Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from SE8504975Aexternal-prioritypatent/SE457823B/xx
Application filed by Uponor AbfiledCriticalUponor Ab
Publication of FI872311ApublicationCriticalpatent/FI872311A/fi
Publication of FI872311A0publicationCriticalpatent/FI872311A0/fi
Publication of FI82978BpublicationCriticalpatent/FI82978B/fi
Application grantedgrantedCritical
Publication of FI82978CpublicationCriticalpatent/FI82978C/fi
Procedimento per la fabbricazione mediante stampaggio di un blocco di propergolo solido a combustione frontale guidata mediante conduttori di calore e blocco ottenuto con tale procedimento