avenir, et suivant les besoins,on pourra même tripler ou
quadrupler le chevauchement ,extrayant ainsi la "quinte-essence" de
la puissance du courant.A chaque fois d'ailleurs qu'une rivière se
déverse dans un affluent,ou qu'un affluent grossit un fle@ve,il y a matière a traite un volume d'eau plus considérable,donc de former une nouvelle "Prooession de Centrales."
Ce procédé est tout a fait différent de tous les moyens
actuels mis en oeuvre pour l'utilisation de l'Energie Hydranlique t ainsi les barrages,qui comme leur nom l'indique barrent le cours du
Fleuve,détériorant le paysage,couvrant de larges espaces "vivants" voir même engloutissant des villages entiers,clochers compris, et sont une menace constante pour les riverains d'aval (on vient dans la région du midi se rappeler le désastre du Barrage de Malpassé et ses nombreux morts.)
D'autre part,un canal de dérivation de petits oours d'eau
Par de mini-canaux latéraux a été fait récemment dans un département du Centre ,ne dènnant qu'un très maigre résultat,et qui a suscité une révolte quasi-générale des habitants de la région au vu du sabotage de leur rivière,et des dégats cansés dans tout l'environnement.
Depending on the size of the stream, an overlap is possible, thus doubling the energy captured from the current (Pl.I / 5, Fig.2.)
In the future, and depending on the needs, we can even triple or
quadruple the overlap, thereby extracting the "fifth essence" from
the power of the current. Whenever a river
pours into a tributary, or a tributary enlarges a fle @ ve, there is matter to be treated a more considerable volume of water, therefore to form a new "Prooession of Power Plants."
This process is quite different from all means
current implemented for the use of Hydranlique Energy t dams, which as their name suggests bar the course of the
River, deteriorating the landscape, covering large "living" spaces or even engulfing entire villages, including steeples, and are a constant threat to people living downstream (we come to the region of the south to remember the disaster of the Dam of Malpassé and his many dead.)
On the other hand, a diversion channel for small water bears
By side mini-channels was recently made in a department of the Center, giving only a very meager result, and which caused an almost general revolt of the inhabitants of the region in view of the sabotage of their river, and damage cansés throughout the environment.

Quant à la production à partir de l'URANIUM,si certains savants en sont ravis,comme les "Firmes" productrices,la population dans son ensemble en est plutôt effrayée, certaines expériences
Américaines et Françaises en plus du rejet des déchets,semblent leur donner raison.
As for the production from URANIUM, if certain scientists are delighted, such as the "Firms" producing, the population as a whole is rather frightened, certain experiences
Americans and French, in addition to rejecting the waste, seem to agree with them.

Et de plus ,comme charbon et pétrole,l'uranium est voué à un épuisament indubitable à plus ou moins brève échéance. And moreover, like coal and petroleum, uranium is doomed to an undoubted exhaustion in the more or less short term.

Le dispositif,objet de l'invention; ne présente aucun de ces inconvénients,ni dangers. En effet:
La chambre de décantation qui sera plut8t une suite de bassins (nombre déterminé par la pureté plus OU moins grande du cou- rant) sera particulièrement soignée,de façon à fournir une eau convenant & * des turbines normales.Elle s'insérera sur lune des rives et gagnerait b strie adossée b la pile aval d'un pont,à proximité d'une route.
The device, object of the invention; does not have any of these drawbacks or dangers. Indeed:
The decantation chamber which will be rather a series of basins (number determined by the greater OR lesser purity of the current) will be particularly neat, so as to provide water suitable for normal turbines. It will fit on one of the banks and would gain b streak leaned b the pile downstream of a bridge, near a road.

Le tube construit en t8le ou en tôle d'acier, en tron- çons déterminés par l'Ingénieur responsable,recouverts de préference d'une couche de goudron protectrice,et reliés entre eux par les moyens usuels: brides et joints,ou rivés bout a bout.il serait intéressant d'essayer les nouveaux tubes en acier extra-doux,mieux de se renseigner sur la récente découverte d'un groupe de chercheurs algériens (Tubes de Métal Enroulé) et déjà utilisés par la"Sonatrach". The tube constructed of sheet or steel sheet, in sections determined by the responsible engineer, preferably covered with a protective tar layer, and connected together by the usual means: flanges and joints, or riveted end it would be interesting to try the new extra mild steel tubes, better to learn about the recent discovery of a group of Algerian researchers (Coiled Metal Tubes) and already used by "Sonatrach".

Bla pose des tubes sera faite par une équipe de plongeurs (il se trouve qu'un bon mombre de ces derniers,très qualifié,vient d'être licencié par une Cie de travaux sous-marins de Narseille.)
Le lit du cours d'eau sera aménagé pour recevoir le tube. (A ce sujet un chantier Marseillais vient de fabriquer un ntrao- teur sous-marin" capable de creuser des tranchées sous l'eau de 60cm de profondeur, sur Om,60 de largeur.Nul doute qu'elle réaliserait un engin similaire bien moine important,pouvant simplement aplanir la surface du fond d'un cours d'eau en y traçant un sillon pouvant reeevoir le tube,dont chaque tronçon reposerait å ses extrémités sur un coussinet b sa mesure,ancré dans le sol.(Pl. 3 Fig. I et 2 ).
Bla installation of the tubes will be made by a team of divers (it turns out that a good number of these, very qualified, has just been dismissed by a Company of underwater works of Narseille.)
The stream bed will be fitted to receive the tube. (On this subject a Marseillais shipyard has just manufactured an underwater trainer "capable of digging trenches under water 60cm deep, on Om, 60 wide. No doubt it would make a similar machine very monk important, being able simply to flatten the surface of the bottom of a watercourse by tracing a groove there which can receive the tube, each section of which would rest at its ends on a cushion with its measurement, anchored in the ground. (Pl. 3 Fig . I and 2).

Pour faciliter d'éventuelles recherches en cas de détérioration ou d'accident,chaque tube portera le NO ou la marque distinctive de sa Centrale. To facilitate possible research in the event of deterioration or accident, each tube will bear the NO or the distinctive mark of its control unit.

Tout le long du trajet,le tube devra (condition néoes- saire,mais suffisante) sousorira à deux conditions obligatoires :
I . En aucun point du parcours il ne devra avoir un diamètre inférieur d celui du dernier tronçon aboutissant b la conduite forcée,2 En aucun
point du parcours il ne devra atteindre l'altitude de la prise d'eau dans la salle de décantation de son départ.
Throughout the journey, the tube must (necessary condition, but sufficient) be subject to two mandatory conditions:
I. At no point on the route should it have a diameter smaller than that of the last section leading to the penstock, 2 In no
point of the course it should not reach the altitude of the water intake in the decantation room of its departure.

Durant le parcours,des sections de courbure calculée,pourront permettre au tube,soit de contourner des obstacles éventuels,soit de les surmonter. During the course, sections of calculated curvature, will allow the tube, either to bypass possible obstacles, or to overcome them.

S'il est à craindra que le cours d'eau,malgré son nettoyage initial présente un danger réel de dépot de déchets divers à son arri
vée à la Centrale ,le dernier tronçon du tube devra être muni d'un regard permettant un ultime nettoyage de l'eau,avant sa montée vers la conduite forcée.
If it is feared that the stream, despite its initial cleaning presents a real danger of depositing various waste on its arrival
vee at the Centrale, the last section of the tube must be provided with a manhole allowing a final cleaning of the water, before its rise towards the penstock.

A son arrivée a la Centrale,le tube se relèvera å la verticale et, en forme de U renversé retombera directement sur la turbine.La branche montante pouvant se dresser le long du mur extérieur de la
Centrale, (Pl.2 Fig.2),ou traversant dans un même ouvrage que labranche descendante les étages de la Centrale.(Pl.2 Fig.I). La hauteur de chute pourra être fixée à volonté en construisant sur la Centrale une tour ou un donjon qui permettrait au U renversé d'atteindre la hauteur désirée.
When it arrives at the Power Plant, the tube will rise vertically and, in the shape of an inverted U, will fall directly on the turbine. The rising branch can stand up along the outside wall of the
Central, (Pl.2 Fig.2), or crossing in a same work as the branch descending the floors of the Central. (Pl.2 Fig.I). The height of fall can be fixed at will by building a tower or a dungeon on the Centrale that would allow the overturned U to reach the desired height.

On pourra plaoer à la psrtie horisontale du tube une fermeture à commande automatique pouvant stopper l'arrivée du courant avant la descente vers la Turbine. We can place an automatic control at the horizontal position of the tube which can stop the arrival of the current before the descent to the Turbine.

La partie descendante du tube sera conditionnée de façon à oe
que sa faceintérieure soit la plus lisse possible donnant ainsi une "conduite forcée idéale permettant d'utiliser dans les calculs de
rentabilité.la formulez
P. . H. s 9,8I x Q tune spécialité de oes tubes à surface intérieure prfaitement lisse est d'ailleurs actuellement commercialisée.)
Evidemment cette "conduite forcée" devra être "blindée" de façon à pouvoir résister aux fortes pressions qu'elle devra subir.
The downward part of the tube will be conditioned so that
that its inner face be as smooth as possible, thus giving an "ideal penstock allowing use in the calculations of
profitability.
P.. H. s 9.8I x Q a specialty of these tubes with a perfectly smooth interior surface is currently on the market.)
Obviously this "penstock" will have to be "shielded" so as to be able to withstand the high pressures it will have to undergo.

A la sortie de la turbinesqaelque soit le mode d'évacuation, tube d'aspiration,cone d'aspiration ou chute libre,le oourant sera recueuilli dans un local approprié,d'où repartira un nouveau tube vers une nouvelle Centrale. Ce local sera d'ailleurs en communication
directe avec le oours d'eau par un tube passant par une chambre de décantation réglable et obturable a volonté,de façon à pouvoir ali
menter le second tube en cas d'accident ou de fermeture obligatoire
du premier circuit.
At the exit of the turbines, whether the evacuation mode, suction tube, suction cone or free fall, the current will be collected in an appropriate room, from which a new tube will leave for a new power plant. This room will also be in communication
direct with the water source through a tube passing through an adjustable settling chamber which can be closed at will, so that
lie the second tube in case of accident or compulsory closure
of the first circuit.

Les tubes seront acheminés sur place par un bateau spécial capable d'effeotuer des navigations fl@viales et côtières en eau peu profonde,et de se passer d'installations portuaires et de mécanisme de manutention.Avec 1.200 tonnes à bord, ce bateau peut naviguer par fond de 3 mètres,et mEme de 2 mètresavec un fret de 400 tonnes. Ce bâteau est déjà commercialisé. The tubes will be transported on the spot by a special boat capable of carrying out river and coastal navigation in shallow water, and of doing without port facilities and handling mechanism. With 1,200 tonnes on board, this boat can sail per bottom of 3 meters, and even 2 meters with a freight of 400 tonnes. This boat is already on the market.

Dans l'avenir, et pour éviter les manoeuvres aller-retour au quai,on emploiera le transport par hélicoptère de l'usine au bateau; et aussi bien pour livrer directement aux plongeurs les tubes,aux profondeurs de 2 mètres et moins.  In the future, and to avoid round-trip maneuvers at the wharf, transport by helicopter from the factory to the ship will be used; and also for delivering tubes directly to divers, at depths of 2 meters and less.

Ainsi se trouve réalisé un système de CENTRALES FLUVIALES
PROCESSIONNAIRES,permettant d'extraire du courant d'eau des Fleuves,
Affluents et Rivières,une quantité d'énergie b l'échelle mondiale qu'il parait impossible a l'heure actuelle d'évaluer tellement elle sera considérable,mais qui,certainement et très rapidement,mettra le pays
premier utilisateur largement en tête des nations les plus évoluées.
Thus is realized a system of RIVER PLANTS
PROCESSIONARY, allowing to extract water from the Rivers,
Tributaries and Rivers, a quantity of energy on a world scale which it seems impossible at the present time to evaluate so much it will be considerable, but which, certainly and very quickly, will put the country
first user widely ahead of the most advanced nations.

Il est à remarquer que ce système n'influe en rien sur le cours du fleuve ou de la rivière qui reste absolument semblable à lui- même,le niveau de l'eau restant inchangé;ni les riverains,ni les pêcheurs,ni les navigateurs,ni même les "utilisateurs du Dimanche"ne
trouveront aucun changement a leur lieu de travail ou de loisir.Et,
comme la Centrale n'aura aucun des inconvénients de nos usines usuelles, ni rejets,ni fumées,ni odeurs,qu'an contraire,lorsque le réseau des
Centrales sera développé en plein,assurant à la direction malgré une
baisse conséquente des tarifs au:: usagers,de très confortables revenus,
on procédera au revêtement du corps des batiments par d'artistiques
ajouts en bois,pierre,stuc,etc...transformant tout le paysage,les minables(pour la vue)usines actuelles faisant place a de superbes cons
tructions de style régional,ajoutant une réelle valeur originale au
paysage.Et, il est oertain que tous les amoureux de la Nature et tous
les Ecologistes les plus exigeants seront enchantés de la mise en
place dans leur Région de nons
CENTRALES FLUVIALES PROCESSIONNAIRES.
It should be noted that this system has no influence on the course of the river or the river which remains absolutely similar to itself, the water level remaining unchanged; neither the residents, nor the fishermen, nor the navigators , nor even "Sunday users"
will find no change at their place of work or leisure.
as the power plant will have none of the drawbacks of our usual factories, neither discharges, nor fumes, nor odors, than on the contrary, when the network of
Centrales will be fully developed, ensuring management despite a
consequent reduction in user fees, very comfortable income,
we will proceed to coating the body of the buildings with artistic
additions of wood, stone, stucco, etc ... transforming the whole landscape, the shabby (for the view) current factories giving way to superb cons
regional style tructions, adding real original value to the
landscape, and it is certain that all nature lovers and all
the most demanding Ecologists will be delighted with the implementation
place in their Region of nons
PROCESSIONARY RIVER PLANTS.

-LES CHUTES d'EAU.
Si on doit ou on veut utiliser les Chutes d'Eau,deux oas
peuvent se présentera
a) La chute est importante,en ce cas on installera au sommet de la chute,en bordue,rive droite ou gauche la Salle de Décantation;et.
-FALLS OF WATER.
If you have to or want to use the Waterfalls, two oas
may arise
a) The fall is important, in this case we will install at the top of the fall, along the edge, right or left bank, the Settling Room; and.

si la penteest ###### très forte ,on reliera directement la sortie de la salle au sommet de la conduite forode,dans la Centrale meme(Pl.4 FigI)
Si la pente est faible (du haut de la chute au bas du terrain) on posera le long de la pente le tube sortant de la Salle de déoantation jusqu'a la Centrale où elle montera en tube en U renversé.(Pl.4
Fig.2).
if the slope is ###### very steep, we will directly connect the exit of the room to the top of the forode pipe, in the Central itself (Pl.4 FigI)
If the slope is slight (from the top of the fall to the bottom of the ground), the tube coming out of the Deoantation Room will be placed along the slope up to the Power Plant where it will go up into an inverted U tube. (Pl.4
Fig. 2).

Venue la période d'abondance ,une savante utilisation du reste de la chute par une équipe d'ingénieux sculpteurs,peintres,ver- riers,etc...transformera l'ex-chute en un véritable spectacle original "EAU et LUMIERE", transformant entièrement le paysage. Come the period of abundance, a skilful use of the rest of the fall by a team of ingenious sculptors, painters, glassmakers, etc ... will transform the ex-fall into a real original show "WATER and LIGHT", completely transforming the landscape.

Les CENTRALES PONTS
Il s'agit ,en acoord avec les services comptants des PONTS et CHAUSSEES de construire directement sur les ponts enjambant les cours d'eau,une Centrale dont le bâti léger sera construit au-dessus même du pont,et la partie servant d'abri à l'appareillage lourd,sur une solide base,surplombant l'eau en aval, profitant de la margelle aval du pont (au besoin oongolidée)et réposant sur de solides constructions bien ancrées dans le lit du cours d'eau,dans la prolongation exacte des piles du pont,de façon à ne gêner en aucun cas la circulation fluviale.
BRIDGE PLANTS
It is, in agreement with the cash services of BRIDGES and HIGHWAYS to build directly on the bridges spanning the rivers, a power plant whose light frame will be built above the bridge, and the part serving as shelter with heavy equipment, on a solid base, overhanging the water downstream, taking advantage of the coping downstream of the bridge (if necessary oongolidated) and resting on solid constructions well anchored in the river bed, in the extension exact bridge piers, so as not to hinder river traffic in any case.

(P1. 5 Fig. 2)
La partie légère de l'ouvrage formera au-dessus de la route se trouvant sur le pont,un tunnel de la hauteur exigée pour les ouvrages de ce genresmais avec oe grand avantage,qu'au lieu de fermer la voute@par un mur plein du coté aval,elle sera soutenue par une série de colonnes placées sur le mur du pont,au besoin renforcé,de façon à
Laisser au pont le libre éclairage du jour.(Pl.5 Fig.I)
La voie ou route sortant du pont (rive droite ou rive gauche) donnera la possibilité de desservir en courant électrique de la Centrale les deux régions bordant le cours d'eau.
(P1. 5 Fig. 2)
The light part of the work will form above the road on the bridge, a tunnel of the height required for works of this kind but with this great advantage, that instead of closing the vault @ by a solid wall on the downstream side, it will be supported by a series of columns placed on the bridge wall, if necessary reinforced, so as to
Leave the daylight free at the bridge (Pl.5 Fig.I)
The way or road leaving the bridge (right bank or left bank) will give the possibility of supplying the two regions bordering the watercourse with electric current from the plant.

Cette manière de procéder constitue d'ailleurs la façon parfaite de justifier l'invention des CENTRALES FLUVIALES qui seront en effet absolument indépendantes des rives. This way of proceeding is, moreover, the perfect way to justify the invention of RIVER PLANTS, which will indeed be absolutely independent of the banks.

Cette méthode,en quelque sorte du 'tout-fluvial',sera très probablement très appréciée des Villes traversées par un cours d'eau conséquentgles citadins tiendront a posséder leur CENTRALE-PONT,monu- ment unique le plus souvent dédié à leur 'Gloire Looale' ou un sujet historique leur étant cher;et de plus occasion d'un spectacle original d'EAU et LUMIERE,ceuvre des artistes locaux. This method, in a way of 'all-fluvial', will very probably be very appreciated by the Cities crossed by a consequent watercourse. 'or a historical subject dear to them; and moreover an opportunity for an original show of WATER and LIGHT, the work of local artists.

LES CANAUX. CANALS.

Après avoir utilisé l'ensemble des cours d'eau des 6 Bassins  After having used all the rivers of the 6 Basins

Claims (7)

Fluviaux,il restera,si nécessaire,la possibilité d'utiliser un certain nombre des Canaux fluviaux du Pays. Quoique la différence du niveau d'eau entre deux écluses est faible ,en général,nous p@ensons qu'il sera possible de trouver entre Amont et Aval de chaque écluse,une hauteur de chute suffisante à alimenter une Centrale de "Turbines Basses Chutes" et un mot d'ordre courra alors dans le Pays: "A CHAQUE ECLUSE SA CENTRALE" REVENDICATIONS. I - Procédé destiné à extraire la plus grande partie possible de l'énergie développé par te courant d'eau des Fleuves,Affluents, Rivières,et la transformer en courant Electrique. Caractérisé par le fait qu'il comporte la captation du cou- rant d'eau des Fleuves,Rivières,dans une suite de Salles spéciales de décantation fournissant une eau apte à alimenter la turbine la plus sensible aux impuretés de l'eau ordinaire des cours d'eau.Fluvial, there will remain, if necessary, the possibility of using a certain number of the Canals of the Country. Although the difference in water level between two locks is small, in general, we think that it will be possible to find between Upstream and Downstream of each lock, a sufficient drop height to supply a "Low Falls Turbines Plant" "and a watchword will then run in the Country:" EACH EACH LOCK ITS CENTRAL "CLAIMS. I - Process intended to extract as much as possible of the energy developed by the current of water from rivers, tributaries, rivers, and transform it into electric current. Characterized by the fact that it involves the collection of the current of water from the rivers, in a series of special settling rooms providing water capable of supplying the turbine most sensitive to the impurities of ordinary water in the course of water. 2 - Dispositif selon la revendication 2. 2 - Device according to claim 2. Caractérisé par la menée de ce courant par un tube placé sur le lit du cours d'eau ,préalablement nettoyé et préparé au moyen Characterized by the conduct of this current by a tube placed on the bed of the watercourse, previously cleaned and prepared by means ohenillette raclante,traçant un sillon de dimension déterminée par le diambtre du tube reposant au principal sur ce sillon,et b chcune de ses extrémités sur un coussinet ancré dons le lit du cours d'eau. ohenillette scraping, drawing a furrow of dimension determined by the diameter of the tube resting in the main on this furrow, and b each of its ends on a cushion anchored don the bed of the river. 3 - Dispositif selon la revendication 3. 3 - Device according to claim 3. Caractérisé par la remontée du tube,en forme de U renver- sé dontla partie descendante ,à l'intérieur parfaitement lisse,et Characterized by the rise of the tube, in the shape of an inverted U whose descending part, inside perfectly smooth, and renforcée à l'extérieur par un blindage approprié,réalisant ainsi une "conduite forcée" exemplaire. reinforced on the outside with appropriate shielding, thus achieving exemplary "penstock". 4 - Dispositif selon la revendication 4. 4 - Device according to claim 4. Caractérisé par le moyen de récupérer l'eau s'échappant de la première turbine,dans une salle appropriée,assurant une décantation supplémentaire,avant une évacuation par un tube identique au premier vers la deuxième Centrale. Characterized by the means of recovering the water escaping from the first turbine, in an appropriate room, ensuring additional decantation, before evacuation by a tube identical to the first to the second power plant. 5 - Dispositif selon la revendication 5. 5 - Device according to claim 5. Caractérisé par le fait que ,suivant le volume du cours d'eau qui par l'apport de ses affluents peut très sensiblement varier,un double,ou triple,voire même quadruple chevauchement sera possible,multipliant ainsi ,de remarquable façon,la productivité du système. Characterized by the fact that, depending on the volume of the watercourse which by the contribution of its tributaries can vary very significantly, a double, or triple, or even quadruple overlap will be possible, thus multiplying, in a remarkable way, the productivity of the system. 60- Dispositif selon la revendication 6.  60. Device according to claim 6. Caractérisé par la disposition spéciale de la prise d'eau au sommet de la ohute,et le chai: du parcours du tube jusqu'à la Characterized by the special arrangement of the water intake at the top of the ohute, and the cellar: from the path of the tube to the CENTRALE.CENTRAL. 7 - Dispositif selon la revendication 7. 7 - Device according to claim 7. Caractérisé par la transformation,lorsque,un certain nombre de Centrales sera réalisé et aura fourni de très confortables bénéfices (malgré une réduction très sensible des tarifs)à la Société Characterized by the transformation, when a certain number of Power Plants will be built and will have provided very comfortable benefits (despite a very significant reduction in prices) to the Company Nationale chargée de la réalisation de oe vaste programme de production d'une Energie nouvelle (les oours d'eau étant la propriété exclusivede l'Etat) en l'occurrence l'ELECTRICITE de FRANCE,de l'aspect extérieur de chaque Centrale (construite à l'origine sur le modèle classique::salle des machines,des commandes,des transformateurs,des appareils de manoeuvre,de connection,etc...)qui pourfait Stre, avec un revêtement adéquat,au goût de la population des environs,changé,de cube de béton" en remarquable construction,objet de l'admiration desNational responsible for the realization of a vast program of production of a new Energy (the water bears being the exclusive property of the State) in this case the ELECTRICITY of FRANCE, of the external aspect of each Plant (built originally on the classic model: engine room, controls, transformers, switchgear, connection devices, etc.) which makes Stre, with an adequate coating, to the taste of the surrounding population, changed, from concrete cube "to remarkable construction, object of the admiration of Ecologistes les plus exigeants.The most demanding environmentalists. 80- Dispositif selon la revendication 8. 80- Device according to claim 8. Caractérisé par la construction des CENTRALES FLUVIALES Characterized by the construction of RIVER PLANTS PROCESSIONNAIRES directement sur les ponts enjambant les cours d'eau.PROCESSIONARIES directly on the bridges spanning rivers. Leur indépendance par rapport au: rives terrestres, justifie pleinement leur appellation: CENTRALES FLUVIALES PROCESSION Their independence from: land banks, fully justifies their designation: CENTRALES FLUVIALES PROCESSION NAIRES.NAIRES. go- Dispositif selon la revendication 9. go- Device according to claim 9. Caractérisé par la construction de CENTRALES à"BASSE Characterized by the construction of "LOW" POWER PLANTS CHUTE" à proximité de chaque écluse d'un Canal.  FALL "near each lock on a Canal.
FR8020555A 1980-09-23 1980-09-23 Hydroelectric power generating system - has series of local power stations along course of river for maximum efficiency, associated with locks Withdrawn FR2490740A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR8020555A FR2490740A1 (en) 1980-09-23 1980-09-23 Hydroelectric power generating system - has series of local power stations along course of river for maximum efficiency, associated with locks
FR8024006A FR2493923A2 (en) 1980-09-23 1980-11-10 Tower generator for water power - has superimposed turbine stations with controlled water head in water stream

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR8020555A FR2490740A1 (en) 1980-09-23 1980-09-23 Hydroelectric power generating system - has series of local power stations along course of river for maximum efficiency, associated with locks

Publications (1)

Publication Number Publication Date
FR2490740A1 true FR2490740A1 (en) 1982-03-26

Family

ID=9246267

Family Applications (1)

Application Number Title Priority Date Filing Date
FR8020555A Withdrawn FR2490740A1 (en) 1980-09-23 1980-09-23 Hydroelectric power generating system - has series of local power stations along course of river for maximum efficiency, associated with locks

Country Status (1)

Country Link
FR (1) FR2490740A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003083293A1 (en) * 2002-04-03 2003-10-09 Elhalabi M Badr Ali Apparatus for generating electricity using flowing water
ES2265721A1 (en) * 2004-07-08 2007-02-16 Eurograficas Pichel, S.L. Hydraulic installation for electricity generation, has tubular conduits operated in sequence to pick up or draw and deliver water from water channel into turbines at speeds in which kinetic energy of water flow drives turbines
RU2448215C2 (en) * 2008-03-04 2012-04-20 Григорий Германович Ушаков Hydraulic power unit with discharge water conduit and side water intake
RU2520336C1 (en) * 2012-10-29 2014-06-20 Александр Николаевич Коробко Damless submersible modular universal coastal hydroelectric power station and energy complex consisting of several modular hydroelectric power stations united by common platform
RU2742850C1 (en) * 2020-04-13 2021-02-11 Александр Геннадьевич Арзамасцев Hydropower station for the production of electrical energy by shallow rivers

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003083293A1 (en) * 2002-04-03 2003-10-09 Elhalabi M Badr Ali Apparatus for generating electricity using flowing water
ES2265721A1 (en) * 2004-07-08 2007-02-16 Eurograficas Pichel, S.L. Hydraulic installation for electricity generation, has tubular conduits operated in sequence to pick up or draw and deliver water from water channel into turbines at speeds in which kinetic energy of water flow drives turbines
RU2448215C2 (en) * 2008-03-04 2012-04-20 Григорий Германович Ушаков Hydraulic power unit with discharge water conduit and side water intake
RU2520336C1 (en) * 2012-10-29 2014-06-20 Александр Николаевич Коробко Damless submersible modular universal coastal hydroelectric power station and energy complex consisting of several modular hydroelectric power stations united by common platform
RU2742850C1 (en) * 2020-04-13 2021-02-11 Александр Геннадьевич Арзамасцев Hydropower station for the production of electrical energy by shallow rivers

Similar Documents

Publication Publication Date Title
US7190088B2 (en) Process of using hydraulic turbines to generate electricity
CN102351376B (en) Riverbank multiple pond wetland waste sewage treatment method and device
Pasalli et al. Design planning of micro-hydro power plant in hink river
WO2015107097A1 (en) Method for installing a so-called "marine" pumped-storage hydroelectric power station and corresponding station
US20070057518A1 (en) Reservoirs in the air and reservoirs on the water
FR2490740A1 (en) Hydroelectric power generating system - has series of local power stations along course of river for maximum efficiency, associated with locks
KR20140032517A (en) Naturally friendly water purification eco-friendly method that saves natural water by saving river water in multiple stages while producing electricity and purifying polluted river water
Zhdanovich et al. Investigations on possible places for installation of small hydro plants at municipal industrial wastewaters
Kardhana et al. Small hydropower spot prediction using SWAT and a diversion algorithm, case study: Upper Citarum Basin
KR20150007271A (en) Friendly eco-friendly water purification system that recovers river ecosystem while producing electricity using eco-friendly multifunctional movable water gate composed of eco-friendly eco-friendly method
Pleau et al. Giving the rivers back to the public. ten years of real time control in quebec city
KR20140025566A (en) Nature-friendly eco-friendly method that restores natural ecosystem while purifying polluted river water by using multi-stage automatic fishery and river ecosystem restoration system
FR2813643A1 (en) Device, for converting hydraulic energy, consists of vertical duct, with lower part fitted with pyramidal-cylinder and upper part with spiral tube and turbine, with curved paddle blades
FR2976134A1 (en) Device for facilitating and protecting passage of electric cables from photovoltaic panels to e.g. converters in airport, has attaching part to join and maintain two buried chutes or standard longitudinal beam and one of buried chutes
Giardino et al. Operational modelling applications for coastal engineering: New developments
Marnezy Hydraulic resources and uses diversification. The case of the upper Arc River (Savoie, France)
Bilodeau Innovative Flood Mitigation through Stormwater Management and Urban Regeneration: A Case Study of South Wilmington Wetland Park
Beilicci et al. ADVANCE HYDRAULIC CALCULATION OF FISH LADDERS, SEBEȘEL RIVER, ROMANIA
Avery Rebuild by Design Meadowlands: Designing for Implementation
Tekounegning et al. Micro hydroelectric power plant development in the west region of Cameroon
Paraschivescu et al. Small hydropower plants standardization, between myth and reality
Koenig et al. Ancient water supply system of the old town of Lijiang, Yunnan Province, China
FR2839121A1 (en) Hydraulic circuit regulated by iron pipes with water take-off at the top of an existing dam, uses turbines at different heights on face of dam fed by pipes from the top of the dam, with valves allowing each turbine to be bypassed
KR20140024943A (en) Nature-friendly, environmentally friendly process that naturally cleans contaminated river water using automatic fisheries and multifunctional movable gates configured to generate electricity
FR3132329A1 (en) Hybrid tidal device, wave motor, electric power generator

Legal Events

Date Code Title Description
ST Notification of lapse