Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from FI920026Uexternal-prioritypatent/FIU920026U0/fi
Application filed by Kyro Board & Paper Ltd OyfiledCriticalKyro Board & Paper Ltd Oy
Priority to FI930014ApriorityCriticalpatent/FI91786C/fi
Publication of FI930014A0publicationCriticalpatent/FI930014A0/fi
Publication of FI930014ApublicationCriticalpatent/FI930014A/fi
Publication of FI91786BpublicationCriticalpatent/FI91786B/fi
Application grantedgrantedCritical
Publication of FI91786CpublicationCriticalpatent/FI91786C/fi
THE INTERNALIZATION OF ENVIRONMENTAL COSTS IN THE PRIVATE ELECTRIC UTILITY INDUSTRY: A THEORETICAL ANALYSIS OF ALTERNATIVE ENVIRONMENTAL POLICIES UNDER RATE-OF-RETURN REGULATION.