Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PROYECTO Y CONSTRUCCION DE APARATOS MECANICOS S L P Y C A M
Original Assignee
PROYECTO Y CONSTRUCCION DE APARATOS MECANICOS S L P Y C A M
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PROYECTO Y CONSTRUCCION DE APARATOS MECANICOS S L P Y C A MfiledCriticalPROYECTO Y CONSTRUCCION DE APARATOS MECANICOS S L P Y C A M
Priority to ES0016963UpriorityCriticalpatent/ES16963Y/en
Publication of ES16963UpublicationCriticalpatent/ES16963U/en
Application grantedgrantedCritical
Publication of ES16963YpublicationCriticalpatent/ES16963Y/en
AN ALTIMETER BAROMETER essentially characterized by consisting of an aneroid capsule counteracted by a strip that makes it sensitive to the slightest fluctuations in atmospheric pressure. (Machine-translation by Google Translate, not legally binding)