Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Proconfort S A
Original Assignee
Proconfort S A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Proconfort S AfiledCriticalProconfort S A
Priority to ES1974206325UpriorityCriticalpatent/ES206325Y/en
Publication of ES206325UpublicationCriticalpatent/ES206325U/en
Application grantedgrantedCritical
Publication of ES206325YpublicationCriticalpatent/ES206325Y/en
Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes
(AREA)
Abstract
Drainage with combined overflow, characterized by the fact that at a corresponding level with the constant level to be maintained, the overflow is placed whose mouth is connected, by means of a tube made in the material itself, to the general drainage pipe with outlet below the mouth, and whose drainpipe is protected and protected by a stiffened nerve that follows its trajectory, protects it and protects it from shocks and shocks, although it allows and admits its scope for subsequent maintenance. (Machine-translation by Google Translate, not legally binding)
ES1974206325U1974-10-031974-10-03
DRAIN WITH COMBINED OVERFLOW.
ExpiredES206325Y
(en)