Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Neste OyfiledCriticalNeste Oy
Priority to FI882823ApriorityCriticalpatent/FI82289C/en
Publication of FI882823A0publicationCriticalpatent/FI882823A0/en
Publication of FI882823ApublicationCriticalpatent/FI882823A/en
Publication of FI82289BpublicationCriticalpatent/FI82289B/en
Application grantedgrantedCritical
Publication of FI82289CpublicationCriticalpatent/FI82289C/en
Rock chamber or tunnel, where the construction lying opposite the rock surface 10 is formed by a sealed inner coating 40 and at least one sprayed concrete layer 30. In order to eliminate the hydrostatic pressure caused by water leakage in the rock chamber, there is between the sprayed concrete layer 30 and the rock wall 10 a network construction 20 made of porous material with open cells, the hydraulic conductivity of which exceeds the hydraulic conductivity of the rock wall 10. <IMAGE>
FI882823A1988-06-141988-06-14
BERGSBEHAOLLARE ELLER TUNNEL.
FI82289C
(en)
Method of construction of circulation muddy water high pressure injection excavation deep layer foundation with compressed air floating device and circulation muddy water high pressure injection excav