ES3418A1 - A safe and fast vertical drilling procedure of probe holes, shafts or holes in quicksand or water. - Google Patents

A safe and fast vertical drilling procedure of probe holes, shafts or holes in quicksand or water.

Info

Publication number
ES3418A1
ES3418A1 ES3418A ES3418A ES3418A1 ES 3418 A1 ES3418 A1 ES 3418A1 ES 3418 A ES3418 A ES 3418A ES 3418 A ES3418 A ES 3418A ES 3418 A1 ES3418 A1 ES 3418A1
Authority
ES
Spain
Prior art keywords
holes
quicksand
shafts
safe
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
ES3418A
Other languages
Spanish (es)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to ES3418A priority Critical patent/ES3418A1/en
Publication of ES3418A1 publication Critical patent/ES3418A1/en
Expired legal-status Critical Current

Links

ES3418A 1883-07-14 1883-07-14 A safe and fast vertical drilling procedure of probe holes, shafts or holes in quicksand or water. Expired ES3418A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ES3418A ES3418A1 (en) 1883-07-14 1883-07-14 A safe and fast vertical drilling procedure of probe holes, shafts or holes in quicksand or water.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES3418A ES3418A1 (en) 1883-07-14 1883-07-14 A safe and fast vertical drilling procedure of probe holes, shafts or holes in quicksand or water.

Publications (1)

Publication Number Publication Date
ES3418A1 true ES3418A1 (en) 1883-09-20

Family

ID=64163444

Family Applications (1)

Application Number Title Priority Date Filing Date
ES3418A Expired ES3418A1 (en) 1883-07-14 1883-07-14 A safe and fast vertical drilling procedure of probe holes, shafts or holes in quicksand or water.

Country Status (1)

Country Link
ES (1) ES3418A1 (en)

Similar Documents

Publication Publication Date Title
Abimbola et al. Dynamic safety risk analysis of offshore drilling
US11255144B2 (en) Annular pressure cap drilling method
BRPI0511443A (en) method of testing a descending hole formation
ECSP23020188A (en) HYDRAULIC FRACTURING OF A ROCK MASSIF
ES3418A1 (en) A safe and fast vertical drilling procedure of probe holes, shafts or holes in quicksand or water.
ES7217A3 (en) A safe and fast vertical drilling procedure of probe holes wells or holes in quicksand or in water.
ES5505A3 (en) A safe and fast vertical perfection procedure of probe holes, wells or pits, in quicksand or in water.
Alberty Shallow water flows: a problem solved or a problem emerging
Akbar et al. Practical approach solving the lost circulation problem during drilling operation
Balsawer et al. Multi-zone completion design for long horizontal ERD wells in Al Shaheen Field
Halafawi et al. Application of risk analysis in drilling well problems and operations-field case study
ALNabhani Safety during offshore drilling operation
WO2016040272A1 (en) Systems and methods for well control during managed pressure drilling
ES8100A3 (en) A safe and fast vertical drilling procedure for probe needles, wells or holes in quicksand or water.
Aarushi et al. A Review on Onshore Drilling for Oil and Gas Production with Its Safety Barriers and Well Control Methods
Muhammad MSc Petroleum Engineering
Chan et al. Can Lost Circulation Materials (LCM) Cure Losses Across Fault Damage Zone?
Keith et al. Coring Parameter Optimisation-The Secret to Long Carbonate Cores
Montilva et al. Onshore MPD system enables lower mud weights for challenging wells
Abd Rahim et al. Geomechanical consideration of drilling through heavily faulted formation
Hosseinian et al. The Effective Operation Parameters On Wait and Weight Method During Drilling Operations
Kumar et al. Risk Analysis on Drilling Rig in Oil And Natural Gas Using Engineering Tools
Akbar et al. Metamorphosis of MPD Method in Managing Combined Risks of Wellbore Stability, Loss Circulation and Narrow Pressure Window in Highly ERD Carbonate Wells in Offshore East Java, Indonesia
Fidiansyah et al. Specific Managed Pressure Drilling (MPD) Strategies for Drilling in South Mahakam Field under Severe Losses Conditions
Mohsen et al. Comparative Study of Drilling Fluid Impact on Well Controls Methods For Deviated Wells, Gulf Of Suez, Egypt.