ES220389A3 - A procedure for forging floors and sterling with prefabricated ceramic elements (Machine-translation by Google Translate, not legally binding)
- Google Patents
A procedure for forging floors and sterling with prefabricated ceramic elements (Machine-translation by Google Translate, not legally binding)
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mandurell Pantebra Pedro
Original Assignee
Mandurell Pantebra Pedro
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mandurell Pantebra PedrofiledCriticalMandurell Pantebra Pedro
Priority to ES220389ApriorityCriticalpatent/ES220389A3/en
Publication of ES220389A3publicationCriticalpatent/ES220389A3/en
Procedure for the forging of floors and screeds with prefabricated ceramic elements, consisting essentially of establishing on the walls that are to be covered with roofs or screeds, reinforced beams, constituted by a series of alveolar elements, provided with longitudinal channels, in which the armours are housed and form a lateral channel on each side that together with the other parallel beam constituted in the same way, allows to establish between them a series of elements, also alveolar, which constitute the beam and with it by means of a mass of concrete arranged in the channels that form each two elements with each other and with those that constitute the beams, establishing, next, a plaster or tiling on the floor or flooring thus formed, or a simple concrete plaster to cover completely all the junts finally, once the floor is formed in the form indicated, it is surrounded by a reinforced concrete frame, which rests on the walls where the beams supporting the vaults are supported, the rods of this frame being joined to the ends, conveniently folded, of the rods that reinforce the beams. (Machine-translation by Google Translate, not legally binding)
ES220389A1955-02-281955-02-28A procedure for forging floors and sterling with prefabricated ceramic elements (Machine-translation by Google Translate, not legally binding)
ExpiredES220389A3
(en)
Improvements in the construction of prefabricated boards applicable to the construction of high floors and roof-terraces. (Machine-translation by Google Translate, not legally binding)
Improvements in the construction of removable modular structures for the forming of floors forged. (Machine-translation by Google Translate, not legally binding)
Improvements introduced in the construction of forged floors and walls of buildings by means of prefabricated panels (Machine-translation by Google Translate, not legally binding)
System for the construction of walls by means of prefabricated hollow panels of pretensed concrete (Machine-translation by Google Translate, not legally binding)
A new procedure for manufacturing and forging floors without formwork, based on elements made at the foot of work with vibrated reinforced concrete, and even pretensed (Machine-translation by Google Translate, not legally binding)