Improvements in the procedure for the formation of forged floors with exterior surface finished. (Machine-translation by Google Translate, not legally binding)
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to ES0325087ApriorityCriticalpatent/ES325087A2/en
Publication of ES325087A2publicationCriticalpatent/ES325087A2/en
Improvements introduced in the object of the main patent No. 323,875 which refers to "Improvements in the procedure for the formation of floor slabs with finished exterior surface", which is characterized essentially by being constituted by plaster slabs, achieved in molds of high precision for the formation of slabs for beams of prestressed concrete, vibrated or other beam method in common use. (Machine-translation by Google Translate, not legally binding)
ES0325087A1966-04-021966-04-02Improvements in the procedure for the formation of forged floors with exterior surface finished. (Machine-translation by Google Translate, not legally binding)
ExpiredES325087A2
(en)
Improvements in the procedure for the formation of forged floors with exterior surface finished. (Machine-translation by Google Translate, not legally binding)
Improvements in the procedure for the formation of forged floors with exterior surface finished. (Machine-translation by Google Translate, not legally binding)
Improvements in the procedure for the formation of forged floors with exterior surface finished. (Machine-translation by Google Translate, not legally binding)
Improvements in the procedure for the formation of forged floors with exterior surface finished. (Machine-translation by Google Translate, not legally binding)