Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to ES55200ApriorityCriticalpatent/ES55200A3/es
Publication of ES55200A3publicationCriticalpatent/ES55200A3/es
ES55200A1913-03-181913-03-18Un procedimiento para la fabricación de cordones con porciones elásticas alternadas con otras inelásticas.
ExpiredES55200A3
(es)