ES242117A2 - New procedure for construction of forged floors of armed concrete (Machine-translation by Google Translate, not legally binding)
- Google Patents
New procedure for construction of forged floors of armed concrete (Machine-translation by Google Translate, not legally binding)
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FRADERA WYNN RICARDO
Original Assignee
FRADERA WYNN RICARDO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FRADERA WYNN RICARDOfiledCriticalFRADERA WYNN RICARDO
Priority to ES0242117ApriorityCriticalpatent/ES242117A2/en
Publication of ES242117A2publicationCriticalpatent/ES242117A2/en
New method of construction of floors of reinforced concrete floors characterized by replacing the beam t, which is described in the second claim of the main patent, by beams formed by ceramic elements, coupled one after the other and filled in its lower and central part, and also in its upper part with concrete, metal rods and abutments in order to absorb the tensile stresses of the beam, and whose resulting shape is also a perfect beam in t-shape of reinforced or prestressed concrete. (Machine-translation by Google Translate, not legally binding)
ES0242117A1958-05-271958-05-27New procedure for construction of forged floors of armed concrete (Machine-translation by Google Translate, not legally binding)
ExpiredES242117A2
(en)
Improvements introduced in the construction of beams with metal reinforcement or other material for covered or forged (Machine-translation by Google Translate, not legally binding)
New procedure for the construction of beams, pillars, floors and roofs of armed concrete (Machine-translation by Google Translate, not legally binding)
A procedure for the preparation of monolithic constructions of armed concrete, such as floors, viguettes and similar (Machine-translation by Google Translate, not legally binding)