ES2570166T3 - Deck and assembly procedure to erect a supporting scaffolding tower - Google Patents
Deck and assembly procedure to erect a supporting scaffolding towerInfo
- Publication number
- ES2570166T3 ES2570166T3 ES11006517T ES11006517T ES2570166T3 ES 2570166 T3 ES2570166 T3 ES 2570166T3 ES 11006517 T ES11006517 T ES 11006517T ES 11006517 T ES11006517 T ES 11006517T ES 2570166 T3 ES2570166 T3 ES 2570166T3
- Authority
- ES
- Spain
- Prior art keywords
- cover
- hook
- erect
- deck
- front side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/14—Comprising essentially pre-assembled two-dimensional frame-like elements, e.g. of rods in L- or H-shape, with or without bracing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G5/147—Railings specially adapted for mounting prior to the mounting of the platform
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/28—Scaffolds primarily resting on the ground designed to provide support only at a low height
- E04G1/30—Ladder scaffolds
- E04G2001/302—Ladder scaffolds with ladders supporting the platform
- E04G2001/305—The ladders being vertical and perpendicular to the platform
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Cubierta de montaje (10) para el empleo en la erección de una torre de andamio portante, con un elemento de cubierta (12), un primer elemento de baranda (14), que está articulado a un primer lado frontal (30) del elemento de cubierta (12), y un segundo elemento de baranda (16), que está articulado a un segundo lado frontal (32) del elemento de cubierta (12), en el que para el enganche de la cubierta de montaje (10) en barras de la torre de andamio portante que va a erigirse el segundo elemento de baranda (16) solamente en la zona de su extremo libre presenta un gancho (36), preferentemente dos ganchos (36) distanciados entre sí, y o a) el elemento de cubierta (12) presenta solamente en su primer lado frontal (30) un gancho (34), preferentemente dos ganchos (34) distanciados entre sí, o b) el elemento de cubierta (12) en su primer y segundo lado frontal (30, 32) no presenta ningún gancho, y el primer elemento de baranda (14) presenta solamente en la zona de su extremo libre un gancho, preferentemente dos ganchos distanciados entre sí.Mounting cover (10) for use in the erection of a supporting scaffolding tower, with a cover element (12), a first rail element (14), which is articulated to a first front side (30) of the element of cover (12), and a second handrail element (16), which is articulated to a second front side (32) of the cover element (12), in which for the coupling of the mounting cover (10) in rods of the supporting scaffolding tower to be erected the second rail element (16) only in the area of its free end has a hook (36), preferably two hooks (36) spaced apart from each other, yoa) the cover element (12) presents only on its first front side (30) a hook (34), preferably two hooks (34) spaced apart from each other, or b) the cover element (12) on its first and second front side (30, 32) it has no hook, and the first railing element (14) has only one hook in the area of its free end cho, preferably two hooks spaced apart.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP11006517.4A EP2557252B1 (en) | 2011-08-08 | 2011-08-08 | Work platform and method for securely setting up a support frame tower |
Publications (1)
Publication Number | Publication Date |
---|---|
ES2570166T3 true ES2570166T3 (en) | 2016-05-17 |
Family
ID=44650813
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES11006517T Active ES2570166T3 (en) | 2011-08-08 | 2011-08-08 | Deck and assembly procedure to erect a supporting scaffolding tower |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2557252B1 (en) |
ES (1) | ES2570166T3 (en) |
PL (1) | PL2557252T3 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102014222249A1 (en) | 2014-10-31 | 2016-05-04 | Hünnebeck GmbH | Method and device for mounting a scaffold tower |
DE102014222248A1 (en) | 2014-10-31 | 2016-05-04 | Hünnebeck GmbH | Covering for a scaffolding tower |
DE102017218929A1 (en) * | 2017-10-24 | 2019-04-25 | Peri Gmbh | Scaffolding with climbing protection |
CN113622638A (en) * | 2021-09-16 | 2021-11-09 | 张相润 | Construction frame and method for manufacturing construction frame |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1260309A (en) * | 1968-05-07 | 1972-01-12 | Kwikform Ltd | Improvements in or relating to builders scaffolding |
FR2762342B1 (en) * | 1997-04-21 | 1999-06-04 | Sgb Comabi | DEVICE FOR SECURELY ASSEMBLING SCAFFOLDING |
JP4037964B2 (en) * | 1998-08-14 | 2008-01-23 | ジャパン スチールス インターナショナル株式会社 | Assembly type scaffolding |
GB0807095D0 (en) * | 2008-04-18 | 2008-05-21 | Turner Access Ltd | Protection system |
FR2939464B1 (en) | 2008-12-10 | 2018-01-05 | Mills | IMPROVEMENT TO STRETCHING TOWERS |
-
2011
- 2011-08-08 EP EP11006517.4A patent/EP2557252B1/en active Active
- 2011-08-08 PL PL11006517.4T patent/PL2557252T3/en unknown
- 2011-08-08 ES ES11006517T patent/ES2570166T3/en active Active
Also Published As
Publication number | Publication date |
---|---|
EP2557252B1 (en) | 2016-04-20 |
PL2557252T3 (en) | 2016-09-30 |
EP2557252A1 (en) | 2013-02-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES2421897T3 (en) | Clamp fixing for one hose end | |
CL2016001970A1 (en) | Mooring method of one or more wind turbine floating platforms | |
AR097572A1 (en) | ROOF MOUNTED DEFLECTOR SYSTEM | |
CO7141449A2 (en) | Wiper Blade | |
CL2015001376A1 (en) | An integral vertical climber comprising a main vertical structure composed of two parallel rectangular profiles that support up to 120 kg and are joined together by a bridge because the climber comprises a "c" shaped piece with triangular faces, arranged on the front face of the vertical rectangular profile. | |
ES2570166T3 (en) | Deck and assembly procedure to erect a supporting scaffolding tower | |
CL2017002877A1 (en) | Scaffolding with admission of scaffolding support and use of a hole in a scaffold post. | |
CA2862967A1 (en) | Sloped roof fall arrest system and brace | |
ES2571105T3 (en) | Modulator | |
AR091048A1 (en) | A FIRE RESISTANT MEMBRANE AND ITS MANUFACTURING METHOD | |
CL2013003625A1 (en) | Compounds derived from tetrahydroquinolines condensed with a cycloalkyl; pharmaceutical formulation that includes them; and use as crth2 receptor modulators in the treatment of asthma, allergic rhinitis or epoc. | |
EP2669448A3 (en) | Improvements in building components and structures | |
AR104189A1 (en) | ELEMENT OF ANDAMIO AND AN ANDAMIO WITH SUCH ELEMENT | |
ECSP13012818A (en) | BOX | |
ES2353511B8 (en) | BASIC SUPPORT OF OBJECT EXHIBITOR THAT INCLUDES AN ARTICULATED POLYMER BOX. | |
MX2016001556A (en) | Scaffold. | |
CL2014000217A1 (en) | Advertising device comprising a support with a lower support surface and a longitudinal housing in its upper area for the assembly and fixing of three-dimensional advertising motifs, means for fixing the advertising motifs, and means for fixing the support to the ground. | |
CL2011002779A1 (en) | Scaffold system with several scaffold elements, where a scaffold element comprises two supports, at least two reinforcing elements, a transverse connection element, where at least two scaffold elements with differently oriented transverse connection elements are arranged one on top of the other; use. | |
ES2338087B8 (en) | CATCH SAFETY DEVICE FOR TWO ACTUATORS. | |
EP2706168A3 (en) | Wall bracket and working platform | |
CO7280473A2 (en) | Carpet cleaning device | |
CO2018003683A2 (en) | Clamp for the coupling of struts on beams, strut that incorporates it and assembly procedure | |
AR090484A1 (en) | CELLULOSE MOLDED CELLULOSE IMPREGATED ASPHALT AND ITS APPLICATION | |
ES2571579T3 (en) | Suspended ceiling structure | |
PE20160345A1 (en) | JOINT SYSTEM ON A GEOTECHNICAL ANCHOR AND REINFORCEMENT ASSEMBLY USING SUCH JOINT |