Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to ES0235019ApriorityCriticalpatent/ES235019A1/en
Publication of ES235019A1publicationCriticalpatent/ES235019A1/en
Improvements in the construction of fuzes, characterized in that the snapshot and delay capsules are mounted on the ends of a drill, perpendicular to the axis of the fuze practiced in a movable mounted piece in a conduit arranged in the direction of said axis and driven towards the position lower by means of a support piston by a helical spring that supports at its other end in a screw cap on top of such conduit. (Machine-translation by Google Translate, not legally binding)
ES0235019A1957-04-231957-04-23Improvements in the construction of espoletas (Machine-translation by Google Translate, not legally binding)
ExpiredES235019A1
(en)