ES2586469A1 - Load shedding system for networks with high power motors (Machine-translation by Google Translate, not legally binding) - Google Patents

Load shedding system for networks with high power motors (Machine-translation by Google Translate, not legally binding) Download PDF

Info

Publication number
ES2586469A1
ES2586469A1 ES201530484A ES201530484A ES2586469A1 ES 2586469 A1 ES2586469 A1 ES 2586469A1 ES 201530484 A ES201530484 A ES 201530484A ES 201530484 A ES201530484 A ES 201530484A ES 2586469 A1 ES2586469 A1 ES 2586469A1
Authority
ES
Spain
Prior art keywords
motors
speed
load shedding
networks
shedding system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
ES201530484A
Other languages
Spanish (es)
Other versions
ES2586469B2 (en
Inventor
Carlos Antonio Platero Gaona
David PAGE ARRIBAS
Rosa María DE CASTRO FERNÁNDEZ
José Ángel SÁNCHEZ FERNÁNDEZ
Francisco Blázquez García
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Universidad Politecnica de Madrid
Original Assignee
Universidad Politecnica de Madrid
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Universidad Politecnica de Madrid filed Critical Universidad Politecnica de Madrid
Priority to ES201530484A priority Critical patent/ES2586469B2/en
Publication of ES2586469A1 publication Critical patent/ES2586469A1/en
Application granted granted Critical
Publication of ES2586469B2 publication Critical patent/ES2586469B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Basic Packing Technique (AREA)
  • Control Of Multiple Motors (AREA)

Abstract

Load shedding system for consumer installations with high power motors. Load shedding system for insulated consumer installations with motors based on the comparison of the speed and/or the variation in the speed over time of the motors with previously adjusted thresholds that disconnect the different motors if their speed and/or variation it does not exceed these thresholds. (Machine-translation by Google Translate, not legally binding)

Claims (5)

REIVINDICACIONES 1. Sistema de deslastre de cargas para redes con motores basado en la medida de la velocidad de giro de los motores, caracterizado porque comprende los siguientes subsistemas: 1. Load shedding system for networks with motors based on the measurement of the rotation speed of the motors, characterized in that it comprises the following subsystems: - Subsistema de medida de la velocidad de giro de los motores. 5 - Subsystem for measuring the speed of rotation of the motors. 5 - Medios de comparación de la velocidad medida con un determinado umbral ajustable para determinar los motores que deben ser desconectados de la red eléctrica. - Means for comparing the measured speed with a certain adjustable threshold to determine the motors that must be disconnected from the mains. 2. Sistema de deslastre de cargas para redes con motores basado en la 10 reivindicación 1, caracterizado porque comprende los siguientes subsistemas: 2. Load shedding system for networks with motors based on claim 1, characterized in that it comprises the following subsystems: - Subsistema de medida de la velocidad de giro de los motores. - Subsystem for measuring the speed of rotation of the motors. - Medios de comparación de la velocidad medida con un determinado umbral ajustable para determinar los motores que deben ser desconectados de la red eléctrica. 15 - Means for comparing the measured speed with a certain adjustable threshold to determine the motors that must be disconnected from the mains. fifteen - Temporizadores ajustables para retrasar las distintas órdenes de desconexión. - Adjustable timers to delay the various disconnection orders. 3. Sistema de deslastre de cargas para redes con motores basado en la variación de la velocidad de giro de los motores, caracterizado porque comprende los siguientes subsistemas: 20 3. Load shedding system for networks with motors based on the variation in the rotation speed of the motors, characterized in that it comprises the following subsystems: 20 - Subsistema de medida de la velocidad de giro de los motores. - Subsystem for measuring the speed of rotation of the motors. - Subsistema de cálculo de la variación de la velocidad en el tiempo. - Subsystem for calculating the variation of speed over time. - Medios de comparación de la variación de la velocidad en el tiempo medida con un determinado umbral ajustable para determinar los motores que deben ser desconectados de la red eléctrica. 25 - Means for comparing the variation of the speed in the measured time with a certain adjustable threshold to determine the motors that must be disconnected from the mains. 25 4. Sistema de deslastre de cargas para redes con motores basado en la reivindicación 3, caracterizado porque comprende los siguientes subsistemas: 4. Load shedding system for networks with motors based on claim 3, characterized in that it comprises the following subsystems: - Subsistema de medida de la velocidad de giro de los motores. - Subsystem for measuring the speed of rotation of the motors. - Subsistema de cálculo de la variación de la velocidad en el tiempo. 30 - Subsystem for calculating the variation of speed over time. 30 - Medios de comparación de la variación de la velocidad en el tiempo medida con un determinado umbral ajustable para determinar los motores que deben ser desconectados de la red eléctrica. - Means for comparing the variation of the speed in the measured time with a certain adjustable threshold to determine the motors that must be disconnected from the mains. - Temporizadores ajustables para retrasar las distintas órdenes de desconexión. - Adjustable timers to delay the various disconnection orders. 35  35 5. Sistema de deslastre de cargas para redes con motores basado en las reivindicaciones 1, 2, 3 y 4, caracterizado porque la decisión de realizar la desconexión de los motores se realiza mediante una lógica donde se utilizan la velocidad de giro, la variación de la velocidad de giro o cualquier combinación de ambas variables así como temporizadores ajustables para retrasar las 5 diferentes señales de desconexión. 5. Load shedding system for networks with motors based on claims 1, 2, 3 and 4, characterized in that the decision to perform the disconnection of the motors is made by means of a logic where the speed of rotation is used, the variation of the rotation speed or any combination of both variables as well as adjustable timers to delay the 5 different disconnection signals.
ES201530484A 2015-04-13 2015-04-13 Load shedding system for networks with high power motors Active ES2586469B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ES201530484A ES2586469B2 (en) 2015-04-13 2015-04-13 Load shedding system for networks with high power motors

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES201530484A ES2586469B2 (en) 2015-04-13 2015-04-13 Load shedding system for networks with high power motors

Publications (2)

Publication Number Publication Date
ES2586469A1 true ES2586469A1 (en) 2016-10-14
ES2586469B2 ES2586469B2 (en) 2018-02-16

Family

ID=57100837

Family Applications (1)

Application Number Title Priority Date Filing Date
ES201530484A Active ES2586469B2 (en) 2015-04-13 2015-04-13 Load shedding system for networks with high power motors

Country Status (1)

Country Link
ES (1) ES2586469B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120053744A1 (en) * 2010-08-24 2012-03-01 Manson Scott M Systems and Methods for Under-Frequency Blackout Protection

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120053744A1 (en) * 2010-08-24 2012-03-01 Manson Scott M Systems and Methods for Under-Frequency Blackout Protection

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
BAI HUA; AJJARAPU VENKATARAMANA. A Novel Online Load Shedding Strategy for Mitigating Fault-Induced Delayed Voltage Recovery. IEEE Transactions on Power Systems. 01.02.2011. pag 294-304. doi:10.1109/TPWRS.2010.2047279. ISSN 0885-8950. *

Also Published As

Publication number Publication date
ES2586469B2 (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CL2018001567A1 (en) Method to control the distribution of energy
CL2017003377A1 (en) Combined method to detect anomalies in a water distribution system
MX2017010709A (en) Power generation and distribution system for offshore drilling units.
CL2018001260A1 (en) Methods and systems to detect heavy machine wear
PH12018500698A1 (en) Apparatus, system and method for energy management
MX2018007217A (en) Prognostic and health monitoring systems for circuit breakers.
SI3238311T1 (en) Method and system for determining the thermal power line rating
BR112018002134A2 (en) electric vehicle charging station, and method for controlling at least one electric vehicle charging station
BR112015023073A2 (en) power system resilience circuit breaker
FR3019304B1 (en) METHOD FOR MEASURING THE ENERGY CONSUMPTION OF THE BRANCHES OF AN ELECTRICAL NETWORK AND MEASURING EQUIPMENT USING THE SAME
AR111283A1 (en) METHODS AND SYSTEMS FOR MONITORING THE PERFORMANCE OF ELECTRIC MOTORS
SG10201810473UA (en) A power monitoring apparatus, a method for power monitoring and a base station used with the aforementioned
BR112015025279A2 (en) method for determining energy efficiency of a power system in a hybrid vehicle
TWI561830B (en) Non-contact type three-phase three-wire power cable measurement device and measurement method thereof
CL2017003087A1 (en) Method for determining electrical losses of a power line, due to a malfunction or alteration of an electricity meter and / or an illegal connection to said power line
ES2586469A1 (en) Load shedding system for networks with high power motors (Machine-translation by Google Translate, not legally binding)
GB2537571A (en) Method for limiting current in a circuit
GB2545293A (en) Method for limiting current in a circuit
GB2556236A (en) Peak current limiting in inductor-based power converter
PH12019500852A1 (en) Information processing device and signaltransmission control method
ES2721447T3 (en) Method to measure electrical power in an HVDC system
RU2014108450A (en) METHOD FOR DETERMINING LOCATIONS OF HEATING DRAINAGE
PH12017501256A1 (en) Prediction device, prediction system, prediction method, and program recording medium
BR112018015510A2 (en) method for predicting the presence of an out of step condition in a power system
FR3028956B1 (en) METHOD AND DEVICE FOR DETERMINING AN APPARENT ELECTRIC POWER CONSUMED BY AN ELECTRICAL INSTALLATION.

Legal Events

Date Code Title Description
FG2A Definitive protection

Ref document number: 2586469

Country of ref document: ES

Kind code of ref document: B2

Effective date: 20180216