ES229250A1 - Improvements in the construction of heating boilers with rehear built in for locomotives (Machine-translation by Google Translate, not legally binding)
- Google Patents
Improvements in the construction of heating boilers with rehear built in for locomotives (Machine-translation by Google Translate, not legally binding)
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Publication of ES229250A1publicationCriticalpatent/ES229250A1/en
Improvements in the construction of heating boilers with reheater built inside for locomotives, with smoke pipe that are crossed by the flow of combustión gases in the direction from the hearth towards the smoke box of the locomotive, and with re-heater tubes that they are traversed by said gases in the opposite direction, with the use of tubes whose cross-section, in a manner known per se, is constantly or stepwise narrowed in the direction of the flow of the combustión gases, characterized in that the heating boiler is subdivided, means of a horizontal separating partition, in an upper vapor-forming enclosure and in a lower pre-heating enclosure, and the bundles of tubes in both enclosures are narrowed in the opposite direction. (Machine-translation by Google Translate, not legally binding)
ES0229250A1955-11-261956-06-15Improvements in the construction of heating boilers with rehear built in for locomotives (Machine-translation by Google Translate, not legally binding)
ExpiredES229250A1
(en)
Improvements in the construction of heating boilers with rehear built in for locomotives (Machine-translation by Google Translate, not legally binding)
Improvements in the construction of heating boilers with rehear built in for locomotives (Machine-translation by Google Translate, not legally binding)
Improvements in the construction of heating boilers for locomotives with reheating rehabilitation under the same (Machine-translation by Google Translate, not legally binding)
Improvements in the construction of devices for the additional warm up of a water heater with gases in smoke. (Machine-translation by Google Translate, not legally binding)
Improvements in the construction of steam generators with horizontal driving of gases in the fire chamber and shots for the same contained side gases. (Machine-translation by Google Translate, not legally binding)