Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jaakko Tapani LahtinenfiledCriticalJaakko Tapani Lahtinen
Priority to FI882698ApriorityCriticalpatent/FI882698A/en
Publication of FI882698A0publicationCriticalpatent/FI882698A0/en
Publication of FI882698ApublicationCriticalpatent/FI882698A/en
FI882698A1988-06-081988-06-08
FOERFARANDE OCH ANORDNING FOER FRAMSTAELLNING AV SKARVAT FANER I SAMBAND MED FRAMSTAELLNING AV VANLIGT FANER.
FI882698A
(en)
FOERFARANDE FOER STRIMLOES APPLICERING AV TUNNA KONTROLLERADE FLUIDBELAEGGNINGAR OCH FOER DETTA FOERFARANDE AVSEDD VALSBELAEGGNINGSANORDNING MED SPRINGMUNSTYCKE.
KALIBRERINGS-, LAENGDMAETNINGS- OCH FOERPACKNINGSFOERFARANDE FOER I KORVINDUSTRIN ANVAENDBARA TARMDELAR OCH ANORDNING FOER TILLAEMPNING AV FOERFARANDET.
LJUSINTENSITETSSTYRKOPPLING FOER GLOEDLAMPOR OCH KOPPLINGSNAETDELAR MED EN SKYDDS- OCH BEGRAENSNINGSKOPPLING FOER ERHAOLLANDE AV EN ELEKTRONISK SAEKRING.