FR2307914A1 - Construction of continuous welded rail track - involves string of two-storey flat wagons carrying overhead gantry crane which avoids construction of temporary track - Google Patents
Construction of continuous welded rail track - involves string of two-storey flat wagons carrying overhead gantry crane which avoids construction of temporary trackInfo
- Publication number
- FR2307914A1 FR2307914A1 FR7512129A FR7512129A FR2307914A1 FR 2307914 A1 FR2307914 A1 FR 2307914A1 FR 7512129 A FR7512129 A FR 7512129A FR 7512129 A FR7512129 A FR 7512129A FR 2307914 A1 FR2307914 A1 FR 2307914A1
- Authority
- FR
- France
- Prior art keywords
- construction
- track
- string
- gantry crane
- sleepers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/05—Transporting, laying, removing, or renewing both rails and sleepers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
Railway construction involves laying sleepers and continuous welded rails onto a new track without the need for first laying an auxiliary track. All of the elements needed for construction are first loaded onto a string of flat wagons with two floors, the lower one being used for the rails arranged lengthwise side-by-side, and the upper one being removable and used for the sleepers which are arranged transversely. Each truck has along the lengthwise edges of the upper floor a rail on which a gantry crane can slide. At the front of the string of wagons is a similar wagon whose upper floor remains empty. Once in position, sleepers are placed on this floor by the gantry crane and are then placed on the track by a second crane. When sufficient sleepers have been laid, two rails are then withdrawn and put in place.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR7512129A FR2307914A1 (en) | 1975-04-18 | 1975-04-18 | Construction of continuous welded rail track - involves string of two-storey flat wagons carrying overhead gantry crane which avoids construction of temporary track |
OA55505A OA05007A (en) | 1975-04-18 | 1975-05-19 | Method of laying railway tracks on a bare platform and corresponding devices. |
EG216/76A EG12379A (en) | 1975-04-18 | 1976-04-17 | Procede de pose de voies ferrees sur une plate-forme nue et dispositif correspondants |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR7512129A FR2307914A1 (en) | 1975-04-18 | 1975-04-18 | Construction of continuous welded rail track - involves string of two-storey flat wagons carrying overhead gantry crane which avoids construction of temporary track |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2307914A1 true FR2307914A1 (en) | 1976-11-12 |
FR2307914B1 FR2307914B1 (en) | 1979-05-04 |
Family
ID=9154147
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR7512129A Granted FR2307914A1 (en) | 1975-04-18 | 1975-04-18 | Construction of continuous welded rail track - involves string of two-storey flat wagons carrying overhead gantry crane which avoids construction of temporary track |
Country Status (3)
Country | Link |
---|---|
EG (1) | EG12379A (en) |
FR (1) | FR2307914A1 (en) |
OA (1) | OA05007A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4205612A (en) * | 1978-03-16 | 1980-06-03 | Dale Luttig | Rail roller |
FR2681082A1 (en) * | 1991-09-10 | 1993-03-12 | Plasser Bahnbaumasch Franz | METHOD FOR THE RENEWAL OF A RAILWAY AND MACHINE ARRANGEMENT FOR IMPLEMENTING THE METHOD. |
EP2094912A2 (en) * | 2006-12-19 | 2009-09-02 | Herzog Contracting Corp. | Self-propelled rail unloading machine |
GB2486524A (en) * | 2010-12-13 | 2012-06-20 | Babcock Rail Ltd | Method and vehicle for transporting rail track and sleepers |
WO2018082797A1 (en) * | 2016-11-04 | 2018-05-11 | Plasser & Theurer Export von Bahnbaumaschinen Gesellschaft m.b.H | Rail vehicle having crane rails for a gantry crane |
CN110271568A (en) * | 2019-07-22 | 2019-09-24 | 株洲长远智造股份有限公司 | Steel rail transport train and rail transporting method |
CN111705567A (en) * | 2020-06-30 | 2020-09-25 | 汪美霞 | Urban rail transit line track laying and installing method |
-
1975
- 1975-04-18 FR FR7512129A patent/FR2307914A1/en active Granted
- 1975-05-19 OA OA55505A patent/OA05007A/en unknown
-
1976
- 1976-04-17 EG EG216/76A patent/EG12379A/en active
Non-Patent Citations (1)
Title |
---|
NEANT * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4205612A (en) * | 1978-03-16 | 1980-06-03 | Dale Luttig | Rail roller |
FR2681082A1 (en) * | 1991-09-10 | 1993-03-12 | Plasser Bahnbaumasch Franz | METHOD FOR THE RENEWAL OF A RAILWAY AND MACHINE ARRANGEMENT FOR IMPLEMENTING THE METHOD. |
GB2259535A (en) * | 1991-09-10 | 1993-03-17 | Plasser Bahnbaumasch Franz | Method and apparatus for renewing a railway track |
GB2259535B (en) * | 1991-09-10 | 1995-02-08 | Plasser Bahnbaumasch Franz | A method for renewing a railway track and a machine arrangement |
EP2094912A2 (en) * | 2006-12-19 | 2009-09-02 | Herzog Contracting Corp. | Self-propelled rail unloading machine |
EP2094912A4 (en) * | 2006-12-19 | 2012-01-25 | Herzog Contracting Corp | Self-propelled rail unloading machine |
GB2486524A (en) * | 2010-12-13 | 2012-06-20 | Babcock Rail Ltd | Method and vehicle for transporting rail track and sleepers |
WO2018082797A1 (en) * | 2016-11-04 | 2018-05-11 | Plasser & Theurer Export von Bahnbaumaschinen Gesellschaft m.b.H | Rail vehicle having crane rails for a gantry crane |
US10822210B2 (en) | 2016-11-04 | 2020-11-03 | Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. | Rail vehicle having crane rails for a gantry crane |
EA037170B1 (en) * | 2016-11-04 | 2021-02-15 | Плассер Энд Тойрер Экспорт Фон Банбаумашинен Гезельшафт М.Б.Х. | Rail vehicle having crane rails for a gantry crane |
CN110271568A (en) * | 2019-07-22 | 2019-09-24 | 株洲长远智造股份有限公司 | Steel rail transport train and rail transporting method |
CN110271568B (en) * | 2019-07-22 | 2024-04-09 | 株洲长远智造股份有限公司 | Rail transport vehicle and rail transport method |
CN111705567A (en) * | 2020-06-30 | 2020-09-25 | 汪美霞 | Urban rail transit line track laying and installing method |
CN111705567B (en) * | 2020-06-30 | 2022-04-15 | 汪美霞 | Urban rail transit line track laying and installing method |
Also Published As
Publication number | Publication date |
---|---|
OA05007A (en) | 1980-12-31 |
FR2307914B1 (en) | 1979-05-04 |
EG12379A (en) | 1979-03-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4522546A (en) | Container-handling system with rail/rail and road/rail transfer | |
CA1046846A (en) | Track renewal method and apparatus | |
ES479737A1 (en) | Train for the renewal of a railway track. | |
ES384307A1 (en) | Method and apparatus for the continuous replacement of an old track by a new track | |
AU553386B2 (en) | Laying new track | |
FR2399346A1 (en) | Mobile rail handling equipment - comprises train with end tracks having rail guides and anchoring tracks between | |
FR2307914A1 (en) | Construction of continuous welded rail track - involves string of two-storey flat wagons carrying overhead gantry crane which avoids construction of temporary track | |
US2486801A (en) | Carrier for tunnel forms | |
GB1278522A (en) | Improvements relating to track maintenance vehicles | |
US4152990A (en) | Mobile track tie transport apparatus | |
US2696791A (en) | Equipment for the laying ahead of railroad tracks by means of completely assembled sections | |
US2876952A (en) | Track for placing equipment car | |
GB1535502A (en) | Machine for use in performing rail works | |
US3687366A (en) | Railway track | |
FR2299459A1 (en) | Renewal of old railway track - using lifting apparatus on end of train carrying new sleepers | |
US1286495A (en) | Track-laying apparatus. | |
US1283621A (en) | Art of building railroads. | |
US989931A (en) | Track-laying machine. | |
SU126863A1 (en) | Device for mechanized rearrangement of coal-loading wagons | |
FR2371547A2 (en) | Railway line laying system - uses temporary wide gauge track to support gantry assembly receiving rail and sleepers from double deck supply train | |
DE861104C (en) | Method of laying reinforced concrete sleepers for rails | |
SU50062A1 (en) | A device for loading onto the railway platforms packages of boards, logs and the like | |
DE560658C (en) | Loading ramp | |
US228505A (en) | Apparatus for laying railway-tracks | |
SU141884A1 (en) | Track laying train |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TP | Transmission of property | ||
ST | Notification of lapse |